How to transfer or copy a title/text from one project to another element?

I have a text with sequences of movement custom built into one project, I would like to transfer to another project.  How can I do?

Hi, once again...

This works!  In GIMP (sorry, no photoshop, but it would have worked, too!), I created an image of 1920 x 1080 green, pure and put it back plan of my animation, moving text.  Then I exported the animation using my usual AVCHD, high option resolution 1920 x 1080 p MP4 H264 30.

When I add that as an asset, I put just the effect of saturation on the animation and I'm all set.  I have to adjust my colors a little, as the Chroma find little green in my text - but I can do without any problem.

We are all together!  Thank you, AT - problem!  The solution was not in export, but how to communicate the transparency of the project has project B.

Thanks for your help!  You got me on the right track...

-Tom

Tags: Premiere

Similar Questions

  • How to transfer the contents of my Itunes from one PC to another?

    Hello

    I tried several options that I found on the web, but no seem to work and my playlist are all empty?

    I have the usual content in Itunes, music, games, memos, tones...

    I would like to use Itunes as I did on my old computer to my new computer...

    Thank you

    Migrate a library iTunes from one computer to another

    These are two approaches that work normally to move an existing library to a new computer.

    Method 1

    1. Save the library with this trick of the user.
    2. Remove the old computer if you no longer wish to access content protected on it.
    3. Restore the backup to your new computer by using the same tool used to back it up.
    4. Keep your current backup in the future.

    Method 2

    Connect the two computers on the same network. Share your folder from the old computer and copy the file whole iTunes library in the folder on the new. Yet once, remove the old computer so is no longer necessary.

    These two methods should give the new computer, a clone of the library work which was on the former. What about iTunes is it is still the 'home' for your devices library you should not have problems with iTunes will erase and reload.

    I recommend method 1 because it establishes a current backup for your library.

    Note If you have iOS devices and that you have not reached your contacts and calendar all in all items, then you need to create a dummy entry in your new profile and iTunes expected to merge existing data from the device.

    If your media folder has been separated in the main folder of iTunes, you may need to do some preparatory work to make it easier to move. See make a library of portable split.

    If you are in the unfortunate position where you're able to access your original library or a backup and then see recover your iTunes from your iPod or an iOS device to get tips on how to configure your devices with a new library with the maximum preservation of data.

    TT2

  • How to use the copy utility for app from one server to another

    Hello
    I use hyperion 9.3.1 and I want to synchronize two applications on different server, I know how to use the utility to copy of app, but on the same server, I think that we can also use this utility to copy the application from one server to another using the properties file but I dnt know how to do it because the example is SQL and I am using and database oracle
    can you guys please help.

    Published by: sharad sapra on March 31, 2011 11:33

    Hello

    1. create a property file (this example is relevant if you have a repository of ORACLE, you can find more information in http://download.oracle.com/docs/cd/E10530_01/doc/epm.931/html_hp_admin/frameset.htm?ch09s01s01.html]):

    SOURCE_APP_JDBC_CATALOG = SOURCE_APP
    SOURCE_APP_JDBC_DRIVER = Hyperion.JDBC.Oracle.OracleDriver
    SOURCE_APP_JDBC_URL = jdbc:hyperion:oracle://RepositoryDatabaseServer; SID = DatabaseSID
    SOURCE_APP_JDBC_USERNAME = schemaName
    SOURCE_APP_JDBC_PASSWORD = schemaPassword
    SOURCE_APP_JDBC_DATABASE_TYPE = ORA
    SOURCE_APP_OLAP_SERVER = olapServerName:port
    SOURCE_APP_OLAP_USERNAME = olapUserName
    SOURCE_APP_OLAP_PASSWORD = olapUserPassword
    SOURCE_APP_OLAP_APPNAME = SOURCE_APP

    TARGET_APP_JDBC_CATALOG = TARGET_APP
    TARGET_APP_JDBC_DRIVER = Hyperion.JDBC.Oracle.OracleDriver
    TARGET_APP_JDBC_URL = jdbc:hyperion:oracle://RepositoryDatabaseServer; SID = DatabaseSID
    TARGET_APP_JDBC_USERNAME = DatabaseSchemaName
    TARGET_APP_JDBC_PASSWORD = DatabaseSchemaPassword
    TARGET_APP_JDBC_DATABASE_TYPE = ORA
    TARGET_APP_OLAP_SERVER = olapServerName:port
    TARGET_APP_OLAP_USERNAME = olapUserName
    TARGET_APP_OLAP_PASSWORD = olapUserPassword
    TARGET_APP_OLAP_APPNAME = TARGET_APP

    2. open CMD and type copyapp /S:yourSourceAppName T:yourTargetAppName P:yourPropertiesFileName.properties /L:yourLogFileName.log

    Once the migration has been successful, you must update your users using the UpdateUsers.cmd (UpdateUsers.cmd and PlanningUserName PlanningUserPassword TARGET_APP).

