Passed my test upgrade to 11g

Phew! Maybe it's because I did take a test in a few years, but this test was really hard.  Took me two tries but I had more determination after I failed the first time.  Redouble my efforts and realized how vague the test questions were and changed the way I studied as well.  However since I am in the mood to study, it is 12 c certification!

Congratulations.  You should know I think (and everyone I talked to agrees) that the upgrade of 12 c (1Z0-060) is more difficult upgrade review Certification Oracle has ever created.  Basic DBA skills section in particular is difficult to study because it is extremely broad.  Don't forget to click on the links to free preparation materials (certification-safe) I put in place for the review:

Oracle Certification Preparation: Details of the examination and preparation for 1Z0 - 060 resources

Tags: Oracle

Similar Questions

  • formulated differently: 10G OCP can upgrade to 11G OCP (1z0-050 or 1z0-034) and be always active, correct?

    The sentence differently: 10G OCP can upgrade to 11G OCP (1z0-050 or 1z0-034) and be always active, correct?

    They should NOT put just to 12 c, correct.

    Someone at work took the Oracle class in Chicago: Oracle 11 g new Featurers for administrators.

    They wanted to ensure that they would NOT have to take another training class Oracle.

    Thank you Roger

    The sentence differently: 10G OCP can upgrade to 11G OCP (1z0-050 or 1z0-034) and be always active, correct?

    They should NOT put just to 12 c, correct.

    Fix.  There is not currently a scheduled date for individuals with 11g as their highest certification of need to obtain a new certification.  If Oracle does not change their policy (unlikely), it will be a date in the future where it is practiced.  However, the upgrade to 11g will prolong the active life of their powers of Oracle by (I guess here) 2-3 years.

    Someone at work took the Oracle class in Chicago: Oracle 11 g new Featurers for administrators.

    They wanted to ensure that they would NOT have to take another training class Oracle.

    I don't know what you mean by "shall take".  Once you have OCP, Oracle requires no additional training for practical requirement - even if the certifications become inactive and must be reactivated. I guess you mean that he took the class because he wanted to prepare 1Z0 - 050. Based on this issue, he now wonders if he needed to go directly to 1Z0 - 060 rather (and therefore would like to take the new features in preparation for this test review 12 c).

  • upgrade to 11g of 10.2.0.4 in SUSE 10.

    Hi gurus,

    We have upgraded database 11g on our EBS 11i environment, the database size is about 1.3 TB, I already test upgrade, this was no positive results expected this as a customer on downtime, I followed the manual upgrade since I am quite familiar with this I have your comments and suggestions to reduce the downtime upgrade...

    upgrade to 11g of 10.2.0.4 in SUSE 10.

    Hello

    Is that your database is RAC or NON-RAC.
    If you go to the Group of patches upgrade, then you can go for patch update of roll .

    as you know, you can't always escape the downtime. ;-)

    I already test upgrade, that it was not positive results is expected this as a customer on downtime, I followed the manual upgrade because I'm quite familiar with that

    Oracle always throws DBUA with many features, why you won't find DBUA?

    You should test the TEST using DBUA environment ;-)

    If for example to 1.3 TB you consistent backup, you still have the downtime. then it is useless to think on the duration of the UPGRADE .

    but you can do proactively as... to install 11g ORACLE_HOME before downtime. & so on.

  • Satellite A500 - HDMI never knit - error don't pass the test regza

    Hi mate,

    I come from Italy and, first of all, I want to apologize for my English... ^ ^
    I'll try to explain my problem:

    Whenever I try to connect to my Pc to my TV by HDMI port "Satellite A500'... an error pops up:

    _The tv is turned off or in standby or does not pass the test regza... _

    What it means?
    What can I do?

    Thank you

    concerning

    Hello

    As I know some of the Toshiba LCD TVs supports binding Regaza.
    This feature allows you to control the device (laptop, LCD monitor, etc.) using only a single remote control.
    But this only works if all devices support the link Regaza.

