OLIVIER 7.9.5 'Financial analytics' full load fails

Hi all

We are implementing instance OBIA7.9.5 Oracle 11.5.10 Vision.

Components installation succeeded.
We followed the respective Configuration steps for the Analytics module and set up the latter.

When we start full charge for financial analytics,
321 tasks, 215 was properly executed, 2 tasks failed and remaining were stopped

below were the failed task
Load in Position Dimension-> create Index W_POSITION_D_U1 INDEX
TASK_GROUP_Extract_EmployeeDimension-> create Index W_EMPLOYEE_DS_U1 INDEX

We received the error log below, on the creation of Index.

ORA-01452: cannot CREATE a UNIQUE INDEX. duplicate keys found

EXCEPTION CLASS: java.sql.SQLException

oracle.jdbc.driver.DatabaseError.throwSqlException(DatabaseError.java:112)
oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:331)
oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:288)
oracle.jdbc.driver.T4C8Oall.receive(T4C8Oall.java:745)
oracle.jdbc.driver.T4CStatement.doOall8(T4CStatement.java:210)
oracle.jdbc.driver.T4CStatement.executeForRows(T4CStatement.java:961)
oracle.jdbc.driver.OracleStatement.doExecuteWithTimeout(OracleStatement.java:1190)
oracle.jdbc.driver.OracleStatement.executeUpdateInternal(OracleStatement.java:1657)
oracle.jdbc.driver.OracleStatement.executeUpdate(OracleStatement.java:1626)
com.siebel.etl.database.DBUtils.executeUpdate(DBUtils.java:266)
com.siebel.etl.database.WeakDBUtils.executeUpdate(WeakDBUtils.java:357)
com.siebel.analytics.etl.etltask.SQLTask.doExecute(SQLTask.java:122)
com.siebel.analytics.etl.etltask.CreateIndexTask.doExecute(CreateIndexTask.java:90)
com.siebel.analytics.etl.etltask.GenericTaskImpl.doExecuteWithRetries(GenericTaskImpl.java:271)
com.siebel.analytics.etl.etltask.GenericTaskImpl.execute(GenericTaskImpl.java:200)
com.siebel.analytics.etl.etltask.GenericTaskImpl.execute(GenericTaskImpl.java:149)
com.siebel.analytics.etl.etltask.GenericTaskImpl.run(GenericTaskImpl.java:430)
com.siebel.analytics.etl.taskmanager.XCallable.call(XCallable.java:63)
java.util.concurrent.FutureTask$ Sync.innerRun (FutureTask.java:269)
java.util.concurrent.FutureTask.run(FutureTask.java:123)
java.util.concurrent.ThreadPoolExecutor$ Worker.runTask (ThreadPoolExecutor.java:650)
java.util.concurrent.ThreadPoolExecutor$ Worker.run (ThreadPoolExecutor.java:675)
java.lang.Thread.run(Thread.java:595)
459 SEVERE kills Nov 10 20:40:50 GMT + 05:30 2009 failure detected during execution of CREATE INDEX: W_POSITION_D:W_POSITION_D_U1.
Error code: 12801.
Error message: runtime error: CREATE UNIQUE INDEX
W_POSITION_D_U1
WE
W_POSITION_D
(
INTEGRATION_ID Asc
DATASOURCE_NUM_ID Asc
EFFECTIVE_FROM_DT ASC
)
NOLOGGING PARALLEL
with error java.sql.SQLException: ORA-12801: error reported in the parallel query P000 Server
ORA-01452: cannot CREATE a UNIQUE INDEX. duplicate keys found
.

everything by analyzing the error code above in the oracle forum, got a clue at the bottom of the link
ORA-01452: cannot CREATE a UNIQUE INDEX. duplicate keys found

even after having made the changes mentioned in the link above and restart the ETL even once, we get the same error message.

Let us know how to solve this

Thank you
Saran

If you right click on the task (or taskgroup) who is a failure in the dac and select 'Détails', you can see a list of the indexes that are supposed to have created and to check on those who fail.

In addition, if you just want to finish the execution plan to look at where you are now find the clues failed and set them to the full status and re-queue implementation plan.

I hope this helps!

