What is the schedule?

I am curious about the timeline for Browserlab.  It seems that we are looking to an alpha here until this right?

I tried to load a lightweight flash homepage (http://www.emcp.com) that I have worked on and he only appears in one of 4 browsers... and only after I had given up on this topic.  (IE7 + XP).  Even for this one, it does not as it really does using IE 7 + XP.

I could really see the usefulness of this product, but only if it displays the pages as they appear in the target operating system/browser AND it supports interactivity.  Most of the Web sites we build requires a connection before you would see at any screen of interest, and ALL have Visual responses to the passage of the mouse, etc. seen static so as there are here are not so useful.

It is a business of "BOLD", I'll be checking back from time to time.

Integration of Greg - Dreamweaver CS4 Live View with BrowserLab allows you to send interactive States of local site/design directly to BrowserLab (dynamic data, rollover and mouse interaction States, States of widget, and al.), and behind the firewall not less - without any doubt a scenario we've covered.  You can get extensions (which require Dreamweaver CS4, of course) upward on the Labs: site: http://labs.adobe.com/technologies/browserlab/

Tags: Adobe Story

Similar Questions

  • What is the scheduled task ' in * ' (there are a lot of tasks (At25 - At192))

    I use Ccleaner on my desktop and it showed a lot of tasks scheduled with the name 'At' and a number behind them (25-192). They seem to be run by the same file "WQ3203G0.exe", so I was wondering what all these tasks/is this file?

    There is a certain malware (details of which I can't find in my notes) which creates a lot of scheduled tasks in your system, so it seems that your system is currently or has been infected by malware.

    Tell us about your system and run some known malware scanners on request and you can clean up the mess that might be left behind.

    Since the implementation of the Microsoft Answers forum does not ask for any kind of information system when a new question is asked, we know absolutely nothing about your system.  Not knowing the basic information a problem prolongs the frustration and the agony of these issues.

    Thank you MS Answers, allowing the resolution of simple problems as frustrating and a lot of time as possible.

    Provide information on your system, the better you can:

    What is your system brand and model?

    What is your Version of XP and the Service Pack?

    Describe your current antivirus and software anti malware situation: McAfee, Symantec, Norton, Spybot, AVG, Avira!, MSE, Panda, Trend Micro, CA, Defender, ZoneAlarm, PC Tools, Comodo, etc..

    The afflicted system has a working CD/DVD (internal or external) drive?

    You have a genuine XP installation CD bootable, which is the same Service as your installed Service Pack (this is not the same as any recovery CD provided with your system)?

    No matter what you use for malware protection, follow these steps:

    Download, install, update, and make at least an analysis full (not at the same time) with these free malware detection programs:
    SUPERAntiSpyware: (SAS): http://www.superantispyware.com/

    These comprehensive analyses can take some time, but you really need to run.  SAS will probably be just a bunch of Internet tracking cookies, but you can remove them.  Once you have done at least a full analysis, you can do quick scans in the future to save time and save the analyses complete for when you have more time or are really suspicious of an infection of the system.

    They can be uninstalled later if you wish.

  • So what's the problem, a timeline for this problem of 9.3 activation?

    I joined the club of activation of! What is the schedule for the difficulty?

    Only Apple knows and I'm afraid it is usually a case of "Here is the fix" or sometimes simply without fanfare or announcement.

  • What are the hours for the sessions from tomorrow

    What are the schedules for the sessions from the 'tomorrow' or how to plan my own schedule?

    The materials for each week, starting March 31, will be available on the main page at 12:00 (midnight) GMT/UTC.

    The complete schedule is here: Details of the schedule for the MOOC (March)

  • My computer makes a clicking noise at random - in the diagnosis of the Apple what is the meaning of error 4HDD/30 / 40000005:SATA (0,0) Please?

    My computer makes a clicking noise at random - in the diagnosis of the Apple what is the meaning of error 4HDD/30 / 40000005:SATA (0,0) Please?

    Several clues:

    1. HARD and SATA drive in the message... On the way SATA HARD drive
    2. Clicking noise, which is an early signal of imminent death for HARD drive (there are only two types of readers... those who died and those who will be)

    I would like to start keep good clones (CarbonCopyClone, bombich.com, $40) for external drives or backups Time Machine.  Any backup of the drive, not just your favorite parts.  Perform backups on a schedule without fail IMHO.

