Why my DPS application synchronize on my second iPad device?

I managed to create an application using DPS. I synced it my iPad to test (an iPad). I have a second device (iPad B) that I need to test the application. I was able to use the same .ipa, the app appeared on the second iTunes that links to iPad B account. When I try to sync the app for iPad B it synchronizes to about 90% and - error, no message is given. Anyone know what is the cause and how can I solve this problem?

Yes, to recreate your configuration file mobile developer and don't forget to check out the new feature to include in your certificates. Then rebuild your application in DPS app Builder using the new certificate of MP.

Tags: Digital Publishing Suite

Similar Questions

  • Automatically update a DPS application?

    A DPS app update automatically? We want to use the application to run on an ipad as a POP display for the customer. But we need to update the attractor loop that plays with sales, new alerts etc. So far, I found nothing in this regard. My guess on this operation would be to have the attractor as a display of web pages with this content remotely hosted on one server. This page is updated every 60 seconds via javascript. Then, when you want to update this attractor we update the HTML etc. Then our button to explore the rest of the application is in html that links to the next article. All the thoughts, ideas would be appreciated. My understanding is that the applications need manually updated on the ipad and wrong at work.

    It is the only way to do this that I can think. Even when the automatic updates app (Android, Windows) supported platform, it's unpredictable timing for when the new update is available in the store and sent to devices.

    Neil

  • How to remove or customize the white preloader with edge content in DPS applications.

    I'm looking for a possible solution with the White Page of Preloader when you create an API via Indesign.

    The content is created entirely in Adobe Edge animate, then its published HTML code is placed by the superposition of Folio of Indesign. Then via the DPS APP BUILDER converted into an IPA, this work is fantastic!

    .. but...

    When the application is launched on the iPad there are always, always the white screen of preload with the wheel of rotation for a few cases.

    Tried to customize the preloader in Edge screen but the white screen will display first, then the custum pre-load the screen, then the content.

    Also tried to directly edit the HTML code, but no luck, still has the white screen with the spinning wheel.

    Someone have an idea how to hide this white screen? Or how to customize it?

    Thanks for any suggestions.

    Instead of creating the image of the poster on the edge, try to use a poster in InDesign. The image of the poster on the top of the overlay from the edge and put the overlay with a delay, for example 0.5 seconds. The image of the poster must appear initially, while the superimposition of edge loading in the background, and then appears in front of the image of the poster.

  • Why is-Web application server on a target at a distance in real time is not start?

    Hi, I need help urgent please

    I was wondering why the Web application server on a target at a distance in real time is not start?

    The target is 9014 real-time and its connected to a local network abroad, I have a public IP address port forwarded to the local IP address of the device (Network Address Translation) with all open TCP/UDP ports. I can log on remotely over the internet using the public IP address to the device configuration page and change many settings. Whenever I have activate the Server Web applications and made port 8080, worth defaults to 0 after the reboot of the target.

    The admin login I use has all permissions to control the unit.

    For this reason, I have a problem, deploy web services remotely through the project after building it as it happens with the following error.

    "Web Services deployment failed. You must start the application Web server OR before you deploy a web service.

     

    I have attached a few screenshots

     

    Thanks for the help

    I had someone to plug his laptop to the same network as the cRIO, logmein used to connect remotely to the laptop, I had to download labview and the software needed for the cRIO in the computer, and then with the help of MAX, I reinstalled the software on the cRIO. The port of the web server application 8080 is now activated and I was able to deploy services web ok.

    I wonder why I can't use MAX distance to reinstall the software on the cRIO.

    The cRIO is installed on a private overseas network (192.x.x.x), then I have a public internet IP address (67.x.x.x) mapped to the private IP address of the cRIO (Network Address Translation). I can connect to the cRIO config page using the address 67.x.x.x, but not via MAX

    If I find target real tiem using the Ip address of 67.x.x.x, sometimes with the private static IP (192.x.x.x) located on the cRIO but it shows disconnected status

    I wonder if someone has an idea how to go about using MAX to reach the target in real time on the internet

    Thank you

  • Why my cpu quits after about 30 seconds of connection!

    Why my cpu quits after about 30 seconds of connection to xp? This happens not once connected to the xp like 3 other users on the same processor, only when logged on as administrator. It is a virus that could be the cause? It will remain long enough to perform a system restore or a virus check.

