Provide Notifications in all of the life cycle App?

Hi, I implement of notifications of type push in a Cordova/WebWorks app, and I would like to know what are the options for notifications I can give my app users during the different stages of the life cycle of app.

When the application is in the foreground , I can post a warning - that's fine. When the application is in the background, I could put the app in the foreground and the attention of the user, although I'd rather see them there is a message to be consumed and let the user decide when to access? The same case applies for push notifications that are received after the app has been closed/killed.

 


If I understand correctly, using webworks I have not access to notifications bar (reference) to my interactive notifications. Although I can use the API of the application to see the/remove an icon + number on the banner/title bar, for example

I can also use a reactivation page to display notifications received while the application was in the background or State of killed. Is that what I missed, and is what the above correct? Any suggestions on how to better manage push messages during history and killed States are welcome. Thank you

Thanks for the quick response.

Yes, when the application is closed, a push message starts the application, but in the background (it is visible in the task Chooser). Without a notification, the user would not necessarily be aware that a new message has arrived, without getting into the app - I don't want to not push messages to open the app in the foreground without consent/intent of the user. I understand that push, notification messages are separate entities, but I'm interested in how they can work together (the use of notifications to give control to the user regarding if/when consuming incoming messages when the application is not already in the foreground - I should maybe reviewing my post otherwise).

I think my strategy will be to check if the application is in the background when a push message, if so, save message push of local storage blob/string, increment the number of banner and then users the ability to use/read the message when they re-enter the app.

Tags: BlackBerry Developers

Similar Questions

  • In an attempt to sign and date a w-9, I get the following message.  "This form is editable in Adobe Acrobat DC.  Please use Adobe life cycle Designer. "How can I get this document dated and signed without having to buy the life cycle Designer?

    Please provide ideas to the next question. In an attempt to sign and date a w-9, I get the following message.  "This form is editable in Adobe Acrobat DC.  Please use Adobe life cycle Designer. "How can I get this document dated and signed without having to buy the life cycle Designer?

    Thank you

    Rick

    Assuming that you are dealing with a PDF file provided by the IRS, you will not be able to e-sign. but you can fill the fields using Adobe Reader or Acrobat. The version of form W-9 that I have does not include a date field, but you can use the feedback tool add text to add a date. You can also digitally sign or use the annotation of pencil tool to draw a signature.

  • Overview of the life cycle of Siebel developer?

    Hi, I'm new to Siebel and want to get a better understanding of the life cycle development.

    I lived the tools and the Dev Guides + deploy, and although they contain a LOT of information, they miss out on the BIG picture.

    What I want to do is:-Add a label to a view so that all clients can see the change.

    I want to know is if the following steps are correct: -.

    1 setting up Siebel Tools + Developer Web Client

    2. remove a database from the server (installation dev user and assign as a mobile user, etc.)

    3 launch tools and get the local database. Use the same for the client to web developer?

    4. GET + project of Fund + changes.

    5 compile locally and test with the local web client.

    6 check for changes to the server.

    7. NEED TO copy the FIU on the server? Or will the check automatic rebuild it? No clear docs.

    Thank you

    NO Check-in is only up-to-date information form of the local repository to the server and YES you will need to compile your SRF to the server.

    Then stop the server siebel, copy/rename old service for backup prupose srf and replace it with the new srf.
    If you use a browser script, the command Genbscript must also be sent.

    BR

  • HPLJ printer M6 - model M605n: need the date of the life cycle (or em) for M6 Printer HPLJ - model M605n

    Hello

    I need the date of the life cycle (or end of Support) to HPLJ printer M6 - model M605n.

    Where is the best location / # to find the dates of the cycle of life for HP products?

    Hello

    You can contact HP for the info.

    Best regards

    Mike G

  • You have to have a license of the life cycle, but also licensed insurance with premium

    I first 2.1 and I'm trying to see what I need to use licenses.  When you enable Netflow on a device, I see where he uses an insurance license.  My question is, should I also use a license of the life cycle?

    Thanks in advance.

    Hi joseph,

    You must purchase licenses of access to the features of the first Infrastructure and insurance licenses to access the features of insurance in the first Infrastructure lifecycle. Each license also controls the number of devices, you can manage using these features.

    If you have installed the first Infrastructure for the first time, you can access the features of the cycle of life and insurance management using the built-in evaluation license. The default trial license is valid for 60 days and a maximum of 100 units. Send a request to [email protected] / * / if:

    You need to extend the evaluation period.
    You need increase the device-County line.
    Already, you have a special license and must assess other feature licenses.

    Hope this answer your question.

  • Support the life cycle of the CPU?

    I have a question about support from the CPU by VMware lifecycle for example Intel has a typical 5 years for a platform support policy CPU has then it means that VMware will remove the code and support for ESXi / ESX codebase once support the life cycle of this CPU platform, Intel is gone?

