Apply calendar watch

Since the update to iOS 10 my Apple Watch will not sync to my calendar on my iPhone. He says I have no regular event when my iPhone calendar shows my events. Before this update that there work.

Find the App shows on your phone, go to the calendar select custom, then mirror my iPhone and close, I hope, will be that resynchronize the connection for you.

Tags: iPhone

Similar Questions

  • Calendar Watch vs iPhone

    My iPhone and Apple Watch are paired.

    Today, the watch displays a calendar to 17:00 event which is no longer on any of my other devices.  The setting of calendar in the application of the watch is mirrored to my phone, but is not.

    This event has been moved three weeks so yesterday on my iMac.

    Tried to turn on the watch and back, always there.

    All my devices are connected via iCloud.

    Hello

    It can help restore your sync data:

    • On your iPhone, in the application of the watch, go: Watch My (tab) > general > reset > tap reset sync data.
    • Nothing seems to happen when you type, but the process will run in the background (invisible to you), allow a minute or two later.
  • Calendar and tasks have disappeared from Thunderbird.

    Have you tried to reinstall & update Thunderbird who worked the last time that this product when you use Windows 7 Pro. (now using Windows 10 Pro.) Restarted and stop / restarted the PC nothing works.
    Calendar is listed in my training under Mozilla Thunderbird program file.
    Windows updated yesterday and completed the beginning until today that may or may not be relevant.
    Email Thunderbird works as it always did.

    Open the Thunderbird file listed under the "calendar" Watch programs

    Don't know what you're talking about. Maybe you can provide a screenshot?
    In any case the calendar is in your Thunderbird profile folder, not in the program folder.

    Lightning is not installed because I don't want.

    Interesting. Lightning * is * the Thunderbird calendar extension.

    If you want the calendar then you need to install Lightning, whether you like it or not. You can get it from AMO.
    https://addons.Mozilla.org/en-us/Thunderbird/addon/lightning/

    In case you have some problems to install it:
    https://addons.Mozilla.org/en-us/Thunderbird/addon/lightning/

  • Noting the Javascript calendar day

    Good day everyone,

    I have the script I've been working from a book.

    However, I am confused how I can highlight the day of the month, so that the calendar watching a knows what date.

    I want to make the text and the background color current day red white.

    I also need the current unpaid months, say like December so it loads with the calendar, during the loading of the page.

    I've been playing with this code all night, no luck, or I'm not smart.

    Any help will be greatly appreciated

    Here is the code:

