Code output for the first 10 Adobe elements 7

I can't install the first 10 elements on my Mac. I tried several times and it's getting frusterating. I received this message:

Exit code: 7

-------------------------------------- Summary --------------------------------------

-0 fatal Error (s), 8 (s), 7 warning (s)

WARNING: DW031: payload: camera profiles Installer 6.0.0.0 {3F023875-4A52-4605-9DB6-A88D4A813E8D} has been updated and has been selected for repair. The patch {FEA75AFB-4905-43BB-B1D5-5B44D681BFE7} Installer_6.4_AdobeCameraRawProfile6.0All camera profiles 6.4.0.0 are uninstalled now.

WARNING: DW031: payload: camera profiles Installer 6.0.0.0 {3F023875-4A52-4605-9DB6-A88D4A813E8D} has been updated and has been selected for repair. The patch {FEA75AFB-4905-43BB-B1D5-5B44D681BFE7} Installer_6.4_AdobeCameraRawProfile6.0All camera profiles 6.4.0.0 are uninstalled now.

-Payload: {68FE2517-2E45-4B03-8241-D0634F43878B} Smartsound1 1.0.0.0.

ERROR: DW006: Apple package cannot be installed successfully.

WARNING: DW036: payload cannot be installed due to the failure of the operation dependent

WARNING: DW036: payload cannot be installed due to the failure of the operation dependent

WARNING: DW036: payload cannot be installed due to the failure of the operation dependent

WARNING: DW036: payload cannot be installed due to the failure of the operation dependent

WARNING: DW036: payload cannot be installed due to the failure of the operation dependent

ERROR: DW050: the following payload errors were found during the installation:

ERROR: DW050:-Smartsound3: installation failed

ERROR: DW050:-Photoshop Camera Raw for 10 elements: installation failed

ERROR: DW050:-Smartsound1: installation failed

ERROR: DW050:-Adobe Premiere Elements 10: due to a lack of Language Pack installation

ERROR: DW050:-Adobe Premiere Elements 10_LangPacken_US: installation failed

ERROR: DW050:-Smartsound2: installation failed

-------------------------------------------------------------------------------------

I have a package which is for Premiere Elements and Photoshop and I could download the Photoshop part but the part first elements does not completely settle. Every time, he gets to about half-way done, then it ejects the disc. I use the disc 3... I use the bad drive? What's wrong? I'm desperate.

try to download the trial version (after all 7 steps): http://prodesigntools.com/photoshop-elements-10-direct-download-links-pse-premiere-pre.htm l

and using your serial number to activate.

If you find an error of dl, you don't follow all 7 steps.

Tags: Adobe

Similar Questions

  • I'm trying to install Adobe Creative Suite for the first time since I replaced my hard drive on my computer. It's saying that the product may be false and it will not be installed. Any suggestions?

    I'm trying to install Adobe Creative Suite for the first time since I replaced my hard drive on my computer. That is to say that this product can be wrong and it won't download. I downloaded before and didn't have any problems. Any Suggestions?

    Use one of the links below

    Available downloadable Setup files:

    Download and installation help links Adobe

    Help download and installation to Prodesigntools links can be found on the most linked pages.  They are essential; especially steps 1, 2 and 3.  If you click on a link that does not have these listed steps, open a second window by using the link to Lightroom 3 to see these "important Instructions".

  • I bought the first elements 13 and 13 Photoshop elements according to a trail. I received 1 set of serial numbers to activate Photoshop and 2 sets for first. However, after you type in the first series of numbers for the first, there was no place to type

    I bought the first elements 13 and 13 Photoshop elements according to a trail. I received 1 set of serial numbers to activate Photoshop and 2 sets for first. However, after you type in the first series of numbers for the first, there is no place to type in the second set. How can I check if the first has been correctly activated?

    You get usually just a serial number by program... a list of 24 numbers, 6 sets of 4.

    Click the icon of the program and see if it boots without asking for a serial number.

    If it is not running now, please contact support:

    To contact support, please click the link below, click on the still need help? option in the blue box below, then choose the cat. Make sure you are signed in with your Adobe ID, have cookies enabled and have deleted your cookie cache.  If you have any questions, try another browser.

