Is snooze for events calendar from iOS10?

After the upgrade to iOS v10.0.1 has more option of repetition of the events calendar from the locked screen.

It is some basic functions which was included in previous versions of Mayor (I think on v8.x) but now is gone...

This will impact significantly every single business user

Hi issac73,

Thanks for the update to iOS 10! I see that you are unable to repeat your lock screen calendar events. Below you will find some tips on managing your Notifications while the iPhone is locked.

Notifications on your lock screen

In iOS 10, you can interact with notifications on the lock screen to catch up on the news, answer messages and more without unlocking your device.
Here are a few ways in which you can view and interact with the lock screen notifications:
To view your lock screen, press the Home button or the sleep/wake. If you have an iPhone 6s or later, pick up your device to see the lock screen.
To respond to a notification, by sweeping left on it, and then tap answer. If you have an iPhone 6s or later, use can use Touch 3D. Just press the notification deeply, then answer.
To open the application to answer, drag right on the notification.

Use the Notifications on your iPhone, iPad and iPod touch

These tips should help you to make the most of your Notifications on your lock screen. Please use the Apple Support communities to post your question. Have a great day.

Tags: iPhone

Similar Questions

  • What decides the default calendar for events?

    How t iPad by default look for the calendar which reflected in Outlook to plan events? I have Outlook 2013 for my mail & calendar on my PC. When I start a new event to my calendar iPad Air app, it is defaulted to work and if I change manually, it does not appear in Outlook. How can I get the default calendar to another calendar of my choice, so I don't have to check and change it every time?

    Thank you

    Personally I use only 1 calendar so I don't have any experience with this...

    But the iPad User Guide says that you should check the settings > Mail, Contacts, calendars.  I suggest you do scroll to the area of calendars to see if there is a setting there to change the default.

    http://help.Apple.com/iPad/9/#/iPad99d9870e

  • Calendar of events created from Mail populate title from El Capitan upgrade

    Hi, since the upgrade to El Capitan, calendar events created from email (hover of dates in an email and more) do not fill a title in the calendar as they did.  They used to use the title of the email as the title of the event - not 'new event '.  In this case if it is set to fill iCloud or google calendars by default.

    Little bored maybe, but it is of course Nice on my old computers using Mavericks/Yosemite do not constantly have to fill in this field by hand.

    Is this behavior changed in El Capitan and so normal?  I can't find someone else to complain of the it (this isn't the old bug where the title goes to "new event" after changing).

    Thank you

    Yes. Same question.

  • Invoke the bean of calendar (from Oracle) on the TIMING of the CLICK of MOUSE events in a text box

    Hello
    I want to get the date the user has selected in a calendar of bean (supplied by Oracle), currently my practice is to put a bean for each calendar and after date selection I am pushing this field required date, suppose I need calendar half dozen in my form I have to place the beans a half dozen, basically I don't want user of bean rather , I want him to click on the text box then CLICK event, it will display a calendar of the bean click and on the selection value will return to the text element.
    Please guide is it possible if yes how.

    Version of Oracle Forms. 10.1.2(webutil installé)
    Database. Oracle 10g Enterprise


    Thank you and best regards,
    Syed Khawar

    now when the user clicks on bean, it appears calendar through trigger WCIE

    It's a way to view the calendar of Java, however, you can simply place a button on your canvas for each calendar you wish to view and then in the trigger Button-When-Pressed (WBP) to run code similar to the following:

    /* Code example assumes you have a CONTROL block with a */
    /* block Item called: CALENDAR_ITEM, which will act as a variable */
    /* to record which date item the Java Calendar was called for. */
    BEGIN
       :CONTROL.CALENDAR_ITEM := 'MY_BLOCK.DATE1';
       Set_Custom_Property('CALENDAR.BEAN_AREA',1,'SHOW_CALENDAR','50,50);
    END;
    

    This code displays the calendar and assign the value "DATE1" to your 'Variable' control block, so that you know what Date is your calendar was called for. Then, in your trigger when-Custom-point-Event (WCIE), you manage the date returned by your calendar of Java Bean and assign the value to the element of date in your CONTROL. Field of Calendar_Item.

