A question about the upgrades and upgrades its

I'll keep this simple;

I have CS5.5 Production Premium. Suppose that I have upgraded to CS6 production Premium. Nice and simple, now for the question.

So, when CS6.5 comes out and I decided to update, will it be considered an upgrade to 5.5 or 6 for pricing purposes?

I guess as more the more expensive software upgrade.

Quite right - it's of the most recent version that you have to the current version... and for the suites, the shorter the distance the less expensive upgrade.

Tags: Adobe Licensing

Similar Questions

  • A few questions about the upgrade on Satellite A300-144

    Sorry for the typos, English is not my mother tongue.
    I want to ask some questions about the upgrade of a300-144.

    * Some info first.*

    CPU: T2370 ([http://ark.intel.com/products/34445/Intel-Pentium-Processor-T2370-1M-Cache-1_73-GHz-533-MHz-FSB]).
    Chipset: GM965 ([http://ark.intel.com/products/29821/Intel-82GM965-Graphics-and-Memory-Controller]).

    * Questions.*

    1. my frequency of laptop memory at 533 MHz, supports 667 MHz memory controller, memory modules can work at 667 MHz. Is - this because CPU FSB 533 MHz frequency and new processor at 667/800 MHz FSB will fix it or it is hardcoded in the BIOS?

    2 Intel said that the size of max memory for my chipset is 4 GB (2 x 2 GB), but Toshiba says that only 2 GB (2 x 1 GB), who is right?

    3 I know, taken of my CPU is μFCPGA-478 aka socket P, max FSB 800 MHz, max 35 W TDP, so T9500 ([http://ark.intel.com/products/33918/Intel-Core2-Duo-Processor-T9500-6M-Cache-2_60-GHz-800-MHz-FSB]) is a compatible processor or there are some limitations in the BIOS?

    > 1. My frequency of laptop memory at 533 MHz, supports 667 MHz memory controller, memory modules can work at 667 MHz. Is - this because CPU FSB 533 MHz frequency and new processor at 667/800 MHz FSB will fix it or it is hardcoded in the BIOS?

    The speed of the memory is related on the material. This means that the FSB is responsible for the limitation.
    If the FSB would allow support 667 MHz then the memory would also at this speed.

    > 2. Intel says that the size of max memory for my chipset is 4 GB (2 x 2 GB), but Toshiba says that only 2 GB (2 x 1 GB), who is right?
    The memory depends on the chipset. So if the chipset supports 4 GB of RAM, you should be capable of this move to 4 GB of RAM

    > 3. I know, my CPU is? FC-PGA-478 aka socket P, max FSB 800 MHz, max 35 W TDP, so T9500 (http://ark.intel.com/products/33918/Intel-Core2-Duo-Processor-T9500-6M-Cache-2_60-GHz-800-MHz-FSB) will be a compatible processor or there are some limitations in the BIOS?

    It might be possible that the new processor would be fully supported by the BIOS, but in most cases it should not be a problem if the chipset would support the new processor.
    But as far as I know the upgrade of the CPU is not supported by Toshiba or any other manufacturers of portable and its your own risk to run laptop with the new processor.

  • Questions about the terms and conditions

    Dear team of Adobe Stock,

    I am considering a subscription for an e-commerce site that I am developing. I have a few questions about the terms and conditions:

    3.5 social media use. You can view or download an unmodified version of the book on the Social media Site if (A) you include a notice of copyright in the work itself (© author name - stock.adobe.com) and (B) the terms of use governing the Social media Site do not include any provision that would grant exclusive rights or the ownership of those works or alterations to anyone. "Social Media Site" means a website or application that puts the main emphasis on facilitating social interaction between its users and allowing users to share content in such social interaction

    What I have to insert in each post on social media on behalf of the author? Generally, this information is displayed only for free images. What I have to insert this information even if I signed up for a plan?

    Thank you

    Hello

    Please see the link below for help:

    http://wwwimages.Adobe.com/content/dam/ACOM/en/legal/servicetou/Adobe-stock-additional-ter ms_20160119.pdf

  • A question about the methods and parameters.

