Process flow NTOP
If enabled, how traffic NTOP is handled?
- Is traffic NTOP correlated and summarized in the ON100 and the results transmitted to OnPlus?
- ... either he transferred to OnPlus in raw form, where this treatment is done?
The concern is if (in the case of #2) there could be an impact on the WAN bandwidth because this traffic seems to be transmitted twice, once as normal traffic and a second time through the SSL to the OnPlus connection.
TIA
Hi Curt,.
My apologies for the delay in response. The application of NTOP is installed locally on the ON100 and all traffic is capture and correlated on the ON100 itself, this information is not processed in the cloud. The cloud provides the tunnel in the ON100 to access environmental NTOP.
You can access locally as NTOP on the ON100 sailing toward the ON100 IP with port 3000.
Thank you
The OnPlus team
Tags: Cisco Support
Similar Questions
-
What version of Oracle workflow is required for owb 11.2 process flow.
Hello
I want to implement the process flow for my mapping.
But I get the error message like,
"The connection has been successful, but not to the version of workflow to recover."
Also the OWF_MGR user is not created.
Oracle 11g on RHEL database is
and autonomous OWB 11.2 under Windows.
I create user owf_mgr who have the schema for the objects in a workflow?
Also what version of workflow required oracle to the process flow. I need to install
Server of Oracle to Oracle db server workflow or it'll get installed with 11g.
Where I'll get measures details to implement the process flow from scratch.
Help, please.
Published by: TN November 21, 2011 06:01>
I create user owf_mgr who have the schema for the objects in a workflow?
Yes
-
How to add a procedure for a process flow, but PF continue immediately
Hi all
In my process flow, I would like to be able to launch a procedure. However, I wish the process flow to continue immediately regardless of the status of the proceedings. I want the procedure that is called, and I want the process flow in order to continue its not regardless of the status of the proceedings. Is there a good / better way to do this?
The following method seems to work. But I don't know if it's the right / best way to do it:
Start-> forks > procedure-> one (must only launch) OR (method A and B card feed the RO)-map C (fill)-> END
Plan B (must successfully complete)
In case the "schema" above is not clear I "FORK" which divides to call the procedure has as b. mapping Procedure A and B map go to a 'GOLD '. The gooes 'OR' la carte b. plan B goes to the 'END '.
Thanks in advance for your ideas and experiences.
-Sam
P.S. I'm on OWB 10.2.0.1If you want a plan B to wait that the procedure is made
proceed this way
Start-online fork => Proc-OR online-online success
-Online card-online A-online the Condition for success-online card B (OR)
HTH
Mahesh -
WFT OWB migration process flow
We have a workflow process defined with Oracle Workflow Builder 2.6 Version. Keep us the workflow in a wft file and deploy it in Oracle 9 and 10 databases with the wfload utility.
The process basically called stored procedures and OWB mappings.
We now want to migrate to 11G.
Is there a way upgrade workflow process in Oracle Warehouse Builder?
Do we need a seprate license to run the engine in Oracle 11 G using Worklfow process flow?
Thank youy at - it all automated migration workflow process flow again OWB.
I do not hear on the means for processflows UAS of OWB migration (at least there is no standard for this task Oracle utility).
Kind regards
Oleg -
Using an OUT in a process flow parameter
I have a SUBPROC1 process flow that contains a PL/SQL procedure. This procedure generates an integer value. PL/SQL procedure output parameter is bound to a variable VAR1 process flow, so that the value can be used by other processes of sub and in conditions of transition in SUBPROC1.
So far so good. Now I also have the same value of the process flow to a process flow parent output so that it can later be used by other processes of void. I have created an OUT parameter PAR1 attached to Start1 of SUBPROC1 activity, but I can only bind the output parameter in PL/SQL to the variable VAR1 process flow or the parameterPAR1 of output, not both.
The only way I can think to do that is to change the signature of the PL/SQL procedure to generate the same value twice through two parameters, one that I can link to VAR1 and the other I can bind to PAR1, but that seems messy.
Is there a trick I'm missing here?You can set the output processflow (from variable) with the Assign activity parameter
Kind regards
Oleg -
How to run an OWB 11 GR 2 process flow using OEMs jobs?
How to run an OWB 11 GR 2 process flow using 11 g OEM jobs?
