Mapping full - process flow occupied

Hi all

I have a problem with a process flow that I imported from another server.
If I run this process flow in the test server it runs and finish without problem.

Now, I imported this workflow process in the production server, but it is not complete. In the browser of the Audit, I see that all mappings have the status "complete", but the process flow is still busy after 1 hour.

In the process flow, there are 7 maps and 3 user-defined operations that use shell scripts.

What did I miss?

Oracle and OWB 11 GR 1 material
OS: Sles 10

Thank you
Gul.

Hi Gul,

We use OWB 11.1 and we went through the same thing.

We solved this by:
-Adding an index on the runtime repository
-clean the runtime verification tables
-collect statistics on the tables at runtime

It should be much information on the previous step.
If you're not familiar with it, then I can understand it in a next message.

-check the process flow of errors.
We discovered that some process flow has been corrupted after import.
Some transitions had flase numbering.
Example: mapping has been a success (0), (1) error and the warning (1).
The error and warning lines had the same number.
After correcting this flow worked properly.

Kind regards

Emile

Tags: Business Intelligence

Similar Questions

  • Call a script shell to an OWB mapping or process flow

    Hello

    is it possible to call a shell script for a mapping owb or process flow and how can I do this?

    Greetings

    Check this box: -.

    http://blogs.Oracle.com/warehousebuilder/2010/05/how_to_use_user_defined_activity_in_owb_process_flow.html

    See you soon
    Katia

  • process flow sequence (output of mapping)

    I have a map where I use the operator sequence and creating a record in the target table, I need to pass this variable out of the mapping and as input to another mapping. I'm not able to go to the sequence of the mapping. How we can assign values to the mapping of the output variables but I do it it says cannot assign variables to the output parameters of the mapping, it is said.

    parameter of input and output parameter mapping mapping are intended to be run before and after the stream of mapping and the cannopt accepts input from any part of the data stream.

    Any ideas as to how this can be done.

    A plug-in mapping can be called in a process flow.

    Thank you

    Published by: user8023060 on June 23, 2009 06:08

    Hello

    write a plsql function that executes returns seq_XXX.currval (or, to be on the safe side, select the value in your table).
    Set this value to an output attribute.

    And no, pluggable mappings can be simply included other mappings, there is no way to run them directly.

    Kind regards
    Carsten.

  • What version of Oracle workflow is required for owb 11.2 process flow.

    Hello
    I want to implement the process flow for my mapping.
    But I get the error message like,
    "The connection has been successful, but not to the version of workflow to recover."

    Also the OWF_MGR user is not created.

    Oracle 11g on RHEL database is
    and autonomous OWB 11.2 under Windows.

    I create user owf_mgr who have the schema for the objects in a workflow?
    Also what version of workflow required oracle to the process flow. I need to install
    Server of Oracle to Oracle db server workflow or it'll get installed with 11g.

    Where I'll get measures details to implement the process flow from scratch.

    Help, please.

    Published by: TN November 21, 2011 06:01

    >

    I create user owf_mgr who have the schema for the objects in a workflow?

    Yes

  • How to add a procedure for a process flow, but PF continue immediately

    Hi all

    In my process flow, I would like to be able to launch a procedure. However, I wish the process flow to continue immediately regardless of the status of the proceedings. I want the procedure that is called, and I want the process flow in order to continue its not regardless of the status of the proceedings. Is there a good / better way to do this?

    The following method seems to work. But I don't know if it's the right / best way to do it:

    Start-> forks > procedure-> one (must only launch) OR (method A and B card feed the RO)-map C (fill)-> END
    Plan B (must successfully complete)

    In case the "schema" above is not clear I "FORK" which divides to call the procedure has as b. mapping Procedure A and B map go to a 'GOLD '. The gooes 'OR' la carte b. plan B goes to the 'END '.

    Thanks in advance for your ideas and experiences.

    -Sam
    P.S. I'm on OWB 10.2.0.1

    If you want a plan B to wait that the procedure is made

    proceed this way

    Start-online fork => Proc-OR online-online success

    -Online card-online A-online the Condition for success-online card B (OR)

    HTH
    Mahesh

  • Cannot run CodeTemplate in parallel using process flow

    Hello

    We use oracle warehouse builder 11 g 2 on Linux.



    Created two mappings of model code, built a process flow to perform these mappings at the same time. When I run this workflow process run only mappings and the second map ends with errors.



    But when I run the same workflow process re-designed to perform the mapping that sequentially, it works fine.



