follow-up activities on eBS R12
Hello worldWe have eBS R12 on Unix, and we want to monitor all activities that made by implementation partner.
Is there a possibility to do these activities, including reports, etc..
Thanks in advance
Hello
This is possible by setting "Sign-On: Audit level" profile option.
Please refer to the following documents for more details.
Note: 436316.1 - audit: how to audit data and responsibilities?
https://metalink2.Oracle.com/MetaLink/PLSQL/ml2_documents.showDocument?p_database_id=not&P_ID=436316.1
Notes; 368260.1 - what the Tables are related to the use of the profile system ' Sign-On: Audit level "?"
https://metalink2.Oracle.com/MetaLink/PLSQL/ml2_documents.showDocument?p_database_id=not&P_ID=368260.1
Note: 395849.1 - How do you audit an Oracle Applications user?
https://metalink2.Oracle.com/MetaLink/PLSQL/ml2_documents.showDocument?p_database_id=not&P_ID=395849.1
Kind regards
Hussein
Tags: Oracle Applications
Similar Questions
-
Hi all
EBS R12.1
RHEL6
I was born notes Doc-ID 761566.1 or 1330701.1
to install fees or charges clone on a new server.
The two notes are similar to pre-reqs
The E-Business Suite pre-installation RPM includes all required above RPM and dependencies for running the application and database levels.
see the "E-Business Suite RPM pre-installation" section below for more details.
I ran the ff to install any pre-reqs:
# cd /etc/yum.repos.d
# wget http://public-yum.Oracle.com/public-yum-OL6.repo
# yum install oracle-ebs-Server-R12-preinstall
But in the end yum install, I get the following error:
(76/81): unixODBC - 2.2.14 - 14.el6.x86_64.rpm | 377 Ko 00:00
(77/81): unixODBC-devel - 2.2.14 - 14.el6.i686.rpm | 53KO 00:00
(78/81): util-linux-ng - 2.17.2 - 12.18.0.1.el6.x86_64.rpm | 1.6 MB 00:00
(79/81): xorg-x11-libs-compat-6.8.2-1.EL.33.0.1.0.2.i386.rpm | 270KO 00:00
(80/81): xorg - x 11-utils-7, 5 - 6.el6.x86_64.rpm | 94 Ko 00:00
(81/81): xorg - x 11-xauth - 1.0.2 - 7.1.el6.x86_64.rpm | 34KO 00:00
----------------------------------------------------------------------------------------------
Total 3.8 MB/s | MB 91 00:23
WARNING: rpmts_HdrFromFdno: header V3 RSA/SHA256 Signature, key ID ec551f03: NOKEY
Get the key to file:///etc/pki/rpm-gpg/RPM-GPG-KEY-oracle
GPG key retrieval failed: [Errno 14] could not open/read file:///etc/pki/rpm-gpg/RPM-GPG-KEY-oracle
Also for yum install > oracle-RDBMS-server-11 GR 2 - preinstall.x86_64
Summary of the operation
=======================================================================================================================
Install the package of 20 (s)
6 upgrade package
Total size: 56 M
Download size: 18 k
Is this ok [y/N]: y
Download packages:
Oracle-RDBMS-Server-11gR2-preinstall-1.0-12.EL6.x86_64.rpm | 18KO 00:00
WARNING: rpmts_HdrFromFdno: header V3 RSA/SHA256 Signature, key ID ec551f03: NOKEY
Get the key to file:///etc/pki/rpm-gpg/RPM-GPG-KEY-oracle
GPG key retrieval failed: [Errno 14] could not open/read file:///etc/pki/rpm-gpg/RPM-GPG-KEY-oracle
Help, please...
Thank you very much
JC
Please see (Oracle Linux 6 "yum" command fails with "GPG key recovery has failed" (Doc ID 1604867.1)).
Thank you
Hussein
-
EBS R12.2 How to add targets to CM?
Hi all
EBS R12.2
Is it possible to add targets of CM just to accommodate the priority waiting for work? Then come back once the work of priority get run?