    You can also start to consider a SSD at macsales.com (their mercury collection is highly recommended) or a new HARD disk, at least start planning if the SSD cost is worth the benefit of speed on the HARD drive.  You can buy it later.

    Just my paranoid approach to this situation.

  • I'm restaurant a 2003 server machine work. She asked a gentleman confirmation with 'Yes' and 'no' buttons. I need a command that can answer that the dialogue when the schedule runs.

    Hi all

    I'm restaurant work that stops a service from one application to the 2003 server machine. She asked a gentleman confirmation with 'Yes' and 'no' buttons. I need a command that can answer that dialogue with 'Yes' at the time of the schedule runs.

    Thank you

    Arun

    Hello

    Are you referring to Windows Server 2003?

    The question you have posted is related to professional level support. Please visit the link below to find a community that will support what ask you:

    http://social.technet.Microsoft.com/forums/en-us/category/WindowsServer

  • Windows XP Pro - failure of the scheduled task?

    Why my regular job failure?

    Is there an example page on things to do and not do?

    I have a backup program will not work correctly.

    TY,

    Bill

    Hi Bill,

    1. what exactly happens when you run the backup program?

    If a scheduled task does not run when you expect it, right-click the task, and then click Properties. On the Task tab, make sure that the enabled check box is selected. On the tab schedule, check that planning is set correctly.

    See scheduled tasks troubleshooting
    See also How do I solve the scheduled tasks in Windows XP

    Visit our Microsoft answers feedback Forum and let us know what you think.

  • change the scheduled backup time

    I put the backup to run at a certain time every day. How can I change the scheduled start back up again? I can't find anything that allows me to change the scheduled time for the backup.

    Hello
     
    You can change the settings to plan return at another time.
    In the article below, refer to the section "to change automatic backups.
    Set up or change automatic backup settings
    http://Windows.Microsoft.com/en-us/Windows7/set-up-or-change-automatic-backup-settings
     
    For more information, refer to the article below.
    Back up and restore: frequently asked questions
    http://Windows.Microsoft.com/en-us/Windows-Vista/back-up-and-restore-frequently-asked-questions
     
     
    I hope this helps.

    Thank you, and in what concerns:
    Shekhar S - Microsoft technical support.

    Visit our Microsoft answers feedback Forum and let us know what you think.
    If this post can help solve your problem, please click the 'Mark as answer' or 'Useful' at the top of this message. Marking a post as answer, or relatively useful, you help others find the answer more quickly.

  • Windows 7 Task Scheduler is not wake the portable computer at the scheduled time

    Instead of stopping my laptop, I put it to sleep at night. Later, the laptop is expected to execute the sequence of tasks scheduled in my windows-7:

    1. 04:00, run a task "A". To perform this task, the laptop awakens from his sleep because "task" was to "wake the computer to run this task" activated.
    2. 05:06, Hibernate (not to be confused with sleep) the laptop by running the command "rundll32.exe powrprof.dll, SetSuspendState 0,0,0.
    3. 05:30, running a "task B". To perform this task, the laptop is supposed to wake up from hibernation, because this "task B" has also the "wake the computer to run this task" activated.

    The problem:

    Faithfully, the laptop awakens from his sleep at 04:00 to run "task A". However, it is not always faithful to wake up from hibernation at 05:30. 3 days (April 13), he stood at 05:46 instead of 05:30. Today, he was not awake to the top even by 06:05!

    Then, there are following around this interesting phenomenon :

    1. Today at 06:05, when I found that the cell had not awakened, I checked if the food was THERE... it wasn't. As soon as I turned on the power, he automatically stood. When he awoke, he showed that the battery is charged to 64%! Which implies, my manual operation of switches WE supply should not have been necessary in the first place!

      Earlier, on 13 April, however, no manual intervention of any kind has happened and the computer had its power supply IT throughout the night. Yet he stood AFTER the scheduled time.

    2. Then, this Act of waking from hibernation after the scheduled time is fascinating to me. From my point of view, the computer must either wake up on time, or it does not wake up at all because I chose NEITHER option "Run task as soon as possible after a regular check is not respected" , OR the ' if the task fails, restart every ' option.

