Display internal to 10 working days to the iRecruitment

Gurus,

I'm new to iRecruitment and would require assistance to get a feature.

Client has a requirement in which they say that its employees in their organization can also apply to internal jobs for 10 working days before it is posted to the outside world.

Can someone help me to achieve this?

Kind regards

Saurabh

Have you checked the profile option - IRC: days of internal validation


The implementation Guide - http://docs.oracle.com/cd/E18727_01/doc.121/e13518/T24319T440324.htm

Set the days of display to set the number of days internal jobs

If you want to make available the details of the work of your employees first, and then set the IRC: days of internal validation profile option. You specify the number of days during which the messages one app announced internally before posting the announcement on the external site.

See you soon,.

Vignesh

Tags: Oracle Applications

Similar Questions

  • I'm looking for the 1st working day of the week.

    Hello

    I'm looking for the 1st working day of the week except Saturday, Sunday and holidays. I have vacation, the name of the table that contains the columns HolidayDate and HolidayDescription.

    Ex:

    01/10/2011 is monday (i.e) 1st company day.check if it is in the host table, then return the result as 01/11/2011 other returns the output as a 11-1-2011(which is the first business day of this week).


    Can someone tell me the query to solve?

    Hello

    If dt is any DATE, it is the first day of work in the same week as dt:

    WITH     all_week     AS
    (
         SELECT     TRUNC (dt, 'IW') + LEVEL - 1     AS a_dt
         FROM     dual
         CONNECT BY     LEVEL <= 5
    )
    SELECT     MIN (a_dt)     AS first_work_dt
    FROM     all_week
    WHERE     a_dt     NOT IN (
                      SELECT  holiday_dt
                      FROM    holiday
                     )
    ;
    

    This assumes that you have never 5 consecutive days. (Where I work, holidays are always at least a week apart, so that's fine.)
    If you have a week's holiday, increase the number of 'magical' in the CONNECT BY clause.

    It also means that holiday.holiday_dt = TRUNC (holiday.holiday.dt).

  • Work day of the week of the date of

    Hi guys, is a bit common code that allows you to work on the day of the week for a given date? IM pretty new to this and I don't know how to write it and thought since it's probably quite commonly need I may be able to get help here. Thank you.

    Day of the week in letters
    Select to_char (sysdate, 'day') of double;

    Day of week in numbers
    Select double to_char(sysdate,'D');

    Day of the month in figures
    Select to_char (sysdate, 'DD') of double;

  • given number of working days for the current month to date

    Hello

    How can I get the number of days of data using SQL date? appreciate for your help. Thank you.

    Hello

    Whenever you have a problem, please report all that is necessary for people to recreate the problem and test their ideas.  In this case, including CREATE TABLE and instructions INSERT for all necessary tables (just a few lines, only relevant columns) and the results you want from this data.

    The syntax of a scalar subquery (that is, a query that takes the place of a single value, as in a CASE expression) is

    (

    SELECT...

    Of...

    )

    in other words, all of the query must be within parentheses surrounding nothing else.  It seems that you have the SELECT keyword in a CASE expression without a parenthesis opening right before she left.

  • Help with comparisons between the work units in the base line

    P6v7 running, I have a base calendar to resources and I want to see the work units of base from the current hourly work units. I go to the spreadsheet of the use of resources and discover real work, budgeted and other units, but I don't have the option to display the basic units. I first thought the budgeted units were the base line reading, but it is not true that the planned duration does not match the unit duration of work budgeted for each particular activity or it corresponds to the duration of the current activity. Don't know what the length of buget reads from.

    I found that I can use the activity using profile window to display units of basic work compared to the real and remains as a histogram, but not in a spreadsheet format.

    Does anyone know how to check the times of the base line in the format of the worksheet?

    Thank you

    user12850365,

    I occasionally use resource and activity of histograms with spreadsheets. After reading your question, I decided to change my own setup and launch a scenario similar to what you're asking and got positive results.

    First of all, I guess a few things...
    * You already have a reference assigned to your project database
    * You are viewing the 'use spreadsheet activity' on the bottom of your screen

    First thing to do is to filter your activities within the project,

    * Group and sort * by 'Total' and show subtotals and totals
    Side to the left of the screen... Display ""BL project Labor units * "and" * budgeted Labor units * "columns on the left side of your screen"
    * To the right of the screen... (The custom Spreadsheet fields) displays budgeted Cum Labor units and Cum BL project Labor
    * My time scale is set to days and weeks

    Adjust your timescale to allow all of your data to display. You will thus limit much of your future data on the screen.

    This should display the two hours provided for in the budget and hours of departure within the spreasheet

    I would like to know if it works for you.

    Hope this helps you

  • Calendar working days


    Hello

    I have a few packages of oracle I plan in a Linux environment using crontab. Its simple to plan their calendar months however, my requirement is to race the working days of the month. For example on the 1st or the 2nd business day of the month, can anyone suggest the best way around to do this

    There is a time dimension in the database that contains an indicator of working_day for each day, that somehow be combined in the crontab Schedule to run only if the 1st of the month is a working day

    Cron or dbms_scheduler have any notion of business day, so you can not schedule automatically for the first working day of the month.

