If SUM of multiple worksheets

Hi all

I have a document of numbers, including about 30 worksheets. One for each room in a building.

I am trying to sum of items shipped quantities or not in these rooms.

Function sum if is good for a worksheet, since I'm looking for a specific object in a single room and adding value in the column "Quantity" of this room.

What I would like is the same function, able to look upward to the reference value in the 30 spreadsheets and give me the result.

I searched through aid, but have not found anything compared to the map of multi calculation process. Is this thing possible?.

Thank you all for your interest and responses.

Lopez.

Hi all

I have a document numbers including about 30 paintings. In practice each room in a building the United Nations.

I'm trying to add up the amounts of the various objects spread or not in these rooms.

The Sum if function is valid pour 1 table (that is, 1 piece of the building) when I search in a room, how many times an object is and allows me to add up the value in the column adjacent 'quantity' of this piece.

What I would like is the same function able to go look in all the tables and give me the sum paid all of the tables.

I have consulted the online help but found nothing about a search in several tables. Is this a possible function?

Merce to everyone for your interest, and your answers.



Hey Lopez,

Consolidate data from different tables is clumsy in number. I don't know how invested you are in your current set up, but a different approach would pay ongoing benefits. Without better understand what you need to follow, it is difficult to be precise. I would try to create an array of data available to all objects in the rooms. This data table would be extract data to the 30 room tables.

Quinn

Tags: iWork

Similar Questions

  • Problems with multiple worksheets XY plotting (program generates repeated data)

    Hello

    I want to make a small program that will reduce the amount of time to go forward with the measurement data. I get data into .dat format, where all the files consist of frequency measurement with an X and a Y column. The problem is that I made 4 experiments (X column is the same for each experience) with 15 measures file each and more than 500 points of measurement in each file. I would like to make a simple manipulation and this copy that information to a file with same X column and multi-column, later I could use these data with Excel or origin (do it manually, it's frustrating and time consuming).

    At the beginning my program reads the background information with X and Y (b), and after I open the worksheet to insert the X and data of Y (n). (make a simple manipulation, like dividing Y (n) /Y (b), program show a graph of the current data and another graph multiple data, which are stored and must be exported in .txt, .dat or directly to Excel (which is more preferable)). I'm OK with the opening of several files of data, but which are not okay with copy/paste file and handle all that data manually, but that's my motivation for this program.

    The attached example can do all this (except for the entry in the file). He draws multiple charts on a XY chart using cluster and travel records. It is even possible to extract data in Excel, all that graphic, but the real problems comes with data are always added because of the loop. This gives a lot of empty and repeated data later. I'm jonesing to get rid of this. I have also attached several files of measure: 1 background and 3 measures.

    P.S. I tried to save time thanks to this program, but now, I spent more time than if I did it manually

    Your program absolutely no sense. What is the purpose of the structure of sequence? It just sits there, operating both in parallel to the while loop. Probably that you read from the local variables before other parts of the program had a chance to write valid data for them.

    In the while loop, you have a case of timeout that adds the same data over and over again, every 50ms. Why?

    Your mechanical actions "switch release" are misguided. Use actions to latch and remove structures deal as part of the event.

    Try to rethink the problem once the mode, and then solve the problem with 20% of your current code. See how far you get.

  • Adding images in multiple worksheets in an excel file

    Hello!

    I would like to know how can I add images to different worksheets of the same excel file. I am currently using the report generation tool (add the image to the report VI). Using the MS Office cluster I can adjust the position of the image in the first worksheet of the excel file.

    However, I would add two images in the THIRD worksheet of the excel file.

    I'm generating a file of PDM first, where I sets different spreadsheets or tabs of the file, and then I became an excel file. How can I put the location of the images in a spreadsheet file concrete?

    Thank you very much in advance!

    Use Excel to Worksheet.vi (from General Excel palette) to select the worksheet of the workbook and Excel Insert Object.vi (Excel advance palette) to add an image.