    Serial number and activation support

    Guinot

  • I tried EvevryThing! The "CREATED WITH ADOBE ELEMENTS 9 TRAIL VERSION FIRST" will not stop Displaying, even after I put in the serial number and Regerstered. Also the product does not show under my profile?

    I tried EvevryThing! The "CREATED WITH ADOBE ELEMENTS 9 TRAIL VERSION FIRST" will not stop Displaying, even after I put in the serial number and Regerstered. Also the product does not show under my profile?

    How can I fix it? Nothing in help or on the Site.

    Once you have registered the product, you should not see the banner of 'Trial' on NEW projects. This isn't the case, right? You only see on the project that you created before you register the product, right?

    That said, to remove the banner, go to the folder of directory on your hard drive where your project PREL files are stored and delete the folder called Adobe Premiere elements preview files.

  • When I connected to adobe photoshop for the first time with my adobe ID and password on my lap top, it couldn't connect and gave me "error 400".  What does that mean?

    When I connected to adobe photoshop for the first time with my adobe ID and password on my lap top, it couldn't connect and gave me "error 400".  What does that mean?

    Hello

    Please visit Adobe Creative Cloud connection errors

    Hope that helps!

    Kind regards

    Sheena

  • The use of Premiere Elements for the first time, cannot open the prproj file

    Help!  I use Premiere Elements for the first time, and I can't open a prproj file

    You're absolutely right, prproj's Premiere Pro.

  • Whenever I try to update the 6 CS Master Collection that I encounter the error Code: U43M1D207 for the following applications: Prelude CS6 1.0.2 updated; Adobe SpeedGrade CS6 6.0.4 update; and Adobe Audition CS6.

    Whenever I try to update the 6 CS Master Collection that I encounter the error Code: U43M1D207 for the following applications: Prelude CS6 1.0.2 updated; Adobe SpeedGrade CS6 6.0.4 update; and Adobe Audition CS6.

    your download has been altered.  You may need to use another connection.

    Error in downloading, installing or updating Adobe Creative Cloud applications

  • I was wondering if there is anyway to Exchange my items from adobe first 14 for the first Pro CC 14 before as I have install >

    I was wondering if there is anyway to Exchange my items from adobe first 14 for the first Pro 14 CC before installing

    Hello

    You may not Exchange.

    But try to return, cancel or Exchange an Adobe order and then buy both pricing and membership creative cloud | Adobe Creative Cloud

    Kind regards

    Sheena

  • The system failure when Adobe Dreamweaver CS6 running for the first time... Why?

    When I downloaded the adobe dreamweaver cs6 and during installation... There is nothing wrong except the screen resolution (required = 1280 * 800, but available = 1330 * 768)

    But when I tried to run the program for the first time, the system had failed.

    Can you help me to know the true cause, please?

    Note: I'm using Windows XP sp1

    CS6 requires a minimum of Windows XP with Service Pack 3. Also, your vertical resolution does not meet the minimum requirements.

  • I try to add an image map for the first time using Dreamweaver CC

    I am trying to add an image map for the first time using Dreamweaver CC in an html site.

    I can get map controls is displayed when I select the image in the code, and I can select the rectangle tool.

    However, when I try to select the area of the image disappears from the section of the map of the properties viewer and I can't select the area for my hyperlink.

    What I am I missing videos online are it seems so simple, but something with my page is not allowing me to withdraw this.

    This is the code section and the image that I'm trying to add the link.

    < side class = "sidebar" >

    < img src = "images/flowchart.jpg" alt ="product dev. Flowchart">

    < / side >

    Please help or give me any advice... There might be something to do with the fact that my site is "sensitive"?

    Hello

    You could just add links to each box, but a better solution would be to use svg for this. Unfortunately, it is easier for me to write for someone who does not know svg to do.

    If you have Adobe Illustrator create your svg using this program, then it would be a case to add links manually to each box created in the svg code. SVG is an xml-based language and not a real image, even if this is how a browser will display the it.

