Tip action copy/paste from one project to another

Hi all

Is it possible to copy the script to a tip of a first draft action and stick it in another project?

Thank you

The answer is, sorry, no. It is related to the required unique ID for every object referenced or used in advanced actions. Please enter a feature request in support of my pleading to have the ability to export/import shares advanced, to add a comment for them and to be able to print them. Only when the sufficient number of users will support these applications, they will be taken into account, at least I hope.

There is a possible solution, which I explained by an example in a blog: Advanced acttions can be transferred by transforming the source into a model project and create the second project target based on this model. Save an existing project as a model is not possible once again (another of my feature requests), but simply to replace the extension by CPTL CPTX will do the trick.

Here's the blog I'm talking about:

Model for reuse the script

Lilybiri

Tags: Adobe Captivate

Similar Questions

  • Can I copy and paste from one project to another?

    I have a scrolling title works very well in a single project and wanted to "simply" copy and paste into another project.  After the copy on the project 1, when I come to 2 project to make the dough, there are nothing to paste.  Is it something with Premiere elements 12, or with my iMac for not keeping that I copied into the memory buffer appropriate?  I found something online which implies there was a software to do this, but I can't believe that this is the only solution.

    I also created a "temporary project" for easier editing with images, transitions and added I want to put into my project "master."  I could create an avi and bring it back on, but I was hoping to get the project finished in a single source.  Any thoughts would be appreciated. Merci.

    Rick

    Rick

    The merger of two projects into one is not relevant and overlooks the important of Premiere Elements concepts if all you want to do is to use a title of a project in another.

    There is a simple and effective way to do it. Essentially, you create your title in the Titler to project 1 and then 'save' as a CTR file which can be imported into another project of Premiere Elements through the Add Media/files and folders.

    1. in the project 1, create your title in the Titler. Close to there.

    2. always in 1 project, go to the active project and it highlight / select the thumbnail for the title.

    3. can I go to Menu/export/name of the file and export/save your title as a file .prtl.

    4. If necessary, import the .prtl file project 2... Add media/files and folders/projects active where drag you it to its destination of chronology.

    Conventional techniques to transfer the contents of one Premiere Elements project to another will not apply to your situation somehow.

    Please see the newsletter and let us know how the above worked for you.

    Remember, you don't want to highlight the title in the timeline to get an active file Menu/Export/Title...needs to be the highlight / select the

    title in the active project, then Menu/export/name of the file.

    RTA

  • Copy slides from one project to another (2 different resolutions)

    Hello

    I have 2 projects of different resolutions (long story) and I want to copy the slides in the smaller project in the cotyledon. But keep the same resolution. (I want to create the Visual of a computer monitor showing the demonstration, as that is the lower resolution to I can have PC monitor as a backdrop)

    When I copy the slides, they are by default resize themselves for the biggest project and I can't change them.

    is there advice?

    is there a 'special' block when it comes to slides?

    Small projects are demonstrations having someone else did for me (so I can't really re - record)

    I want to just try to make them look a little more visually pleasing

    Thank you kindly for your time

    The solution is to:

    • Take a copy of your smaller project and work on that, not the original (in case of screwups).
    • Resize the smallest project using modify > resize the project options.
    • Be sure to work carefully how to increase the size of the stage WITHOUT changing the size of the existing content.  Basically, you want to add an extra space around your current content so that it is now sitting in the middle of the scene.
    • Once you have managed to get your content to the same size as the largest project, copy and paste slides on.
    • You may be able to develop a nice graph of a monitor with a hole in it.  Place it on the slide (or slides model) so that it lies on top of your smaller other screenshots to give effect to look at the screen.

    Is that what you're looking for?

  • Can not copy / paste from one folder to another.

    Just recently, I can't copy and paste a word document to a different folder, and my office is locked and can not move icons. I've unlocked settings, also tried to reconstruct the dates. Running advanced system of care. Creates a new user. Nothing works. My computer as most of the people is a tool and not used to play games, it's time to implement a different system, that is to say Windows 7 or wait 8. I honestly thought that XP Pro has been very stable and I have all the important issues in over 5 years, and in this case. This is the result of an update?

    Hello

    1 did you change your computer, after which the issue started?
    2. the issue of copy paste only occurs with Microsoft Word?