    DECLARE
      v_event_name      VARCHAR2(30) := :SYSTEM.Custom_Item_Event;
      v_event_vals      ParamLIst;
      n_event_val_type  NUMBER;
      jb_date           VARCHAR2(256);  -- Complete Date as returned by the JavaBean
      d_formated_date   DATE;
      jb_day            VARCHAR2(256);  -- Day Number (1-31)
      jb_month          VARCHAR2(256);  -- Month Number (1-12)
      jb_year           VARCHAR2(256);  -- Year Number (YYYY)
    BEGIN
      IF ( v_event_name = 'CALENDAR_EVENT' AND :CONTROL.Calendar_Item IS NOT NULL ) THEN
        v_event_vals := Get_Parameter_list(:SYSTEM.Custom_Item_Event_Parameters);
        Get_Parameter_Attr(v_event_vals, 'CALENDAR_EVENT_DATE', n_event_val_type, jb_date);
        Get_Parameter_Attr(v_event_vals, 'CALENDAR_EVENT_DAY', n_event_val_type, jb_day);
        Get_Parameter_Attr(v_event_vals, 'CALENDAR_EVENT_MONTH', n_event_val_type, jb_month);
        Get_Parameter_Attr(v_event_vals, 'CALENDAR_EVENT_YEAR', n_event_val_type, jb_year);
    
        /* The variable JB_DATE contains the full date formated as MONTH DD, YYYY */
        /* Our date format is different, so I get the elements of the date in the */
        /* jb_day, jb_month, jb_year variables so I can format them the way I need them. */
        d_formated_date := TO_DATE(jb_month||'/'||mb_day||'/'||jb_year,'mm/dd/rrrr');
        COPY(d_formated_date, :CONTROL.Calendar_item);
      END IF;
    END;
    

    This code example will allow you to use a single area of bean to support several calendar items on a canvas. If you have more than one canvas and you have an element of date on each canvas, you would need a surface of bean / canvas.

    Hope this helps,
    Craig B-)

    If someone useful or appropriate, please mark accordingly.

  • Disabling alerts for individual calendars in iOS 9

    Hello

    Is there a way to disable alerts based on calendar in the calendars on iOS 9?  I would like to disable alerts from home on my iPhone, but yet to receive for the work schedule.

    This used to be possible in the iOS 8 by clicking on calendars to display a list of all calendars, tapping the Red I beside work or home and then scroll to the option for Notifications-> alerts of event with a toggle switch.  It no longer appears in iOS 9 and Notification Centre options seems to be all or nothing.

    Any suggestions?

    Hello rechape,

    Thank you for using communities of Apple Support.

    I understand your message that you want to disable notifications for each calendar, but cannot locate this iOS settings 9. I, too, like customize my notifications for calendars. Here's what I recommend:

    1. to turn off notifications for a specific calendar, press the calendar application.

    2. tap on that Word calendars located downstairs at the center of the page.

    3. scroll down to the section iCloud and Red tap I in a circle to the right of the calendar you want to disable notifications for.

    4. scroll down to the Notifications section and slide the switch to the right of the event alerts.

    Best regards

  • How to: call the calendar from my application?

    I want to call the application calendar from my application so that the user can use the calendar interface to define its event.  I would like to be able to send data to the calendar during the call, e.g. the name of a person or place and that this info is included in the calendar in the subject case or place or somewhere.

    Is this possible?

    If this isn't the case, I need to define my own event interface to allow the user to choose a date and time and other details chercher search screen, then add them to an event object?

    Thanks in advance.

    You can call the calendar application using the API invoke, as well as an ApplicationArgument for the calendar.

    See the javadocs.

  • BlackBerry Smartphones transfer between Yahoo mail and Gmail service by default for the calendar

    Nice day

    I'm abandoned on the use of Yahoo Mail after 13 years.  I get expired and are having login problems and some of my messages have forwarded to my BlackBerry.  So I opted to use Gmail as my primary email provider and it has worked fine until now.

    I use the Outlook calendar on my phone and sync it with my Torch 9800 using the USB connection.  If I delete my Yahoo Mail as a sevice of default for the calendar, contacts and Messaing list and select Gmail as my default service how convert all my calendar and contacts with Gmail profile.  In fact, don't know if my list of contacts would be affected since I do not see the association from the list of contacts to my Yahoo Mail currently.   If I delete my Yahoo profile would be deleted my events or would they are transferred in the default calendar profile?  Or do I just sync it again with my vision and my events will be transferred to the Gmail profile after selecting the Gmail as my default service for the calendar and the contacts list.  I hope I explained this correctly.  I also have a profile on Facebook timeline showing birthday reminders, which I am trying to remove, but it is another problem.

    I want to do it right the first time and will not accidentally delete my events and contacts list.