    <!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.1//EN" "http://www.w3.org/TR/xhtml11/DTD/xhtml11.dtd">
    <html xmlns="http://www.w3.org/1999/xhtml">
    <head>
    <meta http-equiv="Content-Type" content="text/html; charset=utf-8" />
    <title>JavaScripted Dynamic Table</title>
    <script type="text/javascript">
    // function becomes a method for each month object
    function getFirstDay(theYear, theMonth)
    {
    var firstDate = new Date(theYear,theMonth,1);
    return firstDate.getDay();
    }
    // number of days in the month
    function getMonthLen(theYear, theMonth)
    {
    var oneHour = 1000 * 60 * 60;
    var oneDay = oneHour * 24;
    var thisMonth = new Date(theYear, theMonth, 1);
    var nextMonth = new Date(theYear, theMonth + 1, 1);
    var len = Math.ceil((nextMonth.getTime() -
    thisMonth.getTime() - oneHour)/oneDay);
    return len;
    }
    // create array of month names
    theMonths = new Array("January", "February", "March", "April",
    "May", "June", "July", "August", "September",
    "October", "November", "December");
    // deferred function to fill fields of table
    function populateFields(form)
    {
    // initialize variables for later from user selections
    var theMonth = form.chooseMonth.selectedIndex;
    var theYear = form.chooseYear.options
    [form.chooseYear.selectedIndex].value;
    // initialize date-dependent variables
    // which is the first day of this month?
    var firstDay = getFirstDay(theYear, theMonth);
    // total number of <TD>...<\/TD> tags needed in for loop below
    var howMany = getMonthLen(theYear, theMonth);
    // set month and year in top field
    form.oneMonth.value = theMonths[theMonth] + " " + theYear;
    // fill fields of table
    for (var i = 0; i < 42; i++)
    {
    if (i < firstDay || i >= (howMany + firstDay))
    {
    // before and after actual dates, empty fields
    // address fields by name and [index] number
    form.oneDay[i].value = "";
    }
    else
    {
    // enter date values
    form.oneDay[i].value = i - firstDay + 1;
    }
    }
    }
    </script>
    </head>
    <body>
    <h1>Month at a Glance (Dynamic)</h1>
    <hr />
    <script type="text/javascript">
    // Initialize variable with HTML for each day's field.
    // All will have same name, so we can access via index value.
    // Empty event handler prevents
    //
    //reverse-loading bug in some platforms.
    var oneField = "<input type='text' name='oneDay' size='2' onfocus=''>";
    // Start assembling HTML for raw table:
    var content = "<form><center><table border='1'>";
    // Field for month and year display at top of calendar:
    content += "<tr><th colspan='7'>";
    content += "<input type='text' name='oneMonth'><\/th><\/tr>";
    // Days of the week at head of each column:
    content += "<tr><th>Sun<\/th><th>Mon<\/th><th>Tue<\/th><th>Wed<\/th>";
    content += "<th>Thu<\/th><th>Fri<\/th><th>Sat<\/th><\/tr>";
    content += "<tr>";
    // layout 6 rows of fields for worst-case month
    for (var i = 1; i < 43; i++)
    {
    content += "<td align='middle'>" + oneField + "<\/td>";
    if (i % 7 == 0)
    {
    content += "<\/tr><tr>";
    }
    }
    content += "<\/table>";
    // blast empty table to the document
    document.write(content);
    </script>
    <form>
    <select name="chooseMonth">
    <option value="January" selected="selected">January</option>
    <option value="February">February</option>
    <option value="March">March</option>
    <option value="April">April</option>
    <option value="May">May</option>
    <option value="June">June</option>
    <option value="July">July</option>
    <option value="August">August</option>
    <option value="September">September</option>
    <option value="October">October</option>
    <option value="November">November</option>
    <option value="December">December</option>
    </select>
    <select name="chooseYear">
    <option value="2010" selected="selected">2010</option>
    <option value="2011">2011</option>
    <option value="2012">2012</option>
    <option value="2013">2013</option>
    <option value="2014">2014</option>
    <option value="2015">2015</option>
    </select>
    <br />
    <input type="button" name="updater" value="Update Calendar"
    onclick="populateFields(this.form)" />
    </form>
    </body>
    </html>

    Webethics wrote:

    Looking at the calendar, how I would align to the center of all the days of the month so they are not is is slanted to the left of the cell.

    The most effective way to do this is with CSS:

    td input {
      text-align:center;
    }
    

    Thanks for your comments on my books.

  • Cannot stop NAS loan rn104 with 6.1.4 RC3

    Hello
    I have a VERY irritating problem. All this time I turn off my NAS unit it just starts again. After 3-4 sec. I disabled sleep off disc and auto calendar watch. Everyone?
    Now, I turn it off and quickly plugg the adapter...

    I found the sollution me!

    This is the addon VPN 1.5.0 which caused the MTU change at each stop of the system. As soon as I uninstalled it all worked flawlessy new!

  • Parameters of the agenda...

    Is it possible to have all the days on the calendar with a white background?  Right now my calendar watch on weekends in white, but in week in gray.  I looked in preferences, but don't see any possibility to change weekends.

    Anyway is to spend the weekend in the same color as the days of the week?

  • POUVEZ synchronization problems

    Hi all

    I'm working on a project to control an industrial player on CAN (CAN be opened to be precise).  I am trying to send and receive messages at regular intervals of 100 Hz.  To do this, I used at the same time while loops (after initialization of CDN); We write CAN messages by using the "ncWriteNetMulti.vi", writing of a table of four messages, the other loop checks and reads the messages using the 'ncGetAttributes' and 'ncReadNetMulti.vi '.  The program also includes a Structure of the event in a separate loop, in order to manage interactions with the user interface.

