PE3 is possible to synchronize two sources video post edit AB Roll?

In PE3, is it possible to synchronize two digital video files (AVI) to create an AB roller type post edit.  My two captured video files seem to have different speeds or od frame.  How do I align and frame corresponds to 2 video sources?  The situation is a 2 photo shoot.  How to best create a roll of AB edict of sources 2 videos with audio of a video file as a common element?

Wes,

Armed with Steve's article, you should be able to do what you want.

I have a question and maybe a suggestion to fix the problem of pace from the start, to help solve this problem without a lot of fiddeling. What are the two frame rates? G-Spot will tell you exactly, if you can't find it in the properties. If the source files are DV - AVI, they must be of the exact same rate initially, but if you're a little off, I would like to convert it the DVD specifications do not support a correspondent. First place I would try this would be to simply interpret footage in the project Panel. If this does not work, then Windows Movie Maker can do for you, or you can use other conversion tools to match. I use DigitalMedia converter, but it's not freeware. Get the two sources in perfect sync at the beginning will go very far to the success.

Good luck

Hunt

[Warning] I don't have PE3, PE4 only, but I think that applies to your version.

[Edit] After reading the article by Steve, the only thing I would do (after the sync property) to help me in the multi-cam editing would be to set the video track display to show all the "frames" and the expansion of the height of each video track two (VT), so that they occupy the largest part of the vertical real estate in the timeline. Then, I would zoom in on the horizontal of the timeline display, so that I could see quite clearly, each image. Basically, this makes the timeline as a line of detailed scene, but you can stay in Timeline Mode. Because you do not have Mode multicamera PrPro, you won't get anything your video footage track higher in the program monitor. You will be viewing the images on the Timeline. This will require a lot of horizontal scrolling on the Timeline, but it is doable. Then, when you want to use the images of VT1, you will cut (scissors tool) VT2 overlay images. Personally, I work out my main sequence (such as the master in the article Steve Audio track) on VT1 and images from my camera "cutaway" on the VT2 console. Like prescedence VT1, VT2 you can leave VT1 footage almost alone and just cut the images on VT2. I would use the Cross-dissolves on the head and the tail of the "Cup" Clips to VT2. Remember that if you use these, you want to make sure that the cutting came where you want the scene on VT2 absolutely start or end. The duration of the cross-dissolves will determine when the stage becomes either visible at 100% (head), 100% invisible (tail). Also, don't forget that Dip - to-black on VT2 takes the image on VT1 to black, where my use of Cross-dissolves.

Using this method, can also do some repositioning of the (cut from the original) Clips to VT2, to offset any loss of synchronization. But you can possibly use it to set the framerate differences, I'll try again to get the images as accurate, as it is possible to start - a lot less work in this way. Also, once the 'holes' were cut into the images on VT2, you can start using the program monitor much more.

As Steve points out, PrPro facilitates locking securities and a double multiple camera monitor, multicamera mode.

This is exactly how we did with film, except that we had to splice in black leader, where cuts were made and could not hold our intact VT1 sequences, we can with an NLE and video. Because we were dealing with sprocket holes, we had doped (sprocket) gears on a 'sync' block, and once we'd get right alignment, would physically renversible by a guide, who would 'lock' the film to these two rolls of film for the sync block. Although it may seem difficult, when you read it, it's really not and so very easy, as it was with the film.

Tags: Premiere

Similar Questions

  • Is it possible to synchronize two computers?

    Two computers running Windows Vista.

    If Yes, can it be done by wireless? Or are you using cables?

    An Introduction toWindows Vista Sync Center - sync files sync Center: frequently asked questions releasing It Easy: with Windows | ActiveWin | Laptops | Microsoft MVP

  • Is it possible to synchronize audio and video with H.264 output?

    Get them this output module. Any ideas? How can we overcome this? I import png and audio/video directly from a DSLR camera in .mov format.

    Thank you


    Adam

    Thank you come back to me, it seems that H.264 does not accept less than 23.976 frame rate, I went from 20 to 25 and problem solved.

  • I got two sources of camera the same audio recording - how to use multicam to audio synchronization and display TWO cameras simultaneously

    I had two sources of camera recording the same audio - I want to be able to do is use mulitcam SYNCHRONIZE the audio and video at the same time and be able to use the two clips simultaneously in a video - multicam - how can we use the TWO videos? In Multicam, I can only go to one video at a time - is to detach anyway, so I can trim two camera responsition camera and 1 on a 16:9 screen? What would be the best way to do this? Any help would be welcome - Ty

    Two PPut copies the multicam in editing element, one on the other.

