With the help of two computers

Question about the creative use of Cloud on two computers: can I use the Photoshop application while my colleague uses the first Pro app on another computer?

License is for a single user on two different computers (but not at the same time).

-Dave

Tags: Adobe

Similar Questions

  • With the help of two GPIB-ENET/100 boxes with ibconf - gpib1 selection?

    I hope this is the right forum for this post.

    I'm trying to use ibconf on Solaris to configure a workstation to use 2 boxes GPIB-ENET/100.  I have never tried to configure a computer to use multiple boxes GPIB-ENET/100 at the time, so I don't have a lot of confidence that I'm doing it correctly for two boxes.  Especially given what I describe below.

    According to the manual page 4-2 of the "Getting started with your GPIB-ENET/100 and NOR-488.» 2 for Solaris. "

    To identify your GPIB-ENET/100 in ibconf, perform the following steps:
    1. press on to select the option rename.
    2. type the alias name of host, host name, or IP address assigned to your
    GPIB-ENET/100 and press .
    3. press to exit, chooose to save your changes.

    I followed these steps for both boxes, but the banner at the top of the menu always says 'Card device for Council gpib0' and he always says "gpib0" just to top the host name that I go.  Shouldn't he State gpib0 first Board and gpib1 of the Committee on the second?  But I don't see a way to move to gpib1, or the unit of the second box ("Board") map.  Instead, it seems that I crushed the entrance of host name for the first box, I've identified using the steps above with the host name of the second box, that I've identified by following the steps above.

    I looked through the manual as well as fact a search online, nothing helps.  Which brings me to this forum.

    How should we do to get the pilot configured to use the GPIB-ENET/100 boxes?

    Thanks in advance.  Out of my ibconf is below (that's what it actually looks like, either incidentally - the strange on the line with dev2, dev13, and dev24 is not an artifact of copy/paste):

    ===============================================================================
    National Instruments GPIB Software Configuration utility Rev A.3.
    Copyright (c) 1991 National Instruments Corp.   All rights reserved.
    ===============================================================================

    File: / etc/gpibrc = CAPACITY: 8-plank 44 devices =
    ----------         -----------
    Press a key to continue * -.
    -----------------  -------
    ----------------  ----

    -------
    ----

    ===============================================================================
    National Instruments |    Card device for Council SPARCstation gpib0
    ===============================================================================
    -----------
    | GPIB0 |
    ----| nienetD |
    |   |_________|     * Use the cursor keys h, j, k, l & to select a device or a Commission.
    |                   * Use the buttons below to select the desired action.
    =====|------------------=======================================================
    | - 0 dev1 |-dev12 0 1 dev23 2 dev34
    = | - dev2 0 = = |-ev13 = 1 dev24 = 2 = dev35
    | - dev3 0 0 |---4 1 dev25 2 dev36
    | - dev4 0 1 dev15 1 dev26 2 dev37
    | - 0 dev5 1 dev16 1 dev27 2 dev38
    | - 0 dev6 1 dev17 1 dev28 2 dev39
    | - 0 dev7 1 dev18 2 dev29 2 dev40
    |---0 dev8            1 dev19           2 dev30                                                                   2 dev41
    | - 0 1 dev20 dev31 2 dev42 dev9 2 |-0 1 dev21 2 dev32 dev10
    | - 1 dev22 2 dev33 dev4311
    3 dev44
    |

    ^ Q: help ^ r: Rename ^ T: (de) connect ^ edit I: ^ o: output

    I just thought of it. My terminal has been updated with the ansi format. That was streaked the menu and blocks my view of the operating instructions ^ B / ^ F to see maps for more tips. The dockers affecting my vt100 terminal. You can even see how my menu was watered to the top at the bottom of my original message. I didn't know until now that the menu was supposed to look like different (although I knew it).

  • With the help of 2 computers

    is it possible to download and use Adobe applications on two different computers, if you are a customer of Adobe Creative Cloud?

