Value to automatically fill in the details on app_id block base

Hi all

I have 2 control data block in my forms, is a common first name in the block and the other a name is common_detail.

In my common block, there is a column called app_id and value when the same user enter this value, the remaining elements for common block is filled...

Note:-this app_id is also exist in my block of common_dtl.

Now what I want to use this common block app_id to fill my block of common_dtl

So I tried to create the join relationship in a common block but no luck.

Now I wonder what I have to use cursor and a loop to fill common_dtl block or y at - it another way that I can use? Thank you

ASA Amatu

At Design time:

------------------

1 create a control block in block Master, database property is set to Yes...

2. create a no. areas related to the block of retail...

3. in the retail block, u should have these control-related positions

at each point of them, you have a copies the value of the item of property u indicate here the:MASTER_BLOCK. Nom_element

4. repeat copy item value for each element of releated to the details.

5.ENFIN, in the retail block, create A time-news-block-Instance Trigger

RUN THE QUERY; -Built-in

I did all your steps provided but I get the following error message.

Error

FRM-30445: use of the Item property include REF requires non-null Alias property.

Block: HEARING_COMMON

Form: APP_HEAR_RSLT

FRM-30085: unable to adapt to the shape for the release.

Tags: Oracle Development

Similar Questions

  • Automatic filling of the order of the day

    Hello

    I am trying to automatically fill in an 'order of the day"a"graphical task"as pictured below.  When the date of the order of the day is changed, I would like to as tasks and details of my task card to automatically fill in the order of the day.  Any ideas what formula that I use to get this working?  I worked on it for a few days now, but I can't seem to find the right combination of formulas to make it work.

    Thank you

    David

    This can do the trick:

    Add a column in the list of tasks as shown above - this column should be the column A now.

    A2 = if (AND (B2 = agenda: $ 1, COUNTA(B2:D2) > 2), MAX $B ($A$ 1: A1) + 1, "")

    It's shorthand dethrone select cell A2, and then type (or copy and paste it here) the formula:

    = IF (AND (B2 = agenda: $ 1, COUNTA(B2:D2) > 2), MAX $B ($A$ 1: A1) + 1, "")

    Select cell A2, copy

    Select cells A2 at the end of the column, paste

    now in the table "Agenda" I suggest merge is NOT the cells in the first row.  My example suppose you follow this advice, and there are two lines:

    -Enter the date in cell B1

    A3 = IF ((LIGNE () −2) ≤MAX(Task Chart::A), LINE (−2), ' ')

    B3 = IF (A3 = "", "", VLOOKUP (ROW (−2, Task Chart::A:D, 3, 0)) ")

    Select cell B3, copy

    Select cell C3, dough

    Select cells A3 to C3, copy

    Select cells A3 at the end of the C column, paste

    now change the text you have in cell B1 of table "Agenda" as needed.

  • Automatically fill in the days of the week in a single field

    I am trying to add a script that is automatically filled in the days of the week in a single field. I have an example script that will populate the fields of today's date, but not what I'm looking for. I need the date to fill from an earlier date which came from a separate field. Any help is appreciated.

    Here is the script I hacked:

    var today = new Date();

    this.getField("sun").value = util.printd ("mm/dd/yyyy", today); fills the field for today

    this.getField("mon").value = util.printd ("mm/dd/yyyy", new Date (today.getFullYear (), today.getMonth (), today.getDate () + 1)); fills the field for Monday

    this.getField("tue").value = util.printd ("mm/dd/yyyy", new Date (today.getFullYear (), today.getMonth (), today.getDate () + 2)); fills the field for Tuesday

    this.getField("wed").value = util.printd ("mm/dd/yyyy", new Date (today.getFullYear (), today.getMonth (), today.getDate () + 3)); fills the field for Wednesday

    this.getField("thu").value = util.printd ("mm/dd/yyyy", new Date (today.getFullYear (), today.getMonth (), today.getDate () + 4)); fills the field for Thursday

    this.getField("fri").value = util.printd ("mm/dd/yyyy", new Date (today.getFullYear (), today.getMonth (), today.getDate () + 5)); fills the field for Friday

    this.getField("sat").value = util.printd ("mm/dd/yyyy", new Date (today.getFullYear (), today.getMonth (), today.getDate () + 6)); fills the field for Saturday

    I know quite dangerous - so maybe that I don't have.

    Thanks for your help.

    ~ C

    You can use the opposite of "printd" to analyze a text representation of a date and convert it to a date. See here for documentation:

    http://help.Adobe.com/LiveDocs/acrobat_sdk/11/Acrobat11_HTMLHelp/wwhelp/wwhimpl/common/htm l/wwhelp.htm?context=Acrobat11_HTMLHelp&file=JS_API_AcroJS.89.1260.html

    All you need to do is replace the first line of your code, where you set and the value of the variable today with a routine that initializes the date from field data. In the simplest form, this may like this:

    var someday = util.scand("mm/dd/yyyy", this.getField("TheDate").value);
    

    Then, you would just use the variable 'someday' instead of 'today' in your code.

