Calendar models

Don't particularly like the model/updated calendar on the page of the calendar in Windows 7.  Are there choices of model?

Hello dognanny1,

·         What is the calendar which you speak?

·         You want to customize the layout of your calendar with different colors?

·         Are you referring to the calendar you have with Windows Live Mail?

The calendar program is not available in Windows 7 by default.

However, it is possible with Microsoft Vista and it is unfortunately not possible to change the color layout for the calendar.

You have an option to customize the colors for your appointments and to customize your Windows Calendar. Read this article which will give you more information:

http://Windows.Microsoft.com/en-us/Windows-Vista/customize-Windows-Calendar

Thank you

Irfan H, Engineer Support Microsoft Answers. Visit our Microsoft answers feedback Forum and let us know what you think.

Tags: Windows

Similar Questions

  • Is it possible to start a calendar in numbers by a Monday instead of Sunday?

    I need to print a calendar for my class in France and we always begin the week on Monday, so

    I would like to print the January calendar models offered by a number, but begins on Monday.

    MacBook air El Capitan

    Here's how you can do it.

    1. click on the table with the name of big month and 'display all the lines '.

    2. change the value in cell A3 to 2.

    3. hide the lines 3 and 14:

    4. slide the day labels in the main table on the left.

    SG

  • Problem of. location() calendar event

    I use the example code for calendar as base point and try to make changes. I'm trying to get the location to display on the screen.

    I changed the QML to

                    ListView {
                        dataModel: calendar.model
    
                        listItemComponents: ListItemComponent {
                            type: "item"
    
                            StandardListItem {
                                title: ListItemData.location
                                description: qsTr ("%1 - %2").arg(ListItemData.startTime).arg(ListItemData.endTime)
                            }
                        }
    

    and I added the location of the template.

    void Calendar::filterEvents()
    {
        // Setup the search parameters with time range as specified by filter criterion
        EventSearchParameters searchParameters;
        searchParameters.setStart(m_searchStartTime);
        searchParameters.setEnd(m_searchEndTime);
        searchParameters.setDetails(DetailLevel::Weekly);
    
        const QList events = m_calendarService->events(searchParameters);
    
        // Clear the old events information from the model
        m_model->clear();
    
        // Iterate over the list of events
        foreach (const CalendarEvent &event, events) {
            // Copy the data into a model entry
            QVariantMap entry;
            entry["eventId"] = event.id();
            entry["accountId"] = event.accountId();
            entry["subject"] = event.subject();
            entry["location"] = event.location();
            entry["startTime"] = event.startTime().toString(Qt::DefaultLocaleShortDate);
            entry["endTime"] = event.endTime().toString(Qt::DefaultLocaleShortDate);
    
            // Add the entry to the model
            m_model->insert(entry);
        }
    }
    

    But nothing is ever displayed. Yet when I break into the event, there is a location. What Miss me?

    Resolved: The EventSearchParameters has a .setDetails flag. The flag that you use dictact what information you get. Just put the correct DetailLevel.

    https://developer.BlackBerry.com/Cascades/reference/bb__pim__calendar__detaillevel.html

  • Modal editor for Calendar area

    Hi people,

    I'm working on an application that includes a calendar of the territory. Currently, clicking on a day in the calendar of links to a second page, where the user can change both values. By clicking on save button takes them to the calendar.

    What I would do is eliminate this second page and implemented so that clicking on a day opens a modal editor region where the user can change sound, press on save and see the calendar update. What is the best way to do it?

    I do partially only when users click on existing record, but when they click in any space to add a new record to the second page insists to appear.

    Thank you

    Trevisan-

    (BTW, APEX 4.1.0)

    Hi people,

    I did this customization of the calendar model. I had to include an 'onclick' in the td tag to call a JQuery function to open my region in modal style.

    Here what I did:

    In "Function and Variable comprehensive statement" on my calendar Page, I put

    function openCalendarDetailsModal (jsCal_Id, jsCal_Date)

    {

    $s ('P4_CAL_ID', jsCal_Id);

    $s ('P4_START_DATE', jsCal_Date);

    var jqDialog = $("#calendarDetails").dialog

    (

    {

    Title: "change the calendar."

    modal: true,

    autoOpen: true,

    Resizable: false,

    Width: 500 'px '.

    }

    );

    }

    And I wrote on my model of personalized calendar (just a copy of the default template) in the "Format" open day"

    style = "cursor: point" onclick = "openCalendarDetailsModal (null, ' #DD #-# LUN #-# YYYY #');'"

    It works.

    Thank you!

  • Assing tabular_form add the process to a link of day calendar?

    Hi all

    I have a following requirement. Can you please help me to get there (hopefully it should be possible!)

