Run Vi at the end of another

Hey,.

I programmed 2 vi of this perfect execution separately, but I try to run the 2nd Vi once one ends, I want the first Vi close out and automatically open + begin the next


Tags: NI Software

Similar Questions

  • How to create a banner size mouseover who starts running only at the end (in Adobe Edge animate)

    A banner general practice is to have the entire banner be clickable as well that trigger the mouseover and mouseout/mouseouthandler().

    In flash, you would do an invisible button that captured the events, and then looks like an internal chronology of a chart of the CTA to play and which would scale upward.  I would also (in the main scenario where all the basic animation) a fade in opacity to the top of the CTA at the end Flash would allow me to set the rollover and rollout on the last image, so no features a rolling code would execute while the button was in invisible state.

    Along the busy, I know how a symbol, with an internal chronology which can evolve the assets. I know how to use the action of another layer to speak to this chronology of symbols and to play and to reverse the trend.

    But I can't understand how the mouseover and mouseout/mouseouthandler() code to run ONLY when the banner has played through the main timeline animation.

    Thank you.

    make a layer/button which is at the top with a transparent png of the size of your project. First frame of the main timeline, the value to display last image off the coast, it appears on the value.

  • I want to add a document to the end of another document in pages. I've seen a solution here by copy

    I can't add to the documents together in pages. I want to add a list of references on the end of an assignment, but they are on 2 separate documents, thank you.

    Open the first document Pages. Add a new section. Copy / paste your list of second document reference material in the first page of the News Section. Record.

  • Insert one table at the end of another...

    Hello, I have spent half a day to effectively solve this simple problem, but in vain... Perhaps you can point to the right direction...

    I have for loop that generates two tables... Each contains usually two or three hundred items... I want to paste these tables to gather in a 2D table long as shown on the attached figure.

    Like this? (assuming that the two small tables have the same length).

  • Determine the end of the month and then run the script

    Hi all

    OK, I'm stumped. I can get all kinds of data to date... but I did not find a way (or the same example script) that shows how to retrieve the end of the month.


    Why?


    I have a master script that runs as a scheduled task. It runs every day and call other scripts based on the date. It is great for things like weekly reports that I just used $dow = {get-date}. DayofWeek but I need to run scripts at the end of the month.

    I can something together that gets the day, and then performs a logical ugly pop-based < or > but I don't know there's a smoother way to do.

    As always, any help greatly appreciated.

    See you soon

    Hello, medalklector-

    One way to do it, it is described by RMToups, Jr. at http://activelydirect.blogspot.com/2011/01/determine-last-day-of-month-in.html.  You should be able to set the output to fit your needs.  How does do for you?

  • End action will not run due to the action of late about final chapter

    I'm still doing my first project, and I get this error message: end action will not run because of the end about final chapter action.

    My calendar:

    I have a unique calendar consisting of a couple of reviews. There is a "chapter Starting Point" yet and 3 additional Points of chapter, I added.

    My goal:

    • A main Menu with
      • A 'Play' button that simply plays the entire timeline, beginning to end, and when finished go back to the main Menu.
      • A 'Scènes' button which brings up a submenu
    • A submenu with 4 buttons of chapter, which each would play a chapter in the timeline and return to the same/auto submenu when finished.

    My end Actions:

    It seems that the end Action is necessary for what is defined. Thus,.

    • The Action of 'end' of the timeline is to return to the main Menu.
    • The Action of 'end' for each chapter in the timeline must return to the submenu.

    My flowchart

    • First thing that works is the main Menu.
      • Links Play button of the timeline (which the end action is back to the main menu).
      • The scenes in the submenu button links
    • In the submenu, each chapter button links to the chapter Point suitable in the timeline (each chapter has an end action to return to the submenu).

    All of this makes perfect sense to me and it reflects exactly what I want to do. If clearly, it won't work!

    When I check my project, I get the error mentioned above. I do not understand how it is even possible to avoid this error: your timeline MUST have an end action, your timeline must have at least a chapter point and each chapter MUST have an end action.

    Thus, by definition, it seems that still

    • REQUIRES the timeline for action to end,
    • REQUIRES the last chapter on the timeline to have an end action, and
    • Gives you an error when you do what it takes.

    What the...?

    My solution

    I was finally able to work around the problem by creating a playlist of "chapter" for each chapter, that is, I created a "Chapter 1 Playlist" where the content has been a link to the chapter Point 1, a "Chapter 2 Playlist" where the content has been a link to Chapter 2 Point, etc.

