Calendar - timer Widget vs drag times

I use Captivate 5 for a few months and have met a synchronization problem between the date set for the clock widget and the date fixed for the slides.

My test is a number of choice questions multipe on regular leaves and then published as a shockwave file. In order to bypass the second 999 limitation by slide, I have the shockwave test play on 4 slides and set each slide for 900 secoonds (15 minutes). I have inserted a timer on the first slide of test and set it for an hour and to display for the rest of the project. But when I check the calendar on the time of the slide show ends about 30 seconds before the timer reaches zero widget. The timer widget is actually too slow time. In addition, the amount of time that the timer is off seems not to be compatible. I need to check more into this by running multiple controls, but they take an hour each, so I was hoping to get a few comments that I went through this process.

I'd really like to know why the clock widget will count and slide length counts do not match?

Also any idea how make it easier would be much appreciated.

I will post here later after running a few iterations of the one hour trial and give the real calendar of results.

Thank you
Chaz

What kind of multiple choice question is it took 15 minutes to answer?

I'm a little confused by the way you use Captivate here.

Tags: Adobe Captivate

Similar Questions

  • Passport blackBerry calendar times are 4 to 5 hours off on my passport

    Hello community,

    I recently got the Passport. Great phone.

    Had a single problem, however. I'm synced to my BES works and whenever someone sends me an invitation from calendar, the time they died in 4 or 5 hours when it hits my calendar of passports.  My calendar looks good on Outlook on my desktop, but on my passport, the times are all off.

    Example: sent an invitation for 16:00 to 18:00 - my passport shows that he is 21:00 - 23:00... difference of 5 hours.

    The problem is, it is not constant. Another recurring invitation is from 1230 am in my calendar, but my passport shows 430 pm - 4 hours difference.

    This may be synonymous with doom very quickly.  No idea what is happening and how I can fix this problem?

    David

    Passport to a time zone change schedule diff and put your again and it should be better after

  • Smartphones blackBerry curve 8330 calendar time

    The time can be extended beyond the exodus of labor before 08:00 or after 17:00?

    If you go to the calendar > Options > General Options, you can change the start of the day and end of day settings.

  • BlackBerry Smartphones calendar time change when moving between time zones

    I travel between mountain and Central time zones. When I get the appointment I specify the time zone that the appointment should occur. When I go back to the other time zone and change the time of BB to the correct area, all appointments move ahead or back one hour. Is there some sort to have well positioned BB time and appointments to stay at the right time without moving forward or backward and time?

    It's normal.  When you change the time zone on the device calendar entries will change, too.  If you set a date on the calendar for the hour 17:00 and you change time zones in Central time that entry calendar will increase to 18:00 18:00 central is 17:00 mountain.  The calendar shows always real-time.

  • Calendar of the ADF: Drag and Drop

    Dear all,

    I tried to add the drag and drop functionality provided by Oracle ADF to a calendar that displays events from the database.

    < af:calendar id = 'c4' value = ' #{bindings. " CalendarView1.calendarModel}.

    calendarActivityListener = "#{CalendarBean.activityListener}" > "

    < af:calendarDropTarget dropListener = "#{CalendarBean.handleDrop}" action = "MOVE" / > "

    < / af:calendar >

    The "CalendarBean" code is that provided in the Oracle ADF Faces "DemoCalendarBean.java" demo application

    Unfortunately, the following error occurs "oracle.adfinternal.view.faces.model.binding.FacesCtrlCalendarBinding$ AdfmCalendarActivity cannot be cast to oracle.adfdemo.view.calendar.rich.model.DemoCalendarActivity.

    Can anyone advise a solution

    Thanks in advance

    Concerning

    Hello

    Start with the calendar using Oracle demonstrations certainly seem convoluted - I did the same thing. I had to interpret what the demo was trying more of in the java code in general, and then write my own code. Below, I have the code that works for my clients.

    1.) tag add calendar Drop target within your calendar.