    Here, I would like to bring a few details & confirmations:

    1. There is no defect in the backup provided by the battery of my laptop because it provides a safe backup for about 2 to 3 hours. Even if I'm typing this message, actually on battery, not on a current area of my laptop power supply.
    2. I usually leave the computer power mobile power during the night as a precaution against the batteries running out of power. Even on 13 April, it was YOU. Last night was the first exception to this regime, which began 21 days ago.
    3. I don't have either the "start the task only if the computer is powered" or the "Stop if the computer switches to battery power" options enabled for a task planned in question.
    4. I also have the advanced power settings "allow wake timers" is set to enable for "on battery" and "Plugged In".

    So, I have the following questions:

    1. Why computer faithfully to wake up from its sleep, but not as faithfully to wake up from hibernation?
    2. The State of food plays a role any in this Act of waking from hibernation? Does it matter if the computer is on battery or plugged when waking up when "start it the task if the computer is powered" or the option "stop if the computer switches to battery power" enabled?
    3. Finally, what can I do to correct this erratic behavior?

    Right - a scheduled task cannot be configured to wake the system from hibernation.

    In the properties of the task, the Condition is "wake the computer to run this task":

    The key words here are "Wake" and "Sleep".

    When your system is in sleep, he is still able to get a stimulus like a click of the mouse or keyboard stroke to wake up or a scheduled task to wake him up.

    The only way you can be awakened, it's if you sleep - you cannot be reactivated if you are hibernating (aka powered off completely = death).

    You cannot use a ST to wake the computer after Hibernation.

    You might be able to set an option in the BIOS to power the system at some point and have then an era channel a few minutes after this date.

    You may be able to configure your router to send a WOL packet (wake on LAN) to the system to a point and then have an era handle a few minutes after that date.

    Useless answers?

    Some often banned users has some good tips:

    Ignore responses that begin with the words "Hi" or "Hello" contain methods and steps, ignore phrases that start with the word 'try' and responses that end with the words "check if it helps" you can save yourself a lot of time and frustration.

  • Scheduler is unable to read the calendar error "the scheduled task no longer exist.

    When I start the Scheduler I get

    Click Refresh doesn't help. It is a matter of concern.

    Please tell me, "what is wrong and what I do about it?"

    Thank you

    Hello

    If you have tried a repair install, and it has not solved your problem, I can now tell you that you try to perform a clean install, which will restore the entire computer to factory settings.

    Make sure you back up all your data.

    How to perform a clean installation of Windows 7

    http://www.SevenForums.com/tutorials/1649-clean-install-Windows-7-a.html

    Thank you

    Party of Lighthouse

  • Permission to create/run the scheduled task

    Hello

    I'm running Windows 7 Pro RTM and I try to use my normal user account to create and run a new scheduled task, but whenever I try to save the task, I get an error msg saying "Task Scheduler cannot create the task.» Does not know the user account, the password is incorrect or the user account doesn't have permission to create this task".

    I have no problems running tasks under my admin account, but I don't want to use it for everyday purposes. I'm also sure that this error must be because of permissions problems, so can I know what is the privilege that a user must have to create/run one account task?

    Thank you very much

    Hi hifer,.

    Please use the forum for answers,

    If your account is a standard account, you will not have permission to create a task or schedule task.  Your account must be an administrator account to schedule the task for the system or it must be run as an administrator.

    It have additional permissions, you can add standard user profile to allow the profile to create the task.  But this option is not available in all versions of Windows and rather complicated.  You can try to add these groups to your profile using computer management in administrative tools.  User with power and Backup administrator can provide you with the authorization that you need if the groups are available with your version of Windows 7.

    Hope this helps,

    Kevin
    Microsoft Answers Support Engineer
    Visit our Microsoft answers feedback Forum and let us know what you think.

  • SQLcl throws the Exception on start and stop operating within the scheduled task

    I'm on Windows Server 2012 R2 runs a script TakeCommand (jpsoft.com) as a task scheduled using SQLcl - 4.2.0.15.177.0246.

    The script is invoked, when the account (with administrative privileges) who runs the scheduled task is not connected to the machine.

