How do I either set channel name of a graph of cluster or get a 1 d waveform chart to start different time (t0) for each line of the waveform?

I have a chart single 2D out a conditional of a loop indexing output such that over the rows of the table are not the same size. -Basically, they have different starting and ending points and sizes. -Not so concerned by the endpoints, because as soon as I get correctly starting points, everything shows fall in place.

The challenge is that when I try to have the variable t0 (start time) for each line, the wave of construction vi form would always keep each line at the same starting point.

I used the approach bundled with success (the cluster approach ensures that each waveform starts at different times according to the guidelines of my t0 defined for each line) but then I'm not able to get in the channel names I could make using the graphical approach (wave generation) waveform.

In essence what I get here, I'm losing here.

Because I don't want one of my mentors, Bob and Altenbach have fed up with me I have attached a vi this time

Attached VI shows a combination of the two attempts (first with the waveform graph) and then with the graph of cluster

1. with the first (graphical waveform), I get my channel names as you wish, but the alignment of the wave is not correct.

2. with the second (graphical cluster), the alignment is good, but I can't do the names of channel in the chart, even if they are present in the cluster.

I read some reviews that mentions that attributes can be displayed with waveform and data Dynamics (not clsuters) so I guess that's why.

I saw another report indicating the start time for a waveform 1 d will always remain the same for the rest lines defined for the first line even if changed for the following lines in a loop.

So I guess my question is: what is the way around questions like that?

First of all, let me be the first to the congratulate and thank you for finally posting a code!  I'm not 100% certain I understand your question or your code, but I have an idea, perhaps, of what you want to do, so I wrote a little VI who made something simple that could be relevant.

You mention waveforms of different lengths and beginning at different times.  You also want everyone to have a unique attribute (although I'm not sure what you want to do with the attribute).  So, I did the following:

  1. Generated an array of 100-sample random to represent one second of a waveform.
  2. Created 4 waveforms on this 100-sample basis.  The first waveform (channel 0) is just these 100 points.  The second, 1 channel, is the concatenation of string 0 with the base of 100 samples, or a waveform "double".  Channel 2 is 1 string concatenated with the base, and channel 3 is 2 string concatenated with the base.
  3. In order to trace the four channels that they rest 'on' the other, the waveform has the number of the channel added to it.  Channel 3 is 3 + (4 copies of the basis of 100 points), a waveform 400-point random centered around a shift of 3.
  4. All channels have dt value 0.01 (but I guess I could have varied, as well).
  5. To make the channels start at different times, I started channel N N seconds before channel 0 (by subtracting the index of the loop, I, T0).
  6. For each channel, I created an attribute called "Chan" equal to "Channel N" (where N = 0, 1, 2 or 3, as the case may be).

This is the plot that results. Scale X is the absolute time value (no Date) using the 24-hour HH: mmS format.  You can see that the plots are 1, 2, 3 and 4 seconds of time, and are offset from each other by a second.  I used the trace attributes to change the name to the respective attribute.

The code to do this is very simple - I almost don't need to show it, because I think it is completely described by the text above, but this is here:

Now, it was not that much faster that some of your previous posts, when you refused to your postcode, "guess us" what you wanted (but not to not correctly guess), you tried to "push" us in the right direction (still refuses to post code), and no one seemed very happy?

Bob Schor

Tags: NI Software

Similar Questions

  • How to print 1 page for each line of the numbers worksheet

    Hello... I am trying to print reports of year-end per person and number.

    Is it possible in number to print 1 page for each row of a spreadsheet of numbers?

    Or suggestions?

    Thank you.

    Hi cm,

    This looks like a work of fusion and mailing.

    The merge document would create in Pages, and the cells of merger on this document référenceriez cells in the table in the document numbers.

    See the documentation Pages (on the Help menu) for instructions on the conduct of merger and mailing.

    To do this in only numbers, you would need to put in place a 'table of declaration' on a separate sheet (in the same document as the table containing information) which would accept a customer number (or other key ID for each individual) then use it to determine the line of the main table to retrieve information about this pattern.