    Hey guys, this is my first post here. I am very new to Java and done a bit of C++ before Java. I had a question about the methods and parameters. I do not understand the methods; I know they can be repeated when it is called, but it's almost everything. I also know that a program should have a class that contains the main method. What I really, really understand on methods is what the parameters are. I know they are in parentheses and that is it. Could you explain what they are? I really appreciate it. Thanks to all in advance. Best regards, Michael

    Taking an example:
    Suppose you calculate area of the rectangle you need two inputs one is the length and the width. Area = l X b, where l = length, b = width

    If your method, say, calculateAreaOfRectangle (length int, int width) will be two parameters as arguments.

    System.out.println ("field of rectangle:" + calculateAreaOfRectangle (40,30);)

    public int calculateAreaOfRectangle (int length, int width) {}
    int area;
    Area = length * width;
    return of area;
    }

    So if you call this method then the output will be returned in 120.

    Parameters of a method are simply the input variables for the method of treatment for all calculations or something useful.

    And we cannot have methods inside the main method in Java. It is in the java syntax and if you do, it will throw a syntax error.

  • Question about the interruptions and priming

    Hello

    I had a few questions about the startup and interruptions in a virtualized environment

    Assuming that, plenty of virtualization (no material assistance to virtualization of memory ).

    1 initialization: in an ordinary PC, the boot process starts with the BIOS, to expansion ROM, back to the BIOS and MBR secondary boot record, then grub (is it) and finally the operating system. In a virtualized environment with VMM running directly on top of hardware (Native VMM), how is the initialization of the different process, as I understand it takes BIOS-> Expansion ROM - > BIOS-MBR-> other record secondary-> VMM-> OS--> applications >. Am I right on that?

    2 breaks: VMM examines the source interruptions prior to the interruption, so in a multicore environment, assuming a 2 processor core, how the VMM decides on the kernel for which the interruption in intended, prior to shipment of the interruption. Interruptions are tag ID, said core ID?

    Thanks in advance

    -SC

    sidc7 wrote:

    1 initialization: in an ordinary PC, the boot process starts with the BIOS, to expansion ROM, back to the BIOS and MBR secondary boot record, then grub (is it) and finally the operating system. In a virtualized environment with VMM running directly on top of hardware (Native VMM), how is the different boot process, if I understand correctly to -> BIOS-> Expansion ROM BIOS-> MBR-> other documents-->--> OS--> requests VMM. Am I right on that?

    It is simplistic but essentially correct.  A metaphor would be a little better thinking that the hypervisor/vmm is an operating system, except that the process on this operating system are requests or comments OSes.  If the BIOS-> OPROM-> BIOS-> MBR-> hypervisor-> init process of the hypervisor-> reviews of fork () s operating systems.  This can become blurred by the design choices (for example Xen/Hyper-V init start a coded parent hard partition that makes hypercalls privileged to fork() guest OSes; ESXi init runs a very limited subset of applications directly on the hypervisor and ESX Classic is somewhere between these approaches).

    There is a subtle distinction between "hypervisor" and "www."  The "hypervisor" is the operating system of single root (e.g. ESX) who interacts directly with the hardware and has access to everything; a hypervisor is not to be used to run virtual machines.  When we talk about a "hypervisor", the tendency is to describe something which is a BONE (although usually a minimal OS designed only to run virtual machines).  The "www" is the layer that allows a virtual machine run: it provides the interposition, virtualization and emulation services and can be plural (for example a vmm by guest operating system).  Architecture of VMware deal with these two separate components, while most other virtualization platforms merge the two.

    sidc7 wrote:

    2 breaks: VMM examines the source interruptions prior to the interruption, so in a multicore environment, assuming a 2 processor core, how the VMM decides on the kernel for which the interruption in intended, prior to shipment of the interruption. Interruptions are tag ID, said core ID?

    Strictly speaking, the interruption is not transmitted to a guest operating system - receives the hypervisor (or rather the VMM it transmits to the hypervisor), the hypervisor drivers interpret the interruption (for example reading package of NIC, I/O process of HBA, the timer tick completion), then after a new appropriate break in the guest OS.

  • General questions about the upgrade

    Hello

    I have aquestion about the upgrade,

    When I did an upgrade from windows 7 home ultimate version or another for example windows 8.

    1. no data not wil drop in time upgrade or I do a backup copy be sure.

    2 wil that any software that is installed before the upgrade for example antivirus, office 2010 wil be on the computer after the upgrade? or what I need to install again!

    3 when I do an upgrade must I pay online for the new version?

    answers very short wil suffice.

    Thank you

    Johan

    1. your files should be kept in an upgrade, but we always recommend making a backup to be sure.