    The scenario is as follows:

    • servers both windows ServerA and ServerB (virtual servers)
    • ServerA has a SAN connected directly (as E drive)
    • ServerB remotely accesses drive E on ServerA and maps in drive E (guest ServerB cmd > net use e: \\ServerA\e)
    • the problem occurs on server b.

    Corr 04/09/2015: the SAN is not the cause of the errors/exceptions - it's just that the user who runs the scheduled task is not logged on and therefore has no APPDATA

    When SQLcl is called, the following lines are recorded... (italics: private information, "BOLD": SQLcl output not visible when the user connects while work is carried out at the request)

    03/09/2015 12:16:41.979 to connect to the jdbc URL ... (this output is to the batch calling SQLcl - everything below is SQLcl or SQL script)

    Sep 03, oracle.dbtools.raptor.console.MultiLineHistory load 2015 12:18:05

    SEVERE: HIST-013 APPDATA is null

    Sep 03, oracle.dbtools.raptor.newscriptrunner.commands.net.NetEntries load 2015 12:18:55

    SEVERE: NET-013 APPDATA is null

    Sep 03, 2015 12:18:55 oracle.dbtools.raptor.newscriptrunner.commands.net.NetEntries save

    SEVERE: NET-013 APPDATA is null

    03.09.2015 12:18:56: updated information on what will be done

    0 lines merged.

    0 lines merged.

    03.09.2015 12:19:15: updated information on what will be done

    0 lines merged.

    Exception in thread "cleansing" java.lang.NullPointerException

    in java.io.File. < init > (File.java:277)

    at oracle.dbtools.raptor.newscriptrunner.commands.alias.Aliases.save(Aliases.java:132)

    at oracle.dbtools.raptor.newscriptrunner.commands.alias.Aliases.save(Aliases.java:128)

    to oracle.dbtools.raptor.scriptrunner.cmdline.SqlCli$ 1.run(SqlCli.java:356)

    In addition, that everything works fine... the script is executed as planned, as expected, the queued files are created...

    So what I am doing wrong?

    Best regards, Peter

    Message geändert durch stueckl - information server added

    Message geändert durch stueckl - information server deleted - it's a general problem

    If we were talking about developer SQL itself rather than SQLcl, then the solution is simple... you can always force your user settings to a folder accessible in arbitrary writing using the ide.user.dir environment variable just add something like this line to the file sqldeveloper.conf to your installation:

    AddVMOption - Dide.user.dir =

    SQLcl, however, is hard-coded dependency on APPDATA in Windows (and user.home on Linux).  May not be feasible in your case, but in some cases simple, APPDATA can be overridden in the script that launches the SQLcl and the NetEntries and xml SQL history files are read from / written to this file.

    For example: value APPDATA = C:\Temp

  • What are the major differences between packages and care Plans?

    Hello

    I want to do the parallel scenario planning & sequentially.

    Packages & load Plans are used to Parallel and sequential scheduling.

    I'm getting confused. What is the best for parallel & Scheduling sequentially?.

    To do this, what should I choose for planning, packages or support Plans?

    In what situations, we will use special & plans load packages?

    I tried to do this. I'm still confuse is...

    Please help me.

    Thanks in advance,

    A.Kavya.

    Might be useful to have a read of https://blogs.oracle.com/dataintegration/entry/what_s_new_with_oracle

    It has a 'Load Plans vs Packages' section that goes through the differences.

    See you soon

    John

  • What is the hot spot?

    Hi there;

    I read some content on the data warehouse, and I met a sentence as such:

    (context) Hardware and i/o considerations in Data Warehouses-> automatic interleaving->

    "For probes of index (for example, within a nested loop join or parallel index scan interval), interlacing of operating system allows you to avoid hot spots by evenly distributing I/O on the discs." http://docs.Oracle.com/CD/B10500_01/server.920/a96520/hardware.htm


    What is the hot spot? Could you please explain briefly; Thanks in advance.

    Post edited by: tahasozgen

    Hot spots: a quarrel of disc, i.e. when an individual disk drive is overloaded with e/s and have the ability to answer within the time scheduled or desired. The term dates with database I/O performance, where a relatively small segment of the database (hot spot) is responsible for a high number of disk bed and written that overloading a single disc.

    StorageRap: How wide distribution eliminates hot spots and displays excellent performance

    Concerning

    Girish Sharma

  • What is the difference between POS and VSC? Which should I use?

