Retriveing the number of plots

I have a XP land with a large number of plots on.  Is there a way I can get it to return the number of plots in use?

Thank you

Matt.

Hi Matt,

You can read the value and the size of the array.

Mike

Tags: NI Software

Similar Questions

  • Number of points and the number of plots for table and graph

    Hi guys,.

    Can someone explain to me why I get when I run the number Vi 1 2 plots for each table and graph with 6 points, but when I run vi 2 I get 4 locations with 1 point each run assuming that the same logic applies to two screws

    Thank you.

    When wiring of the paintings in the graphics, it is assumed that each line are several points of land.

    You must convert the 2D table or right-click on the graphic and select "convert table.

  • How to adjust the number of parcels shown on the maps of waveform

    Hi all

    I am trying to adjust the number of plots shows a graph in the form of wave by use of the node property but I could not succeed him. Is it possible to do? I was only able to adjust the number of legends illustrated map of waveform.

    newbieeng wrote:
    I checked your solution and tried to adapt to my VI, but it does not work like yours. I couldn't find what is wrong with it. I have attached the VI. I work a cDAQ OR simulated 9188 on it with 2 NI 9214 thermocouple analog input modules. I want to use this property for all the graphs on each tab. Can I do this easily? What I need to structure event for each of them separately?

    Just a quick glance up to now:

    • The event loop must be outside the main loop. Currently, it blocks the main loop. He needs work independently.
    • You must add a change event of value on the table of Boolean in case of timeout.
    • The Boolean array has as many items as you have drawn.
    • ...
  • How to ensure that the graph xy plots are present?

    Hello community,

    Since the update to LabVIEW 2014 this week, I have a problem with the code that worked (or didn't, but the problem was unnoticable).

    As example the llb I created to present the question, I'm graphic xy filling with quiete some data and then color programmatically plots.

    The problem is that if there are too many plots then the property nodes that are to color the mistakes of Mr. thow plots as if the corresponding plots were not present in the graph still - even if I used a single flat sequence structure to try to ensure that the data is written in the plot before trying their color.

    Maybe this wouldn't be in LabVIEW 2013 too - but the threshold for the number of plots was higher. All I can say is that I have observed this with data sets that worked well in 2013 of LabVIEW.

    To reproduce simply run 'color of the graphs.vi' with values high enough to 'numerisch' and ' numerisch 2 "(50 on my machine can be more about yours).» I left the terminal nodes property unwired error so you get caught up in the right position when the error occurs.

    Somehow check if all parcels are in the charts again? This way I could introduce a delay that ensures that I don't have the color of the graphics that do not exist yet - regardless of the speed of the target computer.

    Xy graph behavior has changed in 2014 of LabVIEW? Or maybe his performance?

    Best regards

    Florian

    HM, your addendum somehow answered my question. We are indeed an against the user interface thread race condition.

    Unfortunately, I do not know a method to wait than the UI thread to have access to all plots. In addition, the waiting time that you need depends on the ability of the system, which is dynamic, you know not all processes background or in parallel, running applications.

    That being said, I recommend a work around:

    1. create the data for the plots

    2. how many plots you have in query data

    3 write short dummy data in the terminal, and not the data of the whole plot

    4 Recolor plots

    5. write the correct field data

    Norbert

  • How to set the size of plot-legend with properties?

    Hello

    in the screeenshot I create 10 plots that are displayed in a xy chart.

    According to the number of plots of the legend is updated.

    How can we set the legend is highest of 5 plots and other plots 5 (or more) is visible if you are using the scroll bar?

    Thank you

    Solved.

    Name of the property is under: legend + size + high

  • is there a way to get the key of procuct for my system, the number on the sticker are unreadable

    my high tower works fine it's only that I can't read the product key from the sticker numbers disappeared. In any case of retriving the number

    How to get a replacement product key
    If the software is preinstalled on your computer, contact your computer manufacturer to obtain a replacement product key.

    To replace a product key for a Microsoft product that you have purchased separately from your computer, you must contact Customer Support and Microsoft. To locate the phone number, visit the following Microsoft Web site:
    Contact Microsoft (http://support.microsoft.com/default.aspx?scid=fh; EN-US; CNTACTMS)

    For more information on this topic, visit http://support.microsoft.com/kb/811224

  • Is there an upper limit on the number of points that can be plotted using a CW 3 - d graph?