    Remember that this complies not any error checking, you can add a control to "Survive" actually containing valid data, so that the calculation of the other fields, you can jump in case you have for example a string empty, or at a date not valid.

  • I have a request for a phone number in my HTML code in my database which is automatically filled with the correct sales phone number when sending emails. I create HTML code in dreamweaver and then put the code in my e-mail program. I need to do the ph

    I have a request for a phone number in my HTML code in my database which is automatically filled with the correct sales phone number when sending emails. I create HTML code in dreamweaver and then put the code in my e-mail program. I need to make the phone number in the clickable query. I know the code to do it well not in a query. What is the code?

    As far as I saw, most of the smartphones will automatically recognize it these days, as long as the number is written in a format of regular phone number. This format also allows to make images or text other than a telephone number in a tap to call the link.

    Looking at what you have presented I guess it would be something along the lines of...

    urmcell>>">urmcell >

    When the location of the link and the link text would be the same variable.

    I've never worked with Intelliclick so above is a wild guess. They would be those who need to ask themselves if there is a way to fill in the address of a link like that.

  • Items 9 - photomerge panorama - restore the question "do you want to automatically fill in the edges of your panorama?

    When you create a new photomerge panorama in 9 elements of a number of photos, I used to have asked the following question: "do you want to automatically fill in the edges of your panorama? Who responded 'No' on one occasion (with "always perform this action"), this issue never appears again. I have searched all the settings, but impossible to find the solution to reactivate. Can anyone advise how to re - appear? Thank you

    I don't have version 9, but have you tried in the Organizer: Menu Edition / general Preferences and click the button "reset all warning messages?

  • Automatically fill in the Date fields

    Can you have automatically fill fields date after you have entered a date? For example, if someone has put a date in a field "Date Week Ending ', could other date fields automatically fill in office on that date?

    ZeroZone

    Use a calendar for the first field widget.  Then use the text fields for each date, you need.

    If you wanted to tomorrow's date, enter the first field measurements: (formCalc)

    If (StartDate.rawValue == null) then
    $.rawValue = «»
    on the other
    Num2Date (Date2Num (StartDate.formattedValue, DateFmt (2)) + 1, DateFmt (2))
    endif

    If you want to 7 days of the date selected, change + 1 to + 7 and so on.

  • Automatically fill in the field of the first letter of another field

    Hello

    I have a situation where I would automatically fill, in an area depends on the first letter entered in another field.

    Here are some examples:

    1. one - A6805B field two - "UHF" (such as A = UHF)

    2. one - the E1234C Feild field two - 'VHF' (as E = VHF)

    3. a - S5673D field of two field - 'error - no frequency' (such as S has no equivalent)

    Can anyone help?

    See you soon


    Rob

    Hi Rob,

    You can do this by assigning the first letter in a variable and then by testing this variable.

    A sample is here: https://acrobat.com/#d=OoLUPLu1Qy1 * 8Uxz7 * hG6Q

    Hope that helps,

    Niall

  • How to keep the URL bar to automatically fill in the URL?

    I don't want to disable the menu drop down. Only fill in the URL bar with the rest of a URL once I start typing.

    Actually what you want to do is to follow the same procedure but together

    browser.urlbar.autoFill false

    Who stops the bar continuous bit url to populate the drop-down list.

  • How can I get Firefox to automatically fill in personal details on forms?

    In Google Chrome, for example, it automatically fills with personal information such as name, address, Tel and GSM etc.

    Firefox does this and if so, how?

    Using form fill in Firefox or an extension of form filling.

    • Tools > Options > privacy > History: "don't forget to search and form history."
  • Unable to automatically fill in the fields that have a Global data link

    Hello

    I have a long form LCD with a button at the top that I use to fill in the form with the test data.  Then this button has a whole bunch of "rawValue = _" of statements.  But some of the fields in the form use global data binding, and the button won't just fill in these fields.  So, I always fill in these fields manually whenever I want to test.  Can someone tell me if there is a way around this?  Thanks for any help.

    Kam.

    Just figured out the answer myself.  The issue has been one of the issues being filled was a yes / no radio not button who was in command of "xfa.host.resetData" in it.  So whenever this radio button is checked, the function resetData will prepare the fields in this section, and then of course everywhere elsewhere due to binding global data.  I have removed the function resetData and the problem resolved.

  • Automatic filling of the zeros

    Acrobat 9 Pro

    Windows XP

    I have a 9-digit field I want to be formatted with zeros if there is any sort of entry in this field, for example, if a user types in "12345", I want the field to display "000012345".

    Right now, the field is formatted for a maximum of 9 characters in an integer format. I tried the arbitrary mask in all the 9s, but the user must enter the 9 digit and the default error message is in geek speak.

    There was a previous thread on how to fill in a field after an entry (like dashes after a checkbook value element) that I was hoping for inspiration, but I'm not.

    Thanks in advance for any help you can give me.

    If you use the custom for the field validation script, it will give you what you want:

    Custom text field validation script

    Key entry with numbers, maximum 9 characters

    If {(event.value)

    Event.Value = util.printf ("% 09d", event.value);

    }

    Also use a custom script to strike to limit entry to the digits only.

