Progress bar in a case structure

Hello everyone!

As you can see my excerpt of I got a program that 1. How to open a workbook model. 2. he fills with data. 3. copy the model on workbook final and firm model. I use the lib Excel open since I do not have the reporting kit. It is not save time this operation, but I try to learn more about the ActiveX and Excel.

More to my question. Because it takes a few seconds to finish, I would like to have a progress bar. The "delays" that slow, it is when he opens the workbooks and when it copies. I had all this inside a structure of matter if I use a Boolean button to start the sequence. I have the OpenG library with the tickcounter who have the error inside and out. I put one at the beginning and end of the operation. After a subtraction, I could read how long the operation took at the end, but still I don't have any idea to get usable data to feed my progress bar.

No pain, no gain! so I like to try before you ask for help, but I'm a bit stuck now. If you have any advice on where I could place stuff to be able to calculate the progress bar, this would help a lot

Hey, is my bad...

Try this

* There are two http:// in the first link... guess I'm goin' too fast...

-Rkll

Tags: NI Software

Similar Questions

  • Upload progress bar

    When you transfer large files, that the loading bar does not move. I guess it's a bug. It would be nice to see the download bar move and also show a percentage next to the word download. It comes to large files, it becomes difficult to say if the download works or frozen?

    The upload progress bar is a case of all or nothing for the moment.

    Minimal feedback about the status of the download. No incremental updates.

    See http://forums.adobe.com/message/4470988

  • How to associate the audio file with progress bar

    Hi all

    I have a case in which I need to associate an audio file with a progress bar. What I want to do is to able to read an audio file that will say "Started process..." "Continuous on" process ends and it is and must be synchronized with the progress bar. Is it possible to do so.

    Please let me know

    Thank you

    Ankit G

    Are you referring to a LabVIEW horizontal/vertical progress bar that basically an integer U8 constantly wrote in it? Is it in a loop as it fills?

    If so, there is a full range that allows you to listen to the signals. As you write the number of your progress at the helm, you can keep control of what the number is (structure of the event or case), and when it hits special values, you play special sounds. Here's a screenshot of this palette.

  • On the start with progress bar page, after that it becomes a little more than half, the computer turns off.

    MY MacBook Pro is frozen and I had to turn off get out of the frozen page and when I pressed the button to turn it on it makes the departure noise and then the progress bar lights. When it becomes a little to Midway, the screen goes black and the computer turns off.

    The progress bar that starts from the left end appears when your startup disk is too damaged to mount. The illustrious progress is the functioning of the equivalent of disk utility (ERD). He is never more than half before taking a decision.

    If your drive CAN be mounted, start-up continues normally.

    If your drive cannot be mounted, your Mac stops, because there is nothing productive that it can do.

    If your Mac is trying to start and crashes, which can produce always different results, but that doesn't seem to be the case here.

    I recommend that you start in recovery and run utility disk (ERD) until it comes clean or is hopelessly.

  • Progress bar joined two or two range of scale of diferent in a Progress bar!

    Hello guys,.

    I try to get 2 diferent scales range in a progress bar. But I can't get it.

    So, I tried to join 2 progess bar putting made it adapts to look like as I want. One of 0 to 100 and the second from 100 to 300.

    In case I have to use 2 progress bar, the problem is the second start with the mark on the start menu, I would second to be completely clear of 0.

    Is this possible?.

    Kind regards.

    Alternatively, you can set the Fill Style.  0 is no fill, while 1 is fill to Min.

  • In a case structure...

    In a case structure...

    If temp > 800 degrees celsius, then

    Pressure = 100 * e ^(10T)

    where t is the time varies at the rate of 100 ms.

    another pressure = 10 bar

    but t is expected to increase by century of 100ms or 0.1 sec

    It is to calculate the elapsed time. One takes time when you start the vi, one inside the loop takes at the present time and subtract it just determines the elapsed time from the start. I guess that's what you wanted.

    The double conversion (I guess) is just to avoid a point constraint .

  • Custom progress bar

    Hello.

