Adding/changing of base points, data definitions

I've got unifying 9.12 installed on my system to play with at the moment. I am logged on as ottbadmin and when I go to the company work space > Admin Mode > uDesigner > business process I can't do anything with them. The new button is grayed out so I can't create a new, I can't edit existing ones as the status button is grayed.

Same problem with trying to add any cost new Codes under Enterprise workspace > Administrator Mode > Configuration of data Structure > data definitions. Have I completely missed something here? I even created a new user with access to everything that I called God Mode and still could not do everything above.

You probably have your set server in Production mode, not staging Mode.

Unifying Configurator, general tab, you must have the server set up for "staging".  If the value of Production, and then uDesigner feature will be disabled, even with the rights of God.

As a general rule, you would have two separate servers, one in staging Mode and the other in Production Mode.  All uDesigner work would be done in the staging server and then imported into the Production Server.

Tags: Oracle Applications

Similar Questions

  • A record of a point of non-base of data querying

    I work in Apex 4.0. I have a page based on a table with the following columns: borrower, amount, previous_dktnr, dktnr, subsequent_dktnr. The precious_dktnr is the dktnr , under which the loan has been funded in the past, before his support or refiancing. The subsequent_dktnr is the dktnr under which the loan is later identified. When a loan is refinanced, it is assigned a new dktnr a new record and the old dktnr is placed in the column of previous_dktnr of this new record, and the current dktnr is placed in the subsequent_dktnr of the previous record of dktnr column.

    I created two buttons, one for the previous_dktnr and the subsequent_dktnr. When I click on one of these keys, the action redirects to the current page and the value of the anterior or posterior dktnr in the dktnr element. This questions the record for the dktnr that has the same value as the previous or next dktnr.

    This method works. It allows the user to beat back between the two dktnr.

    We can assume then that if a non-base of data element have been created, say: P22_QUERY_DKTNR, you would be able to conclude an existing dktnr of this element and have a button with the same logic as the previous buttons and subsequent dktnr , who would be able to return the record to the entered dktnr .

    I tried this, and it does not work. Can someone tell me why it does not work?

    Published by: Doug on April 9, 2011 15:42

    Published by: Doug on April 9, 2011 15:43

    Published by: Doug on April 9, 2011 15:43

    Published by: Doug on April 9, 2011 15:45

    Published by: Doug on April 9, 2011 15:46

    Doug,

    Make copies of your two pages within your workspace, page 3 & 4.

    It was that page do not have a value in the session containing the value of your Look_Up. I changed the button Search to submit the Page to understand the value of Look_Up and then added a new branch to the Page that has been sequenced before your existing branch. This new branch defines your P4_DKTNR with the value Look_Up and then returns your results.

    Jeff

  • The fixed Point data

    It is possible to specify the length of Word and whole for the fixed point data format, and if so where this work?

    The module I use is a NI 9205 in a cRIO-9074 and seems to have a fixed point default data format of <+-, 26,="" 5="">, which I interpret as meaning that the data is signed, has a length of 26 Word and a length of whole number of 5. This gives a maximum of 16, a minimum of-16 and a size of minimum step of ~4.768 x 10 ^-7, that is to say 1/2 ^ 2.

    Could someone please confirm that this is the correct interpretation, and also explain how it is possible to obtain a length of 26 Word when the analog digital converter / base is only 16 bits.

    Best regards

    amendments


  • I want to do "System Restore" in Windows Vista. But I can't change the restore point

    I want to do "System Restore" in Windows Vista. But I can't change the restore point. How to configure manual restore point? Can I enter a date I want to restore? I tried, but it did not work.

    Original title: in Windows vista system restore

    Hello

    Either the system restore point is already created for an earlier date, or is not available.

    You cannot create a restore today Point to return to yesterday.

    You can create a restore today Point to use in the future.

    Here's how to use the Vista system restore:

    http://bertk.MVPs.org/html/restoresysv.html

    See you soon.

  • How can I change the base color in the work of Recolor settings?

