Consulting multiple models of Score lead in Insight

I would like to compare two models of notation in the Score Dashboard drive in Insight.  Is this possible?

We have two models as described below.

models.gif

However, in the Score Dashboard driving Insight, we can see only the active model.  I wish I could see the two models in Insight.  Page 8 of Eloqua 10 Drive Configuration Guide rating it seems it should be possible, however, I only see one.

Post edited by: J Weis

The aspect of troubleshooting and analysis, whether you have one or more templates "active", is a good point and something I'll discuss with the team scoring lead.  Agreed that allowing the comparison of a production model to a model being developed for production, should be possible on any trim.

Tags: Marketers

Similar Questions

  • Does anyone have experience assigning Score lead when 2 or more product lines are working to the same contact?

    We sell different products to the same list of targets. Prospects respond to different offers, etc. from various product teams.  This translates into a Score to drive only assigned to the contact. We can say that the perspective is A1 or B3, etc.  But with a score of unique lead, we don't know how this tells us what product should be assigned to follow up with highly rated prospects.

    According to your contract, the number of partitions to drive through the new module can be limited. You can always create several programs rating by the manufacturer of the program according to your product lines that correspond to different areas. So that you can more easily compare.

    If you use SFDC, then map to the different types of registration accordingly.

    J

  • Multiple Choice Quiz Score

    Hi all

    This is my first post here, so apologies if I break the unwritten rules, or say something ridiculous, please bare with me.

    So, I created a quiz of multiple choice in my multimedia project using Flash CS5 and wanted to know how (or if) I can integrate a scoring system for the existing quiz.

    I created the quiz using the timeline and layers. For each question, there are three layers;

    Layer 1 - Question w / four possible answers (only one is correct)

    Layer 2 - correct answer

    Layer 3 - incorrect answer

    I use buttons to navigate through the timeline.

    What I want to achieve is, at the end of the quiz, a score to generate based on the questions they got right.

    I hope I've included everything you need.

    Thanks for reading and possible assistance.

    Create an action layer that extends along the timeline and frame 1 create an outcome variable.  As you go with the quiz, addition/subtraction value to this variable to true or false answers.  Until this layer extends until the variable is available to be changed, that in the end will be equal no matter what either believe it has accrued.

  • work with multiple models using the muse of adobe

    How can I copy pages from one model to another by muse adobe

    You can not.

    Mylenium

  • Lightroom on multiple computers, external hard drive + smart insights

    Hello

    I use a desktop pc and laptop (both with windows 7 and LR 5.6). I decided that the best way to work between the two was to use a disk 2 TB with all my photos and my LR catalog on that external drive. Have the catalog on the drive makes sense to me because the process to keep catalogs up-to-date on both computers seems somewhat discouraging and leaves plenty of room for operator error.

    I was looking for in my import operations and 'intelligent Preview' seemed to be an interesting effort for me because there might be a time when my external drive could be left at home or inconvenient to access and I would like to have the ability to work on my photos in offline mode. However, my understanding of the smart insights is that they need to be on a local catalog on the computer. If I try to run LR without my external HDD attached it wants me to locate or choose a different catalog, which is an obvious problem, if I don't have it with me.

    My question is, is it possible to use smart insights into the way that I am currently using LR? and if not, how do I remove the smart clips that I have already created?

    Thank you

    Scott

    If your images and the catalog and associated files are all on the external hard drive, then you have found smart. Smart insights are nice, if you want to take a subset of size reduced with you on your laptop and you do not have the available originals. The problem with intelligent insights, is that you can not turn to Photoshop or other external editors if necessary. This work was smart insights could in some cases limit what you'd be able to do.

  • How create manually the point to the model assembler help leads

    Hello

    I'm using Model Driven Development, but all my data insertion will not happen via forms. There may be a background process that can extract data from somewhere, and insert in the database table, I try to use the existing assembler, for example, CurrencyAssembler to extract all the data or create a new item in there. How can I do? I tried to instantiate CurrencyAssembler in my java class and call the createItem (Currency) but I get null pointer exception, if I call the fill() on that, he needs object PropertySpecifier that is not allowed to create outside its package. How to use these assemblers for my non-form push and pull?