    What I usually do for this kind of thing, is planning the work to be performed on each of the first days of the month (how much would depend on the biggest race of holidays possible considering your holiday calendar).  The first think that the procedure is to check if it's the first day of work, if so then do the work, if not then stops.

    John

  • Display object level settings works does not in CS5

    I can't change the display settings to a level of object in an InDesign document, if I want to change the display settings it will work only at the level of the document. If I try to change nothing to the level of the item arrives. This is a high-performance Windows 7 64 bit with Nvidia GeForce 470, with software to date and drivers, running InDesign 7.0.2.

    I realized what is happening. Your images are in frames pasted into other frameworks, to apply the level of the object display the parameter to 'high level' framework is not affecting the image which is controlled by the setting on the fame that contains the image.

    WASD this document converted from another format, or just built strangely?

  • How can I get the internal speakers to work on a hpvs15 screen

    I have NEEDED HELP GETTING THE INTERNAL speakers to WORK ON A HPVS15 MONTOR!

    Hello

    Try a reset of the monitor. Unplug the power cord from the monitor and hold the power button of the monitor for 30 to 60 seconds. Plug the monitor back in and it lights up.  Does that help?

    Consult this Manual.  Go into the on-screen display-->> volume and turn up to max all the sounds?

    Don't forget that you have a green audio cable plugged into the monitor and audio output on your PC port. Don't forget to unplug the headphones.

    Try a PC speaker separated in order to eliminate the PC as the problem.  You can also try the monitor and cable on another PC.

  • Blocks - Spooler subsystem or the display driver did not work properly

    I have a Vista Home Premium OS. He crashes at least once a day and the State of boxes (approximately equal amounts) dialogue that the Spooler subsystem or the display driver did not work properly and that have been closed by the enforcement data system. Can you give me advice on how to fix these problems?

    Hello

    1 when was the last time, he did not work properly?

    2. the accident happens at random or when executing a particular task?

    3 did you a recent software or changes to the material on the computer?

    Method 1:

    I suggest you to go through the steps mentioned in the link and the Coachman. Run the automated FIXIT and check. You can also follow the other steps listed in the article.

    Solve printer problems

    http://Windows.Microsoft.com/en-us/Windows-Vista/troubleshoot-printer-problems

    Check if the problem persists, if she does not follow the steps in method 2:

    Method 2:

    This problem may occur if a third-party printer driver or service affects the functionality of a newly installed printer.

    I also suggest you to follow the steps mentioned in the link and check.

    Do not operate the automated FIXIT. Follow the manual steps and check.

    You cannot print and you receive the error message "Spooler subsystem app has encountered a problem and needs to close."

    http://support.Microsoft.com/kb/810894/en-us

    (Also applies to Windows Vista)

    Method 3:

    You can also update the display drivers on the manufacturer's Web site or use the link below.

    Updated a hardware driver that is not working properly

    http://Windows.Microsoft.com/en-us/Windows-Vista/update-a-driver-for-hardware-that-isn ' t-work correctly

    See also:

    Pick up the pieces after a computer crash

    http://Windows.Microsoft.com/en-us/Windows-Vista/picking-up-the-pieces-after-a-computer-crash

    Hope this helps and keep us informed if you need help.

  • Procedure for the number of working days per month when the user enters to and from everyday

    Hi all

    Can provide you a solution to this - procedure for the number of working days per month when the user enters and days.

    Suppose that the user enters November 18, 2014 start date and date as November 23, 2014.

    The output should display

    Count: 4

    November 18, 2014 Mar

    Sea 19 November 2014

    November 20, 2014 game

    Fri November 21, 2014

    It will exclude Saturday and Sunday.

    Hello

    Here is an example of removing dates Saturday and Sunday:

    with days as(
         select (trunc(sysdate, 'YEAR') + level) as col from dual
         connect by level < 365
    )
    select * from days
    where trim(to_char(col, 'DAY', 'NLS_DATE_LANGUAGE=ENGLISH')) not in ('SATURDAY', 'SUNDAY')
          and col between to_date('18.11.2014', 'DD.MM.YYYY') and to_date('30.11.2014', 'DD.MM.YYYY')
    order by col;
    

    Cheerz,

    Stako

  • Apple Watch sport does not work correctly. The display is 'crazy' once or twice a week and I need to force restart it. Do you know what is happening with the watch? Is this a common failure?

    Apple Watch isn't working properly. The display is to be 'crazy' once or twice a week. And I need to force restart it. Is this a common failure?

    Hello

    This isn't a failure or defect.

    Zoom (an accessibility function) has been activated on your watch and you are zoomed accidentally tapping on the screen in a particular way.