    I have 2 regions: region A Calendar & tabular region (region Assistant; not manual)

    I've included a link column for the calendar day, which captures date (#DD ##MM ##YYYY) and stores it in a local variable. When you click any date on the calendar, I would like to add a new line in the form of table and assign the date to one of the columns in the new row. At the same time, I need more details to be entered by the user.

    So, is it possible
    > Add a new line (affect the process of page AddRows link calendar day)?
    > How to reference the new line that is added, inorder to fill some values?

    Grateful if you could help me with this!

    Thank you!

    That's what I put in the "day title Format: calendar model

    <a href="javascript:f_setNewRow('&DATE_FORMAT_MASK_ITEM.')" onmouseover="this.style.cursor='pointer'"><div class="t1000DayTitle">#DD#</div></a>
    

    The DATE_FORMAT_MASK_ITEM is a populated point application based on the language of the browser using this calculation:

    DECLARE
       v_lang   VARCHAR2 (200);
    BEGIN
       v_lang := OWA_UTIL.get_cgi_env ('HTTP_ACCEPT_LANGUAGE');
       v_lang := SUBSTR (v_lang, 1, INSTR (v_lang, ',') + 1);
    
       IF v_lang LIKE 'en%'
       THEN
          RETURN '#IMM#/#DD#/#YYYY# 12:00:00 AM';
       ELSIF v_lang LIKE 'de%'
       THEN
          RETURN '#DD#.#MM#.#YYYY# 00:00:00';
       ELSE
          RETURN '#DD#.#MM#.#YYYY# 00:00:00';
       END IF;
    EXCEPTION
       WHEN OTHERS
       THEN
          RETURN '#DD#.#MM#.#YY#';
    END;
    

    Denes Kubicek
    -------------------------------------------------------------------
    http://deneskubicek.blogspot.com/
    http://www.Opal-consulting.de/training
    http://Apex.Oracle.com/pls/OTN/f?p=31517:1
    http://www.Amazon.de/Oracle-Apex-XE-Praxis/DP/3826655494
    -------------------------------------------------------------------

  • Annual calendar (display of 12 months)

    Hello

    I want to create a view of calendar in the apex is it possible? Maybe it uses Sql calendar.


    The weekly, monthly, and daily of Calenders account wizard.


    I'm under the Apex Version 2.0.0.00.49


    Thanks in advance,

    Huw.

    Hi Huw,

    You create a page template "Page Snippet" and apply it to the second page of schedule?

    On the main section of the calendar page, I have a HTML area for each 'drawn' calendars The Source of the region to that of my second calendar is:

    <div id="CALENDAR2"> </div>
    

    I then an another region HTML in the display point "Before the Footer" that has a parameter of area Source of:

    <script type="text/javascript">
    function getCalendar(calPage, calDIV){
      var get = new htmldb_Get(null,$x('pFlowId').value,null,calPage);
      var gReturn = get.get(null,'<htmldb:BOX_BODY>','</htmldb:BOX_BODY>');
      get = null;
      document.getElementById(calDIV).innerHTML = gReturn;
      document.getElementById(calDIV).innerHTML += "";
      gReturn = null;
    }
    getCalendar(3, 'CALENDAR2');
    getCalendar(4, 'CALENDAR3');
    </script>
    

    It's the Ajax call that goes and gets all that overrides the setting #BOX_BODY # on the page template and pushes in the div tag

    The calendar page 2 with no style sheet, the style of the calendar is dependent on the schedule of the first page - this should be ok if both use the same calendar model.

    If you have nothing else on the page for the 2nd page of calendar template, this can interfere with the output

    The parameter 'calPage' in the getCalendar() function is the number of page Apex which is the second calendar-in my example above, the 2nd calendar is on page 3. If you use the number of page bad here, nothing would be returned (or, depending on your application, you get the content from another page!).

    Otherwise, the steps are related, the only other possibility would be a typing error in the javascript code

    Andy

  • Data transfer NI653x

    Hello

    We used the NI6534 card to transfer data from our system in a PC. He works on traditional pilot and DAQmx. We use handshanking calendar for data transfer. Recently, we want to increase the speed of data transfer and need to change the "timing" of the handshake to sample clock calendar (model IO in traditional version). We got it working using the traditional driver, but not by DAQmx. I always get an error code when you try to start the data acquisition. Code error-89129 - Terminal is not valid for the device. Here is C code to configure and start the map:

    DAQmxCreateTask("",&m_taskHandle);
    DAQmxCreateDIChan (m_taskHandle, "Dev3/port0_32", "", DAQmx_Val_ChanForAllLines);
    m_numofSampletoRead = 2000000;

    continue to generate samples up to the stop.
    bRet = DAQmxErrChk (DAQmxCfgSampClkTiming(m_taskHandle,"Dev3/PFI2",20000,DAQmx_Val_Falling,DAQmx_Val_ContSamps,m_numofSampletoRead));
    specify the size of the buffer
    bRet & = DAQmxErrChk (DAQmxCfgInputBuffer (m_taskHandle, BUFFER_SIZE));

    Once he went to configuration and once called the DAQmxStopTask (m_taskHandle) function, he returned this error code I mentioned above.