    2.) create your listener to drop in a managed bean (make sure that your method is mapped into the target calendar Drop). Note the areas where I've "updated HERE". I had fun with the data conversions that you see

    Updated - this must go in your bean example. You can of course do this dynamic, but for now, it should work.

    currTimeZone private zone is TimeZone.getTimeZone (' America/Detroit');.

    This card to your target calendar drop tag

    public DnDAction handleDrop (DropEvent dropEvent) {}

    Method to handle the Drag and Drop feature calendar

    Return _handleDrop (dropEvent, false);

    }

    public DnDAction _handleDrop (DropEvent dropEvent, showPopup boolean) {}

    Drag and drop (mailable)

    Transferable transferable = dropEvent.getTransferable ();

    CalendarDropSite dropSite = (CalendarDropSite) dropEvent.getDropSite ();

    DropSiteDate date = dropSite.getDate ();

    CalendarActivity.TimeType timeType = dropSite.getTimeType ();

    Civil activity

    Activity CalendarActivity = (CalendarActivity) transferable.getData (DataFlavor.getDataFlavor (CalendarActivity.class));

    If (activity! = null) {}

    _handleCalendarActivityDrop (dropEvent, dropSiteDate, activity, showPopup);

    Return dropEvent.getProposedAction ();

    }

    Return DnDAction.NONE;

    }

    private _handleCalendarActivityDrop Sub (DropEvent dropEvent, dropSiteDate Date, CalendarActivity activity, boolean showPopup) {}

    Current start date Info get an activity

    Date startDate;

    startDate = activity.getStartDate (currTimeZone);

    Calendar startCal = Calendar.getInstance (currTimeZone);

    startCal.setTime (startDate);

    Obtain the primary key of the calendar item as we move

    String rowPK = activity.getId (m:System.NET.SocketAddress.ToString ());

    int startDayOfYear = startCal.get (Calendar.DAY_OF_YEAR);

    int startHour = startCal.get (Calendar.HOUR_OF_DAY);

    int startMin = startCal.get (Calendar.MINUTE);

    int startYear = startCal.get (Calendar.YEAR);

    Get current Info from Date of end of the activity

    Date endDate;

    endDate = activity.getEndDate (currTimeZone);

    Calendar endCal = Calendar.getInstance (currTimeZone);

    endCal.setTime (endDate);

    int endDayOfYear = endCal.get (Calendar.DAY_OF_YEAR);

    int endHour = endCal.get (Calendar.HOUR_OF_DAY);

    int endMin = endCal.get (Calendar.MINUTE);

    int endYear = endCal.get (Calendar.YEAR);

    Download New Start Date object dropSiteDate Info

    Calendar dropCal = Calendar.getInstance (currTimeZone);

    dropCal.setTime (dropSiteDate);

    int dropDayOfYear = dropCal.get (Calendar.DAY_OF_YEAR);

    int dropHour = dropCal.get (Calendar.HOUR_OF_DAY);

    int dropMint = dropCal.get (Calendar.MINUTE);

    int dropYear = dropCal.get (Calendar.YEAR);

    calculation variables

    long eventDelta = 0;

    int newEndDayOfYear = 0;

    Check if there is any change with the start date new old vs.

    If (startDayOfYear! = dropDayOfYear) {}

    Get the value of delta beginning-enddate

    eventDelta = endCal.getTime () .getTime () - startCal.getTime () .getTime ();

    Info set start date (Leaving time infact info)

    startCal.set (Calendar.DAY_OF_YEAR, dropDayOfYear);

    startCal.set (Calendar.YEAR, dropCal.get (Calendar.YEAR));

    startCal.set (Calendar.MONTH, dropCal.get (Calendar.MONTH));

    calculate the new endDate

    Day newEndDate = new Date (startCal.getTime () .getTime () + eventDelta);

    endCal.setTime (newEndDate);

    reformat the start date, just in case.