    I hope this helps...

    Kind regards
    André

  • How do I move the express email outlook from one computer to another

    Hello

    How can I move my mail express outlook from one computer to another?

    Thank you!

    Assuming that the other machine is using Outlook Express too...

    Backup restore &:
    http://www.insideoe.com/backup/

    Backup and cloning of your OE identities:
    http://www.insideoe.com/backup/clone.htm

    In other words if you wish is to create folders on the desktop and do drag OE messages to these folders. Copy them to the Office on the new machine and then drag messages in office files to the OE files.

  • Is there a way to copy properties to disable conditional from one project to another?

    I have a bit of code in a project that I want to back off to a colleague and want to do a new 'reduced' project with only a few subvis.  I don't want to necessarily or need him for the entire project, but only access to a privileged few.  Is there a way to copy the conditional disable properties from one project to another?

    Thank you

    Tech12

    Thanks, it works, but I couldn't get the symbols will appear in the 'project' "Properties..."

    Tech12

  • How can I transfer Media Player Playlists and settings from one computer to another?

    How to transfer on sides from one computer to another?
    I use windows media player to work... I'm getting a new computer... I worked hard to rate/organize my music into playlists, etc... How can I transfer this information to my new computer?

    Hi Kristylundahl,

    You can use Windows easy transfer to transfer files and settings from one computer to the other. There is no way to transfer just the playlist of media
    settings to another computer. With the help of windows easy transfer, you can move your music, playlists, and album art files to another computer.

    For more information, see these links:

    Windows Easy transfer of :
    http://Windows.Microsoft.com/en-us/Windows7/products/features/Windows-easy-transfer  

    Transfer files and settings from another computer:
    http://Windows.Microsoft.com/en-us/Windows7/transfer-files-and-settings-from-another-computer

    Kind regards
    Amal-Microsoft Support.
    Visit our Microsoft answers feedback Forum and let us know what you think.

  • How can I copy Creative Cloud applications from one system to another?

    I have a slow DSL connection. I want to install on my desktop computer and a laptop computer creative Cloud applications. Once they are downloaded on my desktop, can I just copy the CC in the application from one machine to the other, so I can't go through the process of long download on both? What is the best way to do it?

    Do not copy the apps from one folder to another. It never works.

    Download installers offline Adobe CC 2014 Direct Download Links: Creative Cloud 2014 Release. ProDesignTools

    First follow the very important Instructions on this page.

  • transfer of all, except the os from one computer to another

    want to transfer everything except the os from one computer to another

    Marce,

    I would like to get an external hard drive - the best of Seagate and Western Digital for about $100. I have a 320 GB Seagate and it's much more that I need. Can I save more than one computer at a time. It's basically a huge flash drive, and you can buy them both at the Wal-Mart or Target or Office Max, Office Depot, etc...

    This option is also better in the long run too - for data transfer in addition to save your documents in one place safe.

    If you feel this isn't for you, then you can move gradually using a flash drive (available at Wal-Mart, Target,...) or burn your data on CD and move it over that way.

    I hope this helps.

    -GT

  • How to remove white screen when you navigate from one page to another in Webworks BB?

    Hi all

    I have developed a web application for Blackberry using Blackberry webworks SDK... I created the package using emulator Ripple... In that when you navigate from one page to another page... coming white screen... How to remove this white screen... and instead of the definition of the loading screen in web application... Please me... Thank you very much in advance...

    With respect,

    Marimuthu_P

    normally it is not a white screen to navigate. You can view data-bb-effect as "bland" for the transition to the screen:

    https://github.com/BlackBerry/bbUI.js/wiki/screens

    second thing, is to use the activity indicator for loading (pending content):

    https://github.com/BlackBerry/bbUI.js/wiki/activity-indicator

  • Need some ideas on the copy of the data from one schema to another.