    Thanks in advance!

    Support and processor needs match the features of VMware (FT, VCA, DirectPath,...), not strictly Intel CPU of the life cycle.

    With ESX 3.x was possible CPU usage also very 'old' (probably some also longer than 5 years).

    But spirit ESX 4.x new 64-bit processor are needed (and 4-5 years ago, it was not them).

    André

  • Serial no for the evaluation version of the life cycle

    Hello

    I tried to download a free trial Adobe life cycle designer og (I guess that's the desginer I need, if I have to make documents/templates?), but when I try to install the designer, I am invited to a series of serial A don't what for? and where can I find the serial No.. ?

    Thanks in advance

    Unfortunately nothing that you can do:

    Adobe trial software has expired at the beginning

    Mylenium

  • I can not open all of the Windows 8 apps including laptop settings and store:

    All windows applications installed with the OS won't launch

    The activation of the windows.immersivecontrolpanel_cw5n1h2txyewy app! microsoft.windows.immersivecontrolpanel failed with the error: this application has failed to launch because of a problem with its license. Please try again in a moment. See the Microsoft-Windows-TWinUI/operational log for more information.

    I can't start same laptop settings to install a clean operating system.

    Support Microsoft says I need to reinstall windows from scratch?  Great productivity tool.

    Try this

    cmd open open with the ADMINISTRATOR:

    PowerShell - ExecutionPolicy Unrestricted Add-AppxPackage - registry DisableDevelopmentMode-$Env:SystemRoot\camera\AppxManifest.xml

    PowerShell - ExecutionPolicy Unrestricted Add-AppxPackage - registry DisableDevelopmentMode-$Env:SystemRoot\FileManager\AppxManifest.xml

    PowerShell - ExecutionPolicy Unrestricted Add-AppxPackage - registry DisableDevelopmentMode-$Env:SystemRoot\ImmersiveControlPanel\AppxManifest.xml

    Now you can open the change pc settings, now you can refresh your pc, it worked for me

  • How to get a notification when all control the spread is active since InDesign

    Hi all

    I need to be notified when any main spread is selected from InDesign or pages are inserted or removed from any master spread.

    To do this, I've implemented a custom Viewer derived from Cobserve.

    In AutoAttach(), the code is as follows,

    InterfacePtr < IWorkspace > docWorkspace (doc-> GetDocWorkSpace(), UseDefaultIID());

    If (! docWorkspace)

    break;

    DocSubject InterfacePtr < Applicationo > (docWorkspace, UseDefaultIID());

    If (! docSubject)

    break;

    docSubject-> AttachObserver (this, IID_ISPREADLIST, IID_IABCDOCOBSERVER);

    docSubject-> AttachObserver (this, IID_ICURRENTSPREAD, IID_IABCDOCOBSERVER);

    docSubject-> AttachObserver (this, IID_IMASTERSPREADLIST, IID_IABCDOCOBSERVER);

    docSubject-> AttachObserver (this, IID_IPAGEPREFERENCES, IID_IABCDOCOBSERVER);

    I have observed these protocols, but still not get any notification when any spread is selected (all active spread) or pages are added in any master spread.

    Do it me know about what interface should be observed to be notified for the same thing? I'm OK for control of the workspace document as topic?

    Please help me. Thanks in advance.

    Daves61,
    I need to specify the type of event you are interested in.

    1. When you click once on the page/spead widget in the Pages panel and only widget is selected. The window layout remains unchanged. OR

    2. When you double-click on the widget selected master spread page/double appears in the layout window.

    In the first case, you work with the Pages panel.

    Take a look at the file PageTransitionsPanelObserver.cpp in the SDK.
    PageTransitionsPanelObserver: LazyUpdate()

    In the second case, you work with the layout window.

  • Link the life cycle for the Type of content?

    Hi all.

    I'm looking for some ideas of best practice to attach lifecycle to URM drop-down select this option for a Content Type. The goal here is to remove the need for the user to choose the correct lifecycle for content they import. Our Content Types are specific and easily attach to our retention schedule categories so we want to automate the selection so that it is accurate and consistent with our company. Any ideas on how this can be done? We are new at the Complutense University of MADRID, so if it is an easy thing to do, I apologize in advance!

    You have a cycle for each type of document, right? So the one-to-one mapping? You can create a table that contains the type of document and the cycle appropriate id/name. Then you can write idoc script in the field drifted to gaze upward in this way you are not changing the code field derived each time.

    Or, you can check in a file and write idocscript (or even java code) to extract the data out there but it would probably be more work in the long run.

  • BlackBerry Smartphones do not receive all of the options world app

    I recently bought two s Blackberry Curve 8330 for Sprint lines and downloaded the App World on both phones. One phone, however, has many more applications available for download. Bloomberg and viigo, for example, are not options available on one even if they are available on the other. No idea why this is? Thank you.

