11i to R12 upgrade with Arabic NLS

Hi gurus,

I'm in the middle of the reclassification of 11i to R12. I know that the entire process of the R12 11i upgrade and I did a few times successfully. But now I have a new client who has also NLS (Arabic) already installed on their 11i instance. Please guide me on the steps I need to take care of this (Arab) NLS component.

Thanks in advance.

Best regards
Sadiq.

Khan wrote:
Thank you again for Hussein. One last question-
I used
options adpatch = nocopyportion, nogenerateportion = u6678700.log driver logfile = u6678700.drv
While applying the American pilot. Do I need to use the same adpatch, i.e. nocopyportion, nogenerateportion options, even in the Arab driver?

No, adpatch of use without option because you will need to copy and generate the files in the patch you downloaded from the e-Delivery Web site.

Thank you
Hussein

Tags: Oracle Applications

Similar Questions

  • Upgrade 11i to R12.2 with active languages activated

    Hello.

    We intend to improve existing R12.2 11i. We currently have 14 languages enabled in 11i.

    When installing R12.2 mode of upgrading and internationalization article, if we need to select all 14 languages or only English American and on the post upgrade allply nls patches for all languages. ?

    Please help us on this. ?

    NLS_LANGUAGE
    ------------------------------
    AMERICAN
    German
    Spanish
    LATIN AMERICAN SPANISH
    French
    FRENCH CANADIAN
    Hungarian
    Italian
    Japanese
    Polish
    Portuguese
    Romanian
    Chinese Simplified
    Chinese Traditional

    14 selected lines.

    Thank you.
    RACLOT

    Select the languages to this step, then apply NLS languages later as part of the upgrade- http://docs.oracle.com/cd/E18727_01/doc.121/e12842/T422699g54547.htm

    Thank you

    Hussein

  • 11i to R12 upgrade: impossible to merge the patch 9179588:R12. AD. B with 9477107:R12. AD. 7461070:R12 B and patch. AD. B.1

    Hello Sir,

    According to the readme for Patch 9179588 , I'm trying to merge the patch (9179588:R12. AD. (B) with 9477107:R12. AD. B and R12. AD. B.1

    ()7461070 fix). When I run admrgpch without the option - admode, admrgpch succeeds.

    However, when I just add option - admode in the same command, get the error this invalid "-s" option To please see below the details and suggest as there Note: this merger should be a full merger with - admode.


    +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

    drix10: / fmstop/patches/R1211AD/fusion > ls - lrt

    13992 total

    -rw - r - r - 1 appltest s/n 7035668 03 August at 10:59 p7461070_R12_AIX64 - 5L .zip

    -rw - r - r - 1 appltest 79016 04 August at 03:48 p9179588_R12 dba. AD. B_R12_GENERIC.zip

    -rw - r - r - 1 appltest 38579 04 August to 05:22 p9477107_R12 dba. AD. B_R12_GENERIC.zip

    -rw - r - r - 1 appltest s/n 94 04 August 13:27 manifest.txt

    drix10: / fmstop/patches/R1211AD/fusion > cat manifest.txt

    p7461070_R12_AIX64 - 5L .zip

    p9179588_R12. AD. B_R12_GENERIC.zip

    p9477107_R12. AD. B_R12_GENERIC.zip

    drix10: / fmstop/patches/R1211AD/fusion >

    drix10: / fmstop/patches/R1211AD/fusion > admrgpch - admode s/fmstop/patches/R1211AD/merge/fmstop/patches/R1211AD/merge-merge_name d merged_R12AD11-manifest manifest.txt

    Error: Invalid Option: s

    use: admrgpch-help

    admrgpch < repertoire_source > < repertoire_destination >

    admrgpch s < repertoire_source > < repertoire_destination > d

    [-> level < detailed] [- merge_name < model >]

    [- manifest < Filename >] [- logfile < Filename >]

    where

    * - help Print message.