    Trainer SimpleDateFormat;

    Formatter = new SimpleDateFormat ("yyyy-MM-DD hh: mm:." "") « « S ») ;

    Date newStartDate;

    newStartDate = new Date (startCal.getTime () .getTime ());

    Formatter.format (newStartDate);

    Take the iterator that is used for the calendar

    DCBindingContainer dcbindings = (DCBindingContainer) BindingContext.getCurrent () .getCurrentBindingsEntry ();

    UPDATE HERE - the name of your iterator binding your view calendar object

    Iterator DCIteratorBinding = dcbindings.findIteratorBinding ("NameOfYourViewObjectIterator");

    Get lines of database that uses the iterator

    Line lines [] = iterator.getAllRowsInRange ();

    Line currentRow = iterator.getCurrentRow ();

    Must make sure that we have the iterator on the right line

    If (rows.length > 0) {}

    for (int i = 0; i)< rows.length;="" i++)="">

    Updated HERE - this is a primary key for your view object

    If (rows [i].getAttribute("Id").toString () .equals (rowPK)) {}

    We found the line, now exit loop and move forward

    currentRow = lines [i];

    break;

    }

    }

    }

    If (currentRow! = null) {}

    Get the binding of operations

    CHECK to make sure that you have a validation link on your Page Def

    OperationBinding commitBinding = dcbindings.getOperationBinding ("Commit");

    / Date start and end Date for the line that we are changing the value

    * We need to create an oracle.jbo.domain.Timestamp because the view entity object using oracle.jbo.domain.Date

    * oracle.jbo.domain.Date does not accept that the oracle.jbo.domain.Timestamp, which stamp accepts java.util.Date

    */

    Start date of new game

    Timestamp newStartDateTs;

    newStartDateTs = new Timestamp (newStartDate.getTime ());

    UPDATE HERE - launched date field

    currentRow.setAttribute ("Startdate", newStartDateTs);

    New defined end date

    Timestamp newEndDateTs;

    newEndDateTs = new Timestamp (newEndDate.getTime ());

    UPDATE HERE - launched date field

    currentRow.setAttribute ("Enddate", newEndDateTs);

    Perform field validation against currently modified line

    try {}

    currentRow.validate ();

    } catch (Exception e) {}

    System.out.println (e);

    Restore all changes so there is no garbage data is entered into the database

    currentRow.refresh (Row.REFRESH_UNDO_CHANGES);

    return;

    }

    Run the validation on the database operation

    commitBinding.execute ();

    Look for errors during validation: If no errors, then update calendar

    If (commitBinding.getErrors () .isEmpty ()) {}

    Refresh the calendar client in order to reflect the new changes

    RequestContext adfContext = RequestContext.getCurrentInstance ();

    adfContext.addPartialTarget (getCalendarComponent ());

    } else {}

    currentRow.refresh (Row.REFRESH_UNDO_CHANGES);

    }

    } else {}

    Nothing to do here.

    }

    }

    }

    protected RichCalendar getCalendarComponent() {}

    FacesContext context = FacesContext.getCurrentInstance ();

    UIComponent root = context.getViewRoot ();

    Hard-coded id for the moment, but that can be loaded dynamically.

    UPDATE your schedule component JSPX HERE - id

    return (RichCalendar) root.findComponent ("c1");

    }

    (3.) If can't remember off hand imports, if you have a problem let me know, I'll send a list of what I have.

    I hope this helps. Good luck!

    Gavin

  • Widget Infosemantics Drag and Drop Interactive

    I added the Infosemantics Drag and Drop Interactive widget to my project, but it works only after the publication by a computer and not on an iPad.  I've published using SWF and HTML5, so it "should" work. The HTML Tracker for this slide does not list the blades not taken in charge or objects.  If this widget is not compatible with the iPad, is the new drag and drop feature Captivate available for subscription customers and ASA work on an iPad?  If so, is there a student for ASA or a subscription fee? Thank you very much.

    No, the widget drag / move does not work on your iPad.  No Infosemantics widget is compatible with HTML5 output at this time.  Forgot to widgets, HTML5 Tracker be not necessarily compatible, so it is not a good guide in this instance.

