scheduling issues

How do you define a reminder for everyday email, that you have an appointment

in the calender

How is it that is related to Firefox?

You have a calendar add-on in Firefox?

Tags: Firefox

Similar Questions

  • BlackBerry Smartphones confused Newbie: scheduling issues

    Hello

    I just got a BB b/c I was sick and tired of issues w / my very popular Palm software.

    But where the hell is the BB calendar on my desktop software?  I downloaded everything... but I can't find the calendar!

    Thank you!

    There is no "calendar software" on your PC, BlackBerry.

    You use the calendar on the BlackBerry and then synchronize these data calendar using the Desktop Manager to your PC for a PC like Outlook application or even a Google Calendar.

    Download Desktop Manager here:

    https://www.BlackBerry.com/downloads/entry.do?code=A8BAA56554F96369AB93E4F3BB068C22

  • DRS issues

    Hello, I have a client who has 2 physical servers and a SAN.  they run vSphere 5.5.  I wasn't the one that setup it environment, but I am now responsible.  Ive been so more things and I noticed that a DRS cluster is configured.  DRS is configured as fully automated.  I then noticed that about 5-10 times per day a virtual machine is migrated from one host to another.

    Servers are speced on two well, Dell Poweredge r.620, E5-2609 Xeon 2 processors in each server, 146 GB memory to each server.  About 17 VM distributed between two servers.

    Im trying to figure out why DRS continues to move vms.  This is not always the same virtual machine every day or at the same time.

    There is more then enough memory, most of the servers are allocated around 4 gigs, some with 8, so, not even using half 146 concerts that are in each physical server.

    Then I looked at the CPU on the host at the time of migration and it not even using 30%, then watched the virtual machine CPU time, it has been moved and basically the same thing, about 20% cpu.  So it's not a CPU problem.

    Use of the network seems weak to non-existent at the time of the movements.

    I noticed one thing, it's that there's no assign virtual machines with 4 vCPU assigned to them.  I know in Vmware 3 cpu scheduling was a problem, but vmware 5 is allot better with it.  Could DRS to move the virtual machine around due to the CPU, scheduling issues?

    When I check the tasks and events, it just shows that the DRS migrated virtual machine, it does not say why.  Is there somewhere else that I should check for this info?

    Im not saying this is a problem that the virtual machine is moved because it seem not to be problems with it.  But it seems not exaggerated so that he can move things around so much.  I would just understand why go here

    I wrote to allot, thanks for any input

    Mike

    Can you tell me the threshold of Migration?

  • Cannot sync. -Com port in use error

    Win7 64 bit, PalmDesk 6.6.6, IR USB dongle. Tungsten E

    Has been able to synchronize the first two times with the new IR USB organization. I ended with triple calendar entries so finally was able to remove old items out of PalmDesk and after doing a hard reset on PDA, could clean the scheduling issues so I thought everything was OK.

    Then tried another HotSync and kept getting an error on the PDA "Cannot start the HotSync operation because the port is currently in use by another application"

    Spent 2-3 hours to get here and other sites for possible solutions. Found none so tried to Soft Reset and then reset hot but neither worked. Finally I did a Hard Reset.

    Was able to do a HotSync.  It took 6:30, but it does not seem complete.  Note that my memory is only half full

    Now, the real problem.  I wanted to see if I could do a HotSync and did not take hours to complete.  But still, I get the port in use message.

    The message comes even if the PDA is not connected to the PC by IR isn't something in the PDA.  He was going to install dbFix, but since I can't synchronize I can't install it.

    I note that after the Hard Reset did only 3 options under connections now, I have 6. There is an IR to a PC/handheld, but the details show that it uses really Cradel/cable. There is an infrared for GSM phone but I can not remove or change it. Also of IR to PC with a speed of 28.8 by default.

    Solutions, ideas or even wild guess appreciated.

    WyreNut

    Thanks for the reply, but you are not the first to suggest not correctly the problem was in the PC.

    I have finally resolved and am posting the investigation and the resolution here in the hope that others can solve the problems of strange synchronization they could find out by doing a similar detailed investigation.