  • is it possible to use two video resolutions in a single project in Pre10?

    I looked at this issue but have not found what I was looking for. Pre10 on XP or Win 7 64 bit (I have 10 pre on two machines) with a lot of RAM. XP has a dual core processor, and Win 7 64 has a quad core.

    I shot a video concert with a Sony HDR-XR160 (1920 x 1080 16:9) on tripod back room for my camera head and used a Mini DV Panasonic as my mobile camera (640 x 480). I use the HD on 1 audio/video in the timeline and want to use the Mini-DV on v / a 2... but when I cut to length mini-dv it plays very well, but I see the edges of the images HD on both sides... is it possible to make this work?

    can I resize images of mini-dv or that will look weird? should I do a new project and make it what it would do to the HD images and 640 x 480? I thought that the 640 x 480 images would look cool like cutting plans because it is different.

    (I have an another question in Pre3 I could click on a video track and hold down the ALT key and use the arrow keys to move the video track to the right or left by one frame at a time and that doesn't seem to work in Pre10 I have an audio track of matrix to synchronize with the video. do you want me to start another thread for this question?)

    Thank you

    When you export to DV - AVI, HD material will be down-rezzed, say to 720 x 480 in NTSC. You can choose Standard or widescreen. If you choose Widescreen, if any, will be lost. Not the case if your SD footage is Standard, but the project is Standard and you choose Standard for output. As I said above, there is a lot to think about and plan. Depends on your SD videos, because that's what you want to match up to.

    Good luck

    Hunt

  • I use SyncToy 2.1 for syncing between two readers and I wonder if it is possible to synchronize three discs without causing confusion for SyncToy.

    Hi all, I use SyncToy 2.1 for syncing between two readers and I wonder if it is possible to synchronize three discs without causing confusion for SyncToy. In other words, I want to have a (portable) master and synchronize with a Home Office and a disc of office disc.

    Original title: SyncToy 2.1

    Hello

    Thanks for posting your question on Microsoft Community!

    After your description, it seems that you need more information about SyncToy 2.1.

    I would like the season help you post you question on the following link for better.
    http://social.Microsoft.com/forums/en-us/SyncToy/threads

    I hope this helps!

  • synchronize two exits of meter 6071E map

    Well, that's usually how to synchronize two problem of counters.

    I use the 6071E with DAQmx .NET 4.0. I set a task and attach to two channels with implicit synchronization and zero initial delay of meter output. When executing the program

    I catch the first edge with a single trigger to scope. There is always a delay between the first edge of ctr0 and the first edge of 16.3 microsecs ctr1. Is it possible, not to mention that affecting the initial delay of ctr0 16.3 microsecs to make meter always start together? What is the source of the delay(software/hardware) and must always remain constant.

    any help is welcome

    The source of the delay is that while he is in the same tasks that the counters are always started sequentially by software.  I'm surprised that the delay you see is constant.

    If you want the counters to start together, you must configure a start trigger.  As soon as you begin the tasks of meter in the software, issue the trigger to start to generate your pulse output.  Relaxation of beginning must be a signal of material - for example, you can configure a digital outputs in software timing and the lead back to one of the PFI lines.

    If you want to avoid any additional wiring, you could split the counters in two separate tasks.  Trigger a counter with the internal performance of the other (start the task that will be triggered everything first).  In doing so, instead of using an external trigger, I expect a delay between the order of 100 ns counters as the initial delay is at least 2 timebase tick.

    Best regards

  • synchronize two cDAQ Chassis with DAQmx 9188

    I try to sync analog entry tasks on two 9188 Chassis utilzing the build in the BNC (PFI 0 and 1) ports.  I also have digital entry spots on the chassis of the master, I want to synchronize. Have been referencing http://www.ni.com/tutorial/5376/en/ and examples, I am not sure I have it set up correctly.

    From the link above, I exported the SampleCLK to PFI0 and StartTrig to PFI1 on the chassis of the master.  I have two BNC cables routed between ports on the two chassis.  I put the trigger DAQmx start on the slave to the PFI1 source (this does not seem to do both tasks at the same time), I tried to adjust the pitch of the DAQmx (sample clock) of source PFI0, but it creates an error (requested sample clock source is not valid).