    Captivate 6.1 drag and drop feature works (somehow) in HTML5.  I suggest that you go down that road.

  • The drop-down list widget by dragging down all other content when it is activated

    Hi there - this is probably a stupid question and reflects my total ignorance - but I'm using the drop-down list Widget and whenever I click to activate the drop down the rest of the page content travels South with it. What did I miss? I thought that the list would automatically be placed above any other content. Help would be welcome. Thank you.

    Please give the link of the page to display, also if it is a third party widget, please communicate with the hardware editor of the widget.

    With a Menu, you can change the Options settings.

    Thank you

    Sanjit

  • Problem of time setting Date DateField

    Hello.  I know I posted simillar in the past but now encounter the problem with what I think is linked to time zone.

    When I use the following code to set the time and date in a DateField leave a string I get the inconsitent results...

    DateFormat df = new SimpleDateFormat ("YYYY/MM/dd HH: mm");
    java.util.Calendar d2 = java.util.Calendar.getInstance (TimeZone.getDefault ());
    String date = ' 11/11/2011-14:11.
    yy int = 0, mm = 0, SD = 0, h = 0, e = 0;
    mm = Integer.parseInt (date.substring (0, 2)) - 1; January = 0
    DD = Integer.parseInt (date.substring (3, 5));
    YY = Integer.parseInt (date.substring (6, 10));
    HR = Integer.parseInt (date.substring (11,13));
    MI = Integer.parseInt (date.substring (14.16));
    D2. Set (Calendar.YEAR, AA);
    D2. Set (Calendar.MONTH, mm);
    D2. Set (Calendar.DATE, dd);
    D2. Set (Calendar.HOUR, human resources);
    D2. Set (Calendar.MINUTE, mi);
    D2. Set (Calendar.SECOND, 00);
    D2. Set (Calendar.MILLISECOND, 00);
    D2.setTimeZone (TimeZone.GetDefault ());
    long t2 = d2.getTime () .getTime ();
    _dateField = new DateField ("", t2, df);
    Add (_dateField);

    So will string ' 11/11/2011-14:11 ' to the datefield causes the time spend at 2010-11-12 02:11.  I've set the default calendar time zone doe.  Not sure why this is now occurring.

    Ah my bad, given the first bit and skips the rest! It is possible that you are using the TIME instead of HOUR_OF_DAY

  • Change the time in my Inbox.

    The time is wrong in my Inbox. It has always been. How can I change the time in the mail?

    Depends on what e-mail program you use, like assuming that your victory time settings are correct, that the e-mail program can have parameters of calendar/time in addition to the parameters of time to win

  • Chronology of the time CS4 don't make sense.

    Hello

    I'm working on a sequence which is 00; 29; 29; 20 in length. For me it is 29 minutes and 29 seconds.  These numbers are shown in yellow on the lower left side of the screen.  These same numbers are also shown in yellow just above and to the left of the timeline.  These agree with my calendar time and play time.

    Now and it is not supposed me...  On the right side at the bottom and just below the screen, white numbers I see show 00; 01; 50 07.  Isn't that supposed to be the total length of the sequence?

    Little worried that only 1 minute and 50 seconds are in the sequence.  I make the entire sequence.

    Help please.              Tom B.

    Tom,

    Looks like you have a "orphan", out past where your Timeline must end.

    When you hit \ (backslash) to zoom out on the entire timeline, you see a Clip, out beyond the end into any track?

    Good luck

    Hunt

  • Problems using Vimeo in widget Web object and error message "What is happening here?"

    Using Captivate last, 8 on Windows 10. I have five minutes 5 HD mp4 videos uploaded to Vimeo Plus account. I used the Web object widget interaction with the embed from Vimeo on 5 empty slides code in my Captivate for learning project.  I've extended once the widget and drag it to the Timeline for a few seconds before the actual length of the Vimeo video. Between each slide video I put one or two quiz slides. Publication and download a Web site online that everything seems to work fine, except that sometimes a video will stop halfway through and the Captivate after project will move immediately to the next quiz slide. It's random. In the test with multiple users, a person can spend all the videos OK but the other may have breaks from 1 to 4. When I tested it online, I found the same erratic behavior.