    The error message not being able to sync because the com port has been used pop up would immediately after recording HotSync. I without having to be connected or even close to a PC to get this error message. I have confirmed that being in front of PC with IR, equipped of Vista 32 bit, so it wasn't a problem with Win 7 64 bit either as I had been able to synchronize PC Win 7 approximately 4 weeks earlier.

    I had 4 chat sessions with Palm TREES, where they provided a number of suggestions essentially to tell me that the problem was Win 7 based or 64 - bit based or that I did a Hard Reset if fixed (none of which were correct).

    I tried a number of sweet, hot and hard resets. The only time wherever I could sync was after doing a Hard Reset and synchronization takes then 3.5 HOURS to complete. I could never do a second Hot Sync that I always get the error message.

    I finally discovered that the list of connections is changing and the individual setting for one of the original connections was changed when I did the sync.

    After a Hard Reset, there are three connection options:

    PC Via cable/home station, Modem Via station home/cable and IR for PC/handheld Via infrared

    When I ran the Hot Sync more than two connections have been added to the list

    IR for GSM and GSM BUT phone serial

    The surprise that took a few moments to discover that the PC/handheld Via IR computer had its details changed to home/IR obviously cable station, I could use this connection to synchronize this is to create a custom connection which was the PC Via IR.

    The dropdown under HotSync would present the old PC/Pocket PC Via IR, but it does not work because he didn't was more IR I would choose the custom, but he made the mistake of com Port conflict

    The SOLUTION was to delete all backup and archiving files, install the PC off, do a Hard Reset of the PDA and then do a HotSync.

    This time sync took only 5 minutes, the connection list has not been changed and the settings in detail for PC/handheld Via IR were not changed.

    I don't know when the commands of GSM phone has been added to the list of options on the PDA, I never used the PDA as a phone. I'm not even sure who's App adding the GSM phone files. He could have been there for years I never had problems with synchronization with USB port and a XP machine. Even the first synchronization IR on Win7 64 bit machine worked so I thought everything was OK.

    Thanks for the suggestion anyway.

  • Windows 7 backup and restore recording is not recent files (and task corrupted images)

    I recently discovered that my Windows 7 backup and restore does not work properly and need help to fix it.  The backup runs daily, but it seems that he spared not the files that have been generated in the last month or so.  For example, I was not able to restore files that have been created last week, even if they have been backed up yesterday.

    Any questions/comments that might relate to the question above:

    -J' had to upgrade to Windows 10 for 1 month and then downgraded to Windows 7, about a month earlier due to some software doesn't work only with Windows 10.
    -Last week, I realized that my automatic backup didn't work automatically.  I found the problem is due to a corrupt image of task in Task Scheduler I could fix.  I have developed from my backup with the recommended settings settings, and I discovered that the problem of missing file today.

    -J' still have a problem with the images of task corrupted because when I open the Task Scheduler, I get about 70 errors which "XXXX task: the task image is damaged or has been tampered with."  Any help

    Help for backup and the Task Scheduler issues would be greatly appreciated.  Thank you!!

    André

    Hello

    Thanks for posting your query to the Microsoft forum. I will definitely help you with this.

    This could be due to corruption on the system files, please follow the methods below.

    Step 1: I suggest you to re-create the Task Scheduler.

    Steps to re-create the Task Scheduler

    1. Click Start; in the start search type regedit.exe and press ENTER. (If you get a consent prompt, click Yes).
    2. Navigate to the following location. HKLM\Software\Microsoft\Windows NT\Current Version\Schedule keys and remove its subkeys.
    3. Save the changes and then close the registry editor.

    Now check if the Task Scheduler works.

    Note: The steps mentioned below includes the modification of the system registry. However, serious problems can occur if you modify the registry incorrectly. Therefore, make sure that you proceed with caution. For added protection, back up the registry before you edit it. Then you can restore the registry if a problem occurs. For more information about how to back up and restore the registry, click on the number below to view the article in the Microsoft Knowledge Base:

    How to back up and restore the registry in Windows

    Step 2: Perform the scan SFC

    I suggest that you can exercise SFC scan and check if that helps. The sfc/scannow command analyzes all protected system files and replaces incorrect versions with appropriate Microsoft versions. It is a Windows utility that allows users to find corruptions in Windows system files and restore the damaged files.