    I'm doing an intelligent progress bar (similar to the picture) where it shows this feint of diagonal dotted the ability to change the color of structure (or something similar) on the progress bar (i.e. light blue when operation successful and red and light red when the operation failed and maybe orange pale (as shown) when finalising the process). Ways to address this problem? Sorry, not much experience in image editing. Whenever I look at photoshop I'll .

    Thank you

    Kas

    I was able to approach fair enough customization of the control in the Editor (I spent ten minutes on this subject).  Replace the background with the image scratched and move the padding on the right side (the filling will cover the BG, creating the effect).  Unfortunately there is no way I know of to control the colors in this way.  But you might have several colors of the same control.

  • Dell Dimension 5150 do not start LED logo on 123 + progress bar is stuck at 5% no beeps

    My old Dell Dimension 5150 has sometimes suffered from crashes during startup for quite awhile, but it now appears permanent.

    The symptom is the logo dell appears, but the startup progress bar stops at 5%, diagnosis LED 1,2 & 3 are stable on, power light is green fixed, no beeps, no response to the keys.

    In the past disconnecting the cable for 5 minutes, which gives all the internal connectors a re-allocation of places, you try to start again seemed to do the trick, but no more.

    Any suggestions where to look?

    No such thing as PC2 4300 except for sellers who are less honest.

    http://www.crucial.com/USA/en/compatible-upgrade-for/Dell/dimension-5100

    PC2 4200 is too slow

    PC2 5300 5 5 5 12 works fine. Suppliers must match for speed and the CASE.

    Blockages can be feed if it isn't certified EPS12v PFC.

    Minimum recommended is CS750M Corsair.

    http://www.crucial.com/USA/en/dimension-5100/CT667636

    Supplies are not units of 12 v x watts.

    You need 150W on the 3.3v 5v Rails and 15-20w on the + 5VSB rail.

    RAM RAM may NOT BE ECC or buffered or Registerd HIGH density AMD.  Must be LOW DENSITY INTEL Compatible ram.

    RAM cannot BE QUADRI ROWS can operate 2R and 1R, but you can NOT MIX the ranks.  They must all be single or dual rank.

    http://www.Newegg.com/product/product.aspx?item=9SIA7S63715258

  • where to find the download progress bar?

    Just reinstall photoshop due to some problems lately - just before I start a large project and you you ask where to find the info that indicates how long the download is?  I didn't think it would take this long and haha, maybe that I would not do with a date limit!

    Thanks for your help - I'd love to see where to find that

    Lisa

    Hi the % 20furnace % 20room,.

    I think that you could get Photoshop download now on the screen, but nothing happens, and you are unable to see progress?

    If this is the case I suggest you to download the first applications of Download Adobe Creative creative Cloud Cloud Desktop application | Adobe Creative Cloud free trial

    and it would help you download Photoshop cc and you would be able to see the download progress bar.

    Let us know if it will work.

  • Muse progress bar says install but is not

    I try to install muse Adobe 2014.3 on an imac running OS 7.5 Lion, but the progress bar just for hours without doing anything in the application manager. I tried with an older version installed and updated, but it's the same thing, so I uninstalled, but it has not changed anything, always the same lack of action. There is no error message or of time, what am I doing wrong? All other Adobe software, I installed worked fine thanks to the application manager by simply clicking on install.

    Hello

    Can add on the suggestions of the CARI you please confirm if you install Muse CC 2014.3 of Adobe Application Manager or Adobe Creative Cloud.

    In the case of any confusion, make sure you install it creative cloud application. You can download it from the link below.

    Download Adobe Creative cloud apps | Free trial of Adobe CC

    Once installed > Sign In with Adobe Id > go to 'Apps' > install Muse C 2014.3 in the list

    Concerning

    Vivek

  • Power CLI - stays on the screen progress bar

    I a scrpt PowerShell autmatically creates a new snapshot, then deletes all previous snapshots. He also powere down and power up the VM.

    In all cases bar one the progress bar if poster while the operation takes place, then disappears when the operation is complete.