    You can install on two computers, but you cannot use the same application on two computers at the same time.  Here is a link to an ad with the information:

    http://forums.adobe.com/message/4379859#4379859?tstart=0http:

  • With the help of two CAN channels on cRIO with 9853

    I have a cRIO 9014 controller RT and 9112 chassis and a CAN Module 9853.  I used successfully CAN receive and channel CAN Transmit example projects to check the work of material.  Then, I took two screws FPGAS of each project and grouped in a single FPGA VI by copying just the two in the same VI.  I can correctly transmit and receive with the host live

    My goal now is to be able to use the two CAN channels on the module 9853 for transmitting and receiving CAN Messages on each channel.  I like to use in a project in hybrid Mode later, so I think that there is only a single DMA channel available after that Scan Engine takes 2.  Maybe that's why I get an error when I make a copy of everything in the FPGA VI, make a new FIFO and make copies renowned host of screws with different names of variables to match the copied content from FPGA VI.

    Any other ideas on how to proceed would be appreciated.

    Also, I know that CAN1 needs an external power supply, so it is no more a problem.

    Thank you

    John

    I thought about it, I don't know why, but some parts with part 'FPGA to receive channel CAN' in their own lines fixed.  Now CAN receive is as fast as can be, never drop frames or overflowing the FIFO.  He also compiled FPGA Bitfile 30% faster and was about 50% less use of the device.  Weird...

    If you're curious, here's the new VI:

    John

  • With the help of two GTX Poseiden GPU on a Mobo 99 X 780

    Hello

    I am in the final stages of construction of a PC workstation for creation, still and video image. I have two GTX 780 GPU and they will be installed in/on an ASUS X 99 Deluxe Motherboard. Can someone tell if it is possible to efficiently run two such GPU under first or AE? I guess that for purposes of exposure with the connected monitors and the other for the treatment only?

    If possible, is there software owners out there that would allow me to create this configuration?

    I guess that the SLI would be useless.

    Kind regards

    LJ

    Xferred in Forum Hardware

  • With the help of two different devices for VDR to save the same virtual machines

    Hello

    I have VDR backup right now most of my virtual machines. I'm experimenting with some recovery scenarios disaster using VDR. I want to set up a new device, backup virtual machines themselves, but with a destination off. My question is, it would cause problems to have two different devices, backup the same virtual machines?

    I'm asking this is because I was looking at the notes of recent VMworld session on VDR and he says, regarding a troubleshooting scenario in which you must create a new device in addition to your current device, both devices back up the same virtual machines do not.

    If it is dangerous to do so because of the likelihood that two devices can save the same virtual machines at the same time, I could schedule the backup windows at different times to avoid this problem.

    Anyone have any ideas?

    I create a second local camera vDR and vDR distance and test it against a test VM. The vDR devices will have their own CBT files for each virtual computer, so they should be able to work together, but I would like to go through tests to see how they work well on the WAN. Make sure that you can transfer enough data to host daily data change.

  • With the help of two iPads

    I have a 2013 3ed generation iPad and iPad 2016 Pro, I have problems with the iPad Pro and need to send it in for a check up... My question is, can I use my old iPad while the other is repaired and fixed? I know I have to erase and store before you send them off to Apple, but will erase information on

    both?

    Erase only information that you erase, iPad 3 will be OK. My I recommend before erasure take a long look at the info on the 3 to make sure there has all your info. Also be sure to have an iTunes or iCloud backup before deleting.

  • With the help of two channels of my 6623A

    Hey there, I'm looking for help reguarding a power supply HP 6623 A DC using Labview 9... I'm working on a project where I need to control all 3 channels of power and switch back and fourth to change their output. I tried to change the code in the example, but it will only be 1 channel and clear the other. I can't get the two simultaneously. Thanks for your help

    OK, let's take a step back.

    You control a single instrument.  Therefore, you shoud have only 1 resource that is initialized once and closed once.  You must perform initialization before your loop and close after the loop.

    What I recommend here, is that you use a Structure of the event for the control when you send commands.  The idea here is that you only send orders when your settings change really.  You can use the case of timeout to make the statements.

    And since you claim that you're new, here are some tutorials that you may find useful.