    A more precise answer requires a more specific desription of your table structure and the desired form of the instruction to take.

    Kind regards

    Barry

  • How to access a column value in a Select list in a tabular presentation for each line

    Hello

    Environment: Using Oracle APEX v4.2.1 on an Oracle 11 g 2 DB

    In a tabular presentation using the following example query, i.e.:

    select
    "EMPNO",
    "EMPNO" EMPNO_DISPLAY,
    "ENAME",
    "HIREDATE",
    "SAL",
    "DEPTNO",
    "MY_LOV"
    from"#OWNER#"."EMP"
    
    

    I need access to every line of my sub form of table, the EMPNO of this line value, within a list of selection (query based LOV) in the column "MY_LOV."

    So, basically, the MY_LOV column in my table presentation, would be a list of selection (query based LOV) where MY_EMPNO =: EMPNO (first column in the select statement above), for each line of the tabular presentation.

    With the help of a picture ( Tom's Blog ) and assuming 'Deptno' column here is actually my new column, i.e. "MY_LOV, I want to know how this list of selection based on lov query would be able to access each EMPNO down in the form of tables, i.e. 7839, 7698, 7782 etc.?

    overview.png

    Any help would be appreciated.

    Thank you.

    Tony.

    Hi Tony,.

    Take a look at the API APEX_ITEM for LOV

    http://docs.Oracle.com/CD/E37097_01/doc/doc.42/e35127/apex_item.htm#AEAPI208

    Kind regards

    Brad

  • How can I make a cell formula will apply for the entire column? For example D2 appears B2 - C2. How can I copy this formula for each cell in the column?

    How can I make a cell formula will apply for the entire column? For example D2 appears B2 - C2. How can I copy this formula for each cell in the column?

    If you want the formula is the same (B2 - C2) in the cell of each column you must change it as ($B$ - 2$ C$ 2). Then copy it, select the whole column and paste.

  • How to add the action button for each column in the interactive report

    Hi all

    I'm new in APEX, so pls forgive my question, if it's simple, but I am struggling with this problem for days now. I have interactive report and you want to add button in each row. What I want to do with this button is the following:

    1. to execute some stored procedure in need of that particular line item values

    2. returns a (id)

    3. go in another page in the application by passing the value out of the procedure (id).

    and I'm not find the way to do it. I tried now means:

    1. If I add the link of the column, so I can refer to the value of the current row, I don't know how to call the stored procedure and perform actions of rest I need

    2. If I add the button to the region, I do not know how to reference the values in column of a particular line of the interactive report...

    and I'm stuck...

    I just forms and global report and probably still think the "wrong" way .

    Any help would be appreciated!

    Thank you!!!


    user3253917 wrote:

    Please update your forum profile with a real handle instead of 'user3253917 '.

    I request of the company: there is a customer who always orders the same standard product orders (always order the same products, fair amount is different). I want to make it simple for the user: instead of retyping the command (master and few records details every time yet) I want to copy selected command (copy of the master record and record details) so that the user will only change date order (in master record) and amount fields in record details).

    So, in order to give him:

    1. the user must be able to choose the order in which I would copy (at page 4), select it,

    2. I need to make PL/SQL procedure to insert the new master record (order) and a few record details (order_items) (copy of the order/order_items chosen in step 1)

    3. navigate the user to page 29, where the master account at stage 2 insterted appears, so that the user can change the date and quantities.

    Any solution will be highly appreciated! Thank you very much!!!

    In simple terms:

    1. Add a link to column "Command copies" in the report on page 4, which sets the COPY request and passes the order ID on page 29.
    2. On page 29, create a process before header, sequenced to be the first process executed and conditional on REQUEST be EXEMPLARY, which creates a new order as a copy of the order with the ID from page 4 and returns the ID of the new order in the PK command ID of 29 page element.
  • How to create buttons for each slide in the slide show

    I currently have a slideshow with prev and next buttons.

    but I would add buttons numbered for each slide to image-base.

    with a static number for the current slide has a circle colorful around this number.