    See the link: use the File Checker system to repair missing or corrupted system files

    Please answer us with this information and the current state of your computer, we will be happy to help you further.

    _______________

    Thank you best regards &,.

    Isha Soni

  • DBSM_SCHEDULER grants

    Hello

    You have some experience with guys Scheduler issues.

    My DBA cannot process my request - I need access to DBMS_SCHEDULER.

    When I block anonymous Planner access it's ok:

    BEGIN
        FOR i_idx IN 1..2
        LOOP
            dbms_scheduler.create_job(    job_name    => 'sample_' || i_idx,
                                          job_type    => 'PLSQL_BLOCK',
                                          job_action    => 'BEGIN NULL; END;',
                                        start_date  => SYSDATE,
                                         enabled     => TRUE);
        END LOOP;
    END; 
    

    but when I put it in the package:

    CREATE OR REPLACE PACKAGE mtr_pg_test IS
    PROCEDURE pr_run;
    END mtr_pg_test;
    /
    CREATE OR REPLACE PACKAGE BODY mtr_pg_test IS
    PROCEDURE pr_run
    IS
    BEGIN
        FOR i_idx IN 1..2
        LOOP
            dbms_scheduler.create_job(    job_name    => 'sample_' || i_idx,
                                          job_type    => 'PLSQL_BLOCK',
                                          job_action    => 'BEGIN NULL; END;',
                                        start_date  => SYSDATE,
                                         enabled     => TRUE);
                                     END LOOP;
    END pr_run;
    END mtr_pg_test;
    /
    

    I get

    ORA-27486: insufficient privileges

    ORA-06512: at "SYS." DBMS_ISCHED', line 135

    ORA-06512: at "SYS." DBMS_SCHEDULER', line 271

    My session privs are as below:

    SELECT * FROM session_privs
    

    ADVISOR

    ANALYZE A

    ANALYZE THE DICTIONARIES

    CREATE THE DATABASE LINK

    CREATE INDEXTYPE

    CREATE JOBS

    CREATE A MATERIALIZED VIEW

    CREATE PROCEDURE

    CREATE SEQUENCES

    CREATE SESSION

    CREATE SYNONYM

    CREATE TABLE

    CREATE THE TRIGGER

    CREATE THE TYPE

    CREATE VIEW

    DEBUGGING SESSION CONNECT

    MANAGE QUEUES

    SELECT ANY DICTIONARY

    SELECT ANY SEQUENCE

    SELECT ANY TABLE

    also:

    SELECT * FROM USER_TAB_PRIVS A 
    WHERE OWNER = 'SYS'
    AND PRIVILEGE = 'EXECUTE'
    

    Returns DBMS_SCHEDULER

    Please advice what lack us,

    Thank you

    Hello

    If you don't see of dba_sys_privs, then there is no direct subsidies. Ask your DBA to grant you the privilege to CREATE a TASK and you should not get this error.

  • Dynamic action for validation of date with the notification message plugin

    Hi all

    Someone help me please with dynamic action for validation of date with the message notification plugin. I have a form with two elements of the date picker control and message notification plugin.

    The requirement first user selects the exam is finished and then selects the date. So, if the date is greater than the date of the examination is over + 2 years then doesn't trigger the message notification plugin. I tried to create that dynamic action on the date picker date that triggers the scheduled issue notification message but I want to make conditional, I mean displays the message only if date of the selected is greater than the date of the exam is finished more than 2 years.

    In terms simple, notification is displayed only if provided is superior to (date of the exam is completed + 2 years).

    I use oracle apex 4.0 version and oracle 10g r2 database. I tried to reproduce the same requirement in my personal workspace. Here are the details. Please take a look.

    Workspace: raghu_workspace

    username: orton607

    password: orton607

    APP # 72193

    PG # 1

    Any help is appreciated.

    Thanks in advance.

    Orton.