    2. your software will be kept, but as with #1 above, we recommend to always have your install CD/file available to be safe in case you need it.

    3. you can buy the edition of Windows 8 Upgrade from a store or online, Yes. It is not free.

  • When is MS stop support Vista service pact 2 and a few questions about the upgrade to the new version

    Hello comrades,.

    I have a few questions and concerns, and hope that you guys can share with me some lights here.

    1. What is MS stop supports the Covenant of service about the update of windows Vista 2 / other online support?

    2. my computer is vista based 32 bit, ultimate version. I heard that there are a lot of wonderful things about Windows 8. Should I move to Windows 8, or should I actually wait awhile then buy a new computer with Windows 8 64 bit attached?

    Honestly, it's a question that has been bothering me for some time. But my laptop is 4 GB of RAM, 1920 x 1080 HD display, 300 GB HARD drive at 5400 RPM (cost me a lot - it's a SONY) and have been works very well even with vista, the operating system highly complainted by many others. I think it would be a waste to buy a new computer, including the so-called net-books and i - PAD, I know, they are beautiful and sexy, but looking at their record, I was speechless. Yet knowing 32bits was maximum and MS has already announced that they stopped support for Vista SP1, consider that SP2 is expected online.

    3. how long do you 32-bit based can last? Should I increase the RAM of 4 GB to 6 GB and upgrade to Windows 8?

    4. How about 64-bit based of the future? Or is it true that most of the computer manufacturing starts in the future these application device of the base (not the real computer-driven software)?

    5. or should I forget it all, wait 3-4 years, until my laptop would be a museum piece, then buy a desktop computer which monitor and hard drive is all separated, knowing it is the best technique for the $s and phone for mobile computing laptop use there?

    I understand that this is somewhat a personal decision, but I really appreciate you guys Preview on the path of the operating system! Thank you

    Yes it will work to buy a copy upgrade of Windows 8.   This is a custom installation rather than an upgrade in place once you switch between 32-bit and 64-bit.  However you can still save money by buying the upgrade license.

    More important is that all the drivers you need will be available.  Your computer manufacturer will not write drivers for Windows 8 because the computer has been out of production far too long.

    Windows 8 is a significant departure from previous versions and I suggest that you upgrade to Windows 7 If you are tired of Vista or wait until you buy a new computer before Windows 8.  You read the discussions on the forums of Windows 8 CP.  At this point, there are many critics of Windows 8 due to the removal of the Start button and Start Menu.  Many people dislike having to rely on style Metro Screen start for many things.  It is becoming a major concern.

    To navigate to the Windows 8 CP forums use in the middle of the dropdown at the top of this forum page.

    Note:  Microsoft has not announced that there will be copies upgrade for Windows 8.  Microsoft has already stopped providing copies of upgrade of Office is not yet clear what will be available for 8.

  • Suggestions and Questions about the upgrade my Hardrive Mac and Ram.

    Hi This is my first time asking something in the forums. (At least I think) Well anyway, I got the Macbook Pro Mid 2012 13 "with the retina also runs the OS El captain. I do computer for school and sometimes animation video editing and ive noticed some performance as my projects get bigger and bigger issues. I want to improve my mac, but I'm not very tech savy and don't want to do something useless, so I had a few questions, I wanted to ask you.

    Do I need for my hard drive and my Ram?

    What effect will the upgrade of my Ram and what effect will be upgrading my hard drive with an SSD?

    I saw this SSD online and thought of novice opion that sounds get Id more bang for my buck (link) with her. Is this good? What more to kill? WiIll it still works? Could you suggest some other good affordable options?

    My next question if I decide to upgrade my Ram can provide you with some good affordable links to buy of new RAM sticks, is also 8 GB, the best he can do?

    My next question I watched a few videos online and by installing the updates level looks really easy and fast. But I use bootcamp (to play games sometimes), and I wanted to know if I save my files on my drive as ive seen people do videos, (something to wipe the drive and put it back in after installing updates) will be I lose my windows 7, I lost the disc to reinstall and he check so I really want to buy a new also do not want to lose the things I put in memory.

    From the retina MacBooks you is impossible to pass the ram as it is soldered to the logic board. As with the hard drive, it's just a card ssd and you can't get those anywhere because their hard to find.

  • Question about the upgrade to ESXi 4.1 and USB keys

    Right now I'm under ESXi 4.1 from a USB key (ie. a very small USB key).