    I tried to put a button 'continue' after the video on the timeline. Video can still stop playing after a few minutes, but the blade now continues until the button is on the timeline. So it does not solve the problem.

    In the properties of the Web Widget object, there is a preview button:

    WhatsGoingOn.png

    When I saw one of the 5 videos shipped I get this message "what happens?", but I can see the first frame of each video in the background, and however, it always seems to start OK.

    WhatsGoingOn2.png

    That means Adobe by "Please install Flash or upgrade your browser." I have 10 Windows that says I have the latest version of Flash Player. I also have Adobe Edge animate installed.

    Help to fix this would be greatly appreciated. I know that I can insert just the 5 videos in the project calendar and it will work, however, these are great HD videos and with 2 or more users who access at the same time, we have some bandwidth problems. I thought that using Vimeo to disseminate video content would solve the problem of bandwidth, but having the halfway cut of videos is not acceptable. Has anyone else had luck with the help of Vimeo in this way? Are there other methods, what can I try?

    Thank you

    Tom

    Hi Tom,

    Why not try the native Web (headings) object that comes with 8 Captivate? In addition, may I know if you publish to SWF or HTML format? You can also share a screenshot of your Timeline slide?

    Thank you

    MohanA

  • Drag and drop questions.

    Hi again,

    I work inScreen Shot 2016-04-25 at 1.07.25 PM.png

    On a Mac

    Screen Shot 2016-04-25 at 1.07.41 PM.png

    I have worked on this problem for a long time and can't find a solution. And it is a problem of multiplayer.

    Initially, I did my interaction drag-and - drop and it worked perfectly. Everything was exactly what I wanted. Then something happened and things are not working more. The problems I have are:

    (1) when the "Submit" button is clicked and the answers are just the right answer comes on for half a second and all then moves to the next slide. I've tried several things so he could stand it no longer, but nothing has had an effect. Click right and disappeared.

    (2) when the wrong answers are selected and as I hit the "Reset" button it will wait until the first item is lowered and then move to the next slide.

    Here is a screenshot of the Actions panel and the calendar

    Screen Shot 2016-04-25 at 1.12.46 PM.pngScreen Shot 2016-04-25 at 1.12.35 PM.png

    My interaction drag-and - drop is included in the scoring of quizzes. The notation always seems to be registered correctly according to the answers provided.

    Have you checked the break? Your actions are configured to go to the next slide, that is not what you wanted? Change to keep in place if you wish not so quickly go to the next slide.

    You have object actions?

    In regards to reboot, I'll create especially my own reset button. You can take a look at this blog post:

    & Slipped in 2016 with Captivate 9 - Captivate blog

  • iCal will sync with google calendar after update

    After the update to El Capitan, the calendar on the macmini syncs with google calendar.  Are there previous events to google calendar but nothing new will come and nothing new on the mac mini will return to google.

    Found a few other posts about it, but their instructions do not work on the mac mini (for example a statement saying select google and click on the sign less - there is no sign less!)

    I looked for a way to remove the gmail out of the mac mini calendar but can't find a way.  I can just uncheck the calendar.  Using mini mac just says if you can't remove a calendar on the mac mini to go and remove it out of google.  I don't want to do that.  The google calendar sync very well to our cell phones and Outlook on the Windows PC.  Google calendar is Center of maintaining us immediately the same way and I don't want to delete it just to try to fix the bug of El Capitan darn!

    I have tried the calendar time, but he acknowledges that he is already in the mac mini.

    I disabled the gmail calendar.  restarted the computer.  again check the gmail calendar.  but the only thing that comes up is the previous items.  I still can't sync it with google gmail ical calendar.

    What should I do next to get the ical to sync with google calendar?

    Please stop calendar and also the application of reminders, runs. Force quit if necessary.