    PZ

  • I am trying to download CS on my HP Z400 running Windows 7 for the first time.  The installer won't boot.  It finally gives a "server not available" error after 30-45 minutes

    I am trying to download CS on my HP Z400 running Windows 7 for the first time.  The installer won't boot.  It finally gives a "server not available" error after 30 to 45 minutes.  I checked to be sure there is no Adobe folder in my program files.

    Hello

    Please check the help below document:

    Error download or update Adobe Creative Cloud applications

    You can also view the nets below where the issue has been addressed:

    Error 207 to "install Adobe".

    Adobe creative cloud installation does not work. Get the error code 207. All solutions?

    Kind regards

    Sheena

  • Get the string invalid Base64 of image of toDataURL() for the first time in 10 of blackberry webworks

    Hello

    I need to get the Contact image converted to string Base64 using BB 10 Webworks (blackberry.pim.contacts) I get only the contact.photos [0] .smallFilePath which returns the path to the phonebook file.

    Now, I want to get the image of this path and convert it to a Base64 string.

    Here's the javascript code :

    var img = document.createElement ('Image');
    var canvas = document.createElement ('Canvas');

    function getBase64Image (p) {}
    img.setAttribute ("src", p);

    Img.width = Canvas.Width;

    Canvas.height = img.height;

    CTX var = canvas.getContext ("2d");
    ctx.drawImage (img, 0, 0);
    Return canvas.toDataURL("image/jpg");

    }

    This means bad Base64 string of image for the first time. When I convert this string to the image it displays white screen. But returns a string in the Mithraeum and after conversion, display a correct image.

    I use Blackberry Z10 (OS 10) for the test.

    I think that the canvas is not drawing image properly for the first time.

    I have searched and tried many things, but not got success. What will be the solution.

    Thanks in advance.

    My guess is that the image did not load the source completely still. Setting the src / image loading is an asynchronous event, which means that your code will continue to the next line regardless of whether the image has loaded yet or not.

    After calling setAttribute instead of execute the code of the Web, you will probably need define an event on img for the load event listener. Once the image is loaded, you can then use the img with canvas variable to retrieve its data.

    Note that getBase64 will return immediately, so you may need to develop some sort of mechanism to wait before returning, or the asynchronous approach and integrate reminders for the success trigger the next piece of code.

  • Click event does not work for the first choice of object field index

    Hello

    In my application, there is a ObjectChoiceField inMainScreen

    I want to get change Listner of ObjectChoiceField after clicking on index 0. When I am clicking on the second element of the choice field, I am able to move to another screen. But for the first selection of the element, it does not move on the screen.

    if(field == mOcfVehicle)
                {
                    Logger.out("MyProf", "vehicle choice field touched ");
                    int index = mOcfVehicle.getSelectedIndex();
                    Vector vecVID = store.getVehicleID("VehicleID");
                    final String strVehId = vecVID.elementAt(index).toString();
                    UiApplication.getUiApplication().invokeLater(new Runnable() {
    
                        public void run() {
                            // TODO Auto-generated method stub
                            UiApplication.getUiApplication().popScreen(MyProfScreen.this);
                            UiApplication.getUiApplication().pushScreen(new AddNewCarScreen(1, strVehId));
                        }
                    });
    //
                }
    

    Please help me...

    Here it happens little differently. I explain the requirement properly. Suppose that the I am A screen where I have the ObjectChoiceField. I added a choice of X. Now, when I am pressing on the field of choice and selection, it must pass on the screen (B) but that the choice of the field is choice (X) only one, it is not mobile. Now if, after the addition of the choice of two X and Y, if I select go, it's going to screen B. But when again, the field of choice has 2 options X and Y with X as the default selection. There is therefore no chance for me to choose the X.

    Therefore, I have added a Select called default choice. Now, if X is added, field of choice is the choice of towing display: Select and X. And while choosing X, it moves on the screen B.

    Hopefully now, it is good for understanding.

    And can help me please to this: http://supportforums.blackberry.com/t5/Java-Development/How-to-on-the-Camera-Flash-for-a-long-time-l...

    Thank you.