    If I want to "start over" and use a newer USB for ESXi 5 but keep my intact, is guest operating systems - this possible?  (For example, if I install ESXi on a Virgin USB 5.0, will I be able to import my existing operating system vmx ESXi 4.1 images, etc.?)

    In addition, what's the downside of ESXi 5 running from a USB?  I spin this in a laboratory at the House and have read that ESXi basically load into memory if you really start player ESXi itself is useless and a USB key is perfectly fine.  Is this true?

    If you do not want re - configure ESXi 5.0, you can proceed as follows:

    1. Use free software, called "USB Image Tool 1.57" make a picture of your USB 4.1 - software available here http://www.alexpage.de/usb-image-tool/ .  This way you can restore it to any USB in the future.
    2. After making a backup of your USB 4.1 image, upgrade installation 4.1 to 5.0.
    3. Make a backup of your configuration of ESXi using the CLI vMA tool / vSphere in Windows with the following command: vicfg-cfgbackup-next - server
    4. The new installation of ESXi 5.0 on new USB
    5. VMA or vSphere CLI tool use in Windows with the following command to restore the backup from step 3 config: vicfg-cfgbackup-load - server
    6. You should now have ESXi 5.0 works on a new USB without any necessary configuration

    Alternatively, you can restore the image USB created in step 1 on your old USB in order to have a 4.1 installation handy...

    I recommend that make you a picture of your USB 5.0 USB as well just in case in the future USB fails.

  • Questions about the upgrade from 4.1 to 5.1

    I posted the following to the thread in the forum of Vsphere upgrade, and in five days I got ZERO responses. Perhaps more here and even here is the wrong place to post things, or maybe I'm not questions easily answer. I'll post it here too, since it mainly Virtual Center, I think. Maybe someone can help me or tell me what is the problem with my announcement that allows to go unanswered. Here we go:

    I'm about to upgrade my little (1 4 host ESX and Virtual Center) environment vSphere 4.1 and 5.1.  My database to the virtual Center lives on a separate SQL server 2008R2 server. My virtual Center Server is virtual, if that matters. I have upgraded my licenses and read the documentation, to try to formulate a plan that escapes enough causing any downtime for my virtual machines.

    I am designing a series of steps that are all pretty low, and such that each step does not harm anything, whereas if I have problems, I can take my time to solve. Then, when this step is stable, I can continue to the next step. I want to tell you what I have in mind, ask a question here and there and hope you can report errors that I make and answer my questions. The big picture is:

    1 Virtual Center update and give him a few days to show me any problem before doing anything else.

    2. upgrade to a host ESX 4.1 5.1 ESXi. Convince me things are okay, before you do more.

    3. put to level the other three 4.1 ESX hosts. Make sure that everything is fine.

    4 create new LUNS, formatted with the new VMFS, move my VM to them and remove the old one.

    If there is nothing wrong with this basic plan, please let me know.

    More details and questions:

    Question: The docs say my Virtual Center Server, under the SSO, the inventory service and the virtual Center Server, will need TEN GIGABYTES of RAM.  Is this true? It seems insane to me.

    Question: Can I install on my Virtual Server 4.1 single signon Center without DANGER?  In other words, its installation will prevent Server 4.1 virtual work center? I hope I can, because it is a new feature that I have trouble with. I don't want to get into a situation where my old virtual server Center does not work, and I can't get the new work.

    Question: The VI 4.1 client can talk to Virtual Center 5.1? The VI Client 5.1 can talk to Virtual Center 4.1? I hope that the answer to one of the people is 'yes '.

    Step 1: Create a backup of my virtual Center VM (with vRanger connection, if this is important) and a backup of my SQL database.

    Step 2: Install single Signon. Here is where I hope that this does not stop 4.1 virtual work center.

    Step 3: Upgrade the inventory Service and Virtual Center to 5.1

    Step 4: Install VI Client 5.1 on the VM virtual Center and on my desk from which I usually manage my environment.

    Step 5: Wait I'm comfortable that everything is fine. It is perhaps a day or two (or more).

    Question: How can I spend my hosts for maximum security? I'd rather put a DVD in the drive and do it from the console, unless this is not a good way.

    Question: Before I update a host, should I remove the fiber channel cables, so he can't see my VMFS LUNS? I think I read that somewhere, and it sounds like a good thing to do, even if I do not have.