    The case where there is:

    $sn = get-snapshot $machinename

    ......

    Remove-snapshot - snapshot £sn-[2] - confirm: $false

    The progress bar remains until I have finished the script. What a pity that my script is intended for a loop continuously and perform a task automated when a file is placed in a folder.

    What can I do to get rid of this progress bar?

    You can try to use the Remove-Snapshot - RunAsync parameter.

    Best regards, Robert

  • CFFILEUPLOAD - files are downloaded, but progress bar indicates the error.

    I'm trying to to cffileupload all rise on CF10. When I download a file, I can confirm the file going to where I specified, but the individual progress bar shows red and says "Error" (without code). The overall progress bar is green, but if there is more than one file, then it will not continue on the 2nd.

    I confirmed that the local account that runs CF has access to all the relevant directories (CFIDE, etc.). I set the values JSON for a status of 200 and the message of "success."

    What else could be?

    Okay, well I got it to work. I don't really understand the logic, but when I added the 'results' parameter to the cffile upload all the tag, the error has disappeared.

    Just in case anyone else has this problem, but here is my tag from the download page:

  • Tage of the percent of completion in the progress bar

    Hi Forum,

    I have a doubt about obtaining 'percentage of completion in the progress bar', while the progress bar is running.

    I'll try to find the percent complete of myFound(); in the progress bar.

    Could someone help with that...

    app.findTextPreferences.findWhat = "UNSCHEDULED STATEMENT"

    app.changeTextPreferences.changeTo = "Reverte;

    app.changeText ();

    var FO = app.changeText ();

    var list = [Tf];

    var l is new window ("the palette");.

    run var = progress_bar (w, list.length);

    for (var i = 0; i < list.length; i ++)

    {

    Progress.Value = i + 1;

    user functions

    $.sleep (400);

    }

    Progress.parent.Close ();

    function progress_bar (w, shutdown)

    {

    pBar var = w.add ("progressbar", not defined, 1, stop);

    pbar.preferredSize = [300,20];

    w.Show (list);

    return pbar;

    }

    Also when adding to the progression of script inside the loop to find the task to find and change is getting delayed.

    Thank you

    rkids.

    Hello

    Assuming that both files are defined in some way...

    myPath1 = "~/Desktop/testCFolder";     // another way to define?
    myPath2 = "~/Desktop/testPFolder";     // another way to define?
    mFolderToCopy = Folder(myPath1);
    mFolderToPaste = Folder(myPath2);
    if (!mFolderToCopy.exists || !mFolderToPaste.exists)
              {
              alert ("No copy/paste folder found");
              } else {
              mFiles = mFolderToCopy.getFiles("*");     // mask files
              action(mFiles, mFolderToPaste);
              }
    
    function action (arr, destFolder) {
         progressWin = new Window ("palette", "" , [50, 150, 384, 240]),
         progressBar = progressWin.add ("progressbar", [12, 12, 312, 32], 0, arr.length -1),
         progressText = progressWin.add("statictext",[12, 52, 312, 72], "copying started");
              progressWin.show();
              for ( var k = 0; k < arr.length; k++) {
                        progressBar.value = k + 1;
                        arr[k].copy(destFolder.fullName + "/" + arr[k].name);
                        progressText.text = "copying file: " + arr[k].name + " (" + Math.round( (k+1)/arr.length*100 ) + " of 100%)";
                        }
              progressWin.close();
              }
    

    In the case of $. sleep() ==> you don't need to actually use it.

    It could be placed just to slow the process and make you see that a window of the progressBar changes.

    No other reason.

    Rgds

    Jarek

  • Progress bar when audio plays on a slide with the button

    Hello

    I use 6 Captivate.

    I have a zipper opening for my demo that introduced the demo. This slide contains 1-3 minutes of audio. On this slide, I have a standard button named 'Start', that the learner must click Start the demo (which is on the next slide). I also have a PlayBar with rewind, Play/Pause, Back, Next buttons and Audio.