    It is in Mode safe?

    Can log you in as a regular users and open an administrator command prompt without loading the profile?

    Start button--> RUN--> type:

    /noprofile of runas/user: Administrator CMD

    He should come and ask you the password for the account "administrator."  Enter it.  Then, it should open a new command prompt - but works as an administrator.  You can then use commands like:

    CD "\Documents and Settings.
    and
    Ren Administrator.old administrator

    To get into the right directory and rename the profile folder for 'Administrator' to 'Administrator.old '.  Then restart and try to log on as administrator again.

  • Lightroom keeps trying to create a second folder "2016" under "2016", then of subfolders, why and how do I remove the second folder "2016".

    Lightroom keeps trying to create a second folder "2016" under "2016", then the subfolders with the correct name (date) at import, why and how can I remove the second folder "2016".

    One of the possibilities: when you import, you select a Destination folder that contains a subfolder of 2016 in the path (displayed in the green rectangle) when you really want a destination folder that does not have the 2016 subfolder in the path (shown in the red rectangle)

  • Why we need application module...

    Hi all

    I doubt cannot we expose our service directly from control data business, why we need application... module for example

    We will create a class and right click and we will expose directly as a data control right! Why cannot the VO

    Why is there another interface like AM

    Thank you

    Delphine

    AMS offer a set of services including pooling of resources, passivation/activation, transaction and lock management.

    All those who work in all of your multiples.

  • My DPS application does not appear in the Iphone App store?

    Hello

    Until very recently, I only ever designed for the ipad, but recently, I made sure that all my folios have made multiple accessible on iphones etc.

    However, I realize that my (Professional edition) published application is not available in the iphone App store and I do not understand why not? It is available on ipad.

    Help, please!

    Thanks a lot and best regards,

    Have you changed the application in the App Builder to be an iPhone and iPad app? Chances are that your existing application was built as a single app for iPad. You must update in the App Builder and then resubmitting to Apple. I think that for it to actually build a new application, as the setting for iPad only cannot be changed via a tool for editing to an existing application.

    Neil

  • I downloaded the trial of the creative cloud vision. But why does the application display a completely black screen?

    I downloaded the trial of the creative cloud vision. But why does the application display a completely black screen?

    I can open the CC but I don't see anything in it.

    I downloaded and months before photoshop. I still see something at the window right there.

    But now, I see the dark window. So I couldn't download the Adobe Illustrator.

    Please help.

    Hello

    Please see the thread below where this issue was discussed:

    Re: screen creative black cloud

    Kind regards

    Sheena

  • Pass parameters in a DPS application

    I have an app from the DPS with 2 slots. A slot contains a built-in code that is supposed to show a list of goods. A slot contains code that launches an external site in a frame within the DPS app.

    In accordance with article API Marketing consumer news | Adobe Developer Connection, it is possible to pass parameters to an external application to a DPS application.

    I'm running a problem. In my external site, I try to call the DPS application like so dpsapp://v1/slot/storefront?path=/content/test.pdf via a button.  What I noticed is that when I do that, the soft switches on the side window but urlPath queryingthe or urlQueryString returns a null value.

    It seems that I can't pass a parameter to the DPS app within a single application. If I load the external website in Safari, I'm able to query for the parameters.

    Am I missing a step here or isn't it possible?

    Thank you

    You need manage paths... the first is when the application has failed.  In this case, just use the code in the previous post ('companyName' change 'path').  However, if the application worked, but it is backgrounded, so you must have annexed a listener for the event event.

    That is to say. adobeDPS.configurationService.applicationContextUpdatedSignal.add (this.updateContext, this);

    And then your method "updateContext" navigate the urlQueryString as previously indicated.

    Additionally, make sure that you have included "showcase" in the "name of the Goto link" when you set your custom button.

  • What is a fast alternative to starting a business of DPS app if Apple Store rejects the App? We are in a long time and can't wait for Apple. We host the application elsewhere. How we host our DPS application on the website of our customers?

    What is a fast alternative to starting a business of DPS app if Apple Store rejects the App? We are in a long time and can't wait for Apple to approve. We host the application elsewhere. How we host our DPS application on the website of our customers? Thank you.