    Step 6: Upgrade a host ESX 4.1 5.1 ESXi. Move a couple of virtual machines essential to it and he give a day or two to settle.

    Step 7: Upgrade the other three ESX host.

    Step 8: Wait until I'm really, really comfortable with things.

    Step 9: Create a new LUN VMFS5, migrate my VMs to them over time and remove the old one.

    I would greatly appreciate all advice and attention that you may have.

    Question: The docs say my Virtual Center Server, under the SSO, the inventory service and the virtual Center Server, will need TEN GIGABYTES of RAM.  Is this true? It seems insane to me.

    If your environment is small you can run all these in one and ofcouse if you execute all these in a server you need more RAM... There is no limit.

    Question: Can I install on my Virtual Server 4.1 single signon Center without DANGER?  In other words, its installation will prevent Server 4.1 virtual work center? I hope I can, because it is a new feature that I have trouble with. I don't want to get into a situation where my old virtual server Center does not work, and I can't get the new work.

    normally if you think only in terms of scalability, it is good to have separate these things... He is sure no questions evey thing won't work if you install it on the same server also.

    Question: The VI 4.1 client can talk to Virtual Center 5.1? The VI Client 5.1 can talk to Virtual Center 4.1? I hope that the answer to one of the people is 'yes '.

    The VI 4.1 client can talk to Virtual Center 5.1? No, but talk about Client 5.1 Virtual Center 4.1

    Step 1: Create a backup of my virtual Center VM (with vRanger connection, if this is important) and a backup of my SQL database.

    Step 2: Install single Signon. Here is where I hope that this does not stop 4.1 virtual work center.

    Step 3: Upgrade the inventory Service and Virtual Center to 5.1

    Step 4: Install VI Client 5.1 on the VM virtual Center and on my desk from which I usually manage my environment.

    Step 5: Wait I'm comfortable that everything is fine. It is perhaps a day or two (or more).

    these steps are ok

    Question: How can I spend my hosts for maximum security? I'd rather put a DVD in the drive and do it from the console, unless this is not a good way.

    BLI, or DRAC suites method what ever you... very well.

    Question: Before I update a host, should I remove the fiber channel cables, so he can't see my VMFS LUNS? I think I read that somewhere, and it sounds like a good thing to do, even if I do not have.

    Installing esxi will not hurt of thing... to the old VMFS... It will ask to keep or to format the old vMFS... BUT I prefer to remove the cables... BECAUSE we are humans...

    Step 6: Upgrade a host ESX 4.1 5.1 ESXi. Move a couple of virtual machines essential to it and he give a day or two to settle.

    no need... . If the hardware is on the HCL, I mean the firmware/driver etc... for the esx is on the HCL, then no problem...

    Step 7: Upgrade the other three ESX host.

    Step 8: Wait until I'm really, really comfortable with things.

    Step 9: Create a new LUN VMFS5, migrate my VMs to them over time and remove the old one.

    assign the new LUN and create VMFS and migrate... It'S her!

  • Three questions about the upgrade of CS6 CC

    Hi, I just have three short questions thinking about an upgrade:

    1. He is there discount any more as a user CS6 when it goes into the CC, right?
    2. Project Comet will be part of the CC when released, right?
    3. When it goes into the CC, is it better to remove the CS6?

    Thank you very much!

    Hi Benjamin,

    Please find the answers below: -.

    1. He is there discount any more as a user CS6 when it goes into the CC, right?

    The discount is gone for the improvement of the Creative as a result of the creative cloud.

    Pricing plans and creative Cloud membership | Adobe Creative Cloud

    2 Project Comet will be part of the CC released, right?

    Please visit:Presentation project Comet: a new tool for the design and prototyping user experiences fast | Creative blog Cloud by Adobe

    App design, prototyping and user experience | Adobe project Comet

    3. when the upgrade to CC, is better to remove the CS6?

    The amount of the fine to have both versions installed on your computer. CS6 version can coexist with a CC version without causing any problems.

    I hope that answers your query!

  • Questions about the upgrade to the 4.0 unit

    Hi all

    I have a few questions before the server upgrade to 4.0 to 3.1.3 and install a new Server 4.0. We currently have 7 servers unit all current 3.1.3 running with digital networks. We are planning to upgrade a Server 4.0 and install a new server with 4.0 costs. This is the beginning of the upgrade of the entire company and my questions are the following:

    1 will update the AD schema during the installation/upgrade to 4.0 problems with the 3.1.3 other servers?