    How can I change the base color in the work of Recolor settings? I know that this seems a silly thing but I really need to figure this point and I have read and went through the manual and the forum for help, without result. Help, please.

    Click the color you want in the "new color" column. Then click the base color next to the list of color harmonies, which will change then, but the harmonies of color will depend on your desired color.

  • Adding security to SQL 2000 data sources

    Adding security to SQL 2000 data sources

    I made ColdFusion programming for more than 5 years and now I hired an assistant for myself. So far, I have no warranty on my data sources, but now I need to add user rights for these so if my assistant made a mistake, nothing would happen to the tables. Currently I have about 3 sources of data. I did some research on creating users under Microsoft SQL 2000 and I have created a user account under SQL, but given that my data sources are connected via the account, this user always have full powers on all the tables. Maybe it is more than a simple creation of a user account under SQL and allows read only access to the tables under the permissions tab. Or maybe I need to create new sources of data with different configurations, or perhaps use ColdFusion Sandbox!

    This is where I am confused right now and don't know what would be the way to protect my assistant from damaging my paintings!

    I'll explain my situation with an example here:

    Let's say Mike is a project manager / database administrator and it is the only one in the network, which must have full access to all sources of data/tables. Juta is the programmer who has access to all tables except the Update/Insert access read-only on the tables of 1 or 2.

    I would appreciate if someone can help me understand what I need to do to get there.

    Thank you

    Mike R

    I assume you are using RDS for Dreamweaver to connect with your ColdFusion server, etc, but ColdFusion doesn't RDS to connect to the database, just for you to be able to 'talk' to CF with Dreamweaver, right? We have RDS enabled in our development environment so that we can use CF Studio (Yes, I know, an antique), but the same thing applies to Homesite or DW, I guess. We have no active RDS on our production server see If I happen to use CF Studio to change templates on the production system, I can not run (or look at databases, etc) and would need to use Explorer to run the model and Enterprise Manager (or SQL Plus, etc) to 'look' to the database. However, you shouldn't really get used to change production CF models without testing in development anyway, so it should really not a problem, unless you do not have instances of database development, etc., which could be a problem with the security of the database. Take shortcuts by not having does not separate and production environments development can bite you.

    Phil

  • Changed the name of data

    SUMIFS (data: $C, data: $B, $A2, given: $A, "> =" & B$ 1, data: $A, "<" & (EOMONTH(A1,0) will GET ($1.0 B) + 1))

    It's the formula that I used until I changed the names of "data Plan". The original names were:

    A1

    A6

    A12

    B1

    B6

    etc...

    I changed the plan of names...  I want to start all over again... The original formula still works?

    The original formula should still work as long as the new plan names are spelled the same in both tables.

    SG

  • Please share your entries on Eg1 and Eg2 dependence of voice messaging port to be hardware based or can be added on a basis of carta ala?

    Hello

    Please share your entries on Eg1 and Eg2 dependence of voice messaging port to be hardware based or can be added on a basis of carta ala?

    1 pls correct if wrong, the number of voicemail ports depends on which model of supported connection of the unit hardware is selected. In addition, the number of voice messaging ports cannot be added as a carta ala and it comes with the hardware.

    Eg1; with the unit Connection8.6 on MCS7845 standalone server would support 250 voicemail ports and if the connection of the unit is used in active-active mode then total 500 voicemail ports would be available with the cluster of connection of the unit.

    Eg2; On a platform of the UCS, the UCS C210 M2 Server connection unit 8.6 with capacity of 10,000 EGGS of voicemail, the voicemail ports would be available:

    (i.) the limits of stand-alone Configuration:

    • 150 ports G.711 and G.729a (combined TUI, VUI or TTS)
    • 35 ports iLBC or G.722

    (ii) limits for the active/active Cluster Configuration:

    • 300 ports G.711 and G.729a (combined TUI, VUI or TTS)
    • 70 ports iLBC or G.722

    (iii) EGGS during model for the Connection8.6 with 10000 EGGS Voicemail capacity 300 GB HARD drive unit is installed on UCS C210 M2 server, he would in his own assign vCPU = 4, RAM = 6 GB, vHDD = 300 GB 150 ports of voicemail and.