    Ben64

  • using two sum() in multiple join query

    Hello

    I'm stuck with the help of two sum() functions in a single query. Are columns of different tables that are joined.

    table of charging

    Date pay_amt cust_id

    1 July 13 500 1

    1 July 13 200 1

    amount of usage

    Date usg_amt cust_id

    1 July 13 100 1

    2 July 13 300 2

    I want a single query to give me sum (pay_amt) and sum (usg_amt) for a client in a single day

    That is to say:

    o/p should be:

    cust_id date sum (pay_amt) sum (usg_amt)

    1 01 - Jul 700 100

    My query is like below. But it gives incorrect total for both. Could someone tell me why?

    Select sum (pay_amt), sum (usg_amt)

    from charging r

    join in-house use u

    On u.cust_id = r.ID_client

    and you.date = r.date

    where u.cust_id = 1

    and you.date = 1 July 13 '

    chris227 wrote:

    I seem to be a bug to me.

    The result is 11.2.0.3

    SUM(PAY_AMT) SUM(USG_AMT)
    700 200

    What is your version?

    What looks like the plan to explain it with predicates?

    BTW, why do you think that both are incorrect, for me, only the second is incorrect, should be 200 instead of 100.

    Post edited by: chris227 Question added

    No Chris, the po said they want the o/p 100, and they were getting an invalid value (for example, the 200 is incorrect).

    It's because of the joining of the usg_amt of duplication:

    SQL > ed
    A written file afiedt.buf

    1 refill as (select date "'2013-07-01 as dt, 500 as pay_amt, 1 as cust_id of union double all the")
    2 select dates "2013-07-01', 200, 1 double)
    3, use as (select date "'2013-07-01 as dt, 100 in usg_amt, 1 as cust_id of union double all the")
    4 Select the dates "2013-07-02', 300, 2 double)
    5  --
    6 select DT, pay_amt, usg_amt - sum (pay_amt), r.id_client, sum (usg_amt)
    7 recharge r
    8 join use u on u.cust_id = r.ID_client
    9 and you.dt = DT
    10 where u.cust_id = 1
    11 * and u.dt = date ' 01-07-2013'
    SQL > /.

    CUST_ID DT PAY_AMT USG_AMT
    ---------- -------------------- ---------- ----------
    1 1 JULY 2013 00:00:00 200 100
    1 1 JULY 2013 00:00:00 500 100

    If the sum is of course to sum up 100 twice because of two lines to pay.

    So why I have indicated that the aggregation (sum) should usually before the join is made, so it is only made the cust_id amount and date for each table and then joined the results.

  • 2.1 EA 1: open multiple worksheets-SQL with the same connection

    Hello

    I usually open a couple of SQL blank worksheets for the same connection. 1.5 when I chose my default connection for all others (just click the worksheet and create a new one for this connection). In 2.1, I have to select the connection again and again which is difficult when you have 20 connections various some very similar for the development, test, production. So, we get errors on the false connection.

    Here have 1.5, default features the first connection selected.

    Thanks, Jürgen

    Connected the Bug 9000801 - ea1: otnforum: spreadsheet Launcher does not remember the last/default connection
    -Rambeau

  • multiple worksheet data in a single pdf file export

    Hi all

    I'm working on the creation of a report that has 5-7 worksheet containing a mixture of tables and graphs. I am able to export worksheets as separate pdf documents, but I was wondering if there is a solution that can be used to export all these sheets in a pdf file instead of 1 pdf for each worksheet.

    I doubt if it is possible, but figured it confirms with experts.

    Thank you.

    Hi Paul
    Not as far as I know. I think they have to be exported one by one. However, if you use Discoverer Desktop, you should be able to set up a script or a batch file to export.

    If you want more information please take a look at an article I did on the calendar that is available for free download on the site muy here: http://ascbi.com/downloads/downloads.htm

    Scroll down to the section called presentations Armstrong-Smith. The one you want is the 2nd on the list of the AUTOMATEDSCHEDULING

    This can help

    Best wishes
    Michael

  • Reporting of Webanalysis in multiple worksheets

    Hi all

    Can someone tell me if we can generate reports in web analytics in several excel spreadsheets in the same way that we generate it in excel add in with the cascade option.

    Thank you!

