Estimated value of T61?

Have a friend who works in an office that has a few T61 he's trying to sell, and asked if I wanted a. Could someone give me an idea of the value?

Its 14 "widescreen display 1440 x 900 (not), it has 3 GB of ram DDR2, disk hard 100gig, NVS140 graphics and dvd burner. The processor is the T7500.

Unfortunately, he also has an inplace of card reader chip of the ExpressCard location that sucks really as I want to get a couple of USB3.0 ports on the thing.

The OWL thing is most of them were fed only on updates to to keep on hand should one of the normal use those get out of service... While he claims that they are in perfect condition with minimal wear of battery.

You guys think, would make a fair offer?

Thank you.

If the machine is older than the 08/08, meaning August 2008 (08/07 would be July of the same year) he is regarded as having a 'potentially dangerous' GPU and isn't worth much, probably less than $100.

Ah. I just spoke with him and he said he had 08/07 on the serial number. He also said he thought he was worth $ 250... Frankly, I wouldn't have a number paying that if she did not have a faulty gpu (I'm in Canada, where things are a little more expensive than in the United States), but if he could up-and-die on me... well, I think I'll pass. I'm sure that nvidia did a recall on this point, if it was really bad, but the realism in me tells me try to request coverage for her that the end of the game would be considered ridiculous. (Just to be clear, I wouldn't ask for it after that I bought it... I would get the friend through his work, as they were original buyers and probably somewhere revenues)

Tags: ThinkPad Notebooks

Similar Questions

  • The size of the estimated value of the project is larger than the chosen target support

    I am at a loss for trying to create a project using Adobe Encore.  I tried initially to the author of the project using the CS2 version.  When you try to export, I received the following message is displayed:

    "The size of the estimated value of the project is larger than the chosen target support.  While it is an estimate, the project may not build. »

    I have created hundreds of projects in the past, but have never received this message before.  I first thought that the problem was with the release of still I used, but I got the exact error that even trying to create the project with Encore CS5.

    The project itself has a menu, a motion menu, and a single video file.  The video file 152 last minute, and I was trying to export that to a double layer DVD.  I tried from the file using CS5.5 Adobe Premier export using a variety of parameters.  I'm trying to export it to a file DVD-2, with the attributes of soure game being the highest value.  The parameter on the main concept MPEG encoder is set to 5. I tried to export the file by using the constant and variable bitrates.

    When I recently exported the file using a contant 6.5 sampling rate, I still 650,4 Mo still remaining on my project.  I still received the same error message on the size of the project, and so I think that something is wrong.

    I even exported the video file into an AVI file compressed and then tried to coding again using CS5.5 Adobe Premier and Adobe encoder.  I always get the same error message on the size of the file.

    Any help or suggestions on how to solve this problem would be greatly appreciated.  Thank you!

    If you do not finish with wasted discs...

    Create an ISO (yet), or a folder on your hard drive (still or Premiere Elements), then use the FREE http://www.imgburn.com/index.php?act=download to write files or folders or ISO on DVD or BluRay drive (send the author a PayPal donation if you like his program)

    .

    ImgBurn will read the mark of REAL from the disk drive, which isn't always the same as the label for the box (Memorex is known for 'nothing' buy and put inside a box of Memorex)

    .

    When you write on the disk with Imgburn, use speed SLOWEST possible setting, so your burner has the best chance to create "good, well trained" laser drill holes... Since no DVD drive is required to read a burned disc, have a 'good' after a try to white high quality will help

    .

    Use Taiyo Yuden simple layer or layer two Verbatim

    Or Falcon Pro for inkjet printable two layer

  • I get a kernel panic

    Hello

    I get a kernel panic, several times a day. It happens when I click - and perhaps because of that a greater change on the screen will be necessary. The report of panic has some info on "nvidia" (I can't interpret this more deeply). Here is a link to the report (valid until the 19.8.2016): https://we.tl/VDVILzWfMn

    I would be interested especially if it relates to a HW failure and if yes, is there a chance for a repair? The estimated value is my MacBook Pro is about $ 350.

    Thank you in advance!

    Sandor

    See Mac OS X-how to connect to a kernel panic. Copy the entire panic report and paste it into your reply. I am not inclined to connect to or download from unknown sites.