    Thanks in advance.

    Prior to do any make a full backup of the device.

    I think that you can solve this problem by Gmail, default service. Then in the calendar app, go to Options. On the screen, enter the letters M O V E. Who should move all the events of the calendar by default. It's been a while since I've done it, though.

  • Synchronize your events calendar iPad (or calendar iCloud) events to your calendar Windows Surface Pro?

    Separated from this thread.

    Have you ever able to synchronize your events calendar iPad (or calendar iCloud) events to your calendar Windows Surface Pro? I tried the two support the Apple technology AND Windows technical support and they have no answers for me. Two of them say don't know is not how the other operating system. Kind of infuriating. Did you?

    Hi cgreen,.

    Here in this scenario, I suggest to add your iClound account to the calendar application and check if it helps. Try the following steps to add an account to the calendar application.

    1. On start, tap or click Calendar.
    2. Enter in the right edge of the screen, and then tap settings.
      (If you use a mouse, point to the upper right of the screen, move the pointer of the mouse down and then click settings.)
    3. Tap or click accounts.
    4. Press or click Add account, le type the type of account you want to add, and then follow the on-screen instructions.

    By adding the iCloud account, you can synchronize the calendar events in iCloud with calendar app in Windows 8.

    For more information, you can consult the following Microsoft Help article.

    http://Windows.Microsoft.com/en-us/Windows-8/calendar-app-FAQ

    Please reply with the status of the issue so that we can better help you.

  • Events calendar Skinning - reorganize af_calendar_toolbar-display-range

    Hello

    Using the calendar to the default event of the WebCenter 11.1.1.9 Portal I can't the reorganization of the default date range that shows the toolbar.

    My requirement is to move the /date for the current month as the first item on the calendar of the toolbar:

    Calendar - Skin 1.png

    Currently, it is show after the date picker control.

    Research on ADF Skinning, I found the following documentation:

    http://docs.Oracle.com/CD/E23943_01/apirefs.1111/e15862/TOC.htm

    It helped identify the elements that allow skinning.

    Customization using Taskflow for taskflow calendar does not work, because the string that includes the Toolbox is:

    toolboxLayout="#{pageFlowScope.calendarModelBean.calendarViewManager.toolbar}"
    

    To display the default calendar.

    It is possible to reorganize the current date on the Calendar toolbar using taskflow customization or creative counting?

    If this is not the case, is there a way to link the current selected date in the calendar to an output text which updates the current date?

    I tried using absolute positioning for the item af_calendar_toolbar-display-range, but the calendar uses overflow: hidden on most containers, preventing the current date appears visible from the outside of the tank of the calendar.

    Yes, you need to customize the toolbar of the entire calendar. See here

    A thing a day: custom Calendar ADF object toolbar

    http://docs.Oracle.com/CD/E24382_01/Web.1112/e16181/af_calendar.htm#ADFUI10106

    Try modifyy the toolbar. You can't do it from here. You must change the standard taskflow for this.

    See here in my video, how you can customize taskflow

    https://www.YouTube.com/watch?v=f4ogRyycE6E

    Spotlight-webcenter ADF task flows-customzation

  • Link to calendar for a calendar with a Union query

    I have a calendar with an SQL query. The query is a union with 3 different tables data.  When a user clicks the calendar of events, go to different pages based on the element in the query

    How to create the link.  Can someone guide me

    I'm on apex.oracle.com

    Caledar Query

    **************

    Select (event_no |) » -'|| event_name) name, event_date main_events

    Union of all the

    Select (order_no |) » -'|| order_name) name, Order_date main_orders

    Union of all the

    Select (action_number |) » -'|| wo_name) name, main_actions scheduled_start_date

    gkthomas wrote:

    Definition of color for the different elements are clear. But building the target of the dynamic link is not clear. Would you like to explain a little more.

    I also want the link to go to that particular record when the user click the input data for the calendar

    I don't really see how it can be made clearer. Have you read the online help for the attributes of link calendar? Do you understand the concept of chains of substitution? And the use of APEX URL to link pages and applications?