    * - < level > detailed can be: {0 (SILENT),

    1 (quiet), 2 (VERBOSE) or 3 (LOUD)}

    Default is-1 (QUIET).

    * - merge_name < model > the name of the merged patch (up to 24 characters).

    Default - "merged".

    * - s < repertoire_source > path of the source directory where all the patches to be

    merged have been decompressed.

    * d < repertoire_destination > path of the destination directory where the merger

    patch will be created.

    * - manifest < Filename > full path of a file that contains the list of

    patch to merge zip files.

    the name of the logfile - logfile < Filename > Admrgpch.

    Default: "" < CWD > / admrgpch.log "."


    +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

    Without the option - admode:

    drix10: / fmstop/patches/R1211AD/fusion > admrgpch s/fmstop/patches/R1211AD/merge/fmstop/patches/R1211AD/merge-merge_name d merged_R12AD11-manifest manifest.txt

    decompression p7461070_R12_AIX64 - 5L .zip...

    p9179588_R12 decompression. AD. B_R12_GENERIC.zip...

    p9477107_R12 decompression. AD. B_R12_GENERIC.zip...

    Execution of the merger of pilots patch

    -Corrective treatment: / fmstop/patches/R1211AD/merge/7461070

    -Treatment did patch: / fmstop/patches/R1211AD/merge/7461070

    -Corrective treatment: / fmstop/patches/R1211AD/merge/9179588

    -Treatment did patch: / fmstop/patches/R1211AD/merge/9179588

    -Corrective treatment: / fmstop/patches/R1211AD/merge/9477107

    -Treatment did patch: / fmstop/patches/R1211AD/merge/9477107

    Copying files...

    all 5%. Files copied from 44 876...

    all the 10%. Files copied from 88 of 876...

    all the 15%. Files copied from 132 of 876...

    all the 20%. Files copied from 176 of 876...

    all the 25%. Files copied from 219 876...

    all the 30%. Files copied from 876 263...

    all 35%. Files copied from 876 307...

    all 40%. Copied the files of 876 351...

    all 45%. Files copied from 395 876...

    all 50%. Files copied from 438 of 876...

    all 55%. Files copied from 876 482...

    all 60%. Files copied from 876 526...

    all the 65%. Files copied from 876 570...

    all 70%. Copied 614 876 records...

    all the 75%. Copied 657 876 files...

    80% finished. Copied 701 876 files...

    85% full. Files copied from 876 745...

    90% full. Copied 789 876 files...

    95% full. Files copied from 833 876...

    100% full. Copying files from 876 876...

    Character file conversion set...

    3 unified drivers merged.

    Patch merger completed successfully

    Please check the log file in. / admrgpch.log.

    +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++

    I will carry out admrgpch after that supply 11i environment and the version of admrgpch is:

    drix10:/fmstop/fmstest/fmstestappl/ad/11.5.0/bin > adident Header admerge.pl

    admerge.pl:

    $Header admerge.pl 115.22 nissubra noship 18/09/2008-12:12:08 $

    You must use the binary of R12 to perform the merge, not files binary 11i

    Srini

  • Migration from HP-PARISC to HP Itanium platform with 11i to R12 upgr

    Hello

    I need to accomplish the following tasks-

    The PARISC HP HP Itanium server integrity server upgrade
    Upgrade database Oracle 10 g 2 to 11 GR 2
    E business Suite Upgrade from 11.5.10.2 to R12 12.1.3

    I think of the following approach-

    I am aware that the 11i applications is not supported by HP Itanium.
    I'm 1st upgrade 10.2.0.4 Database 11.2.0.x on source HP PARISC
    Then install 11 GR 2 (software only) to target Itanium HP.

    After that, I'm not sure about the next steps. I doubt as who is going to be an approach appropriate in the following 2 -.