    My problem is that the timing of the message send loop seems to be a bit spotty, I put the operation of the loop using a "wait until the next ms Multiple.vi" to 10 ms.  However when I analyze the messages that are sent on the bus CAN it seems to be a certain interval between messages; Variant of 7-13th month mainly, however there a bit with separation of 18 to 25 DC between messages. These large differences between messages usually cause communications in the car to fail.

    If I understand this thread: http://digital.ni.com/public.nsf/allkb/859DA6BB71B8A84F86256B3A0071141C?OpenDocument LabVIEW calendar is +/-1ms when running on XP (as I am).  I have a few theories (possibly clutching at straws) as to why the time is so loose, but like some comments on the points of whether experts if they are valid, or there is something wrong.

    1. The laptop I am using has an encrypted hard drive.  This of course slows down reading / writing to the HARD disk, but I expect the program to be loaded in memory when running and thus not be performed there during the execution. Fair supported?  (I'm also trying to 'acquire' a computer unencrypted to rule out / in this theory).
    2. The specifications of the laptop is too low for what is asked offshore.  I killed all unnecessary programs that are running to try to accelerate, but not had much success.  The CPU is usually<10% capacity="" (according="" to="" the="" task="" manager="" window)="" so="" doubt="" its="" not="" up="" to="" the="" job. (with="" the="" unencrypted="" laptop="" i'll="" also="" get="" a="" clean="" install="" of="" xp="" so="" should="" remove="" any="">
    3. My assumption that LabVIEW can run +/-1ms is Wrong.  Again, this is supported by OR above... So I think little likely.
    4. My programming technique is poor leading to the execution of the loop by taking more than 10 ms.  I didn't think my programming was THAT bad, however all comments to improve my coding techniques are more than welcome.
    5. Also built a version the program exe to see if this improves performance.  It does not seem to do anything noticeable.

    All comments appreciated, code attached below.

    Thanks in advance.

    Mark

    OR LabVIEW 2010 Full Development System

    I think the problem is that you have need of determinism and not necessarily accurate.  The Windows timer component will be happily relax a tick count that is accurate to within 1ms, but it is not apply calendar deterministic loop.

    If you really need of determinism, I think you have to go with RT if you must stay with XP, you might consider using a timed loop structure and use some sort of an error handler for once the loop completed later.

    Another option would be to set up periodic messages that use the hardware timing instead of timing SW.  I know you can do this with NOR-XNET but am not in favour of NI-CAN.

  • diagram States-transitions

    I want to apply calendar and control unit of the 8237 DMA controller in diagram States-transitions, I use labview7.1 tool, can you suggest how to proceed

    Do you intend to connect the 8237A in hardware and do interact with LabVIEW?

  • Input language Hotkeys disappear

    Hi all

    Since getting a new laptop with Win8 installed on it, I was faced with a problem similar to that found on this thread.
    I can 'set' of my keyboard shortcuts via language-> settings preferences advanced-> text Services and input languages.  However, shortcut keys do not work always.  As with the thread I quoted above, my keys clears after a reboot or really all this brings me to the lock screen (e.g., Win + L).  In contrast to the thread that above however, my shortcut keys work still even within the session that I am trying to put them.  I can literally click 'Apply' and watch get them deleted sometimes.
    After a reboot, at least some of my keys work, but if I open "Advanced Key Settings" and try to reset the shortcuts, they stop working again.  It is for this reason that I also noticed that the keyboard shortcuts listed as being set does not yet necessarily reflect those that actually work.  For example, I removed all the languages and input methods other than English I want to use (Japanese, Chinese and US International) and added Hebrew.  I then put some access keys, and even if they remained there after I pressed 'Apply', shortcut keys don't really work.  When I rebooted if they did... until I opened again "Advanced Key Settings".
    Anyone happen to know how to solve this problem?
    Note: I restarted mode safe several times and have experienced the same exact set of problems.

    Here is how I could solve the problem:

    http://answers.Microsoft.com/en-us/Windows/Forum/windows_8-desktop/custom-hotkeys-to-change-input-language-disappear/66d1d89d-e5dc-41e1-a8b3-48d596ab8e11?page=4&TM=1391057416056#LastReply
  • How layer comps are linked to the layers in the PSD file?