    Dear all,

    I would like to know the best method and possible by copying data from one schema to another. (I won't use EXP / IMP).
    Example:


    I have a scheme of production on which I have hundreds of tables. I copy the data of the TEST environment after comparing data, I should copy the data incrementally.
    Maybe this copy of data may occur once a month, or on request.

    I want to have this done by a procedure.
    I was thinking about the logic below, using a procedure I will compare the tables and the structures between the two schemas.
    Then I willl use the primary key in both tables column and compare the data first. If the data if it does not exist then I only inserts these records in the target.
    The above said logic could be as similar as the synchronization of data or records, but the table does not all columns to track records archived / copied from the source.
    Suggest me so if you can give me the best logic or solution.

    Thanks in advance...

    Concerning
    Suresh

    GSKumar wrote:
    Dear all,

    I would like to know the best method and possible by copying data from one schema to another. (I won't use EXP / IMP).
    Example:
    I have a scheme of production on which I have hundreds of tables. I copy the data of the TEST environment after comparing data, I should copy the data incrementally.
    Maybe this copy of data may occur once a month, or on request.

    I want to have this done by a procedure.
    I was thinking about the logic below, using a procedure I will compare the tables and the structures between the two schemas.
    Then I willl use the primary key in both tables column and compare the data first. If the data if it does not exist then I only inserts these records in the target.
    The above said logic could be as similar as the synchronization of data or records, but the table does not all columns to track records archived / copied from the source.
    Suggest me so if you can give me the best logic or solution.

    I don't know why you don't want to opt for EXP/IMP.
    As an alternative, if you have a link DB between Production and Test pattern (which I seriously doubt), you can use the MERGER to a copy of data from Production to Test Delta.
    a. INTRODUCE IN test_schema.table_name SELECT sequence_columns, column_list FROM (SELECT column_list FROM prod_schema.table_name LESS SELECT column_list from test_schema.table_name)
    Column_list must not contain columns that contain sequence values because they may differ and result in an incorrect result; Therefore, this is taken into account in the outer query rather than Inline mode.
    b. MERGE STATEMENT
    c. FALL of test_schema.table_name. CREATE test_schema.table_name as SELECT column_list from prod_schema.table_name; -A way very neat to copy all the data, provided you do not keep any changes to test the tables in the schema.

    However, you mentioned to find existing records based on the primary key; IMO, primary key is normally a sequence (may be alphanumeric) and its value on env Production and Test may defer or even can have different attributes, therefore, I find it incorrect to match only the primary keys. I would say to match the key attributes.

    If you want to follow the last update/insert for a record, you can add a column that puts the time of last modification. In this way, you can track the changes of a column. Another alternative would be to use a check to the table.

    Let us know your thoughts or concerns, so that help can be provided.

    I suggest that you read and follow {message identifier: = 9360002}.
    If you will be useful if you can provide all the information required in advance to help us provide you with a quick resolution.

  • Trying to copy a virtual machine from one server to another

    Hi all

    I'm new to ESXi 4, although I used VMWare Workstation for years.  I am trying to copy a virtual machine from a Windows system (Sysprep) from one host to another.  The two hosts are identical systems with the exact same ESXi host configuration.  Same hw, same version of ESXi, same setup, same size of the partition.

    When I use the Vsphere data store browse to 'download' the vmdk and vmx files to a local drive (Windows Server 2003), I get the following 3 files: the same vmx file, a tiny vmdk file and a file huge filename - flat hard.  The file vmdk on browser to store data from the source host is about 23 GB.  The flat on the local system vmdk file is almost 63 GB.

    Can I reopen Vsphere on the destination server and "load" the 3 files in a directory that I created in the data store.  Once there, I use the browser "Add to inventory."  When I try to turn on the virtual machine, I get the error message "not enough space on the data store."

    Any ideas of what I could have done wrong?  Again the data store configuration is identical:

    Local disk to VMware: 62.95 GB, Total formatted capacity: 62,75 GB.  1 VMFS 3.33 MB block size it's the only VM on the system.

    Thanks in advance,

    Mark

    What you see is by design.

    When you try to copy a disc loaded end service, with the browser data store or FastSCP, the virtual disk will be inflated. Use the converter such as recommended by AlbertWT.