    If more than 150 voicemail ports are necessary, then we can have the Connection8.6 of the unit using the active/active mode, then 300 voicemail ports would be available.

    However, if the number of necessary voicemail ports is more than 300, then need to install, Connection8.6 20 000 unit model voicemail OVA on UCS C210 M2 Server capacity. This model has according to the capacity of voice messaging port:

    Stand-alone Configuration limits:

    • 250 ports G.711 and G.729a (combined TUI, VUI or TTS)
    • 60 ports iLBC or G.722

    Limits for the active/active Cluster Configuration:

    • 500 ports G.711 and G.729a (combined TUI, VUI or TTS)
    • iLBC 120 ports or G.722

    Concerning

    Sumit

    There is a hardware support and licensing aspect for the number of ports.  From a support perspective, the number of ports is limited by the physical server hardware (e.g., platform) or virtual resources (i.e., as specified in the files of EGGS).  However, the number of ports, you can configure is also based on how many ports you are licensed for the.  For example, you can have a server that can support 250 ports but if your license file contains only 16 ports then you will only be able to configure 16 ports on the system.  I have a scenario where a customer needed to add more ports; However, I don't think it would be a problem.

    When you talk about port capacities for the connection of the unit, I would recommend that you focus more on the ability of the server port unique compared to the ability of the cluster for normal operations.  Connection of the unit is designed as a cluster in active / active in the intention to provide 100% failover of services if a server is offline.  The recommended design is that the Subscriber must manage all calls with the possibility of overflow to the transformation Editor.  IOW, if you want to support 500 simultaneous calls on a consistent basis but each server is capable of supporting 250 ports on its own then only a failure of a server would immediately block 50% of services.

    Hailey

    Please note the useful messages!

  • Change the time and date of deposit when importing

    Hi everyone, when I import images in my project, automatically first change date and time with the current date and time in the finder. So each imported file have changed the time and date when I search in the finder under the "created" or "modified" column, is this normal?. There is no way to avoid this?

    Thanks in advance

    Yes, you can prevent this! Go to the preferences of first and go to the media section. Uncheck "Write XMP IDS to files on import". Boom, done. First will not add his small beacon of metadata files when you import them. This isn't a huge deal for most publishers except Adobe apps could create media Cache files more than necessary if you re - use clips in other projects. Don't forget, however, anything, if you change the metadata (in the project Panel or metadata) file, it'll still change changed data for the clips.

  • Dynamically change the Format of Date of Application

    Hi all

    I am looking for a possibility to change the format of date of Application in globalization attributes dynamically according to the user.

    Something likeAPEX_UTIL.SET_SESSION_TIME_ZONE but for the date format.

    Does anybody know how it works?

    In detail:

    I want dates in interactive reports display in a specific date format.

    If I put the following in the attributes of 'security' - call the virtual private database PL/SQL to define the security context:

    BEGIN

    If password = "MY_TEST_USER" then

    run immediately "alter session set nls_calendar =" English Hijrah "';"

    run immediately "alter session set nls_date_format =" DD-MM-YYYY "';"

    end if;

    END;

    Then, the dates are indicated correctly in reports interactive but not in the Action menu-> filter.

    If I put date_format = "DD-MM-YYYY" in the attributes of the globalization, it works very well in the interactive report filter.

    The problem is that I want to set this attribute only for some users.

    Thank's,

    Kirsten

    (APEX 4.0/APEX 4.2)

    Because you can use string syntax of substitution for the attributes of the globalization, for example, you could create an element of the AI_DATE_FORMAT application, reference & AI_DATE_FORMAT. and fill out the application element according to certain parameters in the code after the authentication of the authentication system (for example: get a parameter of an array of parameters user or somesuch).

  • Why Illustrator change my anchor points and size race randomly when I'm using the tool pen?