Or I kill just to give room for employment of priority for long running jobs?
For example, users waiting why 14 jobs are still pending and they cannot wait.
The cause is the current jobs running took a lot of time at the end, and they may have problems and issues.
For a temporary solution is it correct to increase the target, then decrease once the other jobs get completed?
Thank you very much
JC
Hello JC,.
Refer to the following MOS: how many concurrent managers or process can be defined? (Doc ID 1945166.1)
Whatever you want to do to the CM evolution, you have to bounce the CM to achieve effect. Make the necessary changes before the next execution of the requests.
Coco - M
-
Browser error - EBS R12.2.4
Hi all
EBS R12.2.4
RHEL6.6
I have created/cloned two instances CRP (8010) and UAT (8020) on the same server.
The CRP is accessible by (firefox 41 or ie11) & java 8.60 and the form of java open correctly.
Before opening the forms, he first asks the following prompts warning:
Run with the latest version allows the browser to open the forms.
But the UAT instance is accessible, but it cannot open the forms of java. Because it has not displayed the warning above.
He lifts just below the error:
How can I activate the browser to request that caveat above?
Whenever this warning box appears, I don't know java forms can open successfully.
Please help how to solve this problem
Thank you, jc
On laptop when there is error, uninstall all versions of java/jre and try UAT first instance and then another instance and verify
concerning
Pravin
-
Change the name of the server - EBS R12.2
Hi all
EBS R12.2.4
RHEL6.6
We have UAT instance apps layer with the name of the server "app.example.com".
I want to change the name of the server to "uat.oracle.com".
What are the activities that I have to do to carry out this task?
Thank you very much
JC
Run preclone
change the name of the server
Make the appropriate changes to/etc/hosts
Run adcfgclone
concerning
Pravin
-
EBS R12.2.4 and 12 Db
Hi all
EBS R12.2.4
rhel6.6
With 11 GR 2
Is that ebs R12.2 supports the database of 12 c?
How to upgrade its 11 GR 2-12 c database?
Thank you very much
JC
Interoperability note EBS Version 12.2 with database 12cR1 (12.1.0.1) (Doc ID 1959604.1)
Complete the checklist for upgrading to the Oracle database 12 c Release 1 using DBUA (Doc ID 1516557.1)
These 2 note would be enough for you. In my view, these notes are pretty simple to follow. I would say to create doc once you start the upgrade and follow the same
concerning
Pravin
-
Server vs CRP EBS R12.2 UAT
Hi all
EBS r12.2
OEL 6
1. we have new servers of CRP and UAT of installation.
2 we install all the required RPM based on the two servers based on the notes 1330701.1
3. after that, I cloned the instance of PROD on both servers of the CRP UAT.
4. cloning works very well on the CRP but gets the error on the UAT.
Is there a tool to compare the RPM of the two servers?
Thank you very much
JC
Hi JC,.
Not sure and I tried to check. But when I got from google, see the following blog:
http://newappsdba.blogspot.in/2011/08/Linux-comparing-packages-on-two-servers.html
Coco - M
-
Cloning of EBS R12.2.4
Hi all
EBS R12.2.4
RHEL 6.5
I always get error when cloning time 2 CRP in the same server instance due to duplicate exist in the OraInventory folder.
How to avoid it? My solution is to manually delete the entries in the xml file that is pretty hard to do because you might accidentally delete the wrong pairs of lines.
Can I use the deregistration of control?
For example:
If none of the mentions above Oracle Home are already enrolled in the Oracle inventory, you can run the following command to unregister or detach that Oracle Home:
$ cd /u02/r122/fs1/FMW_Home/oracle_common/oui/bin
$ ./runInstaller -detachhome
\ORACLE_HOME=/s0/r122/at1/FMW_Home/oracle_common
Thank you
Yes. This is the correct procedure.