In other words, iam trying to create a work of Oracle Enterprise manager for planning and executing an OWB process flow.
Can one of you please heading me to the same documentation or enlist the steps?Hello
Watch OWB QAnywhere (it's the release of 11 GR 1 OWB material but you can apply this procedure to OWB11gR2 as well)
http://download.Oracle.com/docs/CD/B28359_01/OWB.111/b31279/api_4sqlforjobs.htm#BABEBGHAKind regards
Oleg -
Kill a process flow that is add
Hello
I have a problem with a process flow that is append (I see BUSY_FAILURE State on repository Explorer) and it does not allow me to start another workflow process.
How can I kill the BUSY_FAILURE process?
Thanks in advance
SteveHi again, try this:
/ * This query, you get the ITEM_KEY * /.
SELECT * FROM wf_item_activity_statuses_v WHERE
ACTIVITY_TYPE_CODE = 'PROCESSES' AND ACTIVITY_STATUS_CODE! = "FINISH."/ * With this query, you get the type of the object that is running * /.
Select *.
of WF_ITEM_ACTIVITY_STATUSES
where item_key = "/ * And with that, you kill the process that writes first place the type you got in the second query, then the key of the element of the first * /.
Start
wf_engine. AbortProcess ('WF_GC', 'WB_IK_20100408_024043_394762');
end;I hope this helps you
-
Call a script shell to an OWB mapping or process flow
Hello
is it possible to call a shell script for a mapping owb or process flow and how can I do this?
GreetingsCheck this box: -.
http://blogs.Oracle.com/warehousebuilder/2010/05/how_to_use_user_defined_activity_in_owb_process_flow.html
See you soon
Katia -
Mapping full - process flow occupied
Hi all
I have a problem with a process flow that I imported from another server.
If I run this process flow in the test server it runs and finish without problem.
Now, I imported this workflow process in the production server, but it is not complete. In the browser of the Audit, I see that all mappings have the status "complete", but the process flow is still busy after 1 hour.
In the process flow, there are 7 maps and 3 user-defined operations that use shell scripts.
What did I miss?
Oracle and OWB 11 GR 1 material
OS: Sles 10
Thank you
Gul.Hi Gul,
We use OWB 11.1 and we went through the same thing.
We solved this by:
-Adding an index on the runtime repository
-clean the runtime verification tables
-collect statistics on the tables at runtimeIt should be much information on the previous step.
If you're not familiar with it, then I can understand it in a next message.-check the process flow of errors.
We discovered that some process flow has been corrupted after import.
Some transitions had flase numbering.
Example: mapping has been a success (0), (1) error and the warning (1).
The error and warning lines had the same number.
After correcting this flow worked properly.Kind regards
Emile
-
Hello
OWB should he a different license for the process flow? Or is it available with license OWB?
In addition, the process flow module is has any dependencies on other software?
Rgds
SOWB process flow requires Oracle Workflow.
In 10g, you can install Oracle Workflow from the database companion CD.
From 11 g, Oracle Workflow comes with OWB11g.in 11g
You'll find a directory called "wf" under OWB_HOME.
Under that there is a folder called install.
Work flow configuration script wfinstall.bat/sh will implement the necessary schema required by OWB process flows.Thank you
Fati -
Cannot run CodeTemplate in parallel using process flow
Hello
We use oracle warehouse builder 11 g 2 on Linux.
Created two mappings of model code, built a process flow to perform these mappings at the same time. When I run this workflow process run only mappings and the second map ends with errors.
But when I run the same workflow process re-designed to perform the mapping that sequentially, it works fine.
Thank you
JFor execution of the mapping, you can right-click on the enforcement unit and select 'Open Details', here to change the name.
See you soon
David -
Enter the date of transformation in the process flow
Hello
I have a transformation (stored procedure) in a process flow that requires that two input variables. If I execute this stored procedure directly from the database I would use:
Start
package_name. Procedure_name (to_date ('20100101', 'YYYYMMDD'), to_date ('20100102', 'YYYYMMDD'));
end;
/
The problem in the process flow, it's that I'm not able to give the input parameters for the transformation in the correct manner. The process flow is valid, but when I run the workflow process I get ORA-01830 and PRE-02241. What I have in the process flow is:
START-> procedure_name--> END
I also tried with:
START-> ASSIGN--> procedure_name--> END
Someone would ask me how do I pass two input parameters for the transformation are the type of date (format: YYYYMMDD)?