    Thank you

    RK

    My response in a different thread: you must pass the name of destination DST. And it is called . .

    With regard to the PropertySpecifiers:

    You must use the PropertySpecifier.getPropertySpecifier factory method (destName, properties of the list, boolean includeDefault, String [, isUpdate]). It is described here: http://help.adobe.com/en_US/enterpriseplatform/10.0/AEPDeveloperGuide/WSc3ff6d0ea778594611 72e0811f00f6f3f0 - 7ffdUpdate.html

    Rohit

  • Validation of multiple models

    I try to have the LC to validate three different patterns in a text field. One would be a letter followed by 6 numbers, two is 6 numbers and three is 9 digits. That's what I have so far. It's close, but not quite do what I need. It's properly validate one, but with two and three, it's whatever it is between 6 and 9 numbers, allowing not just 6 or 9 numbers. Suggestions?

    var

    r = new RegExp();

    r.Compile ("^ [a-zA-Z] + [0-9] {6} |") [0-9] {6} | "[0-9] {9} $"

    , "i");

    var

    result = r.test (this.) RawValue);

    If

    (result == true)

    true ;

    on the other

    fake ;

    I think you must group your regex to get the beginning of the string and at the end of the anchor chain works, try

    ^ ([a-zA-Z] + [0-9] {6} |) [0-9] {6} | ([0-9] {9}) $

    Having brackets after the beginning before the end of the chain anchor and anchor chain.

    Without the brackets at the beginning of the anchor chain applies to the first model and the end of the string to the second anchor model so the central motif is allowed for matching numbers 6, 7, or 8.

  • Apply multiple models on one html page

    I have a model index.dwt I use for each page of my site, but in the different pages that I have another specific model for this page only. I can't apply the second model without crushing everything on the page.

    Check these out for a Visual of what I'm trying to do.
    http://studentpages.SCAD.edu/~dparso20/stuff/Template1.jpg
    http://studentpages.SCAD.edu/~dparso20/stuff/Template2.jpg
    http://studentpages.SCAD.edu/~dparso20/stuff/template3.jpg

    The third image is what I would like to have but can't seem to understand. Thanks in advance for your help.

    EDIT: I think that my problem was that I wanted to insert a template in a template. I hope that that was it, and I can understand that

    Any given page can only be a child of a single model. I'm sorry.

    --
    Murray - ICQ 71997575
    Adobe Community Expert
    (If you * MUST * write me, don't don't LAUGH when you do!)
    ==================
    http://www.dreamweavermx-templates.com - template Triage!
    http://www.projectseven.com/go - DW FAQs, tutorials & resources
    http://www.dwfaq.com - DW FAQs, tutorials & resources
    http://www.macromedia.com/support/search/ - Macromedia (MM) Technotes
    ==================

    "Objectnull" wrote in message
    News:euh8cf$67P$1@forums. Macromedia.com...
    > I have an index.dwt model that I use for each page of my website
    > but
    > in the different pages that I have another specific to model
    > who
    > the page only. I can't apply the second model without overwriting
    > everything on the page.
    >
    > Check these out for a Visual of what I'm trying to do.
    > http://studentpages.scad.edu/~dparso20/stuff/template1.jpg
    > http://studentpages.scad.edu/~dparso20/stuff/template2.jpg
    > http://studentpages.scad.edu/~dparso20/stuff/template3.jpg
    >
    > The third image is what I would like to have but can't seem to understand.
    > Thank you
    > in advance for your help.
    >

  • collectionDropTarget with multiple models

    Hi, I use jdeveloper 11.1.1.3 and I have the following scenario

    table a drop target
    drop table B source
    drop table C source

    I want the user to be able to drag B and C to A, but I also want to differentiate the two measures. I want to know if it's a B-> A, or a C-> action. Idially I would like to have different dropListeners.
    I tried to add two different collectionDropTarget in table A, for example:
    < af:collectionDropTarget dropListener = "#{backcalcMargin.paralaviProduct} '"
    modelName = "margAllProducts."
    action = "COPY" / >
    < af:collectionDropTarget dropListener = "#{backcalcMargin.dropProduct} '"
    modelName = "margProducts."
    action = "COPY MOVE" / >

    but the second is always ignored (I swap check it out)
    I also hope that modelName is a list, but it is not.
    Any suggestions?