    2 since there isn't that one account of the unit currently with the 3.1.3 configuration, creating 4 new accounts unit cause any problem or should I / can I use the current to the unityadmin the unit account or one of the other 3 new accounts? I would like to start over again with 4 new accounts and not use the current service account and migrate to new accounts during the upgrade other servers.

    3. is there a problem to have 3.1.3 servers running jointly with 4.0 servers in general?

    My impression is that this is very well that I would no problem to start the 3.1.3 servers alongside with 4.0 servers, there should be no problem to use new accounts of the unit and this update of the AD schema should not be a problem for the old servers, but I want to make sure before doing the update/install.

    Oh, it's all run with Exchange 2000.

    Thanks for your time!

    Keith

    (1) it is backward compatible

    (2) creation of 4 new accounts will be fine.

    (3) you can run 3.1 (x) alongside with 4.x

    H. M.

  • Question about the upgrade path Essbase

    Hi Techies,

    We are modernizing Essbase in windows since version 7.1.6 to 9.3.1 platform. Now my question is what is the best way to do that, as first upgrading to 9.2 then 9.3.1 or completely uninstall and reinstall the version 9.3.1 directly? In Essbase 9.3.1 application is rebuilt from scratch, so we thought to stick with the second option IE 7.1.6 to uninstall and reinstall 9.3.1. But now we have other applications that must be replicated from 7.1.6 to 9.3.1 an app frame. We heard that we must follow the path of upgrade first to 9.2, then in 9.3.1. Is this true? !!

    Can you guys shed some light on this as well as the consequences of each option, if applicable.

    Thanks in advance

    K

    personally, I would be completely uninstall, make sure that all the elements of the old version have disappeared, so check the registry and environment variables have been removed. Then install the 9.3.1.
    As it seems as you are going to use the same server, then for the applications that you want to migrate upward all objects (outlines, scripts of calc, rules, reports), export the data.
    So if you want to export security and filters, then I would look using the essbase (free utility) Advanced Security Manager. Then rebuild the applications once the new environment has been built.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Questions about the cost and the best specifications for a new Windows 7 computer

    Hello

    I got most of the things that I should include in the purchase of a new computer.

    Things proposed are the following: Please read and tell me if I need it, and the approximate cost.

    8 GB

    12 GB

    A TB

    VIDEO CARD BUSINESS... I'm QUITE CONFUSED as to IF I NEED. SEE MY QUESTION AT THE END.

    Video card: min. 99 (No. built in chip card (or is it... discreate) dunno... two options different which one.)

    Video card: should be mid to high range; at least at first.  They are beginning to take a long power supply

    supply; and can charge the supply too, so invest in a good to start with.

    Question: Can I add a video card later?  Right now I only use the documents and regular pictures.  Later I want to do

    videos of my pictures; not much more.

    LCD or LED display must be top natch; for Photo Editing/cropping or manipulation?  I do not understand what they

    Let's talk about it.     They speak the monitor?   I DO A LOT OF PHOTO EDITING

    PHOTOSHOP.

    Thank you, Zara3511

    A discreet (dedicated) video card is not necessary. You can always add more later if you need the extra graphics power. Its not harmful if you perform a task such as photos and videos. Benefits is its great for games top of range and can future proof your system. If you are working in Photoshop, certainly invest in the discrete video card. Photoshop she likes it.

  • General question about the updates and version number

    I have a general question about versions and update.  I'm new on this and am in the deep end of learning I want.

    In vSphere web client, I see the following versions (these are exactly as the seller, he left a few months that I have screenshots in my documentation that match)

    Version - VMware ESXi, 5.1.0 1612806

    Profile - Dell (updated) ESXi - 5.1 - 799733 (A00)

    I am trying to familiarize themselves with the Update Manager and I noticed that there are a lot of patches and updates available.

    Lists of Update Manager 5 patches as "Missing" with Red x but directly above them are a list of patches with green tick indicating that "installed" - it is perhaps obvious, but im guessing 'installed' means really installed when displayed on the screen - there is an update installed, labeled "ESXI 5.1 all the update 2-' would be able to tell that it has been installed by the details of profile/version above?

    I don't think it's a big deal at this stage, but if I install all missing patches and then the details of the version/profile change in summary screen?

    I hope this makes sense.