    Back up all data.

    If you synchronize agendas or reminders with a network such as Google service, please open the preferences panel Internet accounts. Make a note of the settings for calendar accounts, then delete and recreate.

    Log off or restart the computer.

    Launch schedule and see if there is an improvement.

  • Calendar and WIA driver

    Had a power outage yesterday, of course PC was when he went out, now the calendar & time was turned off, would not let me set the date. Also my Fijitsu Scanner says that I need a WIA driver. It was working fine. The pilot did fry with the battery that keeps the calendar

    Hello

    CMOS battery allows the Date and the Real Time Clock (RTC) current settings to be saved in your device. Since you had a power failure, this can cause the battery in the motherboard failure. If this occurs, the Date and the Real Time Clock (RTC) settings back to its factory settings. We suggest you to replace your battery to solve the problem .

    Let us know how it goes.

    Kind regards

    MICAH Bat

  • Q10 guest - zone problem blackBerry calendar event

    Hi all!

    I've just switched back to BlackBerry, iPhone and love everything about it so far except for one thing: calls on the calendar time zone problems.

    My work using an OS X hosted the CalDAV server, and I was able to sync my existing calendars to it without problem.

    My timezone: Eastern

    My colleagues timezone: Central

    Question: I received an invitation from a colleague, and on my Mac, it shows 13:00 Eastern, as it should.  The invitation has been sent to 12:00 Central.  This same invitation appears on my BlackBerry at 07:00 Eastern.

    Completed test:

    I added an invitation on my BlackBerry at 06:00 Eastern as a test and it appeared on my Mac at the right time without problem.

    I added an event on another day of my Mac, and it synced to my BlackBerry without problem.

    So it seems that my problem is that when the receiver event invites others, possibly in different time zones.

    My Mac and BlackBerry are both set to the Eastern time.

    My co-workers Mac and iPhone are set to Central time.

    I looked at all the parameters BB and can't find anything that would explain this strange behavior.

    I tried a battery pull - same results.

    I'm on the latest OS available for a Q10: 10.2.1.2976

    Can anyone help with this?  I'd hate to go back to iOS for a question like this, however, a precise and reliable timetable is essential for my work.

    Another update:

    Only, the lady came back on the line and told me that it is a known problem that is "actively investigated."  When asked how long their ticket has been opened on this subject, I was told since September of 2013...

    It seems that there is no resolution for this problem.  I will go back to iOS

Maybe you are looking for

  • TRYING to EXPORT BOOKMARKS - BOOKMARKS-CLICK &amp; IT does not SHOW "MANAGE the BOOKMARKS' HELP!

    TRYING TO EXPORT MY FAVORITES (COMPUTER WILL CRASH SOON). I FOLLOWED THE INSTRUCTIONS TO DO THIS. I CLICKED ON the FAVOURITES and IT does not SHOW 'MANAGE BOOKMARKS' how DO I EXPORT MY FAVORITES IF I can't CLICK ON "MANAGE BOOKMARKS"? Thank you

  • 15 - ac098tu: low Volume by Mic

    Hello I have a huge request concerning the low mic volume by realtek dts sound studio, I can see the mic properties shows low bars when I speak into the microphone through front or through portable computer microphone, but when I uninstall the driver

  • Why my screensaver air Apple TV has stopped working?

    frustrating. I got the new Apple TV for a few weeks and love the new air screensaver while listening to music. All of a sudden yesterday the air screensaver decided to me buggy. It works for about two minutes before the screen turns black. Air screen

  • Reinstallation problem

    I am trying to reinstall vista from a recovery on my Dell laptop drive (cheap Dell has no power discs!). I reboot and go into the repair of my computer, it comes up with a login for 'User' screen profile does not exist on the pc, which in fact there

  • HP D110 - device non-reachable

    I'm trying to set up my D110 for the wireless. I have a new Cisco Valet Plus router connected to the school network with WPA - psk. The Mac connects to the network and the printer connects to the network. But when I try to configure the printer wirel