    You can get the value of the date of entry:

    $(ele) .datePicker ('getDate');

    So what to add functions such as:

    function validateNotification (d1, d2) {}

    Date1 var = $(d1) .datepicker ('getDate');

    date2 var = $(d2) .datepicker ('getDate');

    if(date1 && date2) {}

    return ((date2.getTime()-date1.getTime())/(1000*24*60*60))>(365*2);

    } else {}

    Returns false;

    }

    }

    The logic based on setting (I have two years from years of 365 days preceding)

    Then in the D.A. specify a JavaScript expression as:

    validateNotification ('P2_REVIEW_COMPLETED', this.triggeringElement.id)

    Refer to page 2 for example.

  • Planning of the CPU

    Hello

    I recently inherited a Setup.

    What we discovered was a guest with 8 cores (dual, quad-core processors). It has eight virtual machines running.

    Each of them has been configured with 4 vCPUs. Performance was pretty terrible, as you would expect scheduling issues.

    I've reconfigured seven with one vCPU and two vCPU. Performance is significantly improved.

    The thing about this issue is it was painfully obvious by looking at the configuration. Looking at the indicators of performance, however, what we saw was the counter which showed the use CPU was down around 20% on the host.

    So my question is how do troubleshoot you less obvious examples - where would you diagnose performance due to CPU scheduling problems?

    You would with ESXtop or performance counters.

    in ESXTOP, you scale the CSTP meter to see if coscheduling is causing a problem.  Also watch % RDY to see if you are invading your CPU.

  • Freezing vm workstations

    Some of our users are complaining about their virtual machines are freezing at that time at the time, it can last from a few minutes to several hours.  When we look at the Task Manager, the virtual machine uses the resources of 100%.

    These users are using Sharepoint, Sql Server and BizTalk on their machines.

    It is without limits/reservations/pools or whether to limit these machines and there are a lot or resources on the host.  So, nothing can explain this.

    Does anyone have an idea where to look?

    SQL can be very resource intensive.

    If you have multiple virtual machines on the same ESX host - with this same config and allocate resources - it's pretty easy to get into a situation where you encounter performance problems.

    The thing to really watch is the number of vCPUs that you attach each VM - if you have high amounts of vCPUs per VM (more than 2) and you have a low number of cores / processors on your ESX host - you may feel processor scheduling issues. -In this case, simply reduce the number of vCPUs per VM should help solve your problem.

  • Oracle 10.2.0.4 Index on the time stamp column not used when SYSTIMESTAMP is used.

    Hello
    I have a table with a timestamp (6) column B. About 300000 rows in the tables...
    I created index 'idx' on column B.

    When I compare the column 'B' with systimestamp, it does not use the index, whereas if I compare 'B' with sysdate it uses the index.

    For example:
    Select count (*) in a b where clause < = sysdate;

    The above used the subscript "idx" and executed in 1 second

    Select count (*) in a b where clause < = systimestamp;

    The foregoing does not use the index and performed in 19 seconds.

    Any clue?

    Thanks in advance

    Oracle uses the internal functions when you use SYSTIMESTAMP:

    Work around is to use TO_TIMESTAMP as shown below... Or define a function based index...

    You can check the performance querying against a column "TIMESTAMP WITH time ZONE SCHEDULE" issue link too

    SQL> create table a(b timestamp(6));
    
    Table created.
    
    SQL> insert into a
      2  select systimestamp+(level/24) from dual connect by level <= 30000;
    
    30000 rows created.
    
    SQL> commit;
    
    Commit complete.
    
    SQL> create index ndx on a(b);
    
    Index created.
    
    SQL> explain plan for
      2  select count(*) from a where b <= sysdate;
    
    Explained.
    
    SQL> select * from table(dbms_xplan.display);
    
    PLAN_TABLE_OUTPUT
    --------------------------------------------------------------------------------
    Plan hash value: 3858831102
    
    --------------------------------------------------------------------------
    | Id  | Operation         | Name | Rows  | Bytes | Cost (%CPU)| Time     |
    --------------------------------------------------------------------------
    |   0 | SELECT STATEMENT  |      |     1 |    13 |     1   (0)| 00:00:01 |
    |   1 |  SORT AGGREGATE   |      |     1 |    13 |            |          |
    |*  2 |   INDEX RANGE SCAN| NDX  |     1 |    13 |     1   (0)| 00:00:01 |
    --------------------------------------------------------------------------
    
    Predicate Information (identified by operation id):
    ---------------------------------------------------
    
       2 - access("B"<=SYSDATE@!)
    