    I can get the application of test runs by seting the slave clock "OnboardClock" sample source  When I use this setting, the task two seem to start at the same time, but I don't think the slave chassis uses the master module sample clock and therefore might drift over time?

    I would like to know how to properly synchronize the two analog tasks.  I also want to synchronize digital tasks on the main frame with the analog task.

    Hello

    If you want to synchronize the two tasks, you share examples of clock and triggers via PFI lines. The only exception is that it is not currently possible to synchronize tasks between the chassis that use AI modules with delta-sigma a/d converters.

    Best regards

    Villanueva of the DSL.

  • Multi camera sequence: it is not possible to synchronize audio

    I'm trying to synchronize two clips to make a multiple camera sequence, but there is an error "it is not possible to synchronize, because there is no agreement."

    I do not understand the problem because the two sequences have the same background audio.

    Please check it out on: https://drive.google.com/open?id=0B1_9xcIEJ3BEfldTV1d2cHFqcUU2UUduVFFjQ0ZfVTlnb2N6UU5vUHZK SW5SMllUbGVTeXc

    Thanks for your help!

    No synchronization.

    The audio I hear sounds like a camera tripod rig engine bearing worm drive/gear, to position the camera.

    Better to manually - sync you right with the Commission of "beating", just align the "spikes".

    The clip of 909 has 8819 clapper board spike/claw to 0db.

    Little voice has only a db-21.

    Background noise is of - 35db.

    The music of CN7A749 a Council fighter spike/claw to 0db also.

    Little voice has only a db-17.

    Background noise is on - 22 dB.

    I suggest a few options

    1. - Since you are going to replace the sound in any way (I guess because of the noise of gear) play music so first see a sound wave

    2 - you probably do not want music and prefer peace, so if you want to use the 'create several Source sequence cameras' tabs open in the Source with source monitor key monitor - choose "Audio waveform" and place on spike Board marker clapper, then synchronization by 'Clip marker.

    3. I find the synchronization manually, then nesting, to cause problems with the audio when "flattening" for other operations or programs, but for you there the synchronize manually option in the timeline panel and then nesting to create your multicamera editing.

  • Is it possible to synchronize music and photos from iTunes from multiple computers?

    We have two MacBook Pro - one for me and one for my children.

    Currently, I manage all the music and pictures via my Mac (synchronization of iOS devices), so there is a place for all the music and photos.

    However, children now want to be able to manage their own music and photos.

    Is it possible to synchronize music or photos from multiple computers? for example:

    -Sync Mac and pictures of the other music

    -Synchronize Mac music

    Thank you

    The key thing here is not the machines it's libraries. Devices can synchronize an iTunes library at a time. You have to arrange if both computers have the same library (problems with maintaining them synchronized or using at the same time), or seek a centralized service such as game or music from Apple (with her own set of questions).  The key is that the media distributors wish to exercise tight control over how music and movies can be shared (they don't care about your photos).  You can do things with the homepage of sharing with family.

    Family shares - http://support.apple.com/kb/HT201060 - "family sharing makes it easy for up to 6 people in your family share of each and other iTunes, iBooks, and App Store purchases without sharing accounts.» Families with the same credit card purchases and approve kids' expenses directly from the device of a parent. And share photos, a family calendar and more to help keep everyone connected. »

    «Sharing content with sharing - http://support.apple.com/HT201085 - bought family"with the participation of the family, family members go immediately to each and any other music, movies, TV shows, books and applications and can download to their devices at any time they souhaitez.*" ' * not all content and content types are available in all countries.» All members of the family must use the same iTunes Store country or region. Music, movies, TV shows and books can be downloaded on up to 10 devices per account, of which five may be computers. Apps can be downloaded from the other facilities, family member owns or controls.

    If you do not see your family sharing content - http://support.apple.com/kb/TS5449 also: http://apple.stackexchange.com/a/146077 - exit iTunes Store and App Store apps and start over.

    Who bought content can I share using sharing - Apple-Support - http://support.apple.com/HT203046 family

    Let family sharing - http://support.apple.com/HT201081

    Home sharing Support page - http://www.apple.com/support/homesharing/

    12 iTunes for Mac: use the home sharing to import items from another iTunes library - https://support.apple.com/kb/PH19614

    iTunes: set up sharing at home on your computer - http://support.apple.com/kb/HT4620

    Understand sharing home - http://support.apple.com/kb/HT3819

  • Synchronize two E-card with traditional DAQ series

    Hello

    I have a PCI-6052E and a PCI-6071E and I have a Matlab program that interacts with traditional hardware DAQ driver cards.