    Join our current thread.  The problem is that at least one of your phones is no doubt a 8330 model m.  No word on a fix yet RIM.

    8330 m and Appworld

  • The limit of the device must be less than or equal to the limit of life cycle license in first cisco 2.2

    Hi all

    I have seen under error in the tool main 2.2 Cisco infrastructure

    The limit of the device must be less or equal to the limit of license of life cycle and also secondary device ISE inaccessible since premium.

    Could you please suggest how we can solve your problem.

    Thanks in advance...

    Kind regards

    Sachin

    Yes. Life cycle license are by smart device managed. See this page for a good overview:

    http://www.Cisco.com/c/en/us/support/docs/cloud-systems-management/Prime...

    .. as well as this page:

    http://www.Cisco.com/c/en/us/products/collateral/cloud-systems-Managemen...

    .. who States:

    Life cycle license: allows access to all the features of the life cycle, which includes the configuration of the devices, image management software, basic health and performance monitoring, fault management, troubleshooting and customer visibility on the network. The license of the life cycle is based on the number of managed devices. Life cycle of the licenses are available in sizes from package of 25, 50, 100, 500, 1000, 2500, 5000, 10,000 and 15 000 devices and can be combined as needed to reach a total number of device under license.

    A device is uniquely identified through the assigned IP address and system object ID (SysOid). Routers, switches, light/unified access points and network first Cisco (NAMs) analysis Modules are charged on the number of licenses. If a switch stack is managed via a single IP address, it counts as a single device. A single frame will, however, be counted as multiple devices if the chassis is configured with several IP addresses. For example, a switch with several service cards, such as a firewall and so forth, or a stackable switch with an IP address assigned to each switch who is involved in the stack is considered multiple devices within the first Cisco Infrastructure. Cisco Wireless LAN controllers (WLCs), autonomous and peripheral access points third are not counted against the number of licenses.

    When you have more devices that licenses, you will receive the error see you and prevented from adding additional devices to your inventory.

    We see it more often when it is light (i.e. not independent) APs are added to a wireless controller. PI will not prevent the new APs to be added, they are managed under their association with the WLC. However, if you try to add a new switch it would prevent you to do until the deficit of licenses has been sent.

  • Revisting the UiEngine and screen life cycle, just to be sure I understand why I'm short-term memory

    For arguments sake, let's say I have a UiApplication from where I have a class named MyScreen that extends the screen. MyScreen, I background of work and every time I push a new screen the setTitle is called with a different value.

    With this configuration, I push the following screens on the display stack using a menu that looks like:

    • Press 3
    • Press 2
    • Press 1

    And I create my screens as follows, depending on which menu item has its run method invoked.

    For screen 1 and so on...

    MyScreen newScreen = new MyScreen();
    newScreen.setTitle("Screen 1");
    
    MyScreen newScreen = new MyScreen();
    newScreen.setTitle("Screen 2");
    
    MyScreen newScreen = new MyScreen();
    newScreen.setTitle("Screen 3");
    

    But what happens if I select the item of menu 3 push again, then push 2 once again, my display stack looks like:

    • Screen 2
    • Screen 3
    • Screen 3
    • Screen 2
    • Screen 1

    That's why I have five instances of my object type newScreen MyScreen, correct?

    Each of these five instances of my newScreen object must go through the life cycle standard screen?

    The only method of onUiEngineAttached race twice whenever my newScreen object is pushed and pulled. attached to the true value when the battery display and attached is false when it is taken from the stack display?

    As a result, the screen stack above, onUiEngineAttached is called a total of ten times?

    protected void onUiEngineAttached(boolean attached)
    

    Todd,

    Your description fits what I understand to occur.  RexDoug is concerned that you do not create a new instance of your screen, but I think that you are, you have 5 instances of your screen, some with identical titles.

  • Life cycle of GC and Notifications

    Hello

    Is a call for a MBean WLS to a listener of MemoryNotification included in the life cycle of GC, or is it run completely asynchronous? For example, if my partner had to sleep for 10 seconds, it would increase amount sum of the GC pause time of the same?

    Thank you!

    Sébastien

    No, its completely asynchronous. You are sum of breaks GC will not suffer if your listener to sleep for 10 sec.

    Best regards
    Tuva

    JRockit PM

  • After winning 10 upgrade battery life cycle is no longer available

    Hi all
    I used to have the option for the life cycle of battery inside the usefulness of the economy that leaves the battery load only to 80 in order to increase life expectancy, but since I upgraded to windows 10 I reinstalled again, eco utility but it docent has the option for the life cycle of battery over an idea?

    I have the same problem.
    Does anyone have a solution for this?

Maybe you are looking for