  • iPhone 5 (bought in South America) and get a credit at an Apple store us?

    Hello! I have an Iphone 5 and I m of the Uruguay. It's i´mplnning a trip to the United States and want to trade in my phone for an Iphone 6s.

    I can directly exchange (same s of South America)?

    Alternatively, may obtain a credit of the estimated value (USD 200) in my Iphone 5? I reakky want to update an iPhone 6 s!

    You would have to consult the trade program. Use the link to see if your device is eligible. http://www.Apple.com/iPhone/trade-in/

    Understand that buying a phone in the United States would not be a guarantee in South America and may not support all LTE bands in this region. I suggest that buy you a new device in your home country.

  • HIDE NUMBER OF COLUMNS

    Hi gurus, Experts, friends,.

    I need help from you in this scenario.
    We have a "dayprocess 4" where it will be each month and in this way, we obtain ESTIMATED values for the month following what we run up to. The values of what we get in the given month are considered to be FINAL.
    There are so many companies in my report, which needs their values 'Estimate and final' for each month.so if we run the report of JAN2012 to DEC2012, then the report should give the columns with FINAL - July called data and ESTIMATE for AUGUST.
    But when I run my report that I get Final columns and estimate for each month.so, we get the final for this month and estimate for next month. It follows the same path all the way up to JULY.
    The user only wants to see only the FINAL months and ESTIMATES for the upcoming months and not other columns.
    so the report when it is run from JAN2012 to DEC 2012, should give such output, give only the columns with position FINAL until JULY and column with column ESTIMATE for AUGUST.

    Thses are dynamic columns and I use the pivot TABLE DYNAMIC for this report.

    Let me know, if someone want any other information about this scenario.

    Thanks in advance.

    check your email. I've sent the updated model. check the data at a time.

  • Backup error DataPump

    Hello
    I have created a backup of datapump task which suppose to repeat every day using the following script. But it fails after an execution to return an error-"ORA-39000: bad dump file specification"
    ORA-31641: failed to create the dump file 'e:\oracledmp\EXPDAT01. DMP ".
    ORA-27038: created file already exists
    OSD-04010: < create > option specified, the file already exists.

    How can I replace the file. or how I can set some parameters to the file in which each name may be different. Thanks in advance
    ----------------------------------------------------
    PL/SQL declares
    NUMBER of H1;
    Start
    Start
    H1: = dbms_datapump.open (operation = > 'EXPORT', job_mode = > job_name 'FULL' = > 'EXPORTFullDB', version = > 'COMPATIBLE');
    end;
    Start
    dbms_datapump.set_parallel (handle = > h1, degree = > 1);
    end;
    Start
    dbms_datapump.add_file (handle = > h1, filename = > ' EXPDAT.) (Login", directory = >"Dmp", filetype = > 3);
    end;
    Start
    dbms_datapump.set_parameter (handle = > h1, name = > 'KEEP_MASTER', value = > 0);
    end;
    Start
    dbms_datapump.set_parameter (handle = > h1, name = > "ESTIMATION", value = > 'BLOCKS');
    end;
    Start
    dbms_datapump.add_file (handle = > h1, filename = > 'EXPDAT%U.DMP', directory = > "Dmp", filetype = > 1);
    end;
    Start
    dbms_datapump.set_parameter (handle = > h1, name = > 'INCLUDE_METADATA', value = > 1);
    end;
    Start
    dbms_datapump.set_parameter (handle = > h1, name = > 'DATA_ACCESS_METHOD', value = > "AUTOMATIC").
    end;
    Start
    dbms_datapump. START_JOB (handle = > h1, skip_current = > 0, abort_step = > 0);
    end;
    Start
    dbms_datapump. Detach (handle = > h1);
    end;
    end;

    dbms_datapump.add_file (handle-online h1, => 'EXPDAT%U.DMP' file name, directory => "Dmp" file-online 1 type);

    You could do something like:

    declare
    mydate:=to_char(sysdate,'yyyymmddhh24miss');
    begin
    dbms_datapump.add_file(handle => h1, filename => 'EXPDAT_'||mydate||'_%U.DMP', directory => 'Dmp', filetype => 1);
    end;
    

    Nicolas.

