70 d changed the sequence of 6 numbers... 5...

Numbers of months old 70 d issued sequence OK in August 31 in the range 600 but September 2 (the next time I used the camera), the sequence changed to 5000 numbers. I manually changed the date from October, but the sequence numbers remained in the 5000 range while she probably had nothing to do with the month change. I did a RESET menu, took a picture and it was just the next number (5102) so some help. In both cases, there are a number of 100 and a dash preceding the sequence number. Any suggestions? Thank you

BTW the FILE NUMBERING of the camera setting is CONTINUOUS

Hello bob70D,

The most likely guilty with something like that will be the card.  It is very likely that the camera is reading a file old numbering (maybe even another Canon EOS DSLR) and "pick up" where numbers fail.

To test this and really to resolve this problem, you need to format the card.  Only that in the unit photo, and only once you have saved your photos.  All first, set up the file numbering camera manual reset and then put in shape.  It will bring everything back to 0001.  Then go back in the Menu and then return to file numbering and choose continuous this time.

Tags: Canon Camera

Similar Questions

  • How can I change the sequence of displayed in Thunderbird mail accounts?

    I need to set up a laptop computer to take on the go. How can I change the sequence (list) of e-mail accounts in the vertical pane to match my office?

    Install this add-on.
    https://addons.Mozilla.org/en-us/Thunderbird/addon/manually-sort-folders/

  • How to change the sequence of films in iMovie Theater

    By exporting iMovie projects in iMovie Theater, the sequence of films is determined by the time of download. How to change the sequence of films in iMovie Theater list?

    HI, breeaz,

    I have not found a way to change the sequence of films shown in the movie screen.

    If you access your movies in the Finder folder, then Ctrl-click on the folder of the theatre, you will find your movies to the poster

    in the alphabetical order in archival records.   I was not able to manually rearrange it.   They can be rearranged in some categories, through the view menu item at the top of the screen and the changes applied to the entire window, but it was not carrying at the display of iMovie.  In General, I'd like to make changes to the structure of iMovie in the finder.  It can cause serious problems.

    Best,

    Rich

  • How can I change the sequence exported to iMovie?

    When I finished making the video and it has exported, some errors found only. How can I change the sequence exported in the application iMovie editing new, mainly texts?

    Just open the project that you exported from iMovie, make the changes necessary, then export again.  (Sod / Murphy's law always ensures that errors found only after export)

    Geoff.

  • How to change the sequence of the BIOS?

    Hello...

    I made a bootable CD... using Seagate Disc Wizard... latest version... my computer does not start from the CD/DVD drive via the USB port of a Seagate 1 TB HDrive.

    I have a new HP Pavilion Slimline desktop PC... 400 224

    How can we change the sequence?

    I was not in the BIOS from a few computers in return... I don't remember how I found it... Obviously, it was easy with the Compaq I had at the time.

    Now, with this Windows 8 (8.1) I can't find anything yet... always moving in from previous HP Pavilion...

    It would be well if HP does not assume or Microsoft assume what is desired by the owner about the 3rd - party backups or the CD/DVD drive boot options are not desired by the new owner. I'm not aware the inner workings computer that well. And I like the way the workings and the protections I used with the old computer. Apparently, I'm not one of those people who likes the change. Confusing times.

    I would appreciate help with this... I'm still on warrante since have approximately a month.

    With great satisfaction... truly... jazzman

    Hi, scratching,

    In all HP computers, there is the start menu, you can go to the startup by pressing the Esc key several times. Herer, you can go to the BIOS boot order and other diagnostic tools.

    I've linked to a document relating to the boot for you order.

    Hope this helps you

    http://h10010.www1.HP.com/ewfrf/wc/document?CC=DK&LC=da&DLC=da&DocName=c01443326

    Please let me know how it works.

  • How can I change the sequence of pictures in the picture library

    It helps to have a button MOVE HERE

    When I went to change the sequence of photos to create a slide show...
    cannot find or change anything.
    Help

    Will not to happen outside of rename photos,.