    Then in my submenu, instead of linking to a Chapter Point, I've linked to a list of reading chapter instead and in each Chapter Playlist I put an end to "return to the submenu" action

    It worked - but it really seems kludgy and I can't help but shake the feeling that I do something wrong or I'm doing something good?

    Your "Workaround" is the current main method. Chapter Playlists are a "function". Yes, it seems kludgy, but it avoids the use of substitutions, which are necessary for your first method and cause many headaches without end users.

    Chapters DO NOT need action to end and your workaround solution, should not have their.

    Main timeline, end to the main menu action.

    Chapter playlists, end to the submenu action.

    No further action at the end of editing/chapter.

  • Open a local copy or move on the server, and then disconnect while the task is running until the end

    RNOS6 running on RNDU600 +.

    Looking to start a local copy or move of the large collection of files on the server, and then disconnect the PC while the task is running until the end. For example, to move a branch of several hundreds of GB of small files from one share to another, or copy them to a share.

    Seems to make my PC (in wireless) is inefficient as each file seems to have sent to the PC first, then return to the NAS.

    Is there a way of ordering on the NAS, so that it can continue the operation even if the PC is disconnected?

    Have you tried to make using the web administration page?

  • Run the report to PL/SQL with the branch to another page

    I have an application which, at various times, I run a PL/SQL procedure to perform an action, and then we must run a report while also navigating away from the current page. The actions are performed on a button click.

    I tried several methods, but for the life of me cannot get the system to do the two things (ie. run the report and the direction to another page). I tried to put in page 0 (to be executed after the treatment on the click of a button) a branch with a request line to print the report, followed by a branch to the other page (also to run after the treatment on the button click) - and only the branch page 0 runs in fact. Also tried a branch to the other page only, with the print in the request parameter request - but only runs the report, do not create a branch to the other page.

    I also tried to put the call to run the report in the PL/SQL code, using utl_http.start_request (url), but that came with a "Bad Request" error. Also tried to use the owa_util.redirect_url call, but also no chance.

    I'm pulling my hair out at this time, especially because I am under pressure to get the system in very short time.

    Any suggestion would be appreciated.

    You can run queries report of their URL (f? p = & APP_ID.: 0: & SESSION.: PRINT_REPORT =)

    So one approach would be to
    The button click, call a JS function which

  • 1 use the Ondemand/recall process in order to perform the processing workflow (file selection box)
  • 2 open the report in a popup (from your IR page)
  • 3 redirect leaves the IR page to another page?
    ------
    Another approach:
  • 1. IR report submits the page
  • 2. in the PLSQL block, you do the treatment
  • 3. the branch redirects to a URL that would point to the report URL.
    OR
  • 3. do you have a JS onload which runs only when demand is demand for BUTTON and opens a page that points to the report.
    ------

    Still another way is to use htp.p in PLSQL block which made the treatment of workflow
    So your code PLSQL

    BEGIN
      --Do the workflow processing here
      --End workflow processing
      htp.p('');
    END;
    
  • How to create the failure of another process of running processes.

    Hello

    I want to create an instance of another process of my running processes. At the same time, I want to move a business object as a parameter to this instance. Please help me to do this!

    This and other ways to create an instance in a another process has been described in Re: creating the new process instance

    1 this is how you create an instance in a process using the logic in the activity of the automatic method. This example uses the "Fuego.Lib.ProcessInstance.create ()" method below within a process:

    // "argsIn" is an associative string array (Any[String])
    argsIn as Any[String]
    // this assumes that the Begin activity has two argument variables
    //   named "nameArg" (a string) and "myBpmObjectArg" (a BPM
    //   object variable) and you're setting them
    //   to the previously initialized variables "name" and
    //   "myBpmObject" respectively
    argsIn["nameArg"] = name
    argsIn["myBpmObjectArg"] = myBpmObject
    
    // logic here to determine the name of the process to create an instance in
    idOfProcess as String
    idOfProcess = 
    ProcessInstance.create(processId : "/" + idOfProcess, arguments : argsIn,
         argumentsSetName : "BeginIn") 
    

    ProcessInstance is in the catalog inside Fuego.Lib.