Austin

Tags: Business Intelligence

Similar Questions

  • The execution of work load failed

    Hi experts BI Apps,

    I made a plan to load on the supply of the Oracle and analytics spend, load failed at the SDE_ORAR1212_ADAPTOR_SDE_ORA_UOMCONVERSIONGENERAL_INTERCLASS session

    ODI-1519: series step "start load Plan.

    (InternalID:2278500) ' failed, because the child step "Global Variable Refresh.

    (InternalID:2279500) "is a mistake.

    ODI-1519: series step "Refresh Global Variable (InternalID:2279500).

    has failed, because the step child ' Source extracted phase (InternalID:2282500) ' is

    by mistake.

    ODI-1519: step series ' Source extracted phase (InternalID:2282500) ' failed

    because the child step "1 general (InternalID:2283500)" is in error.

    ODI-1519: series step '1 general (InternalID:2283500)' failed, because

    step child "2 General SDE (InternalID:2326500)" is in error.

    ODI-1519: series step '2 General SDE (InternalID:2326500)' failed

    because no children "Parallel (InternalID:2412500)" is in error.

    ODI-1518: parallel step 'Parallel (InternalID:2412500)' failed. 1 child

    steps in error, which is more than the maximum number of permits

    errors (0) defined for parallel step.  Has no measures of the child: 3 SDE

    General MEASURE unit (InternalID:2432500)

    ODI-1519: series step '3 General SDE UOM (InternalID:2432500)' failed

    because the step of the 'Load Target Table (InternalID:2435500)' child is in error.

    ODI-1519: series step 'Load Table of target (InternalID:2435500)' failed

    because the step 'EBS_12_1_2 - 3 (InternalID:2436500) DSN' child is in

    error.

    ODI-1519: series step 'EBS_12_1_2 - DSN 3 (InternalID:2436500)' failed

    because the stage of the child "UOM_DIM (InternalID:2437500)" is in error.

    ODI-1519: series step 'UOM_DIM (InternalID:2437500)' failed, because

    stage of the child 'SDE_ORA_UOMCONVERSIONGENERAL_INTERCLASS '.

    (InternalID:2438500) "is a mistake.

    ODI-1217: Session

    SDE_ORAR1212_ADAPTOR_SDE_ORA_UOMCONVERSIONGENERAL_INTERCLASS (667500)

    fails with return code 1031.

    ODI-1226: step run

    SDE_ORA_UOMConversionGeneral_InterClass.W_UOM_CONVERSION_GS falls down after 1

    attempt (s).

    ODI-1240: Flow Run

    SDE_ORA_UOMConversionGeneral_InterClass.W_UOM_CONVERSION_GS fails while

    running a load operation. This flow of charge table target

    W_UOM_CONVERSION_GS.

    ODI-1227: SrcSet0 (load) task fails on the source of ORACLE connection

    ON_EBS1212.

    Caused by: java.sql.SQLSyntaxErrorException: ORA-01031: insufficient

    privileges

    I will be grateful someone can give some clues about this.

    Thank you.

    you don't have enough privileges for the user you are using to run the load. Check with the team of DB if the user you are using has obtained the privileges of right or not

  • Run again full load in OLIVIER 11 g

    Hi all

    We want to re-run the full load in OLIVIER 11 g. Could someone guide me how it is done by OLIVIER 11 g (version ODI). Someone talked about reset in Configuration Manager. No idea how to do this reset?

    Thanks in advance for your help.

    This blog describes how to run the scenario of resetting warehouse in BIACM... Become familiar with Oracle BIACM & WSF

  • Version financial analytics

    People,

    I was tasked to provide a document on the drivers of design and customization of Oracle financial analytics... especially, what are the best practices of how the source system should be (Oracle EBS R12), etc. in order to take full advantage of the analytical detail level.

    Is the latest version of financial analytical BI of Oracle 11 g? or is it * 7.9.6.2? *

    Thank you very much!

    Hello

    OLIVIER 11 g is a platform. The financial analytics, you watch OBIA (Oracle Business Intelligence Applications). Later in the stable is 7.9.6.3. OLIVIER is hosted on the platform of the OBI.

    I hope this helps.

    Kind regards
    Jay

  • Financial Analytics: Query GL balance

    Hello

    Someone if the project this far THAT DR/CR represented balances in the table in Oracle GL GL_BALANCES is represented in financial analytics 7.9.6.3.

