Change fondo en XY graph

Quisiera saber TR are posible change el fondo en UN grafico para insertar una imagen of fondo XY. SER posible, would be muy interasado en como conseguirlo. Gracias por el tiempo dedicated.

Please, read a solution here:

http://forums.NI.com/T5/LabVIEW/image-plot-as-background-of-a-XY-graph/m-p/884818#M399983

and here:

http://digital.NI.com/public.nsf/allkb/FF55BDA8C9F0C0ED862573450053A425

See you soon,.

Tags: NI Software

Similar Questions

  • Firefox bars menus, background, and text all change them to black when I put my laptop on the sector.

    My Firefox is quite good on battery. However, the minute I plug my diet, all turns off short name of the Mozilla Firefox window. The text is still there because I can select.

    This change involves the switch graph display card?

    Try disabling hardware acceleration in Firefox.

  • Hide the Parent label for the drilling on the graph

    Hello

    I had built a hierarchy in the RPD (country - salesforece - zone - customer area - market-).
    I show in my graphical analysis, "shipped cases by area. I'm drilling on the area that changes the view of graph in "shipped cases by region. However, in doing so, the label of the box appears always concatenated to the label of the region. This makes it very cluttered labels. Is there a way I can hide the parent labels when drilling?

    Any response would be greatly appreciated!

    Thank you
    Ann

    Hello

    Create a chart report separated with the column of the area as "is invited" and give navigation chart column chart of a region area. Hereby the report would get constrainted.

    Concerning
    Young

  • Data provider changing camembert?

    IV created a pie chart in which the dataprovider often will change, the problem is how can I draw the diagram when the datprovider changes as currently the graph is pulled when the dataprovider was not set and thereforee that nothing shows up?

    Thanks Chris


                       
    Import mx.rpc.events.ResultEvent;
    Import mx.collections.XMLListCollection;
    Import mx.events.ListEvent;
    Import mx.controls.Alert;
               
    [Bindable]
    public var stats_list:XMLList;
    [Bindable]
    public var stats_list_collection:XMLListCollection;
               
    Manager for its xml list stats.
    public void stats_result(event:ResultEvent):void
    {
    stats_list = Event.Result.stats
    stats_list_collection = new XMLListCollection (stats_list);
    }
    ]]>
       


               
                   
               

    Chris,

    I posted some information that may be of some use to you.  Note that my dataProvider PieChart is: stats_list_collection

    When the "stats_result" function is triggered, it changes the data for the pie chart and reset the value of stats_list_collection.  When this happens, it changes the pie chart contains the new values of your XMLListCollection.  Basically how this application was setup is to have a dropdown list selected by a user and option of and he fills data in the pie chart according to their choice.

    Another way to do it (if you want not just update the dataProvider content) is:


            

    Pseudocode

    var dataprovider1:SOMETYPE = SOMETHING;

    var dataprovider2:SOMETYPE = SOMETHING;

    var dataprovider3:SOMETYPE = SOMETHING;

    public void THAT YOU WANT THE TRIGGER TO BE(event:ResultEvent):void
    {
    switch (SOME CONDITION)

    {

    case "case 1": piechart.dataProvider = dataprovider1;

    break;

    case "case 2": piechart.dataProvider = dataprovider2;

    break;

    case "case 3": piechart.dataProvider = dataprovider3;

    break;

    }
    }
    ]]>
        


               
                    
               

    I hope this helps.  The secondary option I posted was for the most part pseduo code but the idea should give you a starting point.

  • Change the width of the Edge Finder?

    Very complex work that needs me to constantly move a stroke object to fill, except that the width of line 1 is much too huge scale, I work at so whenever I change I must also point out the race as 0.1, so I can see what I'm doing.

    Someone knows a way that I can adjust the width of the line: it automatically?

    1 draw a path.

    2 put his race a.1 pt; Fill out to zero.

    3 Mousedown top, press in and hold the Alt key and drop it on the default Style in the graphic Styles palette.

    The default style is maintenant.1 pt stroke. When drawing, type just the D key to set the default path.

    So of you that the default value in the new documents that you create, open the template files you use, similarly change their Style of graph by default, then save.

    JET

  • Support to the Structure of the event!

    Hello

    I am trying to structure of the event a config in the way, I could change the range of graph of sample to analyze.

    I have 3 graphics. The upper part is the input signal.  In the middle is the signal with some calculations and the bottom is the graph where I fixed the width of the sample to be analyzed with other values.