    I am developing an application of external command line c ++ to analyze a PSD file (using the PSD specification - http://www.adobe.com/devnet-apps/photoshop/fileformatashtml/PhotoshopFileFormats.htm#50577 409_17115) in order to extract important information. One of the main things I need is information linking layers to the layers themselves. Digging through the section Image resource specifying "Layers - 1065" I'm only able to extract the name, comments, etc. on the comp. layer is the question I have: how the layers are referenced by the layers in the PSD file? I need to know what layers are applied to each layer comp. Looking through the scripts provided with the PS (for example layers in files), the composition of layers is always "applied" before watching to see what are the layers inside this model. It seems to be the creation of an Action and the implementation of this action with the class identifier of the layer comp before watching his diapers, so this method should know on which layers are referred to by this layer comp. Specifically, what do I need to be able to do and, so far, have failed.

    It is important that I stick with c ++ & that it be an external application, so the Plugin SDK is not much help here.

    I would really appreciate any ideas/suggestions on this subject.

    Thank you all.

    If someone falls on this issue once again, last night, I found the data using a control of the layer comp binary ID I have model layer section. The composition of layers--> data layer is inside a section of "undocumented"data under the tag Layer Records: shmd

    Hope this helps someone.

    TREV-

  • Events calendar on Mac sync iPhone or Apple Watch

    Input events calendar I have on my Mac don't sync my iPhone or Apple Watch.  Events calendar on iPhone synch to iMac.  in iCloud preference, I've marked contacts, calendars and notes.  All the work schedules.  Any suggestions?

    Option 1) update your calendars and reminders of the app of calendars:

    Open the calendar application.

    Choose View > refresh calendars.

    Try option 2) remove the account in calendar > Preferences > accounts.

    Now add back.

    Option 3) if it still fails to work, try to test in the comments or new user.

    CREATE A NEW USER

    Go to system-> Preferences, create a new user in users and groups.

    Switch to the new user by logging incoming/outgoing or use the fast user switching.

    Connection with Apple ID

    Only select Calendar for this test.

    Open calendar and test by adding an event and see if it syncs with the iPhone.

    You still see the issue?

    If so, see these steps by khati for Installation of Sierra difficulty. I suggest you reinstall Sierra again.

    If not, then the problem is in your user folder.

    Journal of the user and then Log in your user folder.

    With Calendar.app quit...

    Go to the library to the user (see below)

    Scroll to the bottom for calendars

    Place these files in the Recycle Bin

    • Calendars/calendar Cache
    • Calendars/calendar Cache-shm
    • Calendars/calendar Cache-shm

    Also in the user's library, scroll to containers. Move these to the desktop.

    • Containers/com.apple.CalendarAgent
    • Containers/com.apple.iCal

    Scroll down to preferences. Move these to the desktop.

    • Preferences/com.apple.CalendarAgent.plist
    • Preferences/com.apple.iCal.plist

    Sign out under the Apple in the menu bar.

    Open a session

    Open Calendar.app

    It's working now?

    Library of the user to see the

    The user library folder is hidden by default. In the unhide: select the Finder in the Dock. Less go in the Menu bar > hold down the Option key and you will see the library.

    Find the library user folder

    http://www.takecontrolbooks.com/resources/0167/site/chap11.html#FindingtheUserLi braryFolder

  • I broke my screen, and now cannot drag to open it.  I have an alarm that don't go.  I also want to synchronize my phone before I take it buy a new one.  Is it possible to synchronize and watch my calendar for the next few days?

    I broke my screen, and now cannot drag to open it.  I have an alarm that don't go. I can let the battery die I know but I really want to be able to access and examine what are the texts I received today. I think that my ICloud is can be disabled. I also want to synchronize my phone before I take it buy a new one.  Is it possible to synchronize and watch my calendar for the next few days?

    Without entering your access code, it is not possible, unless your time is in iCloud. If this is the case, connect to iCloud.com to check your calendar.

    Good luck.