    TIA
    Imane

    Hello

    you know that the drop event contains information about the drag source? This way you can get the information of what it started a drag

    Frank

  • Lead scoring model - when it is updated?

    (Basically), I wonder how much time is the main model of rating?

    For example, if I update the model rules (or thresholds) - should I expect to see the scores change immediately / soon / next day?

    Or, if the model remains the same, but something made contact that should affect their score (for example, a click on an email), the speed at which should change their score?

    (and a related issue: fact lead scoring Dashboard update to the same?)

    It would be useful to know what is waiting, so that I can know how best to use.

    Thank you

    Charlie

    @charlie I know the new scoring track model re-scores all daily records (i.e. every 24 hours), but I'm ccing astanbridge on this thread if it can give you accurate information.  I would recommend also join the group E10 lead scoring so you can stay up to date on all the latest articles about the new rating model drive.

    Hope this has been helpful,

    Leigh

  • Is eloqua offers centralized lead scoring?

    Is eloqua offers centralized lead scoring?

    Hey Sanny,.

    Yes, Eloqua provide centralized lead scoring... If the lead rating model have already been created then you can see the path that follows below:

    Contact > find contact > Double click on Contact > click on marking

    Here you can see all the models and Score.

    Thank you...

  • What gives? Research (w / no luck) of E-mail groups in scoring model to drive E10...

    What I'm missing here, people? How is - E10 - I can search and locate groups specific e-mail through a filter of Contact Power Tools but I can't find the same groups of email through the rule of engagement model criteria scoring lead? It is specifically stated "emails in folders" - I must be missing something here - can someone please shed some light for me?

    Thank you!

    KC

    It is I understand that model E10 rating lead you cannot mark based on Group Messaging. You can only score e-mail based on the folders they reside in.

  • Creation of lead in using eloqua lead scoring program

    Hi all

    I did some major programs before scoring, but never made integration with SFDC, so my questions can be really stupid, please bear with me on this

    We have a lead score and lead program stimulating. Our lead scoring program updates the standard Eloqua (lead score, lead rate fields) fields.

    My questions are

    1. I need to create fields for score of lead and scoring in SFDC and synchronize?
    2. Eloqua automatically create/update an advance for a contact when it hits the site / sends a form?
    3. I want to send only hot prospects and hot leads to sales, how do I achieve it?
    4. How can I assign a new track to a seller?
    5. I have to specify a due date for the hot wire in Eloqua in a separate field and synchronize that by dint of sale? (All the hot wires must be contacted within 24 hours?)

    Thanks for your help.

    Kind regards

    Rama

    Hi Arnaud

    (1) is not necessary. If you want, you can, but there is no requirement. The only requirements from default to create a leader in SFDC are the last name and company. All other fields are optional in a standard installation. This may be different for your instance of SFDC. That said, I recommend you to create these fields as they shed a lot of value to people outside of commercialization (including sale).

    (2) it is possible, but not by default. You can run the integration rules in your form, or you can add calls create lead to an internal event. I would not recommend this because you will be generally overwhelmed with cords honor.

    (3) you can do this making sure son pass through your lead scoring program before being pushed to update CRM program. You can use a decision rule to filter any person who does not meet your criteria of rating of which is considered to be a leader 'in hot.

    (4) you would use in SFDC assignment rules to achieve this. You cannot trigger attribution rules SPECIFIC with Eloqua, only the default allocation rule. However, you can have your specific attribution rules configured to search for specific data from Eloqua, as a salesman, or the owner or something like that.