    I put the structure of the event in the way that I read from the file and later update the data table to force execution of cases "table 2".

    Its only example, but I would change the value 'start' and 'length' of the signal from the sample, but I can't get the data to show it again. I tried different options, like putting another source of the event within the event "together 2.

    I could join cases 1 and 2, but the problem is with the command 'start and length', I can't get its display when I change the values.

    I created an example since its part of my program, in order to simulate the same way I need.

    I thank in advance, Fred.

    You need over the value of table 2 for the tunnel exit of the case of the event.  Currently, this tunnel of output is set to 'Use default if Unwired'.  So, since you have no wire to the top of this tunnel, the value in the shift register will become an empty array.

  • NVIDIA no longer works

    Hey, I have an Acer Aspire V3 - 571 G-53216G50Makk (BE), and today I downloaded the new drivers for my Nvidia Geforce GT630M 2 GB and the new driver (for Nvidia) said my 630M 2 GB was not compatible and now my 630 M 2 GB no longer works (I tried with techpowerz gpu see if my 630 M 2 GB was still working but he found no more).

    What should I do now?

    BTW, I have 64-bit Windows 8 (already on this subject when I bought my laptop in March 2013).

    Download nVidia drivers from the Acer download site.

    It is old (307.17) but it should get you go ok.

    Normally, you cannot install because nVidia site drivers of stock are not suitable for dual graphics.

    Unless you were willing and able to change Setup nVidias, you had to use the old version of Acer.

    In the last week or two, I posted here that nVidia had changed their installer (for graphs of 730M) which made it unnecessary for me to then - change it installed just ok (320.18).

    Maybe it's that they did not all yet.

  • Chronology in graphical mode is displayed as expected!

    Well, I hope that this will be an easy fix. I work with some time-remapping, and I watch a tutorial. In the tutorial video, the instructor has created a time-remapping and graphically, it looks like this:

    Correct Timeline.PNG

    I looked and redid my calendar five times more to see if I could produce the same thing, but every time I get this:

    straight timeline.PNG

    Now, I was able to play with the handles and adjust things but not exactly how I wanted so that I'm missing?

    Change the curve of graph mode to display the value, not the interpolation.

    Mylenium

  • "Less than 40%", "between 40 and 70% ', 'more than 70%

    Experts from the ADF,

    In DVT as graphic funnel, is it possible to change the fork of graph based on the Customs provision.
    For example: graph funnel creates the funnel as "less than 40%", "between 40 and 70%", "greater than 70%. Is it possible to change this to any custom value?


    thnks
    11.1.1.5 Jdev

    Hello

    See 'Threshold' in

    http://download.Oracle.com/docs/CD/E21764_01/apirefs.1111/e12418/tagdoc/dvt_funnelGraph.html

    + 'The number of threshold, interval threshold, and color can be customized in the chart bean. These functions are not exposed to the faces layer yet, but the application can use a graphic link to access these features in the graphics engine. » +

    Frank

  • Remove them historical chart

    Hello

    I read wisdom of Teri: graphics stick than of not where it says:

    Another great tip to follow is not to try to continue to do the new graphics by duplicating same old model diagrams for years and change. Since the historic edition is forever, it can become quite low after you change a graph of hundreds of times. If all you want to change, it is a graph of the data, it is well, because data changes are not counted as a graphic edition. But if you go to the implementation of styles of different column and text styles and attributes to graphic style and transformations, it's cleaner to do it again to make changes to a graph of old.

    No there is no way to remove this graphic story? I'm a perfectionist, I like to keep things nice and clean.

    Thank you!

    Not sure about the removal of the graphic history, but there is an easy way to keep it clean.

    All-> to start a new file-> paste copy everything in place

    Now you have the same file just with no history.

  • may not represent solid and gradient fills on a series

    I have a bubble with a series of simple bubble chart. Each graphic element fill is determined by a fill feature. Initially, this function of fill will fill all elements of graphic with gradient of colors yellow, red and green. As soon as I select an item in the data grid, that I have a function which corresponds to one of the graphic element. Here in this function when an item is selected, I'm changing the fill of graph items by using the property item.fill to a solid color (who initially had a color gradient) and keep the rest of the same graph. So I called the method invaliedseriesstyles on the card that will redraw the map. After the realignment of the graph, I found that the other elements of graph has also changed their solid color fills where I expect only the selected chart element to change the gradient of solid color. Please let me know how to remedy this situation.