    It is possible to synchronize the two cards use RTSI or something? If so, what should I do in matlab to achieve?

    I'm a bit confused, because I don't know if this is only possible using DAQmx.

    Thank you!

    Hi zlyhere,

    Using DAQmx would definitely be the best choice.

    In terms of using C vs the Data Acquisition Toolbox for The MathWorks Inc. Matlab® Software, I would recommend the Toolbox for ease of use.  The MathWorks develops the Toolbox, so they must have documents on how the maps can be synchronized.

    If you find that you need more features, you can fall back to C.  Documentation is available at

    "" "" Start menu"all programs" National Instruments "NOR-DAQ" support textual Code ' using NOR-DAQmx C reference

    MATLAB® is a registered trademark of The MathWorks, Inc.

    See you soon!

  • How to synchronize two chassis

    Dear all,

    I want to synchronize two chassis, chassis first has RFSG 5673E (S) and other chassis a DAMA (S) 5663E, they are connected via MXI, is there anyone who has this experience and can support me to apply it. I know that he used NI-Tclk to synchronize in a single chassis and there is another kit of tools for mult chasis, but I have no idea on how to use it!  Thanks in advance

    Best regards

    Al-Rawachy

    So I did a little research and to allow you to synchronize the two chassis together you must use a map of timing and synchronization in each frame so that you can share Tclk. This is for several reasons: first of all, as well as terminals IN CLK and CLK OUT, several PFI lines are required for the export of various signals used by T - CLK (i.e. Start, Stop and Sync triggers). In addition, the map of timing and synchronization is also necessary to replace clock background basket of 10 MHz, on the chassis of the slave with the master clock. It is essential for the two hunts reference the same clock synchronization. In addition, using a more stable clock source, as provided for in the calendar and map of synchronization, improve synchronization significantly.

    From there, a chassis are sync'd up, TCLKing la 5665 and 5673E should be simple enough. It should be simply a matter of configuration tasks the DAA and RFSG, with a single trigger configured, before feeding the two tasks of the TCLK vi. Here is an example for you to study what explains this:

    http://www.NI.com/example/30254/en/

    I hope this helps.

  • I downloaded separately from all parties to a four-part harmony song, how can I synchronize. two or three playing together? Windows 7.Thanks.

    I downloaded separately from all parties to a four-part harmony song, how can I synchronize. two or three playing together?

    Hello

    Plenty of capable edition

    Audacity - free
    http://Audacity.sourceforge.NET/

    Audacity - Forums
    http://Forum.audacityteam.org/

    Free Audio Editor - free 2012
    http://www.free-audio-editor.com/

    Other sources of information:

    http://Forum.recordingreview.com/

    http://www.djforums.com/forums/

    http://Homerecording.com/BBS/

    http://www.pcmusicstuff.com/

    I hope this helps.

    Rob Brown - Microsoft MVP<- profile="" -="" windows="" expert="" -="" consumer="" :="" bicycle=""><- mark="" twain="" said="" it="">

  • Synchronize two schemas from database on a linux server using Oracle GoldenGate

    I followed this guide ( http://www.oracle.com/webfolder/technetwork/tutorials/obe/fmw/goldengate/12c/OGG12c_Installation/index.html?cid=9167 & ssid = 0 ) and for two different databases running on the same instance of database schemas.


    What I have now is a Linux server with two Oracle database schemas.
    I have access through my Linux virtual machine. I want to do the synchronization possible between them.

    I use Oracle GoldenGate to make this possible. What should I do now? Goldengate is must be installed in the server too? I'm totally new to this situation. Can someone give me at least the major steps before going to the more comprehensive study?

    Well understood. This helped.

    Install Oracle GoldenGate Linux to synchronize two schemas from database on a single server

  • is it possible to use two external LDAP and authentication of external Table?

    Hi, is it possible to use both external LDAP and authentication of the external table?

    they all need two initialization blocks to access a session system variable, USER?

    Thank you

    Hello
    I don't think it's possible to impliment the LDAP authentication both extenal together. The reasons are,
    1. we cannot define two sources (LDAP and Extenal DB) in the same blocks of justine initialization user information.
    2. If two different (one for LDAP) initialization blocks and one for extenal DB are used, we cannot use variable USER twice it's a defined system variable.

    Thank you
    Swami

Maybe you are looking for