Thank you
AndreasHi Andreas,
5472814 UNABLE TO PASS DATE PARAMETERS WITH THE HELP OF RUN_TASK OR SQLPLUS_EXEC_TEMPLATE
No, it has different bug for your problem. Now I can not find this bug on Metalink...
Look at this thread (read the last message in the user philip_b)
Re: Passing Date value to the parameter mapping entryThis is the same problem and the same OWB version
I hope this helps!
-
Process flow of objects in a database diagram
Hello
I want to find a database schema, objects created by the Oracle Workflow. Is this possible?
For example, when I create and deploy a mapping in OWB, a package is created in the target schema. I can manage by using SQL only.
When I create a package, module, and process flows in OWB, is it possible to visualize in a database schema (for example, owf_mgr)?
Thank you.Hello
When you deploy a process flow, it is transformed into an Oracle Workflow and stored in the workflow diagram. There is a client of design (Workflow Manager) and monitor tool (Workflow Monitor) for design/editing workflows and their follow-up during execution as it is seen to display the workflow created.
What do you do with the workflow deployed? Do you want just a few views SQL to see being deployed or you want to run the object 'natively' (such as the HAND of the generated package PLSQL?).
See you soon
David -
How Pass "SYSDATE" through setting of process flow?
Hello
I set the setting of process flow of type 'DATE' to START the activity in process flow. When I specify a value of liter in 'YYYY-MM-DD' format it works fine but it is not, let me clarify "SYSDATE" as input. Is there a way I can spend "SYSDATE" instead of specifying a date?
Thank you.
Published by: user11935561 on September 23, 2009 14:58Must use literal = false to use SYSDATE, which is the expression in words OWB. The OWF user must be a user OWB (in OWB 10 g 2 a target user) so that it runs properly.
See you soon
David -
Thanks in advance
I have a process flow as below
I have function (parameter) out-> return 0 and 1
I have 2 maps
(1) Map1
(2) Map2
What I need, it is
If returns 0 I want to run MAP1
If returns 1 I want to run MAP2
I have my workflow process that I did is
Start-> service-> Map1-> success
-> Map2-> success
After the service, I added the complex condition (RTN_CODE = 0) for Map1
I added the complex condition (RTN_CODE = 1) for Map2
I get error VLD-10028: an activity that has an outgoing transition with a complex condition must have another unconditional outgoing transition
If returns 0 I want to run MAP1Hello
If you use conditional transitions you need a conditional transitions for each possible result condition or a transition without any condition used when none of the other conditions are met.
Therefore, deal with the return value of your function is 0 or 1. Just add a transition condition without a connection to the operator 'end with errors '. It will be fired this way if you make sure that your function returns 0 or 1. It is just necessary to validate the process flow.
Kind regards
Carsten.
Maybe you are looking for
-
Safari is unable to establish a secure connection
More get, "Cannot open page" in Safari "...". because Safari is unable to establish a secure connection... ' Just happened with a page on the site of the City Government. All I can do to fix this. MBP3, 1, OS X 10.8.5, Safari 6.2.8
-
Why can't I now clear the history of the last days or weeks, I was doing?
Unless I remember wrong a few months ago, I could choose different periods to erase history; now only a day or a few hours. Who is new, or can I go back to the older technique?Thank you, Paul G.
-
1766 BWAA PLC - interface Labview Act really strange
Hi all It is a very, very odd response, I want to come. I have an automaton of 1766-BWAA with which I am in communication via modbus. an AIN, a DOUT and a DIN module is connected to the controller. When I decide to the PLC using Modscan - coil status
-
Unable to connect to GFWL (event viewer - 0x8015190e) a previous error was 80072751
I installed Bioshock 2 and GTA 4 EFLC yesterday and after signing of GFWL gave me a 80072751 error when he tried to update the game. After the search of these forums, I tried several things- Permitted by Windows Firewall Open ports on the router (eve
-
Old server will allow new domain and domain controller.
We had old netwrok running a sbs2008 and 3 Server 2003 with domain name xyz.local(not actual), now we have a new server sbs 2008 with new domain name xyzit.loca and put some old sbs2008 at rest (off-grid). How can I join servers olde new domain and d