    • To turn off the Zoom:
      • On your iPhone, in the application of the watch, go to: My Watch (tab) > general > accessibility > Zoom - put it off.
      • Or on your watch, go to: homescreen (via a simple press on the digital Crown) > (cog icon) settings > general > accessibility > Zoom - tap and enable / disable.
    • If the accessibility shortcut has been enabled and configured for the Zoom, you can also enable and disable functionality more conveniently:
      • On your watch: quickly press the digital Crown (the round button) three times.
    • To set up accessibility shortcuts:
      • On your iPhone, in the application of the watch, go to: Watch My > general > accessibility > accessibility shortcut (bottom) > select / deselect Zoom.
  • My internal camera on my MacBook at the beginning of 2008 Pro does not work

    My internal camera on my MacBook at the beginning of 2008 Pro does not work.

    One of them will solve your problem of camera:

    (1) If your Mac restart does not solve the problem,

    (2) use http://support.apple.com/kb/HT2090 from Apple.

    (BTW - troubleshooting section called an "iSight" camera.  However, after that article was published, Apple has changed the name of the built-in camera on the recent "iSight" Macs "FaceTime", then "FaceTime HD."  Whatever the name of your built-in camera, the same info and troubleshooting applies.)

    Be sure to test several Apple app (photo booth, FaceTime, iMovie, QuickTime Player, etc.) in more than one user account.  Do NOT use the 'Guest' for this test account.  If you don't have more than one user account for testing, create one now.  If you need help, how is explained in http://support.apple.com/en-us/HT201754.

    A 'Standard' user account is all you need for the tests.

    (3) If your camera will work correctly even with Apple applications, use OS X Recovery to completely reinstall your Mac OS since system recovery stored on your startup disk.  Don't bother test Skype or other 3rd party apps until you have your camera works with applications Apple.

    (4) If none of the suggestions above resolve your issue, contact Apple or one of the Apple-Authorized Service Provider to have your Mac professionally repaired. Don't forget to back up your Mac and Deauthorize iTunes before the call for tenders for the service.

    Post edited by: Jim EZ

    Mac OSX 10.11.3

  • On the T60 display screen does not work

    Hi, guys! I have a problem. I'm not able to use the screen on my Lenovo T60 1952 - CTO (1952-WJ3), Intel 945, Windows XP 32-bit. I tried everything I installed the correct video driver Intel, installed Hotkey drivers on the Lenovo support site. I see WE screen in "adding / removing" programs, but it simply doesn't. I can use future key like volume control, adjust the brightness, but I don't see anything on the screen - there is no "Fn" icon on the system tray. In the Task Manager, I see TPONSCR.exe or TPOSDSVC.exe. There is also no process called "On screen display" in services.msc. What could be the problem. I used and Lenovo update tool and installed everything, but still nothing

    This version works better on the old Thinkpads, XP/Vista and Win7.

    Integration of ThinkPad keyboard shortcut Setup to make it allows to delete the most recent versions you have of these:

    • OSD: On Screen Display
    • WSF: Full screen magnifier
    • SID: Driver Interface System
    • FROM: display utility
    • ASU: Auto Scroll utility
    • LPU: Lenovo utility Patch

    , or do it via the Control Panel / Add Remove Programs (programs and features in Vista/7)

  • Display driver has stopped working during the game the Sims 3

    Original title: video card? With the Sims 3 ~.

    I bought the Sims 3 and downloaded yesterday. I have played since then, but then the game would freeze and tell me that this ialmrnt5 of display driver has stopped working. So I tried to fix it, and it did not work. Now, he tells me there is something wrong with my graphics card and Sims does not work yet. I keep going from one link to another tells me to download this and that and I don't know what I have to do. I want to be able to play my game, because it's expensive and I bought it only yesterday. Help, please. PLEASE, I BEG YOU.

    -Poprocks26

    I thought about it, are not even worry about this.

    I just needed an update from Intel. It works perfectly now. :]

  • recommended security cumulative ie8 and compatible display updates fail. can install it with the installer of standalone download but then ie8 does not connect. If I remiove update ie8 works very well

    recommended security cumulative ie8 and compatible display updates fail. can install it with the installer of standalone download but then ie8 does not connect. If I remiove update ie8 works very well

    Hi mikedav,

    Thank you for using the Microsoft Windows Vista Forums.

    Method 1:

    Microsoft has released a new "Fix it" solution that should automatically solve your problems with Windows Update.  Just click on the link below and follow the instructions.

    How to reset the Windows Update components?

    http://support.Microsoft.com/kb/971058

    If you are not able to connect to the internet after you install the update, you need to optimize Internet explorer by following the instructions below.

    Method 1:

    Follow the instructions in the link below which will help you solve the problem.

    Tips for solving problems with Internet Explorer

    http://windowshelp.Microsoft.com/Windows/en-us/help/8038f9ac-9bf9-4809-8d75-fc42818d8af71033.mspx

    Method 2:

    Follow the instructions in the link below to optimize Internet Explorer.

    How to optimize Internet Explorer

    http://support.Microsoft.com/kb/936213

    Please post back and let us know if it helped to solve your problem.

    Kind regards

    KarthiK TP

Maybe you are looking for