    If one of the devices (LCD or laptop) doesn t supports the link Regaze then you will probably get an this error message.

    Of course, you can disable this feature as well.
    I m not very well, but you should check the Toshiba applications preinstalled on your laptop (Toshiba assist, etc.). In addition, you should consult your manual for more details

  • How to access the information in the report of a pass/fail test?

    I'll call you a LabVIEW VIs of TestStand which are configured as ' pass/fail Tests. The result of the Boolean "PASS/FAIL" of LabVIEW indicator apparently are accessed through the variable RunState.SequenceFailed of TestStand. However, I can't find a similar TestStand variable that contains the information of 'Text of the report' of LabVIEW. Not such a variable exist, nor will it take to create a?

    Hi bmihura,

    The best approach would be to use direct information from the stage itself. You can get the text of the report of the RunState.Step.Result.Report text

    In this way, you go to the step text report directly.

    Alternatively, you can store the text of the report to a variable in the parameters of the step.

    I hope that gets things moving along to you!

    Kind regards

  • The upgrade from 11g to 12 c

    Hello

    We intend to improve our databases of 11g (11.2.0.3.11) to 12 c (12.1.0.2). We would like to know what are the steps that we need to upgrade the position.

    (1) all 11 g AWs automatically updated to 12 c? or do we rebuild US 11g AWs on 12 c after the upgrade? (We had to rebuild AWs after upgrading to 10g and 11g)

    (2) are there accessories performance in 12 c, which will apply to only AWS built on top of the 12 c?

    (3) we have an AW 10 g 11 g-based. Is it still compatible with 12 c AW?

    Thank you

    Dietsch.

    Hi dietsch,

    My answers are online.

    (1) all 11 g AWs automatically updated to 12 c? or do we rebuild US 11g AWs on 12 c after the upgrade? (We had to rebuild AWs after upgrading to 10g and 11g)

    The upgrade from 11g to 12 c requires no AWs to rebuild.

    (2) are there accessories performance in 12 c, which will apply to only AWS built on top of the 12 c?

    He might have a few new optimizations that have been incorporated into the version of 12 c of the AW you will not have access to until you rebuild the AW, but that does not prevent you from using the 11g version of the AW of 12 c.

    (3) we have an AW 10 g 11 g-based. Is it still compatible with 12 c AW?

    Yes, 12 c is backward compatible with an AW 10 g.

    In addition, once you upgrade it has some new features that you can use for OLAP.  The display below describe some of them.

    OLAP roadmap

    Thank you

    Ken Chin

  • How to change the position of 'you passed the test?

    Hello

    I need help on how to change the position of the message "congratulations, you passed the test. Perhaps the failure message.
    It should be in the Middle, but now to the left, it sinks in the background.
    I Don t see where to change it. All of the index are adjustable but it escapes me...


    Thank you very much!

    I think you are talking about the area of control on the slide to score? Move this area result or score slide himself slide.

  • Upgrade to 11g OCP10g

    Hi Experts,

    I need some information about the upgrade to OCP 11 g.

    Currently, I'm OCP 10g, I introduced myself to review on Nov, 2011 certification and my receipt in January 2012.

    Now I intend to switch to OCP 11 g, according to my understanding, I have to write for 1Z0-050 get a certification on the version 11 g can you please correct me if I'm on the wrong page. Also, is there an upgrade between versions chronology. One of my colleague said that it must be updated within three years of the period since the last time we were here during any review of OCP specific version. I don't know why but it does not seem true, can you please provide me with suggestions.

    Your response will be much appreciated, I intend to write for OCP 11 g next month. Also, if you can provide some guidance with reference books and review material that I should follow, currently I have following this book.

    • BC/OCP Oracle Database 11g all-in-One corrected by John Watson

    Thank you

    Ankur-

    According to my understanding, I write for 1Z0-050 get a certification on the version 11 g can you please correct me if I'm on the wrong page.

    You are on the right page.  1Z0-050 is the correct review for a 10g OCP to upgrade to 11g.

    Also, is there an upgrade between versions chronology.