    I can create static number with circle colored in Photoshop, and add a layer,

    but it's a lot to do this for all the numbers work.

    Is there a better way to create the numbers highlighted for the current slide?

    For the numbered buttons that link to the slides not active, I can create numbers in Photoshop and import images into Flash.

    then convert to symbols and assigns actions to them,

    But it's also plenty to do for all the numbers work.

    Is there a better way to create numbered slide buttons inactive?

    I would also like to have a function to hover over the numbered buttons,

    It changes from plain image from number to number with circle colorful as I want to use for the current slide.

    How can I assign a hover button symbol function, which will load another image or symbol?

    Try to think in terms of having reusable symbols.  Think what it through before you try it.

    Use a movieclip instead of a button symbol.  Have a dynamic textfield in this movieclip to the number and value of the textfield object to not be selectable.  Have a picture of this movieclip where it highlighted as one (selected) and the movieclip go there where you are on this slide.

    Use the textfield for the number - assign dynamically so that you don't have to import an image for it.  Use as many of these clips that you need for all your buttons.

    Have functions that reset all buttons at the same time so that when you move to a new slide, selected earlier dates back to mormal... following with setting one newly selected in his "selected" frame

  • How to perform several steps and the display of charts/indicators without repeating the same code for each entry (of the dozens of entries)?

    I have to repeat the same steps and display in the Panel before (graphic fft and other indicators).

    Do I need to repeat the same code for each entry/channel? I already have too many channels and whenever I change a measure (and code) for an input/channel, I have to repeat the changes to all the other entries.

    Thank you


  • How to assign the different VTEP subnet for each grid of a group pool?

    The design guide NSX to use L3 access design, it is recommended to use the same number VLAN per rack, but with the other subnet

    10.66. < id rack >.0

    10.77. < id rack >.0

    10.88 < id rack >.0

    10.99 < id rack >.0

    If the client compute cluster spread on grids, then we will have a different subnet for each rack VTEP, something like (assuming that vlan 77 is for VTEP0

    < rack 1 > 10.77.1.1, 10.77.1.2, 10.77.1.3...

    < rack 2 > 10.77.2.1, 10.77.2.2, 10.77.2.3...

    During the preparation of the host, GUI invites you to assign VTEP for Pool DHCP/IP, looks like most of the cases we use Pool of IP, then for the compute cluster, how can assign us VTEP IP in a different subnet in a single group?

    Thank you

    Clarisse

    You have two options:

    (1) DHCP using support on every TOR address suggest you. This is the recommended approach

    (2) DHCP then changing manually the VMkernel interface IP address on each ESXi host to match the required subnet - this is not recommended because it is not automatic, but is still supported

  • How to choose a set of points in a graph xy contained in a draw of the area with the cursor?

    I use the tIhe XY graph to draw a Pointcare intervals RR (heartbeat) representation. I would like to use the mouse to draw a polygon around the points of interest and get their index in the original array. Thank you to me a strategy-oriented!

    Olivier

    It seems more difficult to describe in words than just after a simple example.  Simply click on the graphic to add sliders, drag them around as you wish and see the included points.  I used a 1-bit bitmap to detect the inner points and the draw several VI points for the polygon image.

    I sort the points so that the polygon is filled completely, form then, sometimes you see pass all of a sudden.  Not a complete solution, but a good start.

  • How to set the time for each slide in the slide show?

    Length of blade, pan and zoom, melted chained, etc. is adjustable for each slide or have all the same?

    If they can be individualized, what I don't see.

    Use Lightroom CC 2015.

    Thank you

    Leo Sopicki

    These features are not in the Lightroom Slideshow module. You will need to use another third party software to create these types of slideshows.

  • Set different font sizes for certain parts of the text layer?

    I am a novice as AE is going, but I'm working on a script to dynamically change a project.

    The project in question has a text layer has a single string, but with variable font size (the text is a price, where the hundred part is a smaller font to the different initial values).   I want to use a script to change this text, but it is enough to assign a new text document does not retain the variable formatting - all figures are found with the same font size.