    Since the virtual disks of destination must already 60 GB of disk space you may not able to power on the virtual machine, because there is not enough disk space for the swap file, which is the size of the configured RAM (less reserve, if necessary).

    André

  • Rotoscoping mask copy from one project to another

    Hello:

    I did some rotoscoping and put in several hours animating the mask only to realize that I'm not in the project, which is intended to Rotoscoping. Is it possible to copy a layer mask animation of one project to another?

    Save the project with the new name.  Open the correct project and import the project roto.  Copy the layer for the correct model and reduce the project down.  Save as a new name.

  • How to move a specific tablespace data file from one directory to another

    Database: 10.2.0.1
    OS: generic
    Description of the problem: how to move a specific tablespace data file of one directory to another account of the database that is on the installer of Oracle Dataguard

    * Oracle is working on this issue, but at the same time opens the topic community so that community members can add their views, experience, or knowledge. This will strengthen again all the knowledge bases, including My Oracle Support and My Oracle Support Communities *.

    Published by: ram_orcl on August 16, 2010 21:21

    Dear ram_orcl,

    Please follow the procedures here;

    http://download-UK.Oracle.com/docs/CD/B19306_01/server.102/b14239/manage_ps.htm#i1034172

    8.3.4 Renaming a Datafile in the Primary Database
    
    When you rename one or more datafiles in the primary database, the change is not propagated to the standby database. Therefore, if you want to rename the same datafiles on the standby database, you must manually make the equivalent modifications on the standby database because the modifications are not performed automatically, even if the STANDBY_FILE_MANAGEMENT initialization parameter is set to AUTO.
    
    The following steps describe how to rename a datafile in the primary database and manually propagate the changes to the standby database.
    
       1.
    
          To rename the datafile in the primary database, take the tablespace offline:
    
          SQL> ALTER TABLESPACE tbs_4 OFFLINE;
    
       2.
    
          Exit from the SQL prompt and issue an operating system command, such as the following UNIX mv command, to rename the datafile on the primary system:
    
          % mv /disk1/oracle/oradata/payroll/tbs_4.dbf
          /disk1/oracle/oradata/payroll/tbs_x.dbf
    
       3.
    
          Rename the datafile in the primary database and bring the tablespace back online:
    
          SQL> ALTER TABLESPACE tbs_4 RENAME DATAFILE      2> '/disk1/oracle/oradata/payroll/tbs_4.dbf'
            3>  TO '/disk1/oracle/oradata/payroll/tbs_x.dbf';
          SQL> ALTER TABLESPACE tbs_4 ONLINE;
    
       4.
    
          Connect to the standby database, query the V$ARCHIVED_LOG view to verify all of the archived redo log files are applied, and then stop Redo Apply:
    
          SQL> SELECT SEQUENCE#,APPLIED FROM V$ARCHIVED_LOG ORDER BY SEQUENCE#;
          SEQUENCE# APP
          --------- ---
          8 YES
          9 YES
          10 YES
          11 YES
          4 rows selected.
    
          SQL> ALTER DATABASE RECOVER MANAGED STANDBY DATABASE CANCEL;
    
       5.
    
          Shut down the standby database:
    
          SQL> SHUTDOWN;
    
       6.
    
          Rename the datafile at the standby site using an operating system command, such as the UNIX mv command:
    
          % mv /disk1/oracle/oradata/payroll/tbs_4.dbf /disk1/oracle/oradata/payroll/tbs_x.dbf
    
       7.
    
          Start and mount the standby database:
    
          SQL> STARTUP MOUNT;
    
       8.
    
          Rename the datafile in the standby control file. Note that the STANDBY_FILE_MANAGEMENT initialization parameter must be set to MANUAL.
    
          SQL> ALTER DATABASE RENAME FILE '/disk1/oracle/oradata/payroll/tbs_4.dbf'
            2> TO '/disk1/oracle/oradata/payroll/tbs_x.dbf';
    
       9.
    
          On the standby database, restart Redo Apply:
    
          SQL> ALTER DATABASE RECOVER MANAGED STANDBY DATABASE
            2> DISCONNECT FROM SESSION;
    
    If you do not rename the corresponding datafile at the standby system, and then try to refresh the standby database control file, the standby database will attempt to use the renamed datafile, but it will not find it. Consequently, you will see error messages similar to the following in the alert log:
    
    ORA-00283: recovery session canceled due to errors
    ORA-01157: cannot identify/lock datafile 4 - see DBWR trace file
    ORA-01110: datafile 4: '/Disk1/oracle/oradata/payroll/tbs_x.dbf'
    

    Hope that helps.