    Specifically, I want to know where we have the situation where GL is enabled for the project of basic accounting, information project_to_date_cr/Dr. would load in the data warehouse, the standard reports allow you to query this information or do we need project analytics of license for this information or to build a customization?


    See you soon,.
    John

    Hi John, please can mark you my answer as the right pair?

    Thank you very much, glad I could help.
    Andy.

  • BI apps - can separate the full loads for all modules?

    Hi all

    I am trying to load HR, finance and supply chain data to EBS R12.1.1. DAC I create 3 implementation plans for human resources, financial, Supply Chain, one for each. I have run one after the other. Can I activate the option always full load for each execution plan? Or should I keep the 1st (say HR) under full load and other truckload two?

    Thank you and best regards,

    If you check always full for all 3, no matter what consistent size will be truncated for each subsequent load, so don't do no not that. You can run the first Full and then for the second, just run as what (do not always check FULL) and confirmed dimensions should have a discount date that prevents truncation.

  • Rapid decline in full load capacity

    Hello

    I recently bought a new macbook pro 15' and since then, I have read several articles on how to preserve the battery in my macbook. Therefore, I check regularly the full load capacity (perhaps every day...), but yesterday, something strange happened. Full charge capacity was most of the time at approximately 8500 mAh, but yesterday when I checked, it had fallen to 7700 mAh. I am aware that the full load capacity decreases with time, but 800 mAh for one day is certainly something not typical. In general, I charge when it is between 20-40% until it reaches 100%. I did not the little ordinary things on it in order to damage the bad battery. I just read a book and disabled the Wi - Fi in order to preserve the battery life. At one point, I noticed under the battery 'remaining 18 hours', but it's normal since I used it in low light to read a book without a free Wi - Fi connection. I think that the battery may have lost its calibration, so I re - year (wait for the macbook to stop, then wait for 3 to 5 hours and charge up to 100%). Do you have any other suggestions what could be the problem and how to solve?

    P.S. The battery has 37 cycles count.

    Your MBP battery needs to be calibrated.  This will put a useless cycle on this issue.

    Try a SMC reset:

    https://support.Apple.com/en-us/HT201295

    If there is no change, make an appointment with an Apple store genius bar, the assessment will be FREE.

    Ciao.

  • I often use my iPad when it is plugged in, after full load. Can thus damage the battery?

    Leaving the iPad on the charger when it is fully recharged bypass the battery and that the iPad runs on an external source as most of the laptop? Or is the battery constantly being drained and charged at the same time?

    I often play with my iPad 2 plugged Air (often after full load because I think the iPad is directly using the external power source) and I don't know if that night to the iPad or not.

    No, there is no harm in using the iPad during the charge or leave fixed after the battery has reached 100%.

  • E2 bike takes up to 3 hours at full load

    Moto E2 4 G takes up to 3 hours at full load of 100% it is very irritating... How to fix?

    Use more amp charger will damage phone?

  • Core 2 duo powered only 997 mhz at full load

    Hi my new / used thinkpad t60 core 2 duo t2400 1.8 ghz will run only 997 mhz even at full load I disabled speedstep in bios, power management is set to maximum performance and still it doesn't work the clock speed even at 100% load.

    Link to photo

    Thank you for the research

    Eastham.

    PS. your not a 64-bit Intel Core 2 duo processor T2400 is a 32-bit core duo cpu. You can switch to the Core 2 duo, as long as you have a recent update of the bios installed.

  • VN7 791G - CPU AT FULL LOAD

    Hello

    I want to ask you that "what cpu temp is adapted on the full load test?

    I tried on test8 of the pass mark, and some values were critical because the 100% cpu load test

    I saw 89-90-91 degrees Celsius to 4 cores, is it suitible or not?

    now, I'm worried about the cpu, I am a engineering student and I need a good system for etc...

    do you have any suggestions for me?

    my laptop and the system:

    vn7 791g 78 m 4

    4710hq - 16 GB of ram - 860 m graphics card

    No ssd and 1 TB disk

    win10 home

    Hello

    The maximum temperature of the processor Intel Core i7 4710HQ is 100 C. The processor reaches 91 c on 100% load (stress test). It's normal.