    Hello

    Turns out we have a multitude of backup running for our virtual machine environment. We lack vCenter 6.0, 6.1 VDP, VSC 6.2P1, SnapManager for SQL and SnapMirror jobs put in place in OnCommand 3.1.2.

    I go crazy trying to pierce the need to have all these products running of backups and snapmirroring data. Bottom line, our SnapMirrors for one or two Volumes take f o r e v e r... And that impacts my tests of SRM (when you use the replication of data).

    I'm trying to clean up, he perfected down, consolidation, re-scheduling and friction on all these solutions. And in the middle of my panic, I thought that "these all do essentially the same thing? Taking snapshots and SnapMirroring data? »

    So, my question to the community is, what is the difference between these solutions, or are they all essentially do the same thing? They confront each other, vying for the band width and stumbling on them to achieve the same thing? Right now my plan is to suspend all work of everything except VSC and SnapManager for SQL and do all this from VSC. This means suspend jobs in NetApp services.

    I'm not the admin for POS, it is my co-worker, so he who installed independently of my work. Is it still necessary?

    What brought me to all of this, besides the failure of MRS to transfer data (SnapMirror on request within a reasonable time) was noting the deltas for our work of snapshot is always huge at certain times of the day. For example, our biggest pork of data has a light snapshot at midnight, and he is constantly 71GB. This leads me to believe that this is a job, because it is predictable. The net effect is SnapMirror jobs take days, latency are several days and transfers has never really stop.

    We plan to upgrade our pipe between our protected Site (HQ) and our DR Site (branch) of 50mbps at 100 Mbps. We have 100 out of our headquarters and 50 in our satellite TV right now, so we want to both be 100. Maybe that would solve the issue, but I still would be pretty effective.

    If you need more information, let me know and I will fill you, or less make up something so I look like I know what I'm talking about.

    TIA!

    Steve

    The reason why you do SnapMirror replication is DR. It is not a backup solution. If you stop all your SnapMirrors in OnCommand Unified Manager and your storage array, the production goes down, you no longer have a DR.

    What does VSC is, it creates snapshots of your NetApp volumes, you can use for short term backup/recovery. The snapshots are not a real backup solution, however. If someone deletes a volume on the NetApp snapshots of this volume will not save you because they no longer exist. But they are still useful in many scenarios, such as Previous Versions of Microsoft CIFS options.

    SnapManager aims to make consistent snapshots of demand for software such as MS SQL in your case. Instant database do not give you this ability, as they do not trigger the VSS suspension. More SnapManager for SQL gives you point in the ability to recover in time for your databases to SQL transaction logs, which provide none of the solutions above. However, as SnapManager creates snapshots, you must make sure that you have dedicated LUN for you SQL VM, otherwise you will be taking snapshots of the same volumes twice.

    And now VDP makes backups of your environment. It supports long-term retention, as snapshots in general are not kept for more than one week or one month. Make sure that the data are stored on a separate volume from where are your virtual machines. Or ideally to a destination that is external to your storage group.

    Hope that clears things up a bit. The result is, what you have is perfectly fine.

Maybe you are looking for

  • Satellite A200 cannot find the storage driver

    I have a laptop satellite A200 and everytime I restart the computer, it can not find the ' armazenamento driver of massa "in English, I guess it's"storage driver. We can I find it?

  • How can I configure dual-boot with Windows XP and Windows Vista?

    Vista/xp problem Help a friend who currently has installed vista.  What should I do if I want to dual boot with xp (not installed at the time) Thank you

  • HP 6700 in paper

    Had problems with alignment.  As suggested in the forum, ran the clean printhead under Tools.  Now, it is said to add paper, I did.  Then he said: HP recommends HP ColorLok paper, so I added features.  Is not no longer works.  I turned off the printe

  • Native SDK for BlackBerry Tablet OS Beta 1

    I'm new to the BlackBerry development environment. I installed "native SDK for BlackBerry Tablet OS Beta 1 and also I have installedBlackBerry PlayBook Simula in VMware Player.» Now, I want to write some code to test it on the 'Simular '. Since this

  • Programas n applications application compatibility program

    Como puedo hacer than no programa than worked en xp work in Windows 8?