    Introduction of 3 hours
    Introduction of 6 hours
    Bases LabVEW
    Paced self-study for students
    Self Paced Training beginner to advanced, required SSP
    LabVIEW training Wiki
    OR learning
    Getting started with products OR

  • Problem with the connection of two computers with windows7 to internet at the same time with wrt110

    Me and my friend have two windows7 installed on our computers.

    If one connects to the internet via a WRT110 wireless router it goes without any problems.

    But if we both try to connect to the internet at the same time, it does not connect.

    Can anyone help?

    You can try the upgrade/flashing the firmware on the router... Download the firmware from www.linksys.com/downloads and save it on the desktop... Opening of session in the Linksys GUI and click on the Administration tab... Click on the "firmware upgrade" sub-tab and choose the correct .bin file... click on upgrade... Wait a few seconds until it shows that "the update is successful," after the upgrade of the firmware, click on "Reboot" and you will be returned to the same page OR it will say 'cannot display the Page.

    Now, hold down the button to reset for 30 seconds... Release the reset button... Unplug the power cable from your router, wait 30 seconds and reconnect the power cable... Now re - configure your router...

  • With the help of old computers

    I recently purchased 3 computers with OS 8.1 Windows and MS Office 365 to replace my computers in 2005, which took place from the XP operating system.  My old computer still works well, but they are not all the material was updated to use the Windows 8 operating system.  So I want to disconnect them from the internet and use it only for writing files and financial records.  I have the original CD until Service Pack 3 installation. So I want to re - install the operating system to get rid of old programs I need is no longer.  My question is how to do it of updates from Microsoft, I need to re - install for OS the most reliable and effective, in my opinion, there are several updates only slow down the operating system and are not necessary if the machine is not connected to the Internet?  Your contribution to this issue would be appreciated thanks.

    Installation of updates does not cause all more or less the programs to run. Only, it updates the logic that a running program would use if he had ever run.  It is never good to ignore updates, even those that you may not think are associated with online components, because the system uses still common components for video rendering, audio, PDF, print, graphic display and processing files of... this. Updates are also cumulative and build with each other. Any particular update is assuming that all previous ones have been applied. Having gaps in these can be an attack vector important feat. As much as you are using Windows XP, I recommend to get fully updated running a good antivirus that has a subscription of active update (if required for updates) and using a non administrator account for daily use. In this way any attack that never happens to compromise your profile can take administrative measures.

  • With the help of two programs at the same time

    Hello

    I work with both systems (Mac and Windows). For the moment, I use CS6, but would switch to the CC. My problem is the restriction to work with a system or program at a time. This means that I am not allowed to edit images with photoshop, when I visited a movie that I just edited first, right? Premiere Pro would not be closed because of rendering and so I can't open photoshop? Or After Effects for designing menu while the rendering?

    Thank you again and best wishes,

    Daniela

    Hi Daniela

    You are allowed to two activations for example 2 Macs, 2 Windows or Windows & Mac. You can actually install apps on as many machines as you like a long as two only are activated (sign in)

    But you can start and run applications simultaneously. There is no restriction on that.

  • License question: with the help of two "Standard Edition" licenses for > 8 vCPU by host

    Hi, I've been reading place on it for a few hours and would like to get confirmation here.  I have

    -a physical host: dual processor, 8 cores per processor

    -multiple licenses VSphere 5.0 Standard edition

    -VCenter 5.0 Enterprise Edition

    I want to distribute the VM with 12 vCPU and I expect to consume two licenses Standard Edition - one for each CPU, for a total of 12 vCPU.  When I try to do using VCenter I get error "virtual machine has 12 virtual processors, but the host only supports 8.»  "The number of virtual processors can be limited by the OS selected for the guest virtual computer or licensing for the host."

    I think that it is a license restriction because on the same host, the VSphere evaluation has authorized the deployment of a 12 virtual machine using RHEL 6.3 vCPU.  I checked later vCPU on evaluation copy function and it was 32 channels for it proves that it is not a BONE or a physical problem.  I think I downloaded an evaluation of the 'norm' rather 'Enterprise', but I am not sure.