    I started with one of the examples 3-d graphics available on this site. I think it's the 3-d cube (?).

    If I just use the 'Plot3DCurve' method and set the style of track to be the "point", I can trace my data set (approximately 150,000 points) OK.

    If I change the stlye of land on 'line', I get a big blank chart with the exception of the last points of support 30 000 where the plot seems correct.

    If I reduce my data set to 30,000 points seems the sytle of 'line'.

    There is NO error is returned.

    I get similar results if I select a style of track of 'surface '.

    Then...
    Is there an upper limit on the number of points that can be plotted graphic 3-d CW with a style other than the point trace «»
    "?

    Ben

    I can try to post an example this weekend, but I don't know if the scholarship will allow a 5 M attachment.


  • Reduce the number of ticks on a xy plot

    Hi all

    I have a chart that looks very busy on the x axis.

    Anyone know a way to reduce the number of ticks that only, say 5, are visible?

    Thank you

    Sean

    Like this for example

  • Count the number of zero terms between non zero terms

    Hello.  I have a table of data of zero and nonzero (example: {1 2 56 2 3 0 0 0 0 0 2 3 5 2 3 5 2 0 0 0 0 32 43}) I need to count the number of zeros of each string of zeros and mark that number against the first zero no term following the string of zeros (NOTE (: string is used here as a description of a series of zeros, not a string variable).  So the plot which coordinates since my example would be (5.2) and (4.32).

    I'm clear on the way to the path, but I am unable to store only each final count of consecutive zeros without having unnecessary data in my plot.

    Thanks in advance to all those who have advice!

    -Mike

    Do something like that?

    EDIT: Minor Correction because of the additional function of decrement.

  • Setting to change the number of days to sync e-mail

    Where the parameter move to if you want to change the number of days that will be synchronized to your e-mail accounts? Or he is let out iOS 10 for some reason any?

    vrmcw wrote:

    Where the parameter move to if you want to change the number of days that will be synchronized to your e-mail accounts? Or he is let out iOS 10 for some reason any?

    account settings - sync mails - 'Exchange' on my phone - spam day-

    Not an ios 10 issue that I don't have the function to my yahoo account.

    Maybe you should ask your email provider.

  • Need to limit the number of columns

    When a tab in the last cell of the row, I want the cursor to the next line down. Instead, it creates a new useless column. Can't seem to find a setting that allows me to limit the number of columns in a page - someone ' one knows how to do this?

    Thanks for your wisdom shared, Oh wise Ones.

    I'm not aware of do what you want.  You can post your comments directly to Apple using the menu item "numbers > provide Feedback numbers.

    You can still use the key combinations:

    < command > + < right arrow > to access at the end of a line

    < command > + < left arrow > to move to the beginning of a line

    < command > + < down > to pass at the end of a column

    < command > + < arrow > to move to the beginning of a column

  • Can Notes show the number of records with each folder?

    Can Notes show the number of records with each folder?

    No it can't. It would be nice tho.

  • How to change the number of minutes for the exercise of the activity of the application

    How to change the number of minutes for the exercise of the activity of the application

    Hello

    It is not currently possible to change the goal of daily exercise.

    If you want to suggest that Apple consider adding this option, you can submit a request here:

    https://www.Apple.com/feedback/watch.html

  • How to adjust the number of rings on 6s before answering iPhone begins

    How to adjust the number of rings on iPhone 6s before the beginning of voicemail?

    Contact your operator. That is controlled by them. It is not based on the number of rings, it is based on time.

  • is - that the number of track Apple Watch of steps walked each day?  I looked under activity and do not see it.

    Is - that the number of track Apple Watch of steps walked each day?  Looked at the title of the activity, but it has not found.

    Hello Skramer37 and welcome to Apple Support communities. I have a Apple Watch (42mm Sport One series, shows OS 3). To answer your question, yes the Apple Watch keep track of your number of steps per day. We show, in the activity-> scroll down until you see 'Total Distance'-> above 'total Distance', it tells you the total number of steps that you took that day. I hope this helps!

Maybe you are looking for