    Unless I misunderstood the question, you can do what you want to do. Apple does not allow to circumvent their public applications store and host on a Web site. The exception is an enterprise application, which requires a company to both Apple and Adobe account. This type of business application can be distributed only within the company. If that's what you want to do, you can learn more here:

    Digital Publishing Suite help | Creating the observer for private distribution applications

    Distribution of iOS Viewer with Digital Publishing Suite business applications | Adobe Developer Connection

    Another option is to add the development application to multiple devices and use them for your demo.

  • The application for the DPS application cache?

    Hello

    I was wondering if the caching of the Web site data for use in offline mode is available with the DPS applications?

    Basically, I wanted to create an overlay of web, bind it to a HTML article on our server (items change every two weeks and in these articles are for users to fill out forms). I think that perhaps the "appcache" approach is the way to go, by providing experience in offline mode - in terms of being able to navigate and access the forms when they are offline.

    Anyone have any suggestions on how to do this or to have a better way to do?

    Thanks for your help!

    Juan

    You could, but it might be a little semi-complex configuration.

    If you detect the user has a valid internet connect, download the data and cache localstorage, in addition to display to the user. If the user is not online and has never loaded the page before, you will need to present them with a kind of different dialogue probably (please go online..). If the user is not online, and you can find the key/information existing cached in localstorage, then load this information on the page.

  • WHY CLOUDS DON'T INSTALLED ON THE SECOND COMPUTER?

    WHY clouds don't installed on the second computer... It just says time and again failing?

    attach a screenshot of the error message, http://forums.adobe.com/thread/963429

  • Animation of the Adobe & DPS application issues

    Recently, I downloaded the Adobe & DPS application on the app store.  It is mainly a showcase and an informative publication about how the Magazine industry has embraced and incorporated DPS in their creative process.

    I like the effect of the background of the image sharing two screens, so when the user goes to the next page, the central image continuously and moves left.  I managed to reproduce this effect.  My question is however on the animation.

    In the interest of those who have the ipad app, I refer to Page 19 of the production, in front, page directed 18 as Adobe Digital Publishing Suite, for those who do not have the advantage, mainly the central image of 'focus' scrolls to the left like the user enters the page.  There is a delay and then 3 bars of color, red, yellow and blue fly from the background of the central image to the right of the screen.  Text is missing in a downward movement.  Another shot at the next page maintains the continuity of the design of the arrows and melted bars in addition to text after a slight delay.

    I am interested in the technical aspects of this effect.

    In the workflow of InDesign, I'm uncomfortable with the scrolling of the image back picture, but what I can't understand is the following...

    1) are the screen filled in Adobe After effects or Adobe Photoshop animation then exported in the form of sequences of images or videos to load page?  No doubt there is an image of the poster, a delay that triggers the auto start animation then ending on an image rendered ending sequence.

    2) are compliant screens in InDesign, but the images of movement occurs in Adobe Edge to keep the size of the small file (transparent overlays like HTML5).  If so how do write you movie elements to match the background of the image?  Is superimposed on the bottom or each section independently positioned 2048 step?

    I can't post a screenshot, as I don't want to violate copyright, my initial view is that option 1 is easier since the design is contained in this application, but larger files. Option 2 is interesting, smaller file size, lighter app, but I'm not clear integration between ID and edge as the practice of positioning and visualization, because both apps do not visually bind each other.

    I would be grateful on the reflections on the best approaches for this purpose.

    See you soon

    MIK

    We dug into that, it's just a video that auto-joue after a little break.

    Neil

  • Why JDeveloper runs applications that I use are not currently

    Why JDeveloper runs applications that I use are not currently? Whenever I select run > start an Instance Server (Integrated Weblogic Server) standard output for Weblogic indicates that it is trying to load the webapps I use are not currently. Here is the error message weblogic.application.ModuleException: could not load the webapp: "MyJSFApplication-projectName-context-root". This happens just by starting the Weblogic server - I do not say to load MyJSFApplication-projectName-context-root.

    Could you please tell me
    (1) why this is happening?
    (2) how to run Weblogic server integrated execution so that it loads only?

    Those who may be some applications you have running in the past and were not properly deleted server.
    Here's a way to remove them:
    http://blogs.Oracle.com/Shay/2009/08/removing_applications_from_you.html

Maybe you are looking for