    Thank you.

    SCI

    As a variant of the solution is to create an itemRenderer for the selected drawing element using another style.

    Fill in the property if the series is applied to all items.

    In your rendering engine, so you can choose the style of filling based on data and define a special property for the data to distinguish it from the others.

    May be there is easer in different ways.

  • loose piece of SWF imported animation

    I have imported a SWF (following a path, beating of butterfly wings) into a FLA project library and dragged on a frame in my project. When I publish the FLA the butterfly is following the path, but the wings are flapping is more... How is it? When I play the SWF Butterfly alone without import it, it works fine.

    Thank you!
    Anna

    Gatta Design says:
    > Urami thanks. I was able to simply import the film wing flap clip but not
    > the entire swf file where it follows a chronology. When I change the clip to
    > graphic, he loses the flap to the wing as well...

    Sorry, I forgot to mention. You may need to create a loop on the graph
    The symbol properties. Select the clip wings, CTRL F3 (properties panel)
    change the behavior of graph and set the number of loops.

    > As I want this only on butterfly
    > A page in my site web I do not understand how to create the timeline in the same
    > File flash as web site?

    Sorry, I'm afraid, that I do not understand what you are trying to do.
    Can you clarify it please?
    Ideal if you download the image on your server, let us download and check
    based on the work of your source of the solution.

    --
    Best regards

    Urami

    --

    !!!!!!! Merry Christmas!
    &
    Happy new year


    If you want to send me a message - DO NOT LAUGH at MY ADDRESS

  • Script to change the line style in a graph report

    Hi all

    Is it possible to automate the formatting of (linestyle) of a plot of graph in a report?

    friend,

    Ben

    This code accesses a system of axis line style:

    Call GraphObjOpen("2D-Axis1")
    Call GraphObjOpen("2D-Axis1_Curve1")
    D2CurveLineType = "solid".
    Call GraphObjClose("2D-Axis1_Curve1")
    Call GraphObjClose("2D-Axis1")

    Please note that you must know the name of the Axis system and the curve you want to change and use the correct names in the GraphObj... commands.

    The best way to find these commands is via the function Ctrl-A in tiara.

    Valid entries for D2CurveLineType are:




























    End of script Terms of interface, explanation

    solid

    Line

    Dashboard & dott.

    Points and dashes

    1 dotted

    Dashes 1

    2 dotted

    2 dashes

    dotted line

    Dotted line

    I hope this helps.

    Otmar




























       
       
       
       
       
       

  • "Graph - Simple" change issues to include several axes

    I'm changing the workspace "Graph - Simple" object to allow several axes. However, I was do unexpected behavior and I can't find a way to restore the configuration when the next load.

    1. Is there a way I can use the "Custom Data" variant in the Item.Data cluster to store the configuration?

    2. If not, is there another way I can do this work within VeriStand without having to re - develop a full graphical object (based on the free label template) just to add this feature?

    I am currently using VeriStand 2014, but I can be updated until 2015, if there is a new feature that would help.

    Thank you!

    You're very close to having the right answer, but what you call won't work, unfortunately. Overall, it would be nice to put data in the custom as attributes of variant data field, as long as you crush all VeriStand attributes can be expected otherwise. Even if you do this, however, there is no way to save this copy of the cluster of the top-level VI item data. I can't in any way you can get this to work.

    However, you do have to start from scratch. It is an available add-on here called Multi-Y chart with channels calculated. It has multiple scales are natively, but this is a graph open source with a superset of the features in the chart - simple. Here you could probably change to have two or more axes and find a good way of saving data so that it persists on the next load.

    I did not write this control and never used personally, but it might be a more open alternative to watch before thinking to start over from scratch.

  • Table of clusters with graph - scale change event Y

    Hello everyone

    I have an array of Clusters with a graphic within each cluster. I need raise an event when the user, type a new value to the scale of the graphs Y and press "Enter" to apply the change. Any ideas how to trigger that?

    I am not considering event 'mouse enter' because I have other events related to that already.

    Thank you

    Dan07

    Given that the graph is in a table, you must dynamically record the event of change of scale. Typical static records are not allowed for the elements of the array, and it is not a good reason why they cannot be admitted, that's why I created an idea for allow static event registration of items in the array. I hope you go to the exchange of ideas and vote for this idea.

Maybe you are looking for