    Link target URL can be built dynamically in the region of link attributes. In a UNION data source, each request can contain values that are used to specify the different target pages and elements of page/values to define column. These columns are referenced in the attributes of calendar display/change link as substitution strings to specify the page number and set the values of the elements of the requested page:

    Source of the region


    select
        event_no || ' - ' || event_name event_title
      , event_date
      , 'apex-cal-green' css_class
      , '10' link_page
      , 'P10_EVENT_NO' link_items
      , event_no link_values
    from
        main_events
    union all
    select
        order_no || ' - ' || order_name
      , order_date
      , 'apex-cal-yellow' css_class
      , '11'
      , 'P11_ORDER_NO'
      , order_no
    from
        main_orders
    union all
    select
        action_number || ' - ' || wo_name
      , scheduled_start_date
      , 'apex-cal-red'
      , '12'
      , 'P12_ACTION_NO,P12_WO_NAME'
      , order_no || ',' || wo_name
    from
        main_actions
    

    View/Edit link

    f?p=&APP_ID.:&LINK_PAGE.:&SESSION.::&DEBUG.:&LINK_PAGE.:&LINK_ITEMS:&LINK_VALUES.
    


    If you really have trouble with this then as usual the best course of action is to create and share an example on apex.oracle.com where the proper techniques can be demonstrated.

  • Events calendar on Mac sync iPhone or Apple Watch

    Input events calendar I have on my Mac don't sync my iPhone or Apple Watch.  Events calendar on iPhone synch to iMac.  in iCloud preference, I've marked contacts, calendars and notes.  All the work schedules.  Any suggestions?

    Option 1) update your calendars and reminders of the app of calendars:

    Open the calendar application.

    Choose View > refresh calendars.

    Try option 2) remove the account in calendar > Preferences > accounts.

    Now add back.

    Option 3) if it still fails to work, try to test in the comments or new user.

    CREATE A NEW USER

    Go to system-> Preferences, create a new user in users and groups.

    Switch to the new user by logging incoming/outgoing or use the fast user switching.

    Connection with Apple ID

    Only select Calendar for this test.

    Open calendar and test by adding an event and see if it syncs with the iPhone.

    You still see the issue?

    If so, see these steps by khati for Installation of Sierra difficulty. I suggest you reinstall Sierra again.

    If not, then the problem is in your user folder.

    Journal of the user and then Log in your user folder.

    With Calendar.app quit...

    Go to the library to the user (see below)

    Scroll to the bottom for calendars

    Place these files in the Recycle Bin

    • Calendars/calendar Cache
    • Calendars/calendar Cache-shm
    • Calendars/calendar Cache-shm

    Also in the user's library, scroll to containers. Move these to the desktop.

    • Containers/com.apple.CalendarAgent
    • Containers/com.apple.iCal

    Scroll down to preferences. Move these to the desktop.

    • Preferences/com.apple.CalendarAgent.plist
    • Preferences/com.apple.iCal.plist

    Sign out under the Apple in the menu bar.

    Open a session

    Open Calendar.app

    It's working now?

    Library of the user to see the

    The user library folder is hidden by default. In the unhide: select the Finder in the Dock. Less go in the Menu bar > hold down the Option key and you will see the library.

    Find the library user folder

    http://www.takecontrolbooks.com/resources/0167/site/chap11.html#FindingtheUserLi braryFolder

  • I thought WWDC 2016 TEU June 13 at 10 am PDT. Some sites say that the event is from 13 to 17 June. What is the date on which they will announce if there are new products coming out. What is 13?

    I thought WWDC 2016 was just June 13 at 10 am PDT. Some sites say that the event is from 13 to 17 June. What is the date on which they will announce if there are new products coming out. What is 13?

    WWDC is the 13th week, not a single day. However, at 10:00 13 will be the speech. It's what you want to watch. You can download the application to your computer via: Developer Apple WWDC Watch - WWDC -. You can download the app for iPhone, iPad, or contact via the iTunes Store.

  • Event ID, errors, the description for event ID, 1307, 1312

    Hello

    I am getting following error messages inside my Application folder in the event viewer:

    The description for event ID (1312) in Source (ASP.NET 2.0.50727.0) could not be found. The local computer may not have the information necessary registry or message DLL files to display messages from a remote computer. You may be able to use the option/auxsource = flag to retrieve this description; See Help and Support for more details

    and also

    The description for event ID (1307) in Source (ASP.NET 2.0.50727.0) could not be found. The local computer may not have the information necessary registry or message DLL files to display messages from a remote computer. You may be able to use the option/auxsource = flag to retrieve this description; See Help and Support for more details

    Does anyone know how to remove them? Would be very happy to all general approaches, suggestions, ideas, comments etc...
    Thank you
    Colm

    Hi Selvavelan,

    As you mentioned that you use Microsoft Dynamic CRM 4.0, I recommend that you post your question in Microsoft CRM Dynamic support for assistance.