    Note
    -----
       - dynamic sampling used for this statement
    
    18 rows selected.
    
    SQL> explain plan for
      2  select count(*) from a where b <= systimestamp;
    
    Explained.
    
    SQL>  select * from table(dbms_xplan.display);
    
    PLAN_TABLE_OUTPUT
    --------------------------------------------------------------------------------
    Plan hash value: 3918351354
    
    ---------------------------------------------------------------------------
    | Id  | Operation          | Name | Rows  | Bytes | Cost (%CPU)| Time     |
    ---------------------------------------------------------------------------
    |   0 | SELECT STATEMENT   |      |     1 |    13 |    20  (15)| 00:00:01 |
    |   1 |  SORT AGGREGATE    |      |     1 |    13 |            |          |
    |*  2 |   TABLE ACCESS FULL| A    |     1 |    13 |    20  (15)| 00:00:01 |
    ---------------------------------------------------------------------------
    
    Predicate Information (identified by operation id):
    ---------------------------------------------------
    
       2 - filter(SYS_EXTRACT_UTC(INTERNAL_FUNCTION("B"))<=SYS_EXTRACT_UTC(S
                  YSTIMESTAMP(6)))
    
    Note
    -----
       - dynamic sampling used for this statement
    
    19 rows selected.
    
    --"Just tried using TO_TIMESTAMP"
    
    SQL> explain plan for
      2  select count(*) from a where b <= to_timestamp(systimestamp);
    
    Explained.
    
    SQL>
    SQL> select * from table(dbms_xplan.display);
    
    PLAN_TABLE_OUTPUT
    --------------------------------------------------------------------------------
    Plan hash value: 3858831102
    
    --------------------------------------------------------------------------
    | Id  | Operation         | Name | Rows  | Bytes | Cost (%CPU)| Time     |
    --------------------------------------------------------------------------
    |   0 | SELECT STATEMENT  |      |     1 |    13 |     2   (0)| 00:00:01 |
    |   1 |  SORT AGGREGATE   |      |     1 |    13 |            |          |
    |*  2 |   INDEX RANGE SCAN| NDX  |     4 |    52 |     2   (0)| 00:00:01 |
    --------------------------------------------------------------------------
    
    Predicate Information (identified by operation id):
    ---------------------------------------------------
    
       2 - access("B"<=TO_TIMESTAMP(TO_CHAR(SYSTIMESTAMP(6))))
    
    14 rows selected.
    

    Published by: JAC on October 23, 2012 11:18

  • Permissions issue when editing the Task Scheduler Action tab

    Hi all

    I went to my Scheduler of tasks and found something.

    When I hit 'properties' and looked under the 'Action' tab, it says Manager custom.

    That the devil which means?

    I hit the "Edit" button to see what would happen and he said that I'm not allowed to change.

    Why would it be?  I have the darn computer.

    Any help would be great. Thank you.

    Binner

    Original title: Manager of the tasks/Planner

    Hello

    I apologize for the late response.

    You can change an existing task only if you have full administrator permission to the user account. You can follow the below mentioned link to do the same.

    Change an existing task

    http://TechNet.Microsoft.com/en-us/library/cc766442.aspx

    I hope this helps. Otherwise, feel free to write us again and we will be happy to help you.

    Thank you

  • Issues for scheduled task

    Hi guys,.

    I have a few scheduled tasks that works well.  I tried to create a new scheduled task today. It is a Powercli script that is compression and encryption of output with the public key and send by Mail.

    So, for some reason, a scheduled task that runs through without error > but did not have encryption.

    -the PS file works manually without problem

    -manually tested a bat file with the full path to powershell.exe and PS = works as well

    Just once, I try to plan its > it does not Code. simply paste the Code problem

    do I need special Arguments in the scheduled task?  It has not set up for others.

    # #Encrypt #.

    $gpgpath = "C:\Program Files (x86)\GNU\GnuPG\pub\gpg.exe.