  • How to get the height and width of the exact text in TextLayout framework

    Hello fellow developers,.

    I'm starting to work with TLF when there are three different CFC now, I work with unique CFCS with flex 4 and a lot of things are changed as

    I use calculateHeight (), calculateWidth () now these methods are not available.

    If someone knows the replacement of these methods then do let me know.

    Thank you

    If the text exceeds the container, what can happen in a container to scroll where you have to scroll to see some of the text, then returns getContentBounds values are estimated values. It is because we do not want to force the text to recompose all the way at the end of a very long TextFlow in order to return a value. However, if you want to get the exact amount and is not afraid to take the time to redial, call textFlow.flowComposer.composeToPosition (), before calling getContentBounds. This forces all text redial at the end, and then getContentBounds displays the calculated value entirely instead of her estimate.

  • DBMS_DATAPUMP parameter problem

    Hello

    Try to use the aPL/SQL 11g R1 procedure which did a quick export fo a few tables using dbms_datapump which replaces the same output file whenever it is running, the script below. Problem is that it will not overwrite the existing file - I found that there is a parameter REUSE_DUMPFILES, who works with the command of the expdp line but I am unable to be recognized in my script!

    I tried the next line using high - and low of breaks 'Y', but it fails on compiling. What I am doing wrong?

    dbms_datapump.set_parameter (handle = > h1, name = > 'REUSE_DUMPFILES', value = > 'y');


    Main script

    CREATE or REPLACE procedure DCH_ERPM.instant_dump
    as
    NUMBER of H1;

    Start

    H1: = dbms_datapump.open (operation = > 'EXPORT', job_mode = > 'TABLE', job_name = > ", version = > 'COMPATIBLE');
    dbms_datapump.set_parallel (handle = > h1, degree = > 1);
    dbms_datapump.set_parameter (handle = > h1, name = > 'KEEP_MASTER', value = > 0);
    dbms_datapump.metadata_filter (manage = > h1, name = > 'SCHEMA_EXPR', value = > 'IN ("DCH_ERPM")');
    dbms_datapump.metadata_filter (manage = > h1, name = > 'NAME_EXPR', value = > 'IN ("PF00_INDICATORS", "PF01_ANNUALCRIT", "PF02_VALUES")');
    dbms_datapump.add_file (handle = > h1, filename = > 'ERPM_quick' | to_char (sysdate, 'YYMMDDHH24MISS') |'.) (DMP", directory = >"DATA_PUMP_DIR", filetype = > 1);
    dbms_datapump.set_parameter (handle = > h1, name = > 'INCLUDE_METADATA', value = > 1);
    dbms_datapump.set_parameter (handle = > h1, name = > 'DATA_ACCESS_METHOD', value = > "AUTOMATIC").
    dbms_datapump.set_parameter (handle = > h1, name = > "ESTIMATION", value = > 'BLOCKS');
    dbms_datapump. START_JOB (handle = > h1, skip_current = > 0, abort_step = > 0);
    dbms_datapump. Detach (handle = > h1);

    end;

    Hi Steve,.

    You may need to call external shell program to remove the existing files of the procedure. Maybe following help.

    http://asktom.Oracle.com/pls/asktom/f?p=100:11:0:P11_QUESTION_ID:16212348050

    Concerning

  • How do the average of the last 5 values of a column as new values automatically entered?

    If the issue is not clear for you, here's a site I found that teaches you how do it on excel. ml https://www.extendoffice.com/documents/Excel/2533-Excel-average-last-5-values.HT    I can't find the corresponding method on the good numbers. Thank you for your response in advance :-)

    Hi Z_J,

    This number approach pulls the last 5 (low) values of table 1 in another table where the average can be calculated.

    Step 1. Add line numbers in column A of table 1. This gives a way for table 1-1 to extract the last 5 values.

    Formula in A2 (and fill down

    = ROW()

    Step 2.

    In table 1-1, the formula in A6 estimated the maximum line in table 1

    = MAX (Table 1::A)

    The formula in A5 (and filling up)

    = A6−1

    Formula in B2 of table 1-1 (and fill down) using VLOOKUP to find a match for each line number in table 1-1 and get the value out of this line in table 1.