    The processId parameter (the variable "idOfProcess" in the logic above) is the thing that I most often live with that. This is the text that you see when you process in the project right-click browser tab-> "Properties". Look at the value in the field 'Id' and not the field 'Name' (the name without a space). Prefix with "/" as presented here and if you have deployed this using a unit of Organization (UO) then prefix this chain also.

    The third parameter is almost always "BeginIn". Start of activities in a process can have several incoming argument mappings, the default value is "BeginIn". See your, double-click the process Begin activity and seek on behalf of mapping in the upper left corner of the dialog box.

    "argsIn" is the set of variables of incoming arguments you want to spent in the process. A common error is to type the names of the variables argument entering without the double quotes, as follows:

    . . .
    // this will *NOT* work
    argsIn[nameArg] = name
    argsIn[myBpmObjectArg] = myBpmObject
    . . .
    

    Here is the correct syntax:

    . . .
    // this *WILL* work
    argsIn["nameArg"] = name
    argsIn["myBpmObjectArg"] = myBpmObject
    . . .
    

    In this example, the process has two argument variables. It doesn't matter if the incoming arguments are arguments of primitive type (e.g. String, Integer, Decimal...) or objects of BPM, it is always in the same way. In this example, there is an incoming string argument, called "nameArg" and an argument entering BPM object called "myBpmObjectArg".

    2. a process can create a new instance in another process by using the activity subflow, which creates an instance in a child synchronously sub-process and expects the result to return once the instance in the child sub-process reached the end of the process activity. The parent process, you would correspond to the variables of the arguments incoming and outgoing of the child called process with instance variables in your parent process.

    3. a process can create a new instance in another process using the process creation activity that creates an instance of an asynchronous child subprocess (fire and forget), but does not expect the child to respond to the parent company. Once the child is initiated, the mother continues its flow. The parent process, you would correspond to the variables of the incoming arguments of the called child process with instance variables in your parent process.

    Dan

  • Apple Extreme, Time Capsule and Express on the same system, what is the best way to set it up so that all devices smoothly from one end of the House to another?

    Apple Extreme, Time Capsule and Express on the same system, what is the best way to set it up so that all devices smoothly from one end of the House to another?

    I'm going to assume that you plan to have wireless devices.

    Let's say that the Capsule is your "main" router  If this is the case, then it must be located in the House, so that the distance between the time Capsule is the same for the outside walls of the House.

    Then, on the 'left' side of the House, looking for an airport to midway between the Capsule and time of the outer wall of the House. Do the same thing the 'right' side of the House.

    In other words, each of the two airports that "extend" the wireless signal are located at equal distance from the Capsule of time... but they are in opposite ends of the House.

    If you intend to interconnect all the airports and Time Capsule using a permanent, Ethernet wired... which by far is the 'best' way to put in place a network in terms of performance and reliability... then you can locate one of the devices anywhere you want.

  • end of the year - cannot see the end of the year to close this window - is there a script to correct if I'm running an end of year after batches were posted for the new year?

    Hello to someone there is shiny armor!

    My name is Lynne and I have a few questions that I am struggling to solve

    I am running Dynamics GP 10.00.1368 that seems to be sp4

    When I try to open the sales year end closing screen (Tools > Routines > sales > year end close) nothing happens, even through I the end window of the year closing checked ADMIN_SALES_015 slot (period of the end of Sales Routines) for POWERUSER which is how I'm connected (his).

    I assumed (wrongly) that I would be able to address this issue at a later date after the end of June (end of the year our) so I allowed everyone back on the system and displays were held as usual. However, in reading several messages from various sources I have unfortunately starting to recognize I have a made a mistake here & missed the two boats at the end of year!

    I would really appreciate it if someone could: -.

    (a) advise on how I can get to see the end of year sales closing screen &

    (b) run a successful year for end of December 2011 end, then a end of year to end June 2012

    or to offer advice on the best way to address this issue. for example is there there a script that fills all the fields of LYR & CDA and LTD with correct figures once I "tell him" what the 'Calendar' and 'Financial' end of year dates were?

    I understand that buying and year-end sales routines are optional, but nevertheless I am pretty cross with myself for letting these routines lapse.

    If there is no cure here, it will take until the end of December and just close the calendar year then as normal and live with the fact that "Last year" will be two years ' worth of data?

    Should I seek to apply a new service pack / hotfix - I can't even my mind upward that, if all I should download and apply?

    Nothing is ever simple, unless maybe it's typing here!