    N ° and here again... Yes.  There is no timeline set the moment in that you earn an OCP at the same time, you need to upgrade.  However, eventually Oracle certification will be obsolete the upgrade itself.  For example, the 10g certification track is removed in March of next year.  Under the said exam 1Z0-040 will disappear.  This means that 9i POC will no longer be able to upgrade to 10g.  This has nothing to do with the length of time, as they have become certified.  However, it will be several years before the track 11g is in retirement, so not an immediate concern for you.

    In addition, if you can provide some guidance with reference books and the examination material should I follow

    There is an Oracle book press specifically for 1Z0 - 050.  You will also find links to documents and other suggestions at the following ADDRESS:

    Oracle Certification Preparation: Details of the examination and preparation for 1Z0 - 050 resources

  • Remove the old "dump" spfile settings after the upgrade to 11g?

    We have recently upgraded to a development instance from 10g to 11g using dbua. During the upgrade, we have provided a value for diagnosis Destination (diagnostic_dest). However, when I do a "dump of parameter of the show', I see several obsolete parameters like background_dump_dest, user_dump_dest and core_dump_dest. Although filled with places, that we would expect (under "diag"), I had hoped dbua could get rid of these "old" settings I interpreter 'old' to mean "deprecrated."

    1st quarter) I must take action? I've seen several workshops to upgrade - to-11g / slides / tip sheets that recommend the deletion of "old" settings But they never seem to give any details on those who, precisely, to remove. Although I found the syntax (alter system reset < parameter name > scope = spfile sid ='* ') I need additional information on specific settings I should remove.

    Q2) when we went from 9i and 10 g some time ago, I think not that the decisions have been taken to remove settings from 'old', then either. If our current 11g pfile / spfile may have contained superfluous. So what is the best way to review and identify the parameters to delete? I have to do the following:

    Select name, value, isdeprecated of the parameter $ v where isdeprecated = 'TRUE '.

    ... and start from there?

    While it would be nice to have a 'clean' spfile, I didn't much care on superfluous, inert stuff that is not harmful. But I am concerned with settings that could cause unwanted and unexpected behavior or performance problems. Does someone can give a specific example (or examples) settings of 'old' by leaving in place where can cause side effects?

    When upgrading you must first remove all parameters Oracle will not be present. These are usually identified in the documents of upgrade.

    Second, you need to delete probably all parameters that are obsolete and if present ignored. The presence of ignored parameters looks like confusion somewhere down the line.

    Third, if you implement all the new features via database settings, you probably want to remove database settings that apply to the features that your new choice obsolete as you would probably want to remove sga_target and pga_aggregate_target, if you set to 11 g memory_target.

    HTH - Mark D Powell.

  • Pass a test of component

    Hello

    I'm new to Flex and have a number of book before a course in 2 weeks, I created a main appliciotn with the function and can handle events

    private functionfillLabel(evt:Event):void{}

    myLable.text = evt.target.label;

    myButton2.addEventListener (MouseEvent.CLICK, fillLabel);

    }

    []] >

    < / mx:Script >

    < mx:Panel x=" 320 "y =" 127 "height =" 200 "width =" 250 "layout =" absolute "title =" tests of events " " > "" "

    < mx:Label x=" 55 " y=" 45 " id=" myLable " />

    < mx:Button " label = ' Text1 " id=" myButton " x=" 90 "y =" 96 "click ="fillLabel (event)" / >

    < mx:Button " label = ' Text2 " id=" myButton2 " x=" 90 " y=" 126 " />

    < / mx:Panel >

    I also creeate a component, and past custom events the component to the appliciotn main and managed the event

    I can pass values of data [Bindable] in to the 'myButtonComponet '.

    so it's out of the 'myButtonComponent' in the recevine, all good componet a well.

    Thus, compoinent "myButtonComponent" now has a public function that displays a message, nothing complex

    the problem is

    How I would "myButton" passes the test of 'myButtonComponet' to make the function work

    that is to bind the click event of you "mybuttomn" do the Componet "myButtonComponet" do a job

    Your just be difficullt to life for yourself and try to write code that will be confusing.