    Thank you

    This article allows to correlate the updated version: products VMware correlating build numbers to update levels (1014508)

  • Questions about the performance and discs

    Specifications of the computer:
    ASUS P6X58D Premium Mainboard
    Intel Core i7 930 (no decree with Zalman 10 X Flex cpu cooler)
    12 GB (six 2 GB) Kingston PC3 10600
    PSU Antec CP - 1000 1000 watt
    NVIDIA GeForce GTX 480 video card
    Card RAID Areca ARC - 1680IX - 12 PCIe x 8 SAS
    (hard drives listed below)
    Windows 7 Pro 64-bit, with many system applied settings (no antivirus loaded into the machine.
    No startup process all active.)
    Adobe Production Suite (enabled in PPro CS5, update 5.02 MPE) installed
    Latest Nvidia drivers installed.

    Blackmagic Disk Speed Test

    (system disk) Two Intel X25M MLC GEN 2 80 GB SSD drives in a striped RAID 0 array.
    read: 501.0 MB/s write: 130,9 Mbps

    (disk storage) 2 a to 2 WD 7200 RPM 32 MB SATA hard drive.
    read: 117,0 MB/s write: 118.4 MB/s

    (project reader) Three WD black 1 TB X 6 GB/s 64 MB of cache disks in RAID 5 array.
    read: 211,9 MB/s write: 215,3 Mbps

    These moments of read/write comparative look correct?

    Video editing:

    DV (720 x 480) 48 hz audio 30 fps 3.6 MB/s
    4 layers
    Layer 1-100% opacity, applied Cineon converter
    2 - layer 50% opacity, vertical flipping applied
    Layer 3 - 30% opacity, applied color balance filter
    Layer 4 - 20% opacity, filter contrast applied
    read the full resolution
    IN TIME REAL
    CPU utilization - 25% (I knew performance DV would be awesome.) I could have added more layers but stopped at 4)

    AVCHD (1920 x 1080) 48 hz audio 60 fps 3,1 MB/s
    2 layers
    Layer 1-100% opacity, filter contrast applied
    Layer 2-50% opacity, vertical flip
    reading of the resolution 1/4th
    Real-time

    CPU utilization - 98-99% these specifications of reading straight look? The GPU is doing its part to work? I guess that my GTX 480 is positioned in the right slot?

    Question: The cards need fast RAID when the flow of AVCHD is 3. 2 MB/s?    ?

    I find it interesting that I spent $4K on a computer and I only make 2 layers of AVCHD in real-time (from reading of resolution 1/4). I am aware that my provider built computer is more expensive, but in return, I will say it is surprisingly quiet.  :-)

    Should I wait for performance significantly more when I switch to the 980 x cpu and 24 GB of RAM? Maybe I owe OC my processor for best results, but I have neither the time nor the inclination to teach myself overclocking. (Anyone know of a person in the Phoenix area, AZ, who is skilled at overclocking)? I did not test PPBM5 I just want to get better performance for what I paid. Maybe my expectations are wrong?

    I suggest that update you with the version of StorPort that is the improved version of the driver technology Microsoft.  SCSIport is what has been used for Windows XP.

Maybe you are looking for

  • Desktop HP ENVY - 750-150xt CT: Model HP ENVY Desktop - 750-150xt CTO - DVD and specifications

    My new HP computer includes a "Ultra Slim tray SuperMulti DVD Burner", but I have been completely unable to find a model ID or plug on this unit.  I did find a datasheet on the HP dvd940i device, but have no reason to believe that it is the device in

  • Qosmio X 500-too small text in the program

    Hi, I downloaded McAfee internet security on my Qosmio X 500 11.-g.The program works without any problems however, the elements are too small to read in the program. How can I make it bigger? I did the screen display to 150% but still no way.

  • Easy Print silver vi quality control

    Hello I just came across an interesting bug? I use the VI easy to print to print the visible part of my front panel. I had a few money controls (now I just will not replace) on the PC, and I realize that printing as a pdf is bad, only for controls of

  • Strange behavior E3000/observation

    I have been using my E3000 for about 5 months and I have something interesting to share.  If a jump between me and my final destination has a latency problem that this router seems to amplify the latency when you do a trace route.  When this is the c

  • Hidden after system restore files

    recently taken food out of a date. I had a "system check" trojan virus, so took a day before the virus has occurred. When I restore my music, photo folder files, documents, etc. are 'hidden' the reason why I say hidden is because when I right click->