    With respect to the traditional version, I just added a call to the function below and it worked fine.

    If (!) () status = DIG_Block_PG_Config (m_deviceNumber,
    m_group,
    1, / * enable the generation of model using REQ edge lock * /.
    1, / * REQ - REQ external source * /.
    -3, / * time - base 50ns, it is an internal clock * /.
    1, / * interval REQ * /.
    ((((i16) 0))) / * turn on or off the switch * /.

    Can you help me how to make it work with DAQmx? Thank you.

    Thank you, James. The example of aid. The function I called:

    DAQmxErrChk (DAQmxCfgSampClkTiming (taskHandle, "/ Dev3/PFI2", 10000.0, DAQmx_Val_Rising, DAQmx_Val_ContSamps, 1000));

    I missed the first slash highlighted in RED.  I've was allowed past this function call but got stuck at the next function call, DAQmxErrChk (DAQmxStartTask (taskHandle)), that me cheated.

    Thanks again for your help.

  • Screw vs Express SoftMotion function blocks

    Hello

    Are there differences between express screw SoftMotion function blocks? I intend to drive a servomotor through a NI 9505. Examples AND show how using function blocks, but I've been advised to use the screw Express instead, work around odd behavior when using a simulated axis (http://forums.ni.com/t5/LabVIEW/SoftMotion-quot-Update-Buffer-quot-VI-refuses-to-take-more/m-p/22508...

    Thank you!

    Hi JKSH,

    If I booted up a new application, I would use screw Express on function blocks. Here is a list of things to consider when choosing:

    1. By default, function blocks are asynchronous. They run on the rising edge of the entry "run" and are carried out when the output "done" is high. They do not block and function block architecture will almost always call the same function blocks again and again in a loop. You control the flow of execution with the 'run' and 'done' entry and exit. Screw Express, on the other hand, are synchronous by default. They don't have an entry not "run" and instead start running as soon as they are called. They block also until the end screw Express can be converted to asynchronous by right-clicking on them and by changing the "calendar model. When you change the calendar in asynchronous model, the Express VI will now act exactly like a function block.

    2. In general, you should never mix asynchronous and synchronous API. Your application should be one or the other. If it is possible to have safe synchronous and asynchronous calls, you must be very careful and really know what you're doing.

    3. To my experience, write simple applications is easier with a synchronous API, and more complex applications are better suited to an asynchronous API. Since blocking synchronous calls, you need more loops in your application and it can become difficult to maintain.

    4. There is also the property node / API call, on which are based the functional blocks and screw Express. You can do a right click on a function block or Express VI and convert it into a Subvi to see the underlying code. Then the function blocks and screw Express can be pleasant to work with, you must sometimes lower level control that is offered by the property and invoke nodes.

    I looked at your other post and it seems that you meet one of the intricacies of asynchronous calls. In point 1 above, I mentioned that function blocks increase sensitive edge on the execute line. In your modified sample and the original sample, the 'Update buffer' function block is executed when space becomes higher or equal to the "size of the Contour data. In the original example, the size of the table is 40, but in your example, it is 100. We will follow the stream through the example:

    1. We do nothing in the first round since we do not see a rising edge of the signal "run" "Initialize the buffer" until the second iteration.

    2. At the beginning of the second iteration, we initialize the table with 20 points, leaving 20 spaces available. This function block can take more than one iteration to complete, so that the loop can run several cycles before the release of "Done" is set to true. In this case, the next block runs.

    3. Then we start the move of contour. No point is taken in the buffer zone This occurs in the part of the user rather than the scan code.

    4. Then, we see that there are 20 spaces available, so we add more than 20 points to the buffer, leaving us with 0 beds available. This means that in the next iteration of the loop, the signal "run" function block 'Update buffer' will be false. This is essential to the functioning of the example.