    Ogan

  • Can I copy and paste from one project to another?

    I have a scrolling title works very well in a single project and wanted to "simply" copy and paste into another project.  After the copy on the project 1, when I come to 2 project to make the dough, there are nothing to paste.  Is it something with Premiere elements 12, or with my iMac for not keeping that I copied into the memory buffer appropriate?  I found something online which implies there was a software to do this, but I can't believe that this is the only solution.

    I also created a "temporary project" for easier editing with images, transitions and added I want to put into my project "master."  I could create an avi and bring it back on, but I was hoping to get the project finished in a single source.  Any thoughts would be appreciated. Merci.

    Rick

    Rick

    The merger of two projects into one is not relevant and overlooks the important of Premiere Elements concepts if all you want to do is to use a title of a project in another.

    There is a simple and effective way to do it. Essentially, you create your title in the Titler to project 1 and then 'save' as a CTR file which can be imported into another project of Premiere Elements through the Add Media/files and folders.

    1. in the project 1, create your title in the Titler. Close to there.

    2. always in 1 project, go to the active project and it highlight / select the thumbnail for the title.

    3. can I go to Menu/export/name of the file and export/save your title as a file .prtl.

    4. If necessary, import the .prtl file project 2... Add media/files and folders/projects active where drag you it to its destination of chronology.

    Conventional techniques to transfer the contents of one Premiere Elements project to another will not apply to your situation somehow.

    Please see the newsletter and let us know how the above worked for you.

    Remember, you don't want to highlight the title in the timeline to get an active file Menu/Export/Title...needs to be the highlight / select the

    title in the active project, then Menu/export/name of the file.

    RTA

  • Copy slides from one project to another (2 different resolutions)

    Hello

    I have 2 projects of different resolutions (long story) and I want to copy the slides in the smaller project in the cotyledon. But keep the same resolution. (I want to create the Visual of a computer monitor showing the demonstration, as that is the lower resolution to I can have PC monitor as a backdrop)

    When I copy the slides, they are by default resize themselves for the biggest project and I can't change them.

    is there advice?

    is there a 'special' block when it comes to slides?

    Small projects are demonstrations having someone else did for me (so I can't really re - record)

    I want to just try to make them look a little more visually pleasing

    Thank you kindly for your time

    The solution is to:

    • Take a copy of your smaller project and work on that, not the original (in case of screwups).
    • Resize the smallest project using modify > resize the project options.
    • Be sure to work carefully how to increase the size of the stage WITHOUT changing the size of the existing content.  Basically, you want to add an extra space around your current content so that it is now sitting in the middle of the scene.
    • Once you have managed to get your content to the same size as the largest project, copy and paste slides on.
    • You may be able to develop a nice graph of a monitor with a hole in it.  Place it on the slide (or slides model) so that it lies on top of your smaller other screenshots to give effect to look at the screen.

    Is that what you're looking for?

Maybe you are looking for

  • How can I remove Yahoo as a search engine for the bad written URL?

    I've installed a plugin that put Yahoo as my default search engine.Meanwhile, I could remove most of it and I'm able to use Ixquick again.But when I get a bad URL in the url bar, e. g. motsilla.org, me always looking for Yahoo.How can I remove this?I

  • Impression of infinite number of columns in addition of Table to the report

  • Enabling ATSC in Windows Vista for the Canada

    I tried to use the workarounds in the applied forums to Windows 7, but it doesn't seem to work. It is possible to activate the ATSC for my windows media Center for the Canada under the Vista operating system. Thank you.

  • Win 8 upgrade and Express Gate

    How this will be achieved with ASUS Express Gate.  I have an ASUS Eee PC 1005 HA Win 8.  In this implementation, Express Gate is autonomous and does not seem to create it's own partition.  He did install Dual Boot. Yes, Express Gate will need to be r

  • Problemas con el fan

    Instale windows mi hp pavilion g4 8 y prendo mi notbook her primera ves y Fan arranca pelo lo cierro secador como el y is can decir, esta a una segunda ves as pongo normal speed the clave... e buscado el driver del pero lo encuentro ayuda porfavor fa