    (5) you can, but this is not necessary. Really, any system you build around that is running on the wires of hot in SFDC should really be built in SFDC, using a combination of trigger rules and Workflow. Trying to 'too' on the Eloqua side leads generally to a system that is unbearable and not easily editable. For something such as CRM integration, you want to do this either fluid as possible, because most peoples requirements change often (it of to say, sales don't like the quality of the leads (refine the scoring criteria), they want to see threads with X type activities, X seller should get is more driven, etc.). Ensure that you use the functions of each system causes the process more bearable and editable, which means generally on a 50/50 sharing of what happens in Eloqua and what is happening in SFDC.

    If you are not familiar with the integration in Eloqua area, I highly recommend indulging with Eloqua Professional Services, or with one of our partner organizations, or even hire a consultant who knows very well the process (best to ask your account manager for references If you follow this path!). Integration is one of the most difficult concepts in Eloqua, and it's really one of the things thing that really pays dividends to have implemented correctly from the beginning. An incorrect configuration of the integration of CRM can really destroy the integrity of the data of your Eloqua database and your CRM system.

  • Connect a bus to multiple subcircuits

    I've got multiple models that need to connect to the same bus.  I use sc/hb bus connectors.

    I got my bus to the next level.  I can connect fine to the first sub-channel.  (subcircuits are identical, copied and pasted)

    When I try to connect the bus for the second subcircuit, he refuses to allow him and the forces of the bus name to change subcircuit and high level, so they do not correspond in all circuits and I can't connect the appropriate signals.

    I need to have all the signals in this bus connected to the next level and also within each of the multiple identical subcircuits.

    What Miss me?  Why does this work?

    Thank you

    David B

    I don't know that I'm quite what you describe as the first problem. What link is not currently allowed? Is there a specific link I should try to commit in the sample you provided that this poster?

    Regarding the second problem - collection of different parts of the bus in different blocks, there are two ways that you should be able to do. When you connect the bus to the subcircuit, it should ask you how you want to manage connections (assuming that you have defined on the internal and external buses of signals). If you know at that time what signal level should connect with what signal line, you can select "Manually rename for merging bus lines" and rename the internal lines in the block to match the bus lines to use.

    If you forgot right then what line should be, or if you later add bus lines, you can also do it after. Connect the bus - the safer being options "Rename bus lines to keep all existing bus lines and separate nets" or "rename only bus lines to avoid fusion nets" in this case, then change the subcircuit. Double-click one of the entrances to the bus, and you can select a different line for this entry. Choose the one you want and tell him that you want to change all entries corresponding to this subcircuit bus. This will select a bus line different to the subcircuit to use instead of the one he was using.

    Important here is that the various blocks must remain consistent with each other (so if, for example, a block uses 8 separate signals by bus, then all other instances must also use 8 separate signals in the same way). If you try to make a change that would make the incompatible blocks, Multisim will give you the choice to undo the change, or make the same change to the other blocks (which, come to think of it, might be related to your first problem, but I don't see how yet).

  • Budget Management - Eloqua marketing

    Plenty of chatter about managing spend and budget in Eloqua natively on the last three months that I thought it was time to post this (vote on this poll... ( http://topliners.eloqua.com/polls/1222)

    As Michael Kopp has done in the past, I'm testing a potential demand (m - l) on of the Topliner.  Let me know how ridiculous, you think it is!  BTW.  I heard clearly state of Eloqua Senior as "Eloqua is not a MBM tool and has no intend to be the" can I have heard that a month ago, but which is not questions for me.  Im going to keep asking.

    Request to support Eloqua Marketing Budget management.