    I know I asked a lot of questions and I thank you for taking the time to read this.

    Your impotent!

    Lynne

    Hi Lynne999,

    Thanks for posting your question in the Microsoft answers Forum. For questions about Microsoft Dynamics GP, visit the Forum Microsoft Dynamics GP here.

  • When you use the media player, it is possible to take a song that's already torn in our library and announced another song or part of the same song at the end? kinda like a mix.

    When you use the media player, it is possible to take a song that's already torn in our library and announced another song or part of the same song at the end? kinda like a mix.

    Windows Media Player is not a Publisher.

    You can use Windows Movie Maker to split
    and combine audio files, but it works better
    If they are in the. WMA format.

    Also the free Audacity software may be worth a try:

    (FWIW... it's always a good idea to create a system)
    Restore point before installing software or updates)

    Audacity

    http://Audacity.sourceforge.NET/

    How to split a long recording into multiple files or CD tracks?
    http://Audacity.sourceforge.NET/Help/FAQ?s=files&i=split

    How to combine two files into one longer file?
    http://Audacity.sourceforge.NET/Help/FAQ?s=editing&i=join

    How to mix songs with Audacity
    http://www.ehow.com/how_5061510_mix-songs-audacity.html

  • Windows Media Player 11, 20 seconds before the end of a track, and if there is another upcoming track, sound, jumps cracks, breaks upward.

    Original title: dissolution - log jam - sounds 20 seconds before WMP 11 goes from the current track to the other.

    Windows Media Player 11. 20 seconds before the end of a track, and if there is another track to come, the sound cracks, skips, breaks upward. A check in the Task Manager indicates that only when that happens all of a sudden the wscsvc service uses a lot of cpu. All of a sudden, the problem occurred two days ago. I had no explicit amy changed security - but standards updated Windows and McAfee took place.

    As expected Windows difficulty he finds no problem.

    Hi Janssons Frestelse,

    Good to know that you were able to resolve the issue and I thank you for updating the same.

    About the audio driver, you can try uninstalling and reinstalling the sound card and check.

    a. Click Start and type devmgmt.msc, and then Enter.

    b. expand sound, video and game controllers.

    c. right-click on the sound card and choose uninstall.

    d. restart the computer and check

    You can also check the manufacturer's website and try to download the latest verion of Windows Vista audio drivers and check.

    Check out the link:

    Update drivers: recommended links

    http://Windows.Microsoft.com/en-us/Windows-Vista/update-drivers-recommended-links

    Concerning

    Jeremy K
    Microsoft Answers Support Engineer
    Visit our Microsoft answers feedback Forum and let us know what you think.

    If this post can help solve your problem, please click the 'Mark as answer' or 'Useful' at the top of this message. Marking a post as answer, or relatively useful, you help others find the answer more quickly.

  • I want to do a video opening and to redirect to another page after the end of the video, how do?  No matter what widget or code can do?

    I want to do a video opening and to redirect to another page after the end of the video, how do?  No matter what widget or code can do?

    Can do in muse and I tried to use dreamweaver like the code below:

    <! doctype html >

    < html >

    < head >

    < / head >

    < body >

    < style >

    {#video_background}

    position: fixed;

    Bottom: 0px;

    right: 0px;

    min-width: 100%;

    min-height: 100%;

    Width: auto;

    height: auto;

    z index:-1000;

    overflow: hidden;

    }

    < / style >

    < video id = "video_background" preload = "auto" autoplay no Cup >

    < src = "source opening.webm" type = "video/webm" > "

    < src = "source opening.mp4" type = "video/mp4" > "

    This browser does not support video

    < / video >

    < script type = "text/javascript" >

    {document.getElementById('video_background').addEventListener ('ended', function ()}

    window.location.href = ' http://www.xxxx.com';

    (}, false);

    < /script >

    < / body >

    < / html >

    adeletsang wrote:

    Thanks for your reply.

    I just need to click on "object > insert html ' muse and paste the code there?

    My video ID is video_background which is defined by the widget by default, I should change the code below:

    The site I posted has no video in there and I don't have the widget that Peter sugested however, you can replace the startup code Nacy O made (the black with bit blob going around it) and it should work... understand that a ve\ideo will have to be downloaded by your browser clients before they can see it, so it's another delay for them.

    The code you posted is the code of downtime and that seeks a DIV not called "intro" so no do not change his name...