    Thank you

    J

    For execution of the mapping, you can right-click on the enforcement unit and select 'Open Details', here to change the name.

    See you soon
    David

  • Enter the date of transformation in the process flow

    Hello

    I have a transformation (stored procedure) in a process flow that requires that two input variables. If I execute this stored procedure directly from the database I would use:

    Start
    package_name. Procedure_name (to_date ('20100101', 'YYYYMMDD'), to_date ('20100102', 'YYYYMMDD'));
    end;
    /

    The problem in the process flow, it's that I'm not able to give the input parameters for the transformation in the correct manner. The process flow is valid, but when I run the workflow process I get ORA-01830 and PRE-02241. What I have in the process flow is:

    START-> procedure_name--> END

    I also tried with:

    START-> ASSIGN--> procedure_name--> END

    Someone would ask me how do I pass two input parameters for the transformation are the type of date (format: YYYYMMDD)?

    Thank you

    Andreas

    Hi Andreas,

    5472814 UNABLE TO PASS DATE PARAMETERS WITH THE HELP OF RUN_TASK OR SQLPLUS_EXEC_TEMPLATE

    No, it has different bug for your problem. Now I can not find this bug on Metalink...

    Look at this thread (read the last message in the user philip_b)
    Re: Passing Date value to the parameter mapping entry

    This is the same problem and the same OWB version

    I hope this helps!

  • Process flow of objects in a database diagram

    Hello

    I want to find a database schema, objects created by the Oracle Workflow. Is this possible?
    For example, when I create and deploy a mapping in OWB, a package is created in the target schema. I can manage by using SQL only.
    When I create a package, module, and process flows in OWB, is it possible to visualize in a database schema (for example, owf_mgr)?

    Thank you.

    Hello

    When you deploy a process flow, it is transformed into an Oracle Workflow and stored in the workflow diagram. There is a client of design (Workflow Manager) and monitor tool (Workflow Monitor) for design/editing workflows and their follow-up during execution as it is seen to display the workflow created.

    What do you do with the workflow deployed? Do you want just a few views SQL to see being deployed or you want to run the object 'natively' (such as the HAND of the generated package PLSQL?).

    See you soon
    David

  • Help if you process flow

    Thanks in advance

    I have a process flow as below

    I have function (parameter) out-> return 0 and 1

    I have 2 maps
    (1) Map1
    (2) Map2


    What I need, it is
    If returns 0 I want to run MAP1
    If returns 1 I want to run MAP2

    I have my workflow process that I did is

    Start-> service-> Map1-> success
    -> Map2-> success

    After the service, I added the complex condition (RTN_CODE = 0) for Map1
    I added the complex condition (RTN_CODE = 1) for Map2

    I get error VLD-10028: an activity that has an outgoing transition with a complex condition must have another unconditional outgoing transition

    If returns 0 I want to run MAP1

    Hello

    If you use conditional transitions you need a conditional transitions for each possible result condition or a transition without any condition used when none of the other conditions are met.

    Therefore, deal with the return value of your function is 0 or 1. Just add a transition condition without a connection to the operator 'end with errors '. It will be fired this way if you make sure that your function returns 0 or 1. It is just necessary to validate the process flow.

    Kind regards
    Carsten.

  • Can process flow cause a concept of sleep in a language

    I have a process flow where I check and see if there no are data in a table if this mapping is successful I want to continue with the rest of the process flow, otherwise I don't want to wait for 5 minutes and again go through the process of verification of the table. Ideas on how to proceed in OWB.

    Thank you

    Use of loop in the process flow and wait until it gets loaded into the desired table data

    There is activity wait in OWB wait for awhile.

    See you soon
    Katia

    Published by: Katia on August 17, 2009 11:12

  • How to run SQL scripts using OWB process flows?

    Hello
    I have a few SQL Scripts. I run them using process flow OWB.

    Can I get a document or a link that helps me to achieve this?

    Thanks in advance,
    SriGP

    Hi SriGP,

    You can call SQLPLUS using the external process activity.

    Order: Give the full path of the SQLPLUS executable
    Script: specify what you want to do in SQLPLUS

    Thank you
    Fati

  • Refresh of the materialized view; Process flow

    I was wondering if anyone has used process flow to refresh the materialized view.

    I'm trying to use a process flow for it, either run something similar to below
    EXECUTE Dbms_refresh.Refresh ('"ODW_SRC".) "MV_SERVICE_DAILY_AUDIT" ');

    I try to avoid using the Scheduler of DB because I want to make sure that the process flow is not conflict with the update of a materialized view possible cause conflict more execution time of the work expected will refresh window.