    Since the guide of the script, I see that the size of the font of a text document object is available, but only in a very limited form - definition of value he sets for the entire document, without options to set for a range of characters.  I would be fair to assume that programmatically create/update a document with several sizes of fonts is not possible?

    If this is the case, what would be my best options to achieve the same effect?  If the project is modified to have several layers/documents, is there a way to adjust the positioning to maintain good spacing/kerning between independent channels?  (I'm also a dollar with yet another sign size of police prior to the price, so I would have actually three pieces of text to position in my script and just to the right/left cannot justify two strings).

    Thanks for the tips!

    AFAIK, there isn't a convenient way for a script to maintain several font sizes once it changes a text document.

    You can however, use sourceRectAtTime() to get the actual span of text in a text layer, positioning and three text layers to get the desired spacing is not difficult.

    Dan

  • How add us a button to check for each line in a report to oracle Apex?

    How we publish one every line ina report in oracle Apex? (with the help of select * from empdate)

    I need to add new row in the table (with the help of select * from empdate)

    I need to click on the box and I want to delete the row from the table!

    I need to click on the box and I want to change the whole table raow!

    See this blog entry for an example: adding a checkbox to your report & #8211; APEX_ITEM tutorial & #8211; APEX blog

    Thank you

    Tony Miller

    Software LuvMuffin

  • How to make replace() for each symbol in the string instead of the first meeting only?

    Hello!

    This is my simple test script:

    var str = ' re | PLA | ce »;

    var strRep str.toString () = replace (' | ', '-');

    Alert (strRep);

    I'd get a re-pla-this result string.

    But I didn't get my only first symbol replaced:

    replace.png

    Can you advise me please, how to get all the symbols replaced?

    Thank you!

    Thank you very much, Xavier!

    Just for reference, this line will work perfectly:

    Alert (str.toString () replace (new RegExp ("|", "g"), '-'));

  • Fullscreen menu: how to RESIZE for each breakpoint in the reagent?

    I have a menu full screen-width in my site.

    For each breakpoint, I want to the size of the menu to the width of the width of the breakpoint page and to create a mobile drop down when the size of the page becomes small to support the menu width to full screen.

    PROBLEM: Even with the options 'Format text on current breakpoint' selected, when I resize the menu, each menu instance is resized. In the breakpoint, the narrowings of menu, while the smallest breakpoint, the menu is correct for the width of the page. When I hide the menu inside a breakpoint and add new menu in the hope of resizing for this breakpoint, double menus are added for each instance of breakpoint. Again, I selected on current breakpoint Format text. I like to keep my menu to full screen width.

    Most important breakpoint = good

    Screen Shot 2016-07-17 at 3.25.29 PM.png

    Smaller breakpoint = impossible to resize without resizing of all instances of the menu

    Screen Shot 2016-07-17 at 3.25.37 PM.png

    In the order in the menu was receptive you must use the method of uniform size.

  • How to assign the ID of group for each group in the SQL query.

    Hi all

    I want to assign the ID of group for each group (group ID of series). I tried with the row_number function but did not work for my requiredment. Here is my sample data and my requirement.

    Col1
    A
    A
    A
    A
    A
    B
    C
    D
    D
    D
    D
    E
    E
    E
    F
    G
    G
    G

    I want to get number of each column with ID group assign to it value. Here is my example output

    Col1 County Group ID
    A 5 1
    A 5 1
    A 5 1
    A 5 1
    A 5 1
    B 1 2
    C 1 3
    D 4 4
    D 4 4
    D 4 4
    D 4 4
    E 3 5
    E 3 5
    E 3 5
    F 1 6
    G 3 7
    G 3 7
    G 3 7

    Select col1, count (1) NTC (col1 partition).

    ROW_NUMBER() over (partition by col1 by col1 order) tbl_test grp_id.

    Please help me solve this problem.

    SELECT

    COL1,

    COUNT (*) ON MYCOUNT (COL1 PARTITION).

    DENSE_RANK () OVER (ORDER BY COL1) GROUPID

    Of

    T1;