    Hope the helps of information.

    Concerning
    Joel S
    Microsoft Answers Support Engineer
    Visit our Microsoft answers feedback Forum and let us know what you think.

  • Problem at the opening of the event calendar in my application

    I create a new event calendar with this code:

    CalendarService service;
    Event CalendarEvent;

    event.setAccountId (1);
    event.setFolderId (1);

    event.setBusyStatus (BusyStatus::Busy);

    event.setSubject (QString::fromUtf8 ("title model"));
    event.setBody (QString::fromUtf8 ("a model body"));

    event.setLocation (QString::fromUtf8 ("fictional location"));

    event.setTimezone("Europe/Berlin");
    event.setStartTime (QDateTime::fromString ("2014-08-23 15:30", "yyyy-MM-DD hh: mm; :")) "))
    event.setEndTime (QDateTime::fromString ("2014-08-23 17:15", "yyyy-MM-DD hh: mm; :")) "))

    event.setReminder (120);

    service.createEvent (event);

    It works very well. Get an event ID valid and I can see the event in my calendar. Now, I want to open/edit the calendar inside my application entry, so I try to invoke an application to change the event:

    Application of InvokeRequest;

    request.setTarget ("sys.pim.calendar.viewer.eventcreate");
    request.setAction ("bb.action.EDIT");
    request.setMimeType("text/calendar");

    QVariantMap map;
    Map.Insert ("accountId", event.accountId ());
    Map.Insert ("ID", event.id ());
    Map.Insert ("file", event.folderId ());
    Map.Insert ("startTime", event.startTime (m:System.NET.SocketAddress.ToString ()));

    bool ok;
    QByteArray data = PpsObject::encode(map, &ok);)
    request.setData (data);

    m_invokeManager-> invoke (request);

    This opens the calendar inside my application, but with a new empty calendar event.

    What I am doing wrong? I already searched this forum for other people who have or had this problem and I found a few old son but their code looks like mine and I can't find a real difference.

    Okay, I found my mistake.

    bb.action.EDIT<-->

    bb.calendar.EDIT<-->

    :-)

  • BlackBerry® Smartphones for the calendar default email

    Hello

    I use my BB torch for a year with a unique email address and all calendar items are attached to this email.

    Having a new job, I have a new email address (+ private) and want to set the new email as default for the calendar (required for the solicitation process). I can choose the new email for each new event but... a defect would be easier...

    As I don't want to remove all the old calendar events I really hesitated before deleting the old email address.

    Is there a way to set the default address to use for the calendar or delete an old email address without deleting the attached calendar items?

    Thanks for your reply.

    Fred

    Hey, Fred!  Welcome to the forums!

    On your device, go to Options > device > advanced system settings > default Services.  Change the setting CICAL (calendar) to the address that you want to use, press the ESC key and save your changes.  It will be by default all your new entries to the new email address.  You can do the same for your e-mail address (CMIME) so, if you wish.

Maybe you are looking for

  • Find a DVD player that is compatible with my remote

    Hello My DVD player is broken, and I would like to make its remote available on E - Bay or other. As usual, the remote control is compatible with several models. How to know the list of these models? The reference on the remote is SE-R0049. Thank you

  • X 360 Pavilion: Pavilion x 360 SSD upgrade

    Hi all, I have recently (October 2016) bought a Pavilion x 360 (model 13-0004nl); internal 5400 RPM drive 1 TB is extremely slow and so would an SSD. I am not able to find info on this machine, and if it can be upgraded to a SSD drive or not, someone

  • I said that my printer needs me to get service pack 4 on my windows xp. Is there such a thing?

    I recently acquired a HP officejet 8500 - replaced in compensation for damaged earlier.  When I try to install the drivers for it, he says that it is not compatible with my windows xp. Get contacted the company who succeeded him they told me that I n

  • CC 2015 Speedgrade constant crashing...

    So I'm having various problems with CC apps lately especially first, speedgrade, audition. This is my fault for speedgrade issues journal.System - i7 - 4770 k, 32 GB of RAM, GTX 660ti, individual drives for media, project, program, and hides.Seems to

  • Cannot use the new scripts to fill for Photoshop CC 2014.2 pattern

    I installed Photoshop CC 2014.2 (version 2014.2.0), but I am unable to get new scripts to fill pattern to work or even appear in the user interface. Namely, I am referring to the flame, frame photo, and tree scripted profiles described here: https://