    A mandatory opening text

    After 5 seconds, this block will disappear.

    Everything between the two div tags is startup code and replace you it with you video and then use the muse "object > insert html" tool to place on your page.

    The demo includes three bits;

    • the body or the div tag is the code shown above and goes into the tool "insert html".
    • a header code that defines styles i.e. the yellow background and text... cela goes in your location of metadata page

    • The final code is the timeout in jQuery you had but do not change the name to the background image unless you also change the name of your div to match... Nacy O put it in its footer code that is correct for DW, but Muse has no footer as such area so I used a master metadata slot to the same effect. The important point is that it descends UNDERNEATH other codes.

    Have a play with it and see how you go...

  • Is it guaranteed that a started thread will run until the end?

    Hi guys,.

    Someone wrote this on the threads:

    «Thread depends on the VM Scheduler and * it has NOT guaranteed a Thread run and selection by the Scheduler of VM despite you started the thread with a call to x.start () *.» "When you started the Thread it is only in a RUNNABLE STATE, re-read Chapter until you have understood" (Chapter 9 wire - Sun Certified program for Java 6 - Study Guide (310-065) - Kathy Sierra and Bert Bates - 2008)

    It's the Red sentence that make me really confused. In fact, I read this chapter several times, and I couldn't read that kind of statement in the chapter. What I have read is the following,

    Excerpt from the book (pp. 713-714)

    class NameRunnable implements Runnable {}
    public void run() {}
    for (int x = 1; x < = 3; x ++) {}
    System.out.println ("Run by")
    + Thread.currentThread () .getName)
    + ", x is"+ x); ".
    }
    }
    }

    public class ManyNames {}
    Public Shared Sub main (String [] args) {}
    Make an executable
    NameRunnable nr = new NameRunnable();
    A thread = new Thread (nr);
    Put on two = new Thread (nr);
    Thread three = new Thread (nr);
    one.setName("Fred");
    two.setName("Lucy");
    three.setName("Ricky");
    One.Start ();
    Two.Start ();
    Three.Start ();
    }
    }


    And the authors wrote this:

    Nothing is guaranteed in the previous code EXCEPT this:

    Each thread will start and each thread runs until the end.

    I try to explain to me, what I heard in the sentence in the book: "each thread will begin, and each thread runs until the end."

    $java ManyNames

    After this call, the main method of the class that manynames is called and the JVM running the code in this sequential method. When the main thread calls one.start (), the thread (thread Java) is mapped to an operating system thread (well well, in most implementations), but the important thing, the (Java thread) thread gets the RUNNABLE state pending to have a chance to get the State RUNNING one start execution of the its Runnable target run() method. So, at this point, we have two sons who may be selected to get the State of EXECUTION, the main thread and the thread one. Assume the main thread runs a hand through method. In this case, calls two.start () and three.start () are called. Main thread ends, and we have three threads alive, waiting for his ride to get the condition of OPERATION. For me to run in full means that all these discussions will be printed three times the sentence:

    "Managed by [NAME of THREAD: Fred or Lucy and Ricky], x is [1, 2, or 3].

    And each of them will end their run() (AS THE CODE MEANS) method. A possible output might be:
    Directed by Fred, x is 1
    Managed by Lucy, x is 1
    Managed by Lucy, x is 2
    Directed by Fred, x is 2
    Managed by Lucy, x is 3
    Directed by Fred, x is 3
    Managed by Ricky, x is 1
    Is managed by Ricky, x 2
    Managed by Ricky, x is 3

    But this order is not guaranteed.

    So, my question is simple, if we execute THE CODE (without everything changed) in ANY Machine Java virtual, it is GUARANTEED all started threads (main thread, Fred, Lucy and Ricky) will run until the end OR I have to believe what the guy wrote to me: it has NOT guaranteed a Thread run and selection by the Scheduler of VM despite you started the thread with a call to x.start ()?

    If what this guy says is correct, it should be to create and start a thread if it is not guaranteed that this thread will run until the end? Well, if it is a nice Visual clock on the screen it does not matter if we can see the clock or not, but what would you say if it is a wire that control the process of emergency in a factory, just an example.


    Thanks for your opinions,

    Alvaro

    Published by: Alvaro on July 28, 2011 17:15

    While there is no guarantee, the goal of starting discussions is that it will run until the end, and this is what happens under normal conditions.

Maybe you are looking for