    = VLOOKUP(A2,Table 1::A:B,2,FALSE)

    Step 3.

    Now add another row (and insert a new value) to the lower part of table 1

    Lines 3 to 7 are now drawn.

    Ranger by hiding some columns

    Kind regards

    Ian.

  • Take the last value of the timer

    Hello

    Looking for a help store the timer values.

    Set the backround: will be used to gather data for tests on mechanical switch lifecycle sump pumps.

    Needs to: number of cycles (lit-shut down-lit), Count time stuck we or off (authorized in time is the estimated time to fill/drain sump), see the amount of time stuck on or off.

    I got all of these features to work, but my problem is that when I save to spreadsheet each incriment stuck time power is saved. This could lead to a large number of unnecessary data points. Instead, I want only the last zero no value of the glued power saved timer.

    Any help is greatly appreciated.

    ~ Andrew

    Here ya go:

  • System ID: estimated incompatibility of response and simulation

    I use the VI express Estimation of transfer function SO to model a system plant transfer function. The actual data are a step response, where the stimulus is a flow rate report, and the answer is the size of the droplets resulting (it is a system of generation of Fluid emulsion, decreases of drop size as pump ratio increases).

    My problem is when I compare the response data simulated that I see in the "preview" when configuring the express VI, a plot of the simulated response using the model TR Simulation.VI - they do not match, the form of the response is quite different. I'm relatively new to the design and the system id modules command, so I guess I'm doing something wrong.

    A screenshot of the vi express overview as well as Panel frontal/block is attached, as well as the file data and vi.

    TIA

    After puzzling on this for two days, I finally understood the error on mine, obviously only a few hours after I posted this question! (I should have posted earlier )

    For the sake of posterity.

    error #1: I use the data in a table, and I forgot the model IF Simulation.vi wire in the sampling rate
     
    error #2: the transfer functions did not correspond to the preview of express VI and on my front panel because I had not specified the type of realization in convert it IF transfer Function.vi - default value is 'minimum' and it was therefore minimizing States. Change in full sets this inconsistency.

  • Update system-model and serial number in the BIOS on T61

    Hello

    We just changed the motherboard on a T61. After Windows XP starts, we would like to launch ThinkVantage SystemUpdate

    little, it cannot identify the T61 properly because the system Type is not correct in the BIOS.

    In the past, we were able to update it for example on the server X-Series starting with a BIOS update diskette

    and typing the correct values.

    How do I change them on a T61?

    Thanks in advance

    Welcome them

    Chakoe

    You will need the maintenance disk. It is only available to our technicians on the ground, technicians deposit and trading partners IBM/Lenvo. We are NOT allowed to discuss this for security reasons. Hope you understand.

    If you are a business partner, you are more than welcome to go to the website of Lenovo business partners or contact them by phone for help with this question.

    Kind regards

    Mark

  • Hard drive in T500 T61

    With my T61 7665-D61 defect, I bought a T500 and I need all the data to my T61 in my T500 got also a ultrabay (style T61) Player for my music and films and space intensive games, I have a T500 with 160 GB drive with T61 with a 100 GB drive and 80 GB on ultrabay what I have to do. Please notify

    You can install the t61 drive in your t500 and it will start, but if you just want to get the files off of it, you can buy an adapter T500 ultrabay and put the disk in it.

    I have an adapter T500, if you have something of equal value to trade for it.

    PS. What happened to your T61?

  • IPCC Express estimated the waiting time in the queue

    I have an ipcc express 4.0 and my client wants the number of callers to hear a prompt indicating the estimated waiting time in the queue.

    Is this possible with this solution? Maybe to deal with scripts.

    Any idea?

    Jose

    Jose,

    You can do the process you like through the IPCC Express Scripts.

    You must use the "Get Reporting" statistical step under 'IPCC Express' in the script editor and choose the statistics that you want, in your case, you have to select 'Report object'-> 'CSQ IPCC Express' and afte, select 'Area'-> "Expected wait time", store that value in a variable to create as a guest to read the value.