CD $ORACLE_HOME/Yes/bin
. "/ runInstaller-silent - ORACLE_HOME = detachHome"
"ORACLE_HOME_NAME =" " Take a look on
R12.2: How to create, update or rebuild the inventory Central for Oracle Applications E-Business Suite? (Doc ID 1588609.1)
-
Hi all
EBS R12.2.4
OEL 6.5
Check patches (adoption-status) without previous state, I applied a fix to help:
phase of adoption $ = patch = 20059164 patchtop = / home/applcrp2/patch_for_application
But I got the following error:
Successful validation. All are called nodes are listed in the table ADOP_VALID_NODES.
[EVENT] [EARLY 2015/05/25 15:28:41] Mental health of high-performance database controls
[EVENT] [END 2015/05/25 15:28:41] Completed the database sanity checks
[UNEXPECTED] Apply the phase cannot be performed in a fixed cycle, i.e. after prepare phase.
Log file: /home/applcrp2/CRP2/fs_ne/EBSapps/log/adop/adop_20150525_152806.log
[STATEMENT] Run adopscanlog utility, by using the command
"adopscanlog-latest = yes".
for a list of the log files as well as the snippet corresponding to each log file error message.
adopted out with status = 2 (failure)
I tried to run adoption-status and I discovered that there was previous patch hanging series
How do I kill/clear/demolition and clean up the patch suspended?
$ adop-status
Enter the password for APPS:
Current patch ID of Session: 7
Name of node node Type Phase status started completed elapsed
--------------- --------------- --------------- --------------- ------------------------------ ------------------------------ ------------
Master CRP2 PREPARE NOT APPLICABLE
APPLY ASSETS 23 MARCH 15 13:15:35 + 08:00
FINALIZE NOT APPLICABLE
COMMISSIONING DON'T IS NOT APPLICABLE
CLEANING NOT STARTED
Folder synchronization system used in this Patching Cycle: None
For more information, run ADOPTION Status Report using - option detail
Generating the ADOPTION status report to the location: /home/applcrp2/CRP2/fs_ne/EBSapps/log/status_20150525_153549/adzdshowstatus.out
Please wait...
Done...!
Help, please...
Thank you very much
MK
Lol demolition Phase is not necessary.
Don't run cleaning or if you want to apply another /hotpatch so you can continue with the current adoption session.
-
Minimum CPU to EBS R12.2 socket
Hi all
EBS R12.2
RHEL 6.5
Closer or estimate only:
Can you tell me please what is the socket cpu/core / / minimum required to run the TEST instance or VISION EBS R12.2?
Thank you very much
MK
Hello
It could be applicable to a normal situation we have discussed before.
I don't think that the estimates may be doubled for every 100 users.
According to R12.2 installation guide, you need the following resources for 100-200 users:
OAF - tier approx.: 8 GB of RAM and 2 CPU (or carrots)
OAF - DB level: 8 GB of RAM and 2 CPU (or carrots)
Level of forms - App. : 4 GB RAM (for 100 users)
Level of forms - DB: 3 GB RAM (for 100 users)
Foregoing, you will need approximately 24 GB of RAM and probably 8 cores to serve 100 users (assuming that the shape layer needs 4 cores).
The general rule for sizing would be for RAM, multiply by 1.5 and double the power of the processor every time you double the number of users (worst case).
100 users: 8 cores and 24 GB
200 users: 36 GB and 16 cores
400 users: 52 GB and 24 cores
You need to add to the above another 2 for the database layer and 3 GB for the application by the installation guide layer.
Kind regards
Bashar
-
Auto layout power EBS R12.2 Instance
Hi all
EBS R12.2.4
RHEL 6.6
I want that our instance of EBS to be started automatically when the server is started, and stop when the server receives the stop.
Can you share me notes on how to configure these?