    Windows XP is still very stable and reliable. If you want to upgrade to Windows 7 or Windows 8, you can do it. It's a good idea to upgrade your operating system to get used to a new User Interface that would give you a new experience altogether.

    Follow these steps and check if the problem persists.

    Step 1:

    Test the issue in safe mode.

    Step 2:

    If the problem does not occur in safe mode, I suspect that there is a conflict of software of third party causing the problem to occur. I suggest that you start your computer in a clean boot State in order to eliminate conflicts of third party software.

    Note: The steps in the article to restart your computer as usual.

    Step 3:

     http://www.Microsoft.com/security/scanner/en-us/default.aspx

  • Copy paste from one server to another

    Hello

    I just thought with the installation of EMP in a server and copy the file system after installation to the other server.

    Would like to know if it's possible.

    It's

    1. perform a complete installation in Server A.
    2 using the backup of system files (option IBM TSM) option.
    3. load the data in the backup from Server B, Server B now will all the system files as server has (both servers have the same name)

    Can I now use server B to perform all the activities as A server, without any changes/configuration?


    Thank you
    Mathieu

    http://docs.Oracle.com/CD/E17236_01/EPM.1112/epm_high_avail_11121.PDF
    on page 23

    There are generally 3 ways to do it, described in the doc, you describe option 1 where they are on separate networks with the same name:

    Hostname specifications
    EPM System Disaster Recovery deployment requires a way to resolve the references to the host
    between the production and standby sites. Make sure your configuration using one of these
    options, listed in order of preference:
    -Production and standby are on separate networks. Fully qualified host names can be the same in both sites.
    -Production and standby sites have different DNS which resolves to the correct IP address host names in their network.
    The backup site can have an expectation of DNS that is activated when a disaster occurs.
    -Production host names are resolved to a local IP address on the site of relief effort through a file/etc/hosts.

    If you have separate networks, both servers have the same name but are completely separate and everything, including the database server is the same then Yes, you describe the first scenario of DR. I would recommend the hosts file option as it would ensure that guests always resolve to what you expect.

    Nick

  • Copy layers from one project to another

    I have two projects. One with a purpose complex with several layers. The other with a different effect. I need to copy the first into the second, but the two projects have sizes different model and all layers in the first are defined on this size. I tried to change sizes, but they are in percentages, so 100% in a project is a completely different size to 100% in the other. What can I do to fix this?

    There is a comp resizer script included in EI. Simply select the model you want to edit, then click file > Scripts > scale Composition.

  • Is there a way to copy properties to disable conditional from one project to another?

    I have a bit of code in a project that I want to back off to a colleague and want to do a new 'reduced' project with only a few subvis.  I don't want to necessarily or need him for the entire project, but only access to a privileged few.  Is there a way to copy the conditional disable properties from one project to another?

    Thank you

    Tech12

    Thanks, it works, but I couldn't get the symbols will appear in the 'project' "Properties..."

    Tech12

  • When I copy something from one page to another, it seems to change text color or background, that I do not understand why he never used to do.

    When I copy something from one page to another, it seems to change text color or background, that I do not understand why he never used to do.

    Whether it's text or only a shape it changes its color to something else when I copy and paste on.

    Do you mean 'page' or 'site '?

    If you copy something from another site, the reason may be, to have different, but all also named colours on each site.

    It would be normal and causes the noticed effect.

  • Copy data from one schema to another. Reopen the Question

    Hello

    I had asked this question earlier to copy data from tables of one schema to another in the same database using the database link. In my previous post have mentioned below.
    Re: copy data from one schema to another.
    Now I am faced with the question for the remote copy of database

    I have created a DB connection between my local system and the remote database. with the chain of connection as shown below
    CREATE THE DATABASE PUBLIC LINK "MERU_DEV_LOCAL_DEV".
    CONNECT TO MERUDEV IDENTIFIED BY MERUDEV WITH THE HELP OF "MERUPROD";
    In the above script
    LOCAL DEVELOPMENT scheme IS
    REMOTE schema is MERUDEV
    I try to copy remote database to my local database tables using the script below.
    network_link DEVELOPMENT impdp = schema MERU_DEV_LOCAL_DEV = MERUDEV remap_schema = MERUDEV:DEVELOPMENT TABLE_EXISTS_ACTION = REPLACE
    But the copy of the table does not occur. What could be the problem? Please suggest me or do I need to modify the script

    Thank you
    Sudhir

    You can:
    -monitor the BONE with ps - ef
    -monitor data pump: jobs are dba_datapump_jobs and dba_datapump_sessions
    -monitor with logops: v$ session_longops

  • copy data from one database to another

    Hello

    I want to copy data from one database to another.