    Hope this helps,

    Juan Luis

  • The highest sum of the values in any 3 consecutive dates.

    Hello

    Given

    create table test (colamt COMP, coldate date);

    Insert test values (10, sysdate + 1);

    Insert test values (20, sysdate-1);

    Insert test values (5, sysdate-5);

    Insert test values (25, sysdate);

    Insert test values (35, sysdate-11);

    Insert test values (10, sysdate + 1);

    Insert test values (1, sysdate-1);

    Insert test values (5, sysdate-2);

    Insert test values (20, sysdate-3);

    Insert test values (10, sysdate-4);

    commit;

    SQL > select * from test by coldate;

    COLAMT COLDATE

    ---------- ---------

    35 19 MARCH 15

    5 25 MARCH 15

    10 26 MARCH 15

    20 MARCH 27, 15

    5 MARCH 28, 15

    20 MARCH 29, 15

    1 MARCH 29, 15

    25 MARCH 30, 15

    10 MARCH 31, 15

    10 MARCH 31, 15



    I need to find the highest sum of colamt for the whole period of 3 days.

    In this case, it's 50, for the first 3 lines, 19 to March 26.

    (In the real world, I need to know the amount the highest recovery archived how many bytes were generated for consecutive periods of 3 size my FRA v$ archived_log)

    I'm just a DBA and scratch my head to the analytical functions available for me. : ()

    Hello

    To display the best total of 3 rows and the date range when the total highest has been reached:

    WITH got_total_colamt AS

    (

    SELECT coldate

    SUM (colamt) OVER (ORDER BY coldate

    LINES BETWEEN 2 PRIOR

    AND CURRENT ROW

    ) AS total_colamt

    , LAG (coldate, 2)

    COURSES (ORDER BY coldate

    ) AS start_coldate

    OF the test

    )

    got_rnk AS

    (

    SELECT coldate, total_colamt, start_coldate

    , EVALUATE () OVER (ORDER BY total_colamt DESC) AS rnk

    OF got_total_colamt

    )

    SELECT total_colamt

    start_coldate

    coldate AS end_coldate

    OF got_rnk

    WHERE rnk = 1

    ;

    Output:

    TOTAL_COLAMT START_COLDA END_COLDATE

    ------------ ----------- -----------

    50 19 March 2015 March 26, 2015

    If you do not need to display the dates, the above query can be shortened a little.

    Etbin showed how to get 3 days in response #1, usinng the analytical SUM function totals.  The analytic RANK function, estimated above, which of the totals is higher (or, in the event of a tie, lines 2 or more have the largest number).  Because you cannot nest analytic functions, the analytical SUM function should be called in a separate subquery before calling the analytic RANK function.  Since the analytical functions are calculated after the WHERE clause has been applied, you cannot use in a WHERE clause. That is why RANK is compuuted in another subquery and its results used in the WHERE clause of the main query.

Maybe you are looking for

  • Crush the ringing at random

    Anyone has an idea why my Crush vibrated for about 3/4 of a second intermittently. I have disabled all types of notifications of alerts/calls vibrate and still probably 10 to 12 times per hour, it vibrates. I went through all the settings and there n

  • Advice needed on the upgrade of the OS

    Hello. I have an Inspiron 5759 running win 10 Home 64 bit... I have an ISO of Windows 10 education of Dreamspark. I'm in two minds and would appreciate some advice. Firstly, I would like to completely reformat the hard drive and perform a clean insta

  • Width of Popupscreen problem

    Hello Looks like Popupscreen width has a strict limit. On 8800 for example, it seems that there the maximum width of 288, when the width of the screen is 320. As a result, it cut my content on the right. He knows question/made? Does perform a work ar

  • VPN with static nat for a whole subnet

    Hey there, For some reason, I can't do this on the router. Errrr... I'm trying to config a static nat (many to one), which will be in effect only when traffic needs to go on our vpn tunnel to the remote location. example: internal LAN 192.168.0.0 rem

  • How to apply the color profile of nvidia Windows 8?

    So I use a color profile custom driver nvidia problem, after that I restarted Windows 8, the colors of nvidia reset by default and cannot work full screen in 3D games. How can I make windows to always use the colors from nvidia? EDIT: So the problem