    Upgrade to 11.5.10.2 to 12.1.1 PARISC HP source and then cloning of PARISC HP to HP Itanium (don't know if its compatible, please confirm if we can do in this situation the cloning)

    or

    Import/export of Perform from source to target to help Note.557738.1
    Run applications update to the source HP 11.5.10.2 to 12.1.1 PARISC and then migrate from platform to help notes 438086.1 .


    I pray the gurus advising me please with a good approach.

    Thank you
    Khan

    I'm 1st upgrade 10.2.0.4 Database 11.2.0.x on source HP PARISC

    Correct - Database interoperability Notes Oracle EBS 11i with Oracle 11 g 2 (11.2.0.1) [ID 1265268.1]

    Then install 11 GR 2 (software only) to target Itanium HP.

    In this step, see (using Oracle EBS with a layer of database Configuration from Split on 11 GR 2 [946413.1 ID]) - you will have to follow (database to migrate HP PA-RISC (Option C) to HP Itanium).

    In doing the above, you have Oracle Database 11 g 2, installed on the machine HP Itanium (so, no need to export/import the database later).

    After that, I'm not sure about the next steps. I doubt as who is going to be an approach appropriate in the following 2 -.

    Upgrade to 11.5.10.2 to 12.1.1 PARISC HP source and then cloning of PARISC HP to HP Itanium (don't know if its compatible, please confirm if we can do in this situation the cloning)

    Cloning is not a valid option here.

    or

    Perform export/import source to the target using Note.557738.1

    No need to import/export that you have already migrated the database 11 GR 2 (as shown above).

    Run applications update to the source HP 11.5.10.2 to 12.1.1 PARISC and then perform a platform migration using the notes 438086.1.

    Fix.

    For example, the steps are:

    1) upgrade the 10.2.0.4 database to 11.2.0.x on source HP PARISC
    (2) to migrate the database from HP Itanium, 11 GR 2
    (3) 11i to R12 on PARISC HP update
    (4) migrate layer Application R12 to HP Itanium

    You could also log an SR to confirm that the foregoing with Oracle support.

    Thank you
    Hussein

  • Patches NLS after reclassification of 11i to R12

    Hello
    After the upgrade of oracle 11i to R12 applications should I apply patch 6678700 .drv to the additional language. Or instead should I synchronize NLS and american English patch.

    I am referring to the upgrade guide R121 no page: 3-5 and 3-6.
    Oracle Applications NLS, version 12.1 [ID 788053.1]

    Thank you
    Taher

    Thank you. Can I combine the language English and installed the patch 6678700patch.

    Yes.

    Thank you
    Hussein

  • Refresh your EBS 11i to R12 on Solaris 10.

    Hi all,

    My environment is to have DB-9.2.0.8.0/R11.5.10.2.0 on Solaris 10 - 64 bit.

    You will need to update to DB-11.2.0.3.0/R12.1.3.

    My plan is to upgrade of Database 9i to 11 GR 2 directly according to the following documents of the oracle portal.

    Interoperability Notes Oracle EBS 11i with Oracle Database 11 g 2 (11.2.0).) (Doc ID 881505.1()

    Refresh your application 11i to R12 according to the below documents oracle portal.

    Guidelines for preparation of databases for an upgrade of the E-Business Suite 12.1 output (Doc ID 761570.1()

    Oracle E - Business Suite Guide upgrade: Version 11i release 12.1.1, part number E14010-01

    I can able to upgrade DB from 9i to 11 GR 2 directly, which will create 11 GR 2 oracle_home, even while improving 11i to R12, it will create 11 GR 1 material oracle_home. Which the database oracle_home, that should be used to upgrade R12?

    Thank you and best regards,

    Smocky

    My question is what oracle_home of database we must consider to upgrade R12? and what about another an oracle_home?

    When you run a quick installation, please provide details of the 11.2.0.3 already set to day/install ORACLE_HOME.

    For 11 GR 1 ORACLE_HOME material that is installed by a quick installation, please see (how upgrade Oracle E-Business Suite 11i 12.1.1 to and keep the existing Database 10 g? (Doc ID 1345020.1)).