    5. Since there is no abandonment called, we have a loop around back.

  • Each scan, SoftMotion takes a point in the buffer zone. Finally, the number of available points will be 20. When this happens, the entry "run" will switch from false to true on the 'Update buffer' function block and 20 points more will be added to the buffer. This cycle continues until you stop.
  • So, what was wrong with your changes? You did the size of the table 100 points. If you look at the steps above, you will see that in the example, we have 40 points in the buffer before taking points. If you increase the size of the table to 100, it means that there are 60 places available. However, 60 is always higher than the "size of data contours" (which is 20) and so the entry "run" function block 'Update buffer' will never wrong; We have always more available space than the "size of data contours. Since "run" is sensitive edge up, we are never really new data in the buffer, and so you get only two cycles that you initially put in. I agree that it is difficult, but it's exactly as function blocks are supposed to work and are certainly something to think about when you use the asynchronous API.

    Thank you

  • iCal 'Get Info' is grey for the blue calendar; Other calendars are very good. Model name: iMac model identifier: iMac9, 1

    iCal 'Get Info' is grey for the blue calendar; The other color calendars are very good.

    I deleted the file 'com.apple.iCal.plist '... No luck.

    Please notify. Thank you, Roger



    Presentation of the material:

    Model name: iMac

    Model ID: iMac9, 1

    Processor name: Intel Core 2 Duo

    Processor speed: of 2.66 GHz

    Number of processors: 1

    Total number of cores: 2

    L2 Cache: 6 MB

    Memory: 4 GB

    Bus speed: 1.07 GHz

    Boot ROM version: IM91.008D.B08

    Version of the SCM (System): 1.44f0

    If the problem is still there, try to start safe mode using your usual account.  Disconnect all devices except those necessary for the test. Shut down the computer and then put it up after a 10 second wait. Immediately after hearing the startup chime, hold down the SHIFT key and continue to hold it until the gray Apple icon and a progress bar appear. Startup is considerably slower than normal. This will reset some caches, forces a check for directory and disables all start-up and connection, among other things. When you restart normally, the initial restart may be slower than normal. If the system is operating normally, there may be 3rd party applications that pose a problem. Try to delete/disable the third-party applications after a reboot using the UN-Installer. For each disable/remove, you need to restart if you do them all at once.

    Safe mode

  • Adding months to model number calendar

    Can't go beyond January 2016 - how do I create a 14 month calendar to manage a schedule for Planning newsletter.  I don't want to use the Apple calendar due to limitations in the formatting.

    Please help - thanksAbunch!

    No problem here choose months in cell A1 of the table that displays the month in large characters.

    If you don't see it, try to quit numbers, stimulus and the file > New and choose the model of Schedule again.

    SG

  • is there a calendar can be added to wordpad model

    Is there a calendar can be added to Wordpad model which is a secure Microsoft Download?

    No model for wordpad still.

    not sure, what do you mean by "model of editable calendar?

  • Where can I find LR presets for a calendar of the South Africa model?

    Where can I find LR presets for a calendar of the South Africa model?

    Hi Martin,

    Please check the below link that might help:

    http://LightroomKillerTips.com/Lightroom-2015-calendar-template-presets/

    Please let us know if that helps.

    Concerning

    Sarika

  • Model calendar for 2010

    I found a free 2010 calendar template in Microsoft Word, and I tried to download it.  Cannot do.  I put it in a file and the specific program in a folder.  Great, I thought, but I can't extract the program so that I can run.  Because I lost my PDA (another topic for later) I need a calenda to keep track of meetings, etc.

    Thanks for visiting the site of the community responses to Microsoft Windows. The question you have posted is related to Microsoft Word and would be better suited in the Group of Discussion MS Word. Please visit the link below to find a community that will support what ask you

    Lisa
    Microsoft Answers Support Engineer
    Visit our Microsoft answers feedback Forum and let us know what you think.

  • Am having need of a 2015 calendar preset for indesign cc model

    I can usually find one in July, it's a bit early but I have several already to 2015, anyone know where I can download one?

    Sandee Cohen wrote an article on the calendars in InDesign Secrets that might be useful:

    http://InDesignSecrets.com/calendar-template-time.php

    and this is a useful script: https://www.adobe.com/cfusion/exchange/index.cfm?event=extensionDetail&extid=1046667

    Derek

  • Can an automaticly, generative; basic model - script, be productive system by an innstallation possible - out of .jpg images &amp; design and a calendar on this template parameter? To set the edge to self-replicate, based on a configuration of innovation.

    If you guide me in setting up, I'll tell you here all my research on innovation. I'm not a coder, but I had a project in the operation of computers. It is completely free of codes and open innovation describes simply: Sequensive.

    I have all of this art, I did and art photos. And I want to make a list of youtube videos. Out of art. And a classic and redesigned shape in time. And I want to self-replicate.

    * Solved!

    I chose to do a long animation. And divide it.

    However, if you want sensitive information on technology innovation, ask me.

Maybe you are looking for