    Once the project starts, the Play/Pause button on the playback bar turns into mode 'Play '. This, I believe, is an expected behavior because of the presence of the 'button '. However, it causes me problems because, if the learner clicks on the 'Play' button (instead of the start or next buttons) after the end of the audio to the slide of the opening, the progress on the playback bar bar moves for the duration of the audio, so that nothing changes on the screen.

    Is it possible that I can:

    1. Move the progress bar with the button Play/Pause in "Pause" mode when opening, slide audio playback and switch to 'Play' mode once the audio ends? In this case,.

    a. If the learner pauses the audio by clicking Pause and then click on Play, it must continue with the audio.

    b. If the student click on the play button after the audio ends must take sound to the next slide.

    2. turn off the Play/Pause button so that the learner will not click on it?

    I don't want to hide the PlayBar on this slide as I want to give the Rewind option to the learner so play the audio again if he / she wants.

    Anthony

    A colleague found an easier solution than the one I was talking about earlier.

    He just moved the point to pause the start until the end of the slide button. Now, the progress on the playback bar bar moves with audio and the Play/Pause button passes in "Play" mode when audio stops at the end of the slide. On clicking the play button, the project will move to the next slide.

  • CS3 JS progress bar function

    I am trying to create a progress bar function, but the code below creates 6 instances of the progress window rather than the update info in the first window.  I went for the loop process making progress work bars is the only way that it can be used or is it possible to tell if a window is open on if so update the bar and the news of this window?

    to call to the stand, I use stagesLeft ("search duplicates", 1)

    
    
    

    function stagesLeft(myText,stageVal){
       
        var myStop =6;
        var myPbValue = stageVal;
        var myWindow = new Window ( 'window',' Progress');
        var myProgressBar = myWindow.add ('progressbar', [12, 12, 350, 24], 0, myStop);
        var myStaticText = myWindow.add('statictext');
        myStaticText.bounds = [0, 0, 340, 20];
        myStaticText.alignment = "left";
       
            myWindow.show();
            myProgressBar.value = myPbValue;
            myStaticText.text = myText;
            myWindow.text = 'Stage '+ myPbValue + ' out of ' + myStop;

     

           
            if(myPbValue == 6){
            myWindow.close();
                }
        }

    ScriptUI needs time to get used to :-) A 'simple' progress bar was also my first try and I think that I made similar mistakes. But nothing to worry about.

    The reason why you get more than a window, of course, is that this line in your service:

    myWindow = new window...

    (and later myWindow.show ();)

    You must create the window (and in most cases, immediately Show it) somewhere at the beginning of your script in an initialization phase. Who will pop to the top of the window in the State you created. Check the variable containing the window a global, so you can access them even when you use functions to 'drive '.

    In your update loop, you only need to change the elements: myProgressBar.value, myStaticText.text and myWindow.text. ScriptUI is smart enough to check if items are on the screen and change them immediately.

    Only when you have finished processing, you call myWindow.close ().

Maybe you are looking for

  • Camileo S20 stabilization

    Is it possible to turn on stabilization permanently in 720 p mode?When I turn camera on, stabilization is still disabled.Can someone help me?Thank you.

  • Best way to see the photo

    Hello I want the display picture. And I want to be able to: -Scroll if the picture is larger than the screen -Add an anchor of the bitmap on photo (so when I collpart the photo, this bitmap image stays on the screen) -zoom +/- I have two solutions: -

  • a way vpn with asa to the 800 router

    people I have a site to site vpn set up between a asa 5540 and a 800 router I want only the vpn to be initiated from the asa with the 800 remote listen incoming connections I know that I can define the type of connection on the asa as only come but I

  • How to load a DVD on YouTube?

    I need to share a HD DVD with my friends via YouTube, can you tell me how to do the trick on Windows? And the size of the DVD is also a problem, it's more than 3 GB! So I need to reduce the size before downloading. I appreciated that you could help m

  • OfficeJet 6110 - is there a scanner software in windows 7 64 bit?

    I tried to install the full software package of the section of the conductors, but he sees the driver is already there and stops the installation. Can I just get a link to the software only, without the drivers? Thank you Scott