    Thank you

    Hussein

  • 11i to R12 update (custom application)

    Hi all

    We are studying the process of upgrade 11i to R12

    We have a custom application, how to upgrade this application 11i forms and reports new instance R12.

    I mean who are the people involved in the process of upgrading a custom application for R12 for example (DBA, developer)

    Concerning


    Please visit https://blogs.oracle.com/stevenChan/entry/ebs_121_upgrade_whitepaper

    When it comes to upgrade custom applications, DBA and developers should be involved.

    DBA: Copy the CUSTOM_TOP from 11i to R12 APPL_TOP APPL_TOP and ensure that the CUSTOM_TOP is defined in the env application file and in the file default.env - R12 error "Feature is not available to this responsibility" in trying to be custom access form. (Doc ID 553014.1)

    Developers: Ensure that all forms and reports are compiled with success and work in R12

    Using OracleAS 10.1.2 and forms builders reports with Oracle Applications version 12 (Doc ID 444248.1)

    Cannot open custom after R12 upgrade (Doc ID 552010.1) forms

    How to Upgrade 11i forms customized to R12 (Doc ID 563258.1)

    Do not compile EBS R12 reports using Report Builder from gr 10 2 IDS (Doc ID 786794.1) or rwconverter.sh

    Changes to model data identification between 12.1.3 EBS and EBS prior releases

    https://blogs.Oracle.com/stevenChan/entry/ebs_data_model_1213

    Report of comparison data EBS model [ID 1290886.1]

    Comparison of EBS seed data reports now available

    https://blogs.Oracle.com/stevenChan/entry/ebs_seed_data_comparison_reports

    eTRM

    http://ETRM.Oracle.com

    Thank you

    Hussein

  • DB Upgrade during the R12 upgrade approach

    We have a 11.5.10.2 instance with 10.2.0.5 database and we have the intention to upgrade the database to 11.2.0.3 during our upgrade R12.1.1, as in the notes 761570.1 , we have the Patch C and D of path at our disposal. We decided to use the path C upgrade IE the database to 11.2.0.3 during the upgrade R12 itself and not two windows of downtime. According to this Note 761570.1, in the path c If the database upgrade is part of the R12 upgrade, perform all operations in the Interoperabity Notes except the following:

    Check the versions of the software
    Run adgrants.sql
    Implement and run the automatic configuration
    Recreate the grants and synonyms
    Restart the application server process
    Apply the Oracle human resources (HRMS) patch 7721754

    so that means that we do not have to apply all the patches mentioned under the versions of software to check like patch interoperability, ATG Patch 7456837 etc. on 11i?

    Thank you
    Murali

    You must run directly after the upgrade of database with the exception of the measures that require the application to be upward, then you can implement it after starting the application.

    Thank you
    Hussein

  • Information about the SSO while improving the 11i to R12

    Hi gurus,

    I'm upgrading to 11i to R12 oracle applications.
    My current applications have integrated SSO. Please let me know what things I have to take care about the SSO before moving on to R12?

    Thank you
    Khan.

    With SSO proceeding is similar to a no - SSO instance when it comes to the upgrade of the application and no additional steps are necessary - just follow the upgrade docs (which I believe you know).

    Make sure that you review (integration Oracle E-Business Suite Release 12 with Oracle Internet Directory and Oracle Single Sign-On [376811.1 ID]) to check your installation and configuration once you are finished with the upgrade.

    Thank you
    Hussein

  • Node of collapse during the R12 upgrade

    Hi all

    I have a question regarding the collapse of one of our nodes of E-Business.

    Our current environment is 11.5.9.2. Web/forms are on one W2003 node and "everything else" is on since the HP - UX node. Due to changes in our business, we look at the whole of the application running on a node, our HP - UX server. Of course, we would like to test this out first to make sure that no problem of performance.