  • automatic filling of the contacts in the mail are stored where?

    I'm running on my iMac and could always Yosemite 'manage' my e-mail contacts.

    I was happy enough to just start typing its name or your e-mail address and their name appears (along with other similar names), and that's worked pretty well for me. Is not ideal, but I did not had the time to add them manually to the app "AddressBook."

    I KNOW my mac has those who are stored somewhere, but when I try to find them in the address book sad, well, nothing appears.

    How can I find the file or the library that contains all these e-mail addresses that it stores and uses to auto-fill?

    Thank you

    Mechelle

    PS the reason I want the file's to use in an another e-mail client (post office box) or a third-party address book. I'm done with mac Mail and address book!

  • Automatic filling of the field Date in the text field to the Format YYMMDD

    Hello

    I need to automatically populate a text field with a date that is entered in a date field. I was able to do this, but I couldn't find a way to have him fit in the text as YYMMDD field (with no spaces, dashes, etc) instead of "MM/DD/YY" as it is displayed in the date field.

    Could someone help me with the right code?

    Best regards

    ZeroZone110

    I don't know if it's the best option, but here is a workaround...

    using formcalc you can format your date fields

    var myDate = Date2Num (DateField1.rawValue, "YYYY-MM-DD")

    var format = Num2Date (myDate, "YYYY-MM-DD")

    TextField2.rawValue = format

  • Can I link together two forms acrobat 9 so that info typed in one is automatically filled in the next?

    I have several forms that are created. In some cases, I need two forms submitted. Both forms have the same information at the top. Is it possible to link the fields of the form so that once filled it auto fills the corresponding fields in the other form? I can't combine the two forms into one, because management thinks it's confusing. Any help is appreciated.

    There are a number of possibilities, but they may not work depending on who are the users of the forms and how the form will be used. For example, if users are the general public and only have the drive, then there is not much you can do. If you have a control on the users machine you and/or they are using Acrobat, there are more options.

  • Filling of the elements in another block in when-validate-item

    When the user changes the value in the given field, I need to insert records into different blocks. The second block is block of multi-record. The two blocks are no db block, just for display. When the value is changed by the user to the first block, calculating product collecton who wish to view the content of each element in the second record to display block. The problem is that I can not enter the values for records in the second block other than the first record. To access the second records block display, need to navigate to display block with go_block and navigate to new records with next_record. Both go_block and next_record cannot be called from the Organization in the form of small modules.

    I want to avoid having to press the button that makes a new calculation and redisplay (so can use go_block and next_record), wish just to refresh when the user updates the value, IE the Organization

    You can use WHEN-VALIDATE-ITEM trigger to loop through the record of the block in detail using the TIMER. What you have to do is in the trigger WHEN-VALIDATE-ITEM create timer like below...

    TRIGGER = WHEN-VALIDATE-ITEM
    DECLARE
      vTimer TIMER;
    BEGIN
      vTimer:=CREATE_TIMER('MY_TIMER',10,NO_REPEAT);
    END;
    

    Now, create a trigger more on called WHEN-TIMER-EXPIRED at the form level and use the code below...

    TRIGGER = WHEN-TIMER-EXPIRED
    BEGIN
      GO_BLOCK('DETAIL_BLOCK');
      FIRST_RECORD;
      LOOP
       -- Perform your functionality here...
       IF :SYSTEM.LAST_RECORD = 'TRUE' THEN
         EXIT;
       END IF;
       NEXT_RECORD;
      END LOOP;
    END;
    

    -Clément

Maybe you are looking for

  • Cannot locate sneaky Adware

    Hi all I have somehow ended up with a virus adware that keeps hijacking Safari to play all kinds of crappy ads. I installed and run MalwareBytes that deleted a few files updated cache in Safari, but the problem persisted. So I installed another antiv

  • HP pavilion 500 - a60: erratic internet connection

    With the help of hp pavilion 500 - a60. 3 years.  Just go to uverse internet.  Several times per minute for 10 seconds let connect to internet and flickiering of thin lines on the screen.  Att says tech problem is w/workstation.  It was suggested tha

  • question on locking of LabVIEW amplifier design

    Hi all I use myDAQ with the NI DAQPad-6259 pinout for the input signal measurement. and I want to build an amplifier to lock by labview to measure the input signal. Does anyone have this kind of tutorials or vedios that enjoy helping me build this? I

  • RegCean Pro

    Is the advanced program of RegClean Pro of Systweak (e Cleverbridge) safe? I bought this program, struggled to save, got help from systweak, always had hurt, and since installing I can not change the browser and get a lot unwanted ads. I wonder if th

  • How can I get my XP after that I have lost?

    How to get the XP key Dear Sir, I have an Original XP CD, but I lost my original key, I brought some time before, but na not installed, nw m Trying ti install XP dnt have KEY, so HOW CAN I INSTALL XP WITH CD BUT WITHOUT CD ORIGINAL KEY? Where can I g