EBS high availability VS. Continuity

Hi all

I'm confused about high availability and business continuity.

They are the same or similar?

Assuming I have cluster tier1 Apps and Apps-teir2 installation on the same instance.

If Apps-teir1 fails, users assigned to that transferred to Apps - level 2 will be and vice versa?

If they do fail-overed in another layer Apps, what do you call this kind of configuration?

Is - this high availability and business continuity? or other type of installation available in EBS?

How about the Site configuration after disaster with dataguard standby server.

If the PROD fails, it will automatically transfer to the Site of recovery with dataguard. Can it be called high-availability as well?

Kindly enlighten please...

Thank you very much

JC

For your type of installation, it will work, but you have to take care now

1.) as DB side is supported by the installer of dataguard, phase applications file system, you will need to find ways to transfer files on Server2. Maybe you can use Rsync.

2.) failure to PROD you convert DB mode ensures prod.

3.) next to the application, you will need to run the combination adcfgclone/autoconfig (what URL you want to have Dr. Côté, CM Setup etc.)

Please be aware that in the case of installation Ebiz DR there will always a downtime (you can reduce to a minimum the same but can't avoid it)

concerning

Pravin

Tags: Oracle Applications

Similar Questions

  • Deployment of high availability of the IPCC 4.5

    In a future HD architecture implementation, the voice service will provide CallManager 5.0, that will integrate with 4.5 of the IPCC. 4.5 (required with 5.0 CM) IPCC does implement a high availability. How can we ensure that technical support continues to operate if the IPCC goes down? One possibility might be to configure CM such that if the IPCC goes down, all the number of help desk calls are automatically and immediately headed to a group (which includes all extensions help desk). This redirection can be configured in CM? Is there a better option?

    Thanks in advance,

    SB

    This is your best bet. On the road Points for your call center just put the call before busy, no answer and failure to the fighter pilot. Thus, when the IPCC Express Server is down it will sent to your fighter pilot.

    Please evaluate the useful messages.

    adignan - berbee

  • ODI 11 g high availability features

    Hello

    Is there a link to all official documentation describing how ODI can be configured for high availability, and more specifically, which described how agents and repositories behave in case of failure.

    I saw the notes on how to configure the load balancing between two or more agents.

    However, I would like to know what happens if an agent fails:

    • Is there a process of follow-up that imprisons the failure and tries to restart the agent?
    • In this case, the ODI load balancer will be perfectly direct traffic only to available agents.
    • What happens if the agent fails in the middle of a stage of script performance?
    • Will of the database session, getting lost and rollback?
    • Stop the script or remaining available agents will manage the process of running success?

    Similar requests are the repository itself - if the master repository database or the work fails what is happening? Assuming, the repository is installed on a multiple-node cluster environment, if only one node fails, everything will run scenario fail (and need to reboot) or that there is a transparent failover to the remaining nodes in the cluster housing deposits ODI?

    I have a requirement where the ETL (ODI) system must be available 99.5% of the year and thus resilience is a key factor and I need to understand the capabilities.

    I need to know if high in ODI availability simply means that a process is restarted, if a node or agent fails, or if an existing process will continue until the end due to a transparent failover.

    see you soon,

    John

    Take a look at the link below:

    http://www.rittmanmead.com/2012/03/deploying-ODI-11g-agents-for-high-availability-and-load-balancing/

    I hope this has given a table on this topic clear about close.

    Apart from this we use EM to monitor the status of the Agent.

    See you soon!

    SH! going

  • Configuration of high availability.

    Hello

    Please help me to configure high availability for Foglight existing environment, please send me the steps and requirements of pre.

    How many servers can exist in a cluster?

    Capacity how do we need on the primary server and the other servers if there is a failure?

    We currently have 1 unifying and 3 child FMS.

    version: 5.6.10

    Thank you

    Vicky

    Vicky,

    There are 2 very useful field guides that go through the requirements and the Setup process.

    High Availability Guide - http://edocs.quest.com/foglight/5610/doc/wwhelp/wwhimpl/common/html/frameset.htm?context=field&file=HA-field/index.php&single=true

    Federation of field guide-

    http://eDOCS.quest.com/Foglight/5610/doc/wwhelp/wwhimpl/common/HTML/frameset.htm?context=field&file=Federation-field/index.php&single=true

    Note the following points, known issue

    http://eDOCS.quest.com/Foglight/5611/doc/wwhelp/wwhimpl/common/HTML/frameset.htm?context=field&file=HA-field/overview.1.php&single=true

    "A master of the Federation running in mode high availability is not supported. Only children Federated can be run by high availability. »

    Golan

  • High availability of components in the design of vWorkspace tips

    Hi all

    Would ask you some advice regarding the design of vWorkspace components highly available. Suppose that vWorkspace components will be deployed in vSphere or hypervisors managed SCVMM hence HA is in place, if the failure of a host. In this situation, if we still need components redundant (n + 1 VMS) vWorkspace?

    On the other note, I understand that we can add a couple of broker for vWorkspace in vWorkspace Management Console connections and based on KB 99163 it would just work. I'm not sure how the traffic would be when an application is web access? As in, I guess that the connection broker news would be 'defined' at the request of the web call to the broker for connections. Or this is done automatically? Access Web would choose randomly from the broker for connections to go?