    If I understand you correctly,

    The user clicks on the button 1. The 'something' do, then tell button2 to do "something else".

    Don't, don't.

    Write your code like this:

    Better yet write separate handlers for this sort of thing...

    and put the code you need within these managers.

    Paul

  • The Oracle Express Edition XE upgrade to 11g (11.2) using DBUA

    Hi all

    I have a server Oracle xe on a platform of red hat linux 4, I need to upgrade to 11g (11.2) using DBUA.
    This is the first time for me to use DBUA, I'm following the steps described in the Oracle database upgrade guide.
    I'm a little confused, I have a very basic question:

    in step pre using DBUA, when I install the 11g, can I install the oracle software only, or can I also create an 11g database?
    in other words, I have the impression that the DBUA will upgrade the XE database itself, change the data files and tables of the tenth to 11g?

    Thanks in advance for your time.

    You did not mention the full version of your database in the tenth. If one 10.2.0.1, you cannot improve it 11.2 using DBUA directly. First, you must update at least to 10.2.0.2 before going to 11.2.

    Please refer to Metalink Notes 980693.1 and 837570.1 for more details.

  • Why a sql statement has become slow after upgrade to 11g database

    Hello

    My previous version of the database is 9I and any sql statement are well-developed.
    but after upgrading to 11g database, a sql statement become slowly.

    My senior dba friend told me there are a few different calculating methods from 9i to 11g.
    is any body can explain this different methods from 9i to 11g, and what should be attention to calculate at what level 9i to 11g. I thank.

    Sean

    The administrator of yours is correct. What he meant, 9i, the works of the optimizer with different formulas and 11 g, there are different formulas. PS this sometimes causes when you upgrade from 9i (or even 10g too), analyze the queries that worked with RBO in 9i perfectly and used indexes, all of a sudden they stop using it because the CBO think not that this is a good choice. It would be too difficult to put formulas here by anyone, but what I can say is that to buy a book.
    http://www.Amazon.com/cost-based-Oracle-fundamentals-experts-voice/DP/1590596366

    And practice on 9i, 10g and 11g. It would say a lot of formulas used by oracle.

    HTH
    Aman...

  • X 230 does not pass Windows 10 upgrade

    The upgarde test 10 Windows is not running on this PC.

    CPU, memory & disk space are ok.

    He says that 'the display is not compatible with Windows 10'

    I've updated the drivers dosplay.

    Any suggestions...

    Try to uninstall the current driver (do not restart after the command prompt). Repeat the upgrade.

    Would be more stable with the USB or other removable media creation tool .

    Had 10 Windows on my X 230, but only for the future upgrade (do not see what is happening... ). Worked well, but I love my Windows 7 without all the telemetry.

    Hope that all of the tricks on.

  • passed the test after the step failure

    Hello

    I have a stage with test of numerical limit.

    I checked in properties, under run Options, step failure causes the sequence

    But when I washed up on the market, the result of the test is passed.

    When I change the Actions Post - on is not going to the next step Goto cleanup

    then the result of the test is failed.

    I have two other stations where I limited digital test with the same properties, but here I don't have to go to cleanup for a failure result.

    I use TestStand 2013.

    Please help me, thanks

    / Magnus

    Magnus,

    Instead of setting RunState.SequenceFailed in your Expression after, try setting Step.Result.Status to this value instead. It worked on my machine.

    I hope that helps!

  • Brother HL-2140 printer has not passed logo testing for XP

    Use printer Brother HL-2140 for nearly two years without problem. Recently started to receive the message "Printer not passed Windows Logo testing to verify its compatibility with Windows XP Pro." Tried to change the settings through "driver settings" and "security options". Printer works but I find annoying pop ups whenever I go to print something.

    If you uninstall the current driver can change the warn to ignore, restart your computer and reinstall the current driver the popup should disappear.

    This is the driver that is causing the popup.

Maybe you are looking for