    My question: in the 11.5.9.2 > R12 upgrade process, you run rapidwiz. Rapidwiz ask you what components are on which node. I think it should be possible to remove our W2003 node during upgrade (process rapidwiz). Rapidwiz should create services http, etc. on HP - UX and we should be ok? Good or bad?

    Thank you all... colin

    Colin,

    You must move the components you have on Windows server to the node in HP - UX (as shown (Note: 238276.1 - migration to Linux with the Oracle Applications 11i version) before you start the upgrade that you already have files on the Windows node and install quickly running during the upgrade isn't enough.)

    I think that your approach is not supported, you can check with the support of Oracle.

    Note: Please make sure that you have enough resources on the computer from HP - UX and test the performance before proceeding with this plan.

    Kind regards
    Hussein

  • Changes in 11i and R12 file server

    Hi guys,.

    Currently we are upgrading to 11i to R12.

    After the functional analysis, we work for changes to system files between 11i and R12.

    If there is any document on metalink share pls...

    Thank you

    Atul R

    PL see if MOS Doc 1446430.1 can help you

    HTH
    Srini

  • R12 upgrade test

    Hi all

    We have improved of 11.5.10.2 to R12 (12.1.3) on linux (rhel 4.6 to 6.2) platform

    The one you suggest what testing (technical) we have to cross after the R12 upgrade has been done.

    Thank you

    In addition to what you can find in the manual to upgrade Oracle E-Business Suite Upgrade Guide the healthy list of mind, check question would include something like the following:

    Create/update users/responsibilities/functions/menus

    -Introduce the different types of concurrent programs

    S ' ensure cm and workflow works as expected

    -Check the OPMN components and log files

    -Check your custom tops (if any)

    .. etc.

    You should come up with your own list when you upgrade your instance to test and verify the same for the upgrade of production.

    You can Google "R12 Upgrade Lesson Learned" and/or "R12 Post technical Upgrade" and you should get many hits.

    Thank you

    Hussein

  • R12 upgradation, top custom

    Hello


    I have a doubt,
    If I'm customized in my 11.5.10.2 tops/items those who come to R12.1.1 after upgrade?
    Or we must customize those of R12.
    Please specify.

    Thank you
    Chandra

    If I'm customized in my 11.5.10.2 tops/items those who come to R12.1.1 after upgrade?
    Or we must customize those of R12.
    Please specify.

    What do you mean by customizing those? You will need to copy the CUSTOM_TOPs from 11i to R12 APPL_TOP APPL_TOP and edit your custom of .envfile under the directory $APPL_TOP.

    Oracle E-Business Suite Upgrade Guide, version 11i to 12.1.3
    http://docs.Oracle.com/CD/B53825_08/current/Acrobat/121upgrade.PDF

    https://forums.Oracle.com/forums/search.jspa?threadID=&q=custom+and+move+and+R12&objid=C3&DateRange=all&userid=&NumResults=15&rankBy=10001
    https://forums.Oracle.com/forums/search.jspa?threadID=&q=CUSTOM_TOP+and+R12&objid=C3&DateRange=all&userid=&NumResults=15&rankBy=10001

    Thank you
    Hussein

  • After R12 Upgrade login page is not displayed.

    After R12 Upgrade from 11.5.10.2 login page is not displayed.

    I still believe that it's something with the compilation of JSP.

    Please review these documents (search for 'oracle.classloader.util.AnnotatedClassNotFoundException')-[454178.1 ID], [ID 467562.1], [435550.1 ID]

    Please make sure that you compile JSP files successfully and bounce enforcement then.

    Thank you
    Hussein

  • You want to upgrade to OS for my Mcair with mem 4 GB 10.7.5 running. Which that I had to upgrade with? Thank you, hhai65c

    You want to update OS for my Mcair 10.7.5 running 4 GB mem. What operating system should I upgrade with? Thank you, hhai65c

    More details about exactly what MBA you have would be useful?

Maybe you are looking for