    I have two patterns such as

    dev1/dev@ORCL
    DEV2/dev@DCEL


    I have same tables dev1 and dev2 (tables)
    but I have not given in dev2 (tables).
    now, I want to copy dev1 (tables) in dev2 (tables).

    You can also use the database link:

    select * from dev1.emp@orcl;
    

    What database are you connected to?
    You must create and use the links in the database for all other databases.

    For example if you are connected to the database A and to retrieve data from database B, you must create a connection of database in base B

    create database link B connect to  identified by  using 'B';
    

    Then you can retrieve data from database B with

    select * from [yourschema.]yourtable@B;
    

    This will work only for tables that are visible to the user that you used in the definition of database link.

    Published by: hm on 10.08.2011 22:15

  • Copy sheets from one workbook to another

    Hello
    Is it possible to copy sheets from one workbook to another in the same sector of activity? (discoverer more 10g v 10.1.2.55.26)
    Thank you
    Select this option.

    Hello
    It is not possible to use the most.
    It is possible to do so using the Discoverer Desktop edition.

    with office, follow these steps:
    1. connect to the discoverer desktop computer and open the workbook you want to copy from.
    2. open the workbook you want to copy.
    3. While both are open, press the "Restore down" button in the upper right area of the worksheet. (the Center button of the 3 to minimize, restore down, and close).
    4. now change the size of windows so that you will be able to see two worksheets side by side 1.
    5. place the mouse on the name of the new worksheet, press left click and drag the worksheet in the second workbook.

    You move the worksheet from one to the other, if you copy the worksheet to another workbook, and then before you start duplicate the worksheet and accomplish the foregoing on the duplicated worksheet.

    Tamir

  • Rotoscoping mask copy from one project to another

    Hello:

    I did some rotoscoping and put in several hours animating the mask only to realize that I'm not in the project, which is intended to Rotoscoping. Is it possible to copy a layer mask animation of one project to another?

    Save the project with the new name.  Open the correct project and import the project roto.  Copy the layer for the correct model and reduce the project down.  Save as a new name.

  • Possible to copy templates from one application to another?

    4.2.1

    Theme 25

    Hello

    I have an application where the developer seems to have created its own model - body one tab-2 columns. Is it possible that I can use this template on my page, which is another application in the same environment? I don't see the option to copy under shared-> model components. But she copy the model of the same application.

    Also, can copy us the template from one theme to another? Or we can copy the model on the same topic only

    Thank you

    Ryan

    Yes, it is possible, but perhaps not obvious:

    1. go into shared components > models.
    2. click on create >.
    3. Select the required model type.
    4. Select a copy of a model existing.

    5. follow the rest of the wizard to identify the required application, theme and style.

  • Scheduled tasks are stored in a file that can be copied easily from one server to another?

    We have a multitude of scheduled tasks.  When moving from one server to another, we currently re-enter manually the tasks.  There are problems which the least is my strike capability.  The tasks are saved in a XML or any other file type that I could just copy from one server to the other instead of re-entering?

    Thank you!

    The file is \cfusion.ear\cfusion.war\WEB-INF\cfusion\lib\neo-cron.xml

    See also: http://helpx.adobe.com/coldfusion/kb/purpose-location-xml-configuration-files.html

  • copy objects from one server to another schema

    Hello.


    Oracle 11g running on multiple servers.


    Is it possible to copy tables and procedures, at the same time
    from one server to another using sqlplus?


    For example, I would like to do something like this:


    From sqlplus on server1:


    create or replace mytable from dblink_server2.mytspace.mytable;


    Any suggestions are greatly appreciated.


    Thank you.

    user652257 wrote:
    Why does in SqlPlus but not in my procedure?

    You need a direct privilege to create objects to work through the procedures or plsql.

    Grant Create Table to user1;

    HTH

    SS

Maybe you are looking for