  • How to set the flag for the first 3 days

    Hi all

    I have a table with a complete list of April and may 2015 date month and his working days (just for example, I have included only in April and may 2015 data but the table has data for 20 years since 2000).

    Below is the table create and insert scripts for complete data.

    CREATE TABLE dates_dim(day DATE, business_day NUMBER, month NUMBER, day_of_week VARCHAR2 (100));
    
    Insert into DATES_DIM Values (TO_DATE('05/01/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 1, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/02/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/03/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/04/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 2, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/05/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 3, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/06/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 4, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/07/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 5, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/08/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 6, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/09/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/10/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/11/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 7, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/12/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 8, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/13/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 9, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/14/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 10, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/15/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 11, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/16/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/17/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/18/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 12, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/19/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 13, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/20/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 14, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/21/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 15, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/22/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 16, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/23/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/24/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('05/25/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'MONDAY');
    Insert into DATES_DIM Values (TO_DATE('05/26/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 17, '201505', 'TUESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/27/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 18, '201505', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('05/28/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 19, '201505', 'THURSDAY');
    Insert into DATES_DIM Values (TO_DATE('05/29/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 20, '201505', 'FRIDAY');
    Insert into DATES_DIM Values (TO_DATE('05/30/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SATURDAY');
    Insert into DATES_DIM Values (TO_DATE('05/31/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201505', 'SUNDAY');
    Insert into DATES_DIM Values (TO_DATE('04/01/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 1, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/02/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 2, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/03/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 3, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/04/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/05/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/06/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 4, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/07/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 5, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/08/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 6, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/09/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 7, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/10/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 8, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/11/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/12/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/13/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 9, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/14/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 10, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/15/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 11, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/16/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 12, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/17/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 13, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/18/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/19/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/20/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 14, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/21/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 15, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/22/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 16, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/23/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 17, '201504', 'THURSDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/24/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 18, '201504', 'FRIDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/25/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SATURDAY ');
    Insert into DATES_DIM Values (TO_DATE('04/26/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 0, '201504', 'SUNDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/27/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 19, '201504', 'MONDAY   ');
    Insert into DATES_DIM Values (TO_DATE('04/28/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 20, '201504', 'TUESDAY  ');
    Insert into DATES_DIM Values (TO_DATE('04/29/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 21, '201504', 'WEDNESDAY');
    Insert into DATES_DIM Values (TO_DATE('04/30/2015 00:00:00', 'MM/DD/YYYY HH24:MI:SS'), 22, '201504', 'THURSDAY ');
    COMMIT;
    

    I'm looking for a select statement that defines the indicator 'Y' for April records months and "n" for records in may for the first 3 days of the request. Here's the difficult thing, the results should vary depending when they run the select query.

    For example:

    Scenario-1: If I run the SQL code may 1st, 2nd, 3rd, 4th, or 5th (with in the first 3 days), FLAG must be set on 'Y' for records in April and "n" for records in May.

    Scenario 2: If I run anywhere between May6th 31, FLAG must be set to ' do for April month and 'Y' for records in May.

    Search results for scenario 1 should look something like this the results of the SQL query below (as I can't keep the complete set of results, I wrote a select query which will give you the expected results if you run the DDL and DML scripts above)

    select day,case when day between '01-APR-2015' and '30-APR-2015' then 'Y' else 'N' end flag from dates_dim;
    

    Results for the scenario-2 should look something like this the results of the SQL query below (as I can't keep the complete set of results, I wrote a select query which will give you the expected results if you run the DDL and DML scripts above)

    select day,case when day between '01-APR-2015' and '30-APR-2015' then 'N' else 'Y' end flag from dates_dim;
    

    Please let me know if it is confusing. Thank you.

    Hello

    Thanks for posting the CREATE TABLE and INSERT statements; It's very helpfu.

    Month article it should really be a DATE, not a NUMBER. This issue (and many others) would be simpler and more effective it was a DATE, rather than a NUMBER, since it must be compared with the DATEs.

    As the month is a NUMBER, do not insert VARCHAR2 values, such as '201505', in it.