    I read compare VMware vSphere editions and the 'Standard' column has CPU line: "CPU 1" and line vCPU: '8 - way '.  This makes me think that, for each new license, I should have a CPU with up to 8 cores.  that is by consuming two licenses, I use 2 CPU and up to 16 cores.

    I also read the EULA VMware multi-core pricing and Licensing Policy , and he said:

    Software licenses with six (6) cores per processor

    It does not say "with hearts of six (6) software licenses by host '

    The following excerpt from the EULA is the only evidence that I could find to support the conclusion that for Standard Edition, the maximum number of vCPU for each host is 8 (regardless of the number of licenses consumed);
    Combines VMware licenses on a single host software. Licensing policy allows combining the even on software licenses uniprocessor.

    Someone can confirm the limitation and is there something obvious that I missed to compare VMware vSphere editions.  The difference between host and per processor is huge, I'm surprised that it is ambiguous.

    Thank you

    Diarmuid

    Looking at this picture, it is said that you need 1 VMware Standard license per physical processor that your host has.  Down the chart to the vCPU, who said that a VM can have at most 8 vCPUs (for Standard).  Isn't 8 vCPUs per license, which is 8 vCPUs total.

    The demo version is licensed Enterprise Plus and develops of vCPU 32 on a virtual machine.

  • With the help of two models on a single site.

    Im trying to design a Web site and because of my lack of experience, I went down the road of model. I have download two adobe model muse. I think my website on one of them (so it comes to a site), I want to use the second template as a new page to my site current Web how can I do this?  Thank you. If I have more complicated things, in short how can I use two templates in a site as two distinct pages.

    Hello

    You can configure two different master page, each with a model. See if it works.

    If you are not already aware of the page master, please take a look at this.

    Understanding master pages | Adobe Muse CC tutorials

    Let me know if you have any question.

  • With the help of two sheets of different styles in a scene

    I write a tool with which a user can design screens. In the tool, there is a wysiwyg preview area.
    What I want to do: the tool itself must use a certain style (call it 'style sheet tools'). The preview screen should use a different style, which is defined by the application that is presented in preview ("stylesheet for the application").

    Is it possible to define the outer part is using 'tool style sheet', the inner part is using 'application style sheet' - so to have two different style sheets, being assigned to different areas of the screen (a field being nested within each other).

    Of course...: I could assign special style classes to all the controls in the tool, but it would be much easier for me, if I could avoid this...

    I believe very strongly that what I want is not possible: scenes cannot be nested in another, style sheet assignments are made at the level of the stage.
    But: maybe I'm wrong with my assumptions... and there may be a single magic solution...

    Thanks for the tips! -also negative adivce ("it is not possible!") is appreciated!

    style sheet assignments are made at the level of the stage.

    This is not necessarily true.

    The CSS reference guide: http://docs.oracle.com/javafx/2/api/javafx/scene/doc-files/cssref.html

    Starting with JavaFX 2.1, the parent class has a property of style sheets, allowing style sheets to be located on a container. This allows a single branch of the graphic scene to have a separate set of styles. Any instance of Parent can have style sheets. A child will have its styles of its own inline styles, stylesheets, of all his ancestors and leaves the scene style.

  • EXTRACT DATES WITH THE HELP OF TWO DATES AND THE BOX

    Hello

    I HAVE 2 DATE PICKER ITEMS
    : P1_ARRIVAL_DATE AND: P1_DEPARTURE_DATE

    AND I HAVE 7 ITEMS in BOXES DAY it return values are 'Y '.

    : P1_MON
    : P1_TUE
    : P1_WED
    : P1_THU
    : P1_FRI
    : P1_SAT
    : P1_SUN

    as I choose date: P1_ARRIVAL_DATE AND: P1_DEPARTURE_DATE
    AND THE DAY, AS: P1_MON, ONLY THE DATES HAVE TO RETURN WHO HAVE MONDAY AS DAY BETWEEN: P1_ARRIVAL_DATE AND: P1_DEPARTURE_DATE.