    Why Illustrator change my anchor points and size race randomly when I'm using the tool pen?

    k,

    It looks like you might be haunted by the Align attribute to the ghost of the pixel grid.

    You can select the entire document and untick finally align on the pixel grid in the Transform palette and uncheck also align new objects to the pixel grid in the options of the Launcher. It is crucial that the checkbox is disabled completely, not just a - which also count as ticked.

    It may be noted that even align with the pixel grid is cleared with all the selected objects, align new objects to the pixel grid is checked as the creation of new objects will result in these new objects being aligned, even when they are created from existing objects that can happen with Pathfinder operations.

    You can avoid the types of documents with the default (RGB for the web and other) or change the default value for such documents.

    Here is a screenshot of exquisite made per ton in the first post:

    https://forums.Adobe.com/message/7841770#7841770

  • How to integrate the dynamic SQL generated in the data definition XML file?

    Hi all

    I have it here is the XML file that is attached to the definition of data model RTF as below. Also, I have a function that will return to create a dynamic query as shown below.

    <?xml version="1.0" encoding="UTF-8"?> 
    <dataTemplate name="XYZ" description="iExpenses Report" Version="1.0"> 
    <dataQuery> 
    <sqlStatement name="Q2"> 
    <![CDATA[
    

    Hi guys,.

    I was able to solve above the requirement. It was not possible to create only from SQL dynamically. Instead, I created a procedure that would create & update (attached to the data definition) XML file dynamically for each race.

    Kind regards

    Patricia K.

  • How to remove an XML data model in data definition screen

    Hello

    Question: I downloaded the data definition file in the data model.
    How to remove it.

    What means each file type?
    XML Schema
    Data model
    Preview of a file
    Breaking control file

    I have an XML file and a XSL file. I need to have an output in XML format.

    So I installed my XML file in the data definition of data model.
    And the XSL file in the templates.

    Am I wrong?

    11.0.10.2

    Kind regards
    Sabine

    Question: I downloaded the data definition file in the data model.
    How to remove it.

    You can not remove it, but you can date deadline there.

    What means each file type?
    XML Schema
    Data model
    Preview of a file
    Breaking control file

    This is explained in the manual 'Oracle XML Publisher Administration and the Developer Guide Release 12' - http://docs.oracle.com/cd/B34956_01/current/acrobat/120xdoig.pdf

    I have an XML file and a XSL file. I need to have an output in XML format.

    So I installed my XML file in the data definition of data model.
    And the XSL file in the templates.

    Am I wrong?

    Good - See Chapter 2, "Creating the model" and Chapter 5 "models and chapter data ' in the same doc referenced above for more details.

    Thank you
    Hussein

  • Cannot change the type of data in the columns referenced by foreign keys

    Hello:

    I'm using Version 3.1.0.691 and change the types of data in many columns of data derived from the field types. If a column is referenced by a foreign key, however, the data type radio buttons are grayed out. I suppose that if I deleted the foreign key, that I would be able to change the data type of the column to a field, but that would be tedious. Is there another way to go about this?

    Any help would be greatly appreciated.

    Thank you

    Doc

    Hi Doc,

    If a column is referenced by a foreign key, however, the data type radio buttons are grayed out.

    It is not good - if you have the PK column, and it is called by another FK column you can change the data type of column PK and FK column data type will follow the change. You cannot manually change the data type of column FK. Good column PK itself could relate to another column, and in this case you cannot change the data type of column PK.
    In your case - you need to find the first PK/Uk column that is not the column FK itself and change its data type. FK columns in the chain will follow.

    Philippe

  • How to remove data definition form XML Publisher administrator

    Hi all
    I want to ask is possible to delete the existing data definition of responsibility of the administrator of the Publisher XML?


    Version: 11.1.0.7.0


    Kind regards

    Alexander.

    http://symplik.blogspot.com/2010/06/how-to-delete-XML-Publisher-definition.html
    or manually from the
    XDO_TEMPLATES_B
    XDO_DS_DEFINITIONS_B

Maybe you are looking for