    Thanks for any advice in advance

    Kind regards

    Cyril

    Hi Cyril,.

    Big questions. As with any IT architecture in layers, you must plan HA and redundancy at all points of failure required by your environment or level of Service (SLA) agreements. For vWorkspace, the center of his universe is SQL and you must plan accordingly the failure and recovery. In some environments, full backup can meet the requirement of HA. In others, full SQL Cluster, Mirroring, replication, or Always-On configurations may be required. With our broker, we recommend N + 1 deployment in most scenarios HA. When you move peripheral components or enabling, you must evaluate each component and needs its impact of failure as well as its valuation to determine the appropriate AP.

    Load balancing between several brokers is done automatically by logic in the client connectors. In the case of Web access, when you configure the site Web Access in the Management Console, it includes broker list in the Web access configuration xml file. As client connectors, Web Access includes balancing logic that distributes the client load on brokers available automatically.

    If you have any questions about specific components and requirements of HA or architecture, please add them in the discussions.

  • WLC 5508 high availability

    Hello

    Today I have two WLC 5508 (with license for 100 AP each of them), on a single site.

    The WLC work availability (active-standby).

    However, we have a new scenario, with 02 sites: A and B (attachment).

    I would like to know if it is possible to work as follows:

    The WLC - A as the main controller of site A. WLC - B as a backup (BDC) of WLC.-a.

    The WLC - B that has the PDC site B. WLC - as a backup (BDC) to WLC - B.

    For example:

    If WLC - a falls, site access Points are managed by B WLC site - B and vice versa.

    Is this possible?

    How can I configure the new scenario? Don't forget, there is a site-to-site between Site A and Site b.

    Another point:

    If I add more than 50 APs on Site A. How does the license number?

    Should I buy a license for the two WLC?

    TKS,

    >....

    >.. .is it possible?

    No. , high availability in terms of controller is supposed to be what is said, the backup controller is not 'full' - stby and cannot play other roles.

    M.

  • IPCCX high availability

    Does anyone know if Cisco will provide redundancy standby high availability of IPCC express?

    Chris

    Search in the next major version of the IPCC Express. Last I heard it was scheduled for release next month some time.

    Jim

  • IPS high-availability Solution

    Hi all

    obligation to have redundancy for appliance IPS placed on data center design, I dug on Cisco docs but found the resilience and the HA (High Availability) from the point of view of IPS could take place in the side of switches (HSRP/Eth channel balance).

    is there a visible way to implement high availability of dynamically!

    Kind regards

    Belal

    Yes Belal, both of the things mentioned by you are right. There is no function available which allows "failover" communications between IPS two boxes as do Cisco firewalls.

    Yes Etherchannel load balance traffic to each pair of IP from sensor single src - dst.

    Concerning

    Farrukh

  • SNS with high availability option

    I need help to understand the requirements of network and connectivity to deployment Cisco show and share with the high availability option where the DC and DR are different geographical locations.

    As I understand it, to achieve high availability, the DMM and the SNS servers require a L2 connectivity between the primary and the secondary server. How can this be achieved in a scenario where two data centers are connected by WAN / MAN links?

    Thank you.

    Chaitanya Datar

    + 91 99225 83636

    Hi, Datar,

    I already asked this question to the TAC, and it is unfortunately clear today the HA mode with 2 servers connected mode "back to back" via Ethernet2, REQUIRES to be on the same network of L2.

    It is not yet based on the IP routing layer, and therefore it is did not in charge of the design when using remote data centers...

    :-(

    It's a shame, I know, and I pointed to the BU of the SnS.

    May be part of a next version of work will be based on network IP L3 routed...

    Wait and see.

    Hervé Collignon

    Converged Communications Manager

    Dimension Data Luxembourg.

  • Two WLC 5508 anchor high availability

    Hello.

    It is possible use 2 WLC 5508 EN HOW to ANCHOR in an active scenario?.

    For example, if a WLC down the service, another Dungeon provide service to customers of anchor?

    At the moment we have just a WLC 5508 anchor mode. What do I have to configure high availability of the ANCHOR.

    Thank you very much!!!

    You have redundant WLC as anchor points, but if an anchor fails, the user must reconnect.

    There is a feature on the WLC HA, but it is mainly for foreigners redundancy WLC anchor no redundancy. With guest several anchors overseas WLC balance the load between the two. You will not be able to put a primary or backup.

    Sent by Cisco Support technique iPhone App

  • IPS 4240 high availability?

    Hello

    4240 running in HA mode?

    Or should I look at 4255 if I need to work in HA mode?

    Kindly help me with this info... Thanks in advance.

    Kind regards
    RAM

    Just to add a little bit to Bob's response.  It is possible for the HA, but as mentioned above, it is not HA as you would expect of a firewall and requires significant network planning and is rather technical in nature.

    The best documentation I could find about the designs HA is in chapter 21 - "Deploying Cisco IPS for high availability" and High Performance of Earworms security CCNP 642-627 official Cert Guide, ISBN: 9780132372107.  She gets quite detailed and explains a large number of different methods.