    1. An additional tab in the campaign settings capture
      • dates with a greater depth (cmpn start/end, statement of the dates of beginning and the cuttof, dates in. has been raised and consumed, start and closing date for acceptance of stakeholders)
        • dates not only, but the ability to measure internal and timestamping cycle time (time in State xx)
      • amounts of $$$ investment partners: think of this as a list of choices, where options include 'spend buckets': partner MDF Plan/actual, real/Mktk program Plan, specific campaign plan/actual (books white, sem, testimonials, webinars, etc.).
      • Maybe an additional tab (or layer) in the middle of camp, showing the requested amount consumed vs, #associated po #s, contact details of the seller, owner budget info (associated: integrate the contact information of the seller.) Quelque_chose different, easy to address)
    2. The ability to place/view/align campaigns in multiple models [view by a. region, b. spend, c. Conversions, bang more high e., 5 the lowest cost...], it could be interpreted as allowing the structures of expandable files for campaigns, programs, models, etc..
    3. Added value.  Threshold alerts. Simple alerts config for the leadership that the objectives of investment/expenditures are 'at risk' or "Maxim Performance".  Something that says "Hey J, this pipe might be leaking.  Check it out! »
    4. Change of paradigm? Budgets as separate unique objects, with links to campaigns, programs, lps, active, forms, content etc.  As opposed to the current arch, which I believe only has budget fields on the object of the campaign.  I don't really know the ERD.  It's just how I see it.
    5. All the required synchronizations for happy healthy CRM integration & & integration of Insight.  WRT to Insight, there are the usual caution need to have the "usable" data for reporting.  Would be really nice working MDX!

    MktOp'rs would be happy if we could get our paws on these data for reports, within our Elq instance.  I would very definitely. From there on, I think that everything would be in place for an intuitive journey in Mktg Budget Mgmt.

    If this business process has been truly supported in Eloqua, natively, my desire to...

    • looking outside the seller tools, APIs, services, or to
    • create a solution of kludgy with custom fields campaign, including the awkward foreign key relationships

    ... decreases significantly.

    There are other issues to consider: change of acceleration, meetings of stage, compile, test, documentation user, change process documentation, deployment, QA, Workflows, UAT, UAT, training teams, etc.  No reason to not work seriously in the wings, while the architecture is established (or built!) by a small team.

    Finals.  I am confused on how to evaluate investment, overall marketing, everything, thick-Tech white papers for Brochures fantasy w/quote of day; Cost of running a team of operations, Vs cost of Production and QA in Pune? Return on cost of Dreamforce? Effectiveness of the roadshows. and how to manage the partner MDF with grace and financial responsibility dilemma (and son of string).

    J

    A few Eloquans (members of staff + customers) have shared their career prospects on the theme of the budget monitoring, including Ann Tebo, Egan Cheung, francisco.dominguez, Michael Kopp,dstevens10, Jocelyn Brown-Oracle, Aaron Riley - Bluekai DMP-Oracle, Rajesh tarik, Sarah Hums-Oracle, Oracle kroman, peggy.sehorn, stevewoods (I'm list names in hopes of attracting a few comments on this post)

    Among the chatter, I did reference:

    Re: calculation actual cost of the systems of Marketing (KING) (capture that we now have a dimensional 1 metric campaign cost)

    Re: Inability to capture Marketing spend in Eloqua?

    System of management of marketing resources Tue 3/19

    Poll: What comes after income. Topliners

    Default response rules campaign & integration rules - discuss

    Re: Deactivation and reactivation of the campaigns

    Message has been designed by: J Weis

    Post edited by: J Weis

    jweis,

    I like how you described carefully your requests to find out where their maybe some Eloqua gaps for management of the marketing budget. For many of your points above, software Allocadia (partner appcloud) connects to Eloqua to offer the functionality of your applications noted above, such as:

    -amounts of $$$ investment partners: think of this as a list of choices, where options include 'spend buckets': partner MDF Plan/actual, real/Mktk program Plan, specific campaign plan/actual (books white, sem, testimonials, webinars, etc.).

    -ability to set/view/align campaigns in multiple models [view by a. region, b. spend, c. Conversions, bang more high e., 5 the lowest cost...

    -Budgets as separate unique objects, having links with campaigns, programs, lps, active, content, forms

    A useful demo - how you can manage the marketing spend in Eloqua (in a campaign program, global level):

    Marketing investment planning & budgeting Eloqua users

Maybe you are looking for