    Have you updated the driver for chipset for Windows 64-10?

    ChipsetIntelDriver Chipset10.1.1.84.7 MB27/08/2015Download

  • How long the "rocket" can be connected to full load?

    How many time the rocket can be connected to a computer source or power at full load until the battery or the system is affected?

    The processor handles for lithium polymer power management, shut off the power when the battery is fully charged.

    I left the devices connected by curiosity, and they very cold to the touch.  You can leave it connected until the cows come home home!

    Bob

  • IM only get a full load of 70% on my battery now, does that mean my battery is to expire?

    IM only get a full load of 70% on my battery now, does that mean my battery is to expire?

    Hello

    Check with support from the manufacturer of their books online and the drivers and their forums system
    (as applicable) for known issues. Some manufacturer issued BIOS and other updates to help the battery
    problems.

    Control Panel control - plan change Options - power plans - power - advanced settings
    Parameters for the drainage and the use of parameters (this is how much to use and not how much or how)
    long to load).

    In fact, what causes a lot of wear on a battery empties it too low on several occasions. With today
    systems overload are not a problem.

    Here are some tips to help and troubleshoot battery issues.

    Old battery? Unplug the power to the computer - remove the battery and clean the contacts with a pencil
    eraser (do not use this, if your battery is fine slots - just clean up the edges of the knife which fit in)
    them and be careful). Batteries are old, or it could be a problem with the computer.
    Check with the support of the machine system, and many of them have on line forums.

    New Lithium-Ion type battery usually last longer if you do not unload then less than 30%
    However on a laptop that not extend their life a lot. Best is to use the a/c adapter
    When this is possible.

    I use the free version of BatteryBar to monitor my battery. Click on the green button on the
    Yellow box on the right side of the page to download the latest stable version.

    BatteryBar - free version available
    http://osirisdevelopment.com/BatteryBar/index.html

    Another good program

    Vista battery saver - free
    http://www.codeplex.com/vistabattery

    Problems with the lives of its use and the battery of power - Mr Fixit
    http://support.Microsoft.com/GP/windows_battery_power_settings

    You can also check with the manufacturer of system and forums that many use their own
    proprietary software to monitor the battery and they could be known problems with your battery.

    ============================================================

    Try this - to make a Restore Point

    How to create a Vista System Restore Point
    http://www.Vistax64.com/tutorials/76332-system-restore-point-create.html

    How to make a Vista system restore
    http://www.Vistax64.com/tutorials/76905-System-Restore-how.html

    Then Control Panel - Manager of devices - Batteries - Double click on each item - drivers - tab
    Update the drivers (which can do nothing) - then do a right click and UNINSTALL each.
    RESTART which will update the driver stacks.

    Problems with the lives of its use and the battery of power - Mr Fixit
    http://support.Microsoft.com/GP/windows_battery_power_settings

    I hope this helps.

  • How can I force DAC to run always full load for one of the task that executes the stored procedure? And remaining tasks load incremental in the second and sub sequent executions.

    Hello

    How can I force DAC to run always full load for one of the task that executes the stored procedure? And remaining tasks load incremental in the second and sub sequent executions.

    Thank you

    Jay.

    Hi if your task is running an informatica mapping you can set your DAC task to run the full mapping for incremental and full loads, so tab task just point to the mapping.

    Hope that helps.

    Thank you

  • While you sleep, how the Droid says "full load" status once the loading is done?

    Hello world

    During the load, assuming that I'm not using it for other reasons at the moment, my Droid goes to sleep.  Thus, although it may flash a small green light next to the Power/Lock button if incoming is a message waiting for me, or show a red light it when the battery becomes weak, the droid status 'full charge' somehow like that once the loading is done and if so, how?

    Please note that, Yes, I'm aware that if I use it, the battery indicator screen will be completely green when it is fully charged.  However, I wonder when the Droid is asleep, because I see that the indicator unless I pressed the Power/Lock button to wake up.

    Thank you very much!

    Sincerely,

    Bram Weiser

    Yes it is, but look for.  When you plug it in to charge, you will see a white light where you connect the power cord on the phone.  At full load that the light goes off.  As I said, you'll have to look at the Droid.

Maybe you are looking for