    I was also able to find some information on this site, but it is at a higher level and does not provide as many options.

    https://www.NetworkWorld.com/community/node/18384

    I had to work HA in some of our environments, and I'm here to tell you, plan ahead, far in advance, test several methods to find one that suits.  We were using a method that I just couldn't find it mentioned anywhere.

  • Remove the secondary controller and tertiary high availability for each access point

    I want to remove secondary and tertiary sector controller of high availability for each access point. I have more than 900 APs associated with a Version of the WLC 8510 8.0.121.0 software. What is the best/better way to remove secondary and tertiary controller?
    Or I can create a model first. We use version 2.2

    Hello

    Easiest way:

    Yes you can do this by using the first Cisco Infrastructure, you can create a Setup AP Lightweight model to specify the name of the PDC and the IP address and specify an empty value (choose the first empty option in the drop-down list) and 0.0.0.0 for the secondary and tertiary sector controllers.  Then you can apply this model to the AP, and she must remove (virgins all) values for these fields.

    Long way:

    Yes there is no clean way to remove it from the CLI. you need to manually remove each on the AP.

    Concerning

    Remember messages useful rates

  • NAC Manager high availability peer CAM DEAD

    Hello

    I have two managers of the NAC with high availability and I used both interface eth1 of sides as a link Heartbit.

    I did following steps for high availability.

    (1) synchronize the time between two cams.

    (2) generate a temporary SSL certificate in CAMs and import-export procedure made in the other.

    (3) make a CAM as a primary and the other as secondary.

    But after all this made configuration I can see the State in surveillance > reports-primary CAM is in place in both servers and redundant CAM is down.

    Also on the failover tab, I can see - Local CAM - OK [Active] and counterpart CAM:-DEAD.

    I have attached some screenshots so that you can find the same.

    Your help will be very appreciated.

    Thank you

    Try these steps and check that all steps were followed:

    http://www.Cisco.com/c/en/us/support/docs/security/NAC-appliance-clean-access/99945-NAC-cam-HA.html

  • Fabric interconnecting Cisco high availability

    Hi Experts,

    I would like to know,

    (1) what does fabric adapter interconnection cluster (L1, L2) ports are using high availability?

    (2) can form us able to interconnect fabric and fabric interconnection interconnection 6100 6200 to a cluster? If ok means how they exchange of history since the two are completely different material. ?

    Thanks in advance,

    Jako Raj

    Hello

    (1) L1 and L2 ports are used for the purpose of managing only basically to synchronize data management, triggering a possible failover.

    (2) different hardware platforms are supported in the same cluster only in a process of upgrading equipment. Actually what really happens in this meanwhile is the copy of the configuration and the new FI is promoted as primary. Although he works as a group, he is an active-standby cluster, where a single FI acts as principal.

    Kind regards

  • VPN high availability: double 3 k in the hub and the PIX as rays

    Hi Experts.

    In my scenario, I need routing between the rays and, above all, high availability (HA).

    On the shelves, I have Pix 501/506E, OS ver 6.3. In the hub, I have a couple of redundant VPN3k.

    What mechanism is the best:

    1 - hub and spoke topology with remote EzVPN in rays - to HA, I can take advantage of the "load balancing" feature of the VPN3k?

    2 - hub and spoke topology with remote EzVPN in rays - to HA, I can take advantage of the "backup server" feature of the VPN3k?

    3 any-to-any topology (an IPSEC tunnel between any pair of sites) - for HA, I can take advantage of the 'LAN-to-LAN backup' feature of the VPN3k?

    Thank you

    Michele

    I'd go with NLB on the backup server. With load balancing your connections will be spread over the two hubs. If a hub dies, then at least it will only affect half of your connections, rather than each of them in case of death of your primary and backup servers using.

    If a hub dies, your PIX connections will be de-energized for a short period, but they will be able to reconnect back automatically without making you no change.

Maybe you are looking for

  • Disabled Iphone 5s

    My 5s iPhone is disabled and its 'home' button is also broken. I can't connect to iTunes, and I can put it in recovery mode. I don't know what to do.

  • Looking for DVD recover my Satellite P200

    Hello I am looking for a DVD reinstall my Satellite P200 - 12 K (preferably in french)Thank you for your help. Philippe

  • Satellite L500-246 - HARD drive not found in BIOS

    Good afternoon My problem is that I have a Toshiba L500 - 246 to oblivion, put a password on Windows 7 and now, don't remember. I decided to start over and delete the entire computer. I clean the fan, I put thermal paste to the processor and the grap

  • Equium P200 1IR - update driver display

    I have been using my Equium P200 1IR awhile to play world of Warcraft. After an update the game crashes now, the screen becomes black when I'm in an area of the game where there are a lot of things. WoW advised me now, they do not support my driver w

  • HP Pavilion x 2 10-n100na swimming: choosing a memory card

    I just took one as a gift for my daughter. I want to buy a good SD card, but you need to know what size and speed is supported by this product. I would go for the UH-1 type SDHC card, but I'm worried the laptop would not support. Can someone tell me