    Windows live photo gallery offers the possibility to rearrange your photos just for a slide show.

    Open wlpg, find the folder or photos in several different folders, searching all the photos and videos from search on the search up option on top of the left column and begin to look at the little boxes that appear when you hover over the pictures,

    When you have selected all the photos, click on (create a tab, then movie) or if offered slideshow, then all photos of will open it in a review of dialog box and slide it in the direction you want, click the next button when your done and follow the rest of the customization options.

  • Changing the sequence of thumb in the Collections?

    Hello

    I created smart Collections inside the sets of the Collection through keywords, and then I tried to change the sequence of these inches in the order viewing good.

    But the system will not allow it.

    So, what are my options for a group of pictures of various records in one place, in the desired sequence?

    Thank you very much

    Raphael

    PS Ce that means: tag your content to make it easier to find? How I tagged content?

    Open the 'Smart' Collection of images,

    Select all [CTRL + A]

    Create a standard collection [+]

    Change the sort order in the toolbar, or drag and drop to a sort of "Custom".

    'Tag' in my opinion, is another term for "Keyword". When you the keyword of the images he puts a 'Tag' icon on this thumbnail preview.

  • How can I change the sequence of photos in slide shows (especially full frame)?

    I am a beginner of the use of muse.  I don't know how I can change the sequence of photos in slideshows?

    2 ways:

    1. display temporarily thumbnails and drag them to the right place.

    2. open the layers panel, activate the slide show, click on the magnifying glass at the bottom of the layers panel to locate the slideshow widget. Drag the photo entries in the place you want.

  • How to change the sequence?

    Hello gurus,

    I have a sequence like this
    CREATE SEQUENCE  seq_idea
      START WITH 6
      MAXVALUE 9999999999
      MINVALUE 1
      NOCYCLE
      NOCACHE
      NOORDER;
    I want to change the start with 100, can someone tell me how to change the sequence



    Kind regards
    friend

    glory wrote:
    Hello
    You cannot change a sequence created with the value start.
    Better, you drop the sequecne and recreate the sequence with what you want.

    Regads,
    Fame

    See this link
    http://docs.Oracle.com/CD/B28359_01/server.111/b28310/views002.htm#i1006623

    FYI :)

  • Slide show - how to change the sequence of images

    How to change the sequence of images in the slide show.

    I'm trying to highlight in the film strip, and I can drag.  But, when I try to place it somewhere else, it comes in the original location.

    What I am doing wrong?

    Yu can not change the order of the images in the slideshow module.

    To change the order, go to the library module (must be seen grid), enter the part of the image of the thumbnail and drag if it is a new position in the sequence. Switch to the slide show module when all the pictures are in the order of preference, and then create a Collection of slide show. The order and the setting is stored in the collection.

  • CHANGE the SEQUENCE on a busy server translates into very high unexpected values

    Our sequence was 782,393,232, or so, when I came it up through 30 000. Here are the commands I used:

    change the sequence of OUR_SEQ increment in 30000;
    Select double OUR_SEQ.nextval;
    change the sequence of OUR_SEQ increment in 1;
    commit;

    When I questioned nextval in the sequence, a few minutes later, he had climbed up to more 8 billion! I have reset quickly up to 783 million or more, and it behaved correctly after that. I saw some posts on the net that infer that the reset sequence is heavily used can cause "unpredictable." Everyone knows this or y at - it a bug known?

    I am running:

    Oracle Database 10 g Enterprise Edition Release 10.2.0.4.0 - 64 bit, RAC system.
    PL/SQL Release 10.2.0.4.0 - Production
    "CORE 10.2.0.4.0 Production."
    AMT for Linux: release 10.2.0.4.0 - Production
    NLSRTL Version 10.2.0.4.0 - Production

    Sven,

    I'm not sure I understand what you're clarifying...