    $recipient1 = "xxxxxx".

    $recipient2 = "xxxxxx".

    $encrypt = "recipient $recipient1 - recipient $recipient2 F:\Report\vCenter\Finance\9-6-2016\Finance.zip--encrypt--.

    $Process = start-Process $gpgpath $encrypt - WindowStyle hidden

    If I make a New point between lines > it creating folders as test > just to see if script is running or not.

    I have some ideas right now, why the scripts - but does not not the encryption Code. As manually PS is doing well.

    I even made with 7-zip. and that works well.

    Perhaps some clues?

    Best regards

    Max

    You specify an account under which the scheduled task to run?

    By default, this is the system account if I remember correctly.

  • Scheduling blackBerry Z10 issues

    I have troublesentering a new entry in my calendar on my z10, whenever I try to update the time in a new topic, it closes the application. Anyone else having this problem?

    Go to the calendar settings and select any calendar other than GMail as the default calendar. This is a known bug and should hopefully be fixed in a future update.

  • vCenter 5 rename bug (zone schedule known issue)

    Everyone puts a vCenter appliance 5 out there and after installing tried to rename the system? After you rename the system through the interface web and restarted unit the vCenter Server installation fails to start with error "error: VC was able to start. Always pass tests of embedded database connectivity. I can still start the ESXi servers for syslog, coredump and autodeploy, but not the FV function. Any ideas?

    Hello:

    Thanks for your report.

    I think you hit a problems at the time of change, please see RN http://www.vmware.com/support/vsphere5/doc/vsphere-esx-vcenter-server-50-release-notes.html

    ...

    On a vCenter Server Appliance with an embedded database, vpxd restart may fail. An error message similar to the following appears in the vpxd.log file:
    Alert: fake @ /build/mts/release/bora-336896/bora/vpx/vpxd/util/vpxdVdb.cpp:403

    This error occurs if the vCenter Server Appliance system clock is reset to a time earlier than the time when the database was created. This translates into the database of objects created by the vCenter Server Appliance with time stamps that seem to be in the future. This causes queries for database objects to fail.

    ...

    Please ensure that if you hit this disorder also. If so, we should ignore operation to avoid this DB; later, change of time zone was workaround on our test bench.

    We hope to get good news and more comments for our products

    Thank you.

    Frank Hou ([email protected]: VMware QE)

  • Blue or white line horizontally across the top of iPHONE 6Plus.  Frozen screen.  Phone hardware issue/replace?

    Blue, sometimes white horizontal line appears at the top of the iPHONE 6Plus.  Sometimes, the size increases.  The screen freezes.  Restart does not help.  Phone hardware issue/replace?

    knittyfingers wrote:

    Blue, sometimes white horizontal line appears at the top of the iPHONE 6Plus.  Sometimes, the size increases.  The screen freezes.  Restart does not help.  Phone hardware issue/replace?

    Back up your device, schedule an appointment with the genius bar and bring it to the Apple store.

Maybe you are looking for

  • Siri don't text my contacts in iOS 10

    I have a problem with my iPhone that I didn't have before the update to iOS 10. I think that it is somehow connected to the Contacts, but I can't understand that. If I go to Messages and select an existing thread, can I message someone quite easily w

  • How can I display the first image of a built-in clip?

    I prepare a presentation for my 10.11.16 retina, with Keynote 6.6.1 MacPro OSX. I want that it contains clips integrated to my films. I chose the simplest theme - plain black.  I drag and drop these Quicktime movies or .mov of iTunes to a new black s

  • How to activate an adblocker, without separate download?

    I had many adds while shopping on Amazon, which I did not before. I would like to activate an adblocker without having to download one, but I am not opposed to download a free which is good. I'm tired of constantly clicking the close button (and we d

  • How can I delete password for connection so that I want to type it every time

    Password will automatically appear on identify you. How can I remove it so I want to type it every time. He used to work in this way and all of a sudden, it is still in and I need to remove it.

  • AT100 - update to android 3.2

    I try to activate the encryption on my tablet, but it seems to be freezing everytime I try.What I read that it would seem that encryption on 3.1 does not work (which is the OS that I currently have). It's going to be until an update available for the