    I guess I could use a transformation and build. but I was wondering if there is an easier way in the execution of it just line... an idea

    Thanks in advance for your help

    Sorry, I think that the term OWB is post mapping process, its actually an operator in an OWB mapping where you can add a procedure for example call. The procedure can do pretty much what he wants.

    See you soon
    David

  • Assistance of activity defined by the user process flow

    Hello

    I am trying to create a process flow that renames a file. I use the activity of the users defined, but I encountered some problems. First some background info, Oracle 10 G are the DB and it runs on a Unix system, the Oracle user account has read/write access in the used directories.

    For the parameters of the activity, I set myself
    Order > I tried everything here
    Setting > Virgin
    Script >
    filefullname = ip_xref.dat
    filename=${filefullname%.*}
    fileext = ${filefullname # *.}
    "DATE ='date + %m %d %Y"
    NewFileName = "${filename} _ {DATE}." "${fileext}.
    MV $filefullname $newfilename
    MV $newfilename backup.

    in the command section, I tried out this way, I can think of: / usr/bin/ksh, / bin/ksh, ksh, / bin/bash, done a script outside owb with the same thing and robbed on that and yet all I get is "/ bin/bash: not found" or "/ usr/bin/ksh: not foundĀ»
    Ideas/suggestions, I'm open to anything.

    As side note, I tried to do with UTL_FILE, but our DBA has informed me that it has been disabled for security, it's on.

    For safety reason process UDA isn't the environment variables (including PATH variable that used by shell to search for executable files).
    If you need to specify the full path to the executable file or set the PATH environment variable that you need (use as the first command in your script
    export PATH = / bin: / usr/bin).

  • WFT OWB migration process flow

    We have a workflow process defined with Oracle Workflow Builder 2.6 Version. Keep us the workflow in a wft file and deploy it in Oracle 9 and 10 databases with the wfload utility.
    The process basically called stored procedures and OWB mappings.

    We now want to migrate to 11G.

    Is there a way upgrade workflow process in Oracle Warehouse Builder?

    Do we need a seprate license to run the engine in Oracle 11 G using Worklfow process flow?

    Thank you

    y at - it all automated migration workflow process flow again OWB.

    I do not hear on the means for processflows UAS of OWB migration (at least there is no standard for this task Oracle utility).

    Kind regards
    Oleg

  • Using an OUT in a process flow parameter

    I have a SUBPROC1 process flow that contains a PL/SQL procedure. This procedure generates an integer value. PL/SQL procedure output parameter is bound to a variable VAR1 process flow, so that the value can be used by other processes of sub and in conditions of transition in SUBPROC1.

    So far so good. Now I also have the same value of the process flow to a process flow parent output so that it can later be used by other processes of void. I have created an OUT parameter PAR1 attached to Start1 of SUBPROC1 activity, but I can only bind the output parameter in PL/SQL to the variable VAR1 process flow or the parameterPAR1 of output, not both.

    The only way I can think to do that is to change the signature of the PL/SQL procedure to generate the same value twice through two parameters, one that I can link to VAR1 and the other I can bind to PAR1, but that seems messy.

    Is there a trick I'm missing here?

    You can set the output processflow (from variable) with the Assign activity parameter

    Kind regards
    Oleg

Maybe you are looking for

  • iPad iOS 10 Mini

    I had this morning a large number of conflicting reports regarding iOS 10 compatibility. On the Apple website, it stated that iOS 10 would be compatible with the iPad Mini 1; However, other sites of technology, it has been reported that the iPad Mini

  • How can I print only the body of the e-mail without all the "history of received.

    When I print an email received, the first page is a list of "Received:" data and X. How to print only the message body? John Sykes

  • Need a new screen for my Equium

    Could someone help me? I'm trying to find a replacement screen for my laptop.Does anyone know where the best place to buy a new or used is (good condition)?Help, please

  • Dv6833us Pavilion: Pavilion dv6833us Entertainment PC had Vista... vista needs more

    Dv6833us of Pavilion Entertainment PC had Vista... need vista again I can upgrade to 7 or 8 / 8.1where I can download new software to "repair the disk? Cannot get to recognize the partition D origin to reinstall. Win 7 does not accept the product key

  • Skin wireless keyboard

    HI people, Does anyone found a cover/skin for the new (iMac 21.5 "Oct 2015) wireless keyboard? The 'old' have smaller left and right arrows. Thank you Adam