    Published by: user8819264 on July 14, 2010 12:43 AM

    You need to review the requirements, some push back is needed here. Who or that you do not use the proper tool (web analytics) for the job (reporting).

    If you have created the Web Forms analysis of all, explore several controls that can be placed on the screen and linked to your contour allowing the selection members (areas drop-down list, check boxes, radio buttons, etc.).

  • How to create new worksheet in excel without using report generation tools

    Hello

    Im trying to create a file with 8 spreadsheet excel. I am currently using scripture to the worksheet of the vi for that file. But how to create multiple worksheets in an excel file without using the report generation toolkit module of the OR?

    Concerning

    Jay

    Hello

    You can use the nodes property with the class selected as Activex Excel and create all the tools to Excel. See the attached example.

    Kind regards
    Constant

    (Bravo to give good answers, mark it as a Solution If your problem is resolved)

  • How graphic how the sum of several metrics of in a dashboard.

    I'm looking to find out how the graph of the sum of multiples of the metric, as CPU ready, or latency of disk in one graph on a dashboard / report.

    An example would be showing collective management s VM in balloning of CPU and memory of the pool on line on a chart.

    Thank you!

    If you want the chart to reflect everything that you can do the stacking graphics option which will be sleeping all values.

  • Deliver EN import in Excel using 'Split on the worksheet Pages'

    Hi all
    I'm having a problem of my import EN in which there are several members of the 'Page' in which I would like to display in multiple worksheets. I tried checking the box 'Split Pages through spreadsheets', however, only the first member of Page is imported. I am running EN version 11.1.2.721 using SmartView version 11.1.2.2.310. Thanks in advance!

    I tried on 11.1.2.2.000 (Build 453) Smartview and 11.1.2.2.300 EN and it works very well.

    He adds all pages as worksheets in the same workbook. See if it's a problem with your en version

    Concerning

    Celvin

    http://www.orahyplabs.com

    Please check the answers as useful/correct as appropriate

  • How to export channels tiara to excel with a certain configuration file

    Hello

    I would like to export some channels from the portal of the DIAdem of data to an existing excel file. The excel file is made up of multiple worksheets, and each channel must match to a worksheet.

    I ve tried to use EXCELExport() function but it doesn´t work. (this feature is designed for something else, it generates a new excel file). I ve tried to access each worksheet and copy the information across a statement but this solution requires a lot of time. If anyone has an idea, please help.

    Hey,.

    Use a connection "Ole" to edit your excel file,

    Example:

    Dim excel
    Dim excelbook
    Set Excel = New
    Excel.Visible = True
    The value excelbook = Excel.Workbooks.Open ("File path")
    excelbook. Leaves .cells (j) ('A1') = 'value '.

    Excel.Quit

  • Why the report designer opens all of my excel files?

    My application uses vi in the report generator toolkit to continually save data to an excel spreadsheet (in fact, several worksheets in the same file). It works fine, however, the problem comes when we try to open/view all log XL files previously created (or _any_ other file XL by the way), because it is basically impossible to read the file due to the constant blinking/flashing XL writes in the log file. If you make the mistake of close open files, the firm application of logging (may be able to intercept this error, but didn't think of it yet). Also, when you start closing records in XL, it seems that he opened to all (or almost all) of files in at least the log folder, but in other (some) places as well. The bottom line which is the only way we found to process view, all the files of log XL is to stop the application - which is not really acceptable.

    I'm under LabView 2011, in development (OS Win7) and executable mode distributed (Win Server 2008 R2 OS) and see the same thing. I searched the internet and OR support site hi/lo for clues, but if none of them worked (XLSTARTUP, etc.).

    I have several other applications that use log files, and in all cases we can open/close the files of active log (read-only) with no problems. Does anyone have an idea of what could happen here and how to fix it?

    Thank you

    Mark-san

    Charlie,

    Well, I thought to use scripture to the SS... but I have not seen an easy way to manage multiple worksheets. Would need a separate file for each worksheet?

    Although I love the .csv format since it is essentially text (readable), I think the TDMS format may be better suited due to the structure of the channel - think I can use one channel for each worksheet (?). But can I open a TDMS (read-only) file then it is written to, and then create the desired output of Excel (snapshot) from there?