    FOR EXAMPLE IF I CHOOSE THE DATE: P1_ARRIVAL_DATE AS 07_NOV_2011 AND: P1_DEPARTUE_DATE AS: P22_NOV_2011 AND IT HAS 3 MONDAY BETWEEN THESE DATES
    RESULT SHOULD BE DISPLAY AS
    ======================================
     ARRIVAL DATE-------ARRIVAL DATE+6
    ============================
     07_NOV_2011 ---     13_NOV_2011       // THESE ARE MONDAY DATES
    14_NOV_2011 ---     20_NOV_2011     
    21_NOV_2011 --      28_NOV_2011 
    CAN I CHOOSE MORE THAN ONE CHECK BOX AT THE SAME TIME
    FOR EXAMPLE IF I CHOOSE: P1_MON AND: P1_TUE, THE RESULT SHOULD BE

    ARRIVAL DATE-------ARRIVAL DATE+6
    ============================
     07_NOV_2011 ---     13_NOV_2011   
     08_NOV_2011 ---     14_NOV_2011      
    14_NOV_2011 ---     20_NOV_2011      // MONDAY AND TUESDAY DATES
    15_NOV_2011 ---     21_NOV_2011  
    21_NOV_2011 --      27_NOV_2011
    22_NOV_2011 ---     28_NOV_2011 
    HOW CAN I DO THIS? PLEASE HELP SOLVE THE PROBLEM.



    THANKS and GREETINGS
    CORINE

    X the problem you see is a misunderstanding on my part about what is the date of arrival date of departure... it's inverse reasoning: at your arrival is before departure (and I got it on the other hand, the departure before arrival (:-))

    But there is also a flaw in the code (instead of the Date of arrival by using the select sysdate).

    Please run the code like this:

    with dates as
    (select to_date(:P1_ARRIVAL_DATE,'DD-MON-YYYY')+level-1 as day from dual
     connect by level <= to_date(:P1_DEPARTURE_DATE,'DD-MON-YYYY') - to_date(:P1_ARRIVAL_DATE,'DD-MON-YYYY')  +1
     )
    select day, to_char(day,'Dy') from dates
    where to_char(day,'Dy') = 'Mon' and :P1_MON = 'Y'
    union
    select day, to_char(day,'Dy') from dates
    where to_char(day,'Dy') = 'Tue' and :P1_TUE = 'Y'
    union
    select day, to_char(day,'Dy') from dates
    where to_char(day,'Dy') = 'Wed' and :P1_WED = 'Y'
    union
    select day, to_char(day,'Dy') from dates
    where to_char(day,'Dy') = 'Thu' and :P1_THU = 'Y'
    union
    select day, to_char(day,'Dy') from dates
    where to_char(day,'Dy') = 'Fri' and :P1_FRI = 'Y'
    union
    select day, to_char(day,'Dy') from dates
    where to_char(day,'Dy') = 'Sat' and :P1_SAT = 'Y'
    union
    select day, to_char(day,'Dy') from dates
    where to_char(day,'Dy') = 'Sun' and :P1_SUN = 'Y'
    

    for the period from 01 to 15 November 2011, with P1_TUE and P1_FRI, flag in there, I got this result:

    DAY      TO_CHAR(DAY,'DY')
    11/01/2011     Tue
    11/04/2011     Fri
    11/08/2011     Tue
    11/11/2011     Fri
    11/15/2011     Tue
    

    To simplify (can only test inside the apex report, could not run code in SQL Wkshop):

    with dates as
    (select to_date(:P1_ARRIVAL_DATE,'DD-MON-YYYY')+level-1 as day from dual
     connect by level <= to_date(:P1_DEPARTURE_DATE,'DD-MON-YYYY') - to_date(:P1_ARRIVAL_DATE,'DD-MON-YYYY') +1
     )
    select day, to_char(day,'Dy') from dates
    where v('P1_'||to_char(day,'DY')) = 'Y'
    

    Published by: Kléber M on November 14, 2011 05:06

Maybe you are looking for