    Why is-day_of_week 100 characters?  The longest name in English ("WEDNESDAY") is 9 characters.  Day_name fairer apply in trouble.

    Here's a way to do what you asked:

    DEFINE SYSDATE = "DATE" "2015-05-05.

    DEFINE SYSDATE = "DATE" "2015-05-06.

    WITH got_effective_month AS

    (

    SELECT TO_NUMBER (TO_CHAR (ADD_MONTHS (& SYSDATE

    CASE

    WHEN COUNT (*)<=>

    THEN-1

    0 OTHERWISE

    END

    )

    , "YYYYMM.

    )

    ) AS effective_month

    OF dates_dim

    Day WHERE BETWEEN TRUNC (& SYSDATE, 'MONTH')

    AND & SYSDATE

    AND business_day > 0

    )

    SELECT d.

    CASE

    WHEN month = e.effective_month

    THEN 'Y '.

    ANOTHER "N".

    Flag of the END as the

    OF dates_dim d

    CROSS JOIN e got_effective_month

    ORDER BY d.day

    ;

    I used the proxy & SYSDATE to test.  In Production, you will use the SYSDATE function instead.

    A calendar table, like days_dim, is really a good idea.  You may consider adding a column business_day_count cumulative, a NUMBER that increments of 1 every day business.  To find out how many days passed since any day x (for example, the 1st of this month), you would only need extract the 2 rows in the table: line x and the line today.

  • How to have the different path in the campaign for the first user of N who register for an event?

    Hi all

    I have the following scenario for which I am trying to understand the best way to get the desired results.

    A society organizes events in several places and wants to offer widgets for the first 100 registered. We would like the confirmation of registration email (and perhaps the form submit redirect action) to recognize for the first 100 registered that they will receive their gift in the mail shortly.

    Maybe we would also like to use the Cloud2You component to post on the key ring.

    I searched around the documentation and so far it seems, in the program generator, you have a decision stage to search by the number of Contacts in a Contact Group - however when I try to play with the program generator I don't see the option.

    Any help and insight would be appreciated.

    Stone

    Hi Pierre,.

    The only way I was able to satisfy this use case in the past was to create a custom object first with a meter and e-mail address fields. In the custom object have a counter range from 1 to 100. As the first 100 people to register, the tire registration page the next value of the counter (see data card with space for e-mail address) and select it as a value on the registration page, pass it back through form with e-mail custom object. This way you are able to have the first 100 e-mail address to fill.

    Now you can feed these contacts in a program, send them email you have to looking for a value of data card custom 100 by the decision rule object, and if the value is 101 or more, you can send them another type of communication.

    The only reason why I recommend this path, because the main challenge is to keep track of number of contacts in eloqua, and this deffinately has been a path before open API that I have been able to use successfully for the distribution of promotion code.

    I hope this helps.

    Thank you

    Amit Pandya

Maybe you are looking for

  • By mail to Outlook conversation configuration

    e a Macbook 2015 with Retina display. I use an Exchange account in the Mail from Mac application. When sending mail to an Outlook on a PC, it reconfigures the email icon at the top of the email. It will not be on the page, the enamel in standard conv

  • annoying text on screen box

    Hiya all Today for the first time that a box appeared on the screen with the text of recognitian voice on it, although not always what we say lol How can I get rid of it please, it's so annoyint grrr

  • How to get the manual for Satellite Pro 4200?

    How to get the manual for Pro 4200. I have download olm_up and setup.exe (72 kt) of http://eu.computers-toshiba-europe.com?.

  • Pavilion DV7: How to make windows 10 talk to external monitor?

    I changed my Pavilion DV7 (product # ww185av) from Windows 7 to Windows 10. Since then, the laptop appears on my external monitor (HP x 2511). The screen remains black. Laptop computer connection and monitor worked very well just before the switch. I

  • Pavilion 17-f100nh: forget my BIOS password

    Please help me! My mother died and I did not use my phone for a month. Then I discovered that I had forgotten my BIOS password. I typed in it for 3 times, but I wasn't sure. I n ' know that there are only 3 possibilities.  I received a message "syste