    Mark

  • Developer application newbie - EXE does not write to disk

    I am running LabVIEW 14 on a box of Windows 7 here in my office.  I develop and test here, and then build an EXE file and deploy this EXE on a remote PC from Win7 via TeamViewer.  He worked for a number of intermediate screws that do not involve writing to the disk.  The last EXE works exactly as I want it to work on my local machine, but when I deploy it into the remote area...

    .. .There seems to have difficulty to create the output file that is generated by the Subvi 'write the spreadsheet file.  To emphasize: it works on my local PC.

    I assume that the problem is a permissions issue, so after trying a number of different paths, both coded hard in the VI as a path variable and dynamically generated by an access path dialog box, I've hardcoded the path as

    C:\Users\Public\

    and changed the permissions on this folder in the "permissive" possible.

    Now, the VI correctly generates the next file of daughter, e. g.,.

    C:\Users\Public\20140902144410\

    in which the name of the folder is simply the yyyymmddhhmmss to the current timestamp to execution of VI.  Whenever the VI runs, I want it to create this unique folder and put the files of multiple worksheet in it.  THIS FOLDER if POSTER, but none of the files are created inside.  So that troubleshooting, I have created an indicator to show the path of the initial release that is created during the start-up phase of the VI, and it returns the correct value, as shown in the attached JPG screenshot.  Yet once again, the folder appears successfully at the right place in the directory structure.

    Am I wrong to assume that the likely problem here is a permissions problem?

    Thanks for any help... and the solutions!

    Brent Auvermann

    Professor of agricultural engineering, TAMU

    NathanD, I just checked the code works on my local PC if I run in the development environment or as an exe.  I have also found, alas, that several different programs on the remote PC have difficulties to establish links with virtual COM ports through which my series instruments are available.  As my LabVIEW code do attempt to read a same COM port the first time, unless you bytes is > 0 to this port and the output files will be created only once the first stream of data is read from a COM port, that must be the problem, and not something with my LabVIEW code after all.

    Once again, thank you to you two.

  • Tracing the 2D string array

    Hi, I need to create an xy chart that draws a 2D array.  The first - and all other entries is a timestamp.  Each mark must trace (in sequence) along the x-axis.  Each constant that follows cooresponds to the timestamp preceding and must be drawn accordingly along the axis is labeled "account".  Don't forget, I also have to expand this to allow multiple worksheets with the same format on the same graph.  Please, see attached and thank you for your help!

    John

    You try to generate a graph that looks like this? If so, see attached code (VI is registered for 2011 match your upload, but the single is in 2012).

  • Microsoft works spreadsheet program

    Can you have multiple worksheets in a single document in the spreadsheet works just like you in excel?

    These tend to confirm the response as a resounding "no".

    "NOTE: Excel workbooks were usually several pages, called worksheets." "Works Spreadsheet can open only one Excel worksheet at a time, so you will be asked what to open spreadsheet.

    Microsoft Works and Microsoft® Office
    http://www.Microsoft.com/products/works/more/worktogether.mspx

    «The Works Spreadsheet allows you to create a spreadsheet, use basic formulas and create and view graphs.» Sorting works as well as I can tell. Also in this case you did not change, macros, AutoShapes, WordArt, and other features to Microsoft Excel. A big difference compared to Excel is the spreadsheet Microsoft Works 9.0 allows only a Works spreadsheet. If you open a Microsoft Excel document with several worksheets, you'll get a dialog box asking you to choose which piece of work you want to load. Another difference is that in Excel, you can select several sections not connected to the document, but in a worksheet Microsoft Works 9.0, you can do that. The Microsoft Works 9.0 spreadsheet also allows only of 16 384 rows and 256 columns. I tried to open a number of sheets Excel spread to work and it did not work very well. First of all, I had to choose a worksheet. Then the Works spreadsheet cannot load many of the formulas and the names of symbol and in the end, I had nothing but nonsense. »

    Great potential sloppy by Microsoft (on purpose?)
    http://www.Epinions.com/review/Microsoft_Works_9_PC_882224268370/content_472853352068

Maybe you are looking for