    In a CCR cluster, a sequence with a cache has a separate cache in each node of the cluster. If the cache has been set to 20 (the default), and the increase was set to 30,000, each node is hiding 20 values separated by 30 000. And caches would be overlapping (i.e. node A would get 20 values of 1-570 001, node B would get 20 600 001-1 170 001 values). I don't see that this is in contradiction with what I posted.

    Obviously, the presence of a cache creates a bit of a ride with when, exactly, you say that a sequence is incremented. The NEXT_VALUE in DBA_SEQUENCES is incremented by cache * interval when any node exhausts its cache. The NEXTVAL of a sequence for connections that hit a particular node will increase by interval every time another session gets the NEXTVAL of a sequence. The NEXTVAL of a sequence for connections on a different node is not affected by what is happening on the current node. What enlightenment do you? If so, I agree.

    user11300030,

    Discussion on the sequence of caching can provide insight into why none of the lines are between 780 million and 1 billion. It is quite possible that these values have been cached on one node other than the node where the pads were executed. Had caches was flushed not when change you the sequence, inserts run on these other nodes could have used this range values.

    Justin

  • change the sequence of client file when Ctrl F5

    I have a 2011 test system based LabVIEW and teststand 2010. I modified the sequential model 'Single Pass' so that when you press Ctrl + F5, test 'main sequence' sequence of a self is executed, not the 'main sequence' of the currently loaded test sequence. Everything seems to work, but when the test report is created that it contains the name of the loaded test sequence, not the name of the automatic test sequence...

    Is there a way to teststand that the sequence of the client is the not the test sequence loaded in teststand free test sequence when Ctrl + F5 was pressed, therefor the name of the report file will contain the name of the current not the name of the loaded test sequence automatic test sequence?

    Any help or pointers would be very useful...

    See you soon

    Price of Derren

    Instead of changing the model to change what sequence is called, you must change to modify the sequence of the client. Look at the example of DynamicClientSequenceFile in the directory examples of TestStand.

    Hope this helps,

    -Doug

  • Change the sequence directly after loading sequences

    Hello

    I intend to write a sort of Profiler to see what stage most testtime consumtion.

    That's why I use engine callbacks SequenceFilePreStep and SequenceFilePostStep.

    Whenever a step in order is executed the SequenceFilePreStep generates a timestamp and after executing the step of the SequenceFilePostStep generates a different timestamp. Two timestamps can be used to estimate how long this step has been performed.

    I use several different sequence files (for example a gall for characteristic sequence a sequence one to feature B and so on).

    A sequence file can be called (charged) many times the sequence of higher level or any other file of sequence file.

    My problem is that I don't want to edit each file sequence. Profiling should be initited automatically.

    My idea is that the process template will add the mentioned subsequences above in each sequence file that is used during the execution of the testplan.

    No idea how to implement that?  As far as I've seen there is no ProcessModel callback that is called when loading a sequence file, is it not?

    Thank you very much

    Thorsten

    I forgot to mention, I'm currently using Teststand 3.1, but intend to change to 4.x

    No, you wouldn't.  Read the description carefully.  Also, I tested it by adding the process template.  You can do the same thing and just put a simple message popup in there.  The popup message fires once for each stage of your Client's sequence.

    Kind regards

  • How to change the sequence vendor_id and vendor_site_id in R12?

    Hello

    I want to increase the internal vendor_id sequence and vendor_site_id of AP_SUPPLIERS and AP_SUPPLIER_SITES_ALL table.

    Is there a sequence that I can change so after I created or suppliers of the interface, the vendor_id will start on a specific number.

    Thank you.

    You can check in the all_sequences table.

    I think that the corresponding sequences are

    PO_VENDORS_S

    PO_VENDOR_SITES_S

    You will have to perhaps double control by creating a new provider and check the value of the sequence.

    It will be useful.

    See you soon

    AJ

  • How to change the sequence in Premiere Pro CS6 settings and earlier versions?

    Is it possible to change sequence settings once you have set up the sequence?

    In sequence settings, everything is grey so I can't change it.

    In this case, no.

    But you can create a new one with the desired settings and clips of paste inside.

Maybe you are looking for