  • Apple Watch calendar will not sync to iPhone

    I got my Apple Watch 2 days.

    I configured everything that he, as I think the proper way

    the watch displays all the my iphone (icloud) calendar entries

    When I add an entry to the lookout with Siri, it only appears on the watch and not on icloud / iphone. the difference between the titles coming from icoud and the one with the watch have a different color. This means that they are in different calenars, but I can not choose the type of calendar when I add an entry with the watch.

    Happens wrong here?

    Help, please!

    Hello

    When you add a new event calendar using Siri on your watch, it will be added automatically to your calendar by default (unless you specify a different timetable during the creation of the event). To see what calendar currently selected as your default calendar (and, if you wish, to change):

    -On your iPhone, go to: settings > Mail, Contacts, calendar > default calendar.

    Having noted what timetable was initially selected to check if this calendar is currently hidden on your iPhone:

    -On your iPhone: open the calendar app > tap calendars (low center) > check if this calendar is registered and if it's hidden. To turn if a calendar is displayed or hidden, tap on it.

    Calendars can also be shown / hidden in iCloud:

    iCloud: Customize the calendar view

  • Alerts/Notifications however not passed to watch calendar

    I scoured the forums and I have yet to find a clear answer to my problem.

    I get all my phone calendar alerts to my Apple Watch. I have 'mirror iphone' lit. I have notifications on the value in the phone settings. I'm the calendar reminder (alerts) 5, 10, 15 minutes before the event very well on the phone itself, but never pushes at my watch. The phone is not on or unlocked when alerts expected (should) come through.

    I have NO problem get any other phone notification/alerts to look outside the calendar. I use the stick ical app on iphone.

    Any help would be appreciated.

    Hello

    It may help to try these settings:

    -On your iPhone, in the application of Eve, go to: My Watch (tab) > calendar > choose custom and turn on all the options available.

    Otherwise, it can help to restart your iPhone and your watch:

    -Turn off the two devices together, and then restart your iPhone first.

    -To switch off your watch: press and hold the button side until you see the cursor off the power; slide it to turn off;

    -To reactivate: press and hold the side button until you see the Apple logo.

  • Create a calendar with Watchapp1 on the Apple Watch event

    Hello

    I'm new to the SWIFT programming language. During our school to school project, we would like to create an Apple Watch app, which allows you to create a calendar event. I get several pages of Google, but I can't find the right answer. Does anyone know if this implementation is possible with Watchapp1? On Google I found a few solutions, but these are developed with Objective C.

    I want to thank you in advance!

    Jelle

    Hi Jelle

    You posted in the technical support for the end user community.

    Developer forums are here:

    https://forums.developer.Apple.com/

    https://developer.Apple.com/

    Other resources for developers are available here:

    https://developer.Apple.com/

Maybe you are looking for

  • External monitor for the 13 mid-2014' rMBP

    Hello I'm looking for an external monitor for my rMBP mid-2014 13 "resembling a Retina display (I'm only looking for quality of retina monitors). Not extremely concerned about 4K because my Mac cannot run most 4K poster but of course wouldn't mind it

  • Qosmio G40-10 s: graphics card problem

    Hello. I have a Toshiba Qosmio G40 laptop 10s with a Nvidea 8600 M GT grafixs card. I was playing a game when it locked up and pasted what I would describe as flashing red/green 'Matrixy' search screen. He then a blue screen and trys to reeboot.He tr

  • How can I install windows XP on my Satellite A300-129

    Hello Since a few days, I bought a Toshiba Satellite A300-129. I am very satisfied with the laptop, although I do not work with Vista, so I prefer the laptop reformat and install Windows XP Professional(32 or 64 bits, dunno yet). However I do not kno

  • My Sims 3 game guard stop under Vista with a Dell Studio 17

    It has worked well over the two days, but when my game load im playing for 1 min then the gos to black screen, then on the desk.

  • Cannot get alerts for agent LogFilter

    Hi all We have deployed the log file monitoring on servers windows 2012, but we are unable to generate alerts on these files. Please find the attached agent logs and let me know what could be the problem. Please help me on this matter as soon as poss