Thank you very much
MK
Hello
See the following link in which question already raised + links to other sources:
https://community.Oracle.com/thread/1130334
Kind regards
Rajen
-
Unable to set data EBS R12 loading mappings in FDMEE
Hello
I try to incorporate EBS R12 and HFM, using FDMEE 11.1.2.3.500. Here are the steps I followed:
a. set up the EBS_DATA_SERVERS and the PHYSICS of PATTERNS in ODI to point to the EBS Instance using user applications
b. set Source EBS R12 system and click INITIALIZE. (Validated that initialization is complete without errors)
c. selected the ENTITIES of ACCOUTING suitable SOURCE for Source R12 system
Now, when I define a new IMPORT LOCATION, I am unable to see that no matter what EBS the SEGMENTS of the SOURCE under the grid of DATA SUPPORT MAPPING format to import
Is there something hurts? Also strangely, I'm not even in the SOURCE ACCOUNTING ENTITIES RESPONSIBILITIES when I want to define the Drill Through function
Thank you
Mohit
One of the reasons that you might not see entries in the drop-down segments are filtered by the entries according to the language of the browser or the language settings of the user FDMEE for localization purposes. You might want to try adjust the configuration > user settings > language of the user FDMEE to see if that can do the segments appear.
We have a system of source English EBS 12 test with and if I change my installation > user settings > user language in FDMEE for something else that the English United States then save and return to the screen of import format, segment menu drop-down boxes are now completely empty. If I change to en - us while they are back once again. I believe that the language accepted by the browser or the user language setting in FDMEE must match the language of 'base' on the source system registration screen.
With a little luck it might be
-
Hello
I am upgrading R12.0.6 EBS EBS R12.1.1 and in the process after the 455492.1 document.
It is said in the document-
" ..
Step 3.3: Download the latest JDK 6.0 update
Click on the appropriate link below to download the JDK on the site that corresponds to the operating system used on the application tier node. Download the 32-bit JDK, not the Java (JRE) runtime environment. Due to the integration of Java and C++ code that is currently available on 32-bit do not choose the 64-bit version, which is not supported on the 10.1.2 House.
"
What it means? Under Linux, you just need 32-bit jdk installation?
After that, I followed the document 1439822.1 and downloaded the next jdk:
19138237 Oracle JDK 6 Update 85 OCTOBER 14, 2014
What is the correct jdk for my environment (Oracle AS 10.1.3 on Linux 64 bit)?
BR,
Anurag
What it means? Under Linux, you just need 32-bit jdk installation?
Yes.
After that, I followed the document 1439822.1 and downloaded the next jdk:
19138237 Oracle JDK 6 Update 85 OCTOBER 14, 2014
What is the correct jdk for my environment (Oracle AS 10.1.3 on Linux 64 bit)?
Fix.
Thank you
Hussein
-
girdles you installation control 12 c with EBS R12.1.1
Hi I can install grid control 12cr3 with EBS r12.1.1 (11.0.1.7 database). I tried several times but it fails at 36%. gives error OPatch file not available.
Please provide some doc id.
and suggest how I can install it successfully.
concerning
pritesh Rodriguez
Pritesh,
First of all, it is recommended to use a dedicated database to host a repository EM.
Make sure that you follow these instructions 8.2 "before you begin" section of the earlier mentioned Basic Installation Guide.
", You should not set the
ORACLE_HOME
andORACLE_SID
environment variables." "You must make sure that the Oracle directories do NOT appear in the path."Did you follow the steps listed in the section below? If so, at what stage you encountered the error?
Installation of a system of Enterprise Manager
Kind regards
-Loc
-
OBIEE + OLIVER + installation of end to end EBS R12
Hi gurus of the Oracle,.
I have installed the following applications. OLIVIER 7.9.6.3
1 OBIEE 11 g (11.1.1.6)
2 CAD 10.1.3.4.1 (imported repository)
3 Informatica 9.0.1 (imported repository)
4 EBS R12
Everything is setup and works very well. Now, I want to connect it.
EBS is up and running, OBIEE works, but where will find the diagram of DM for OBIEE and I arrived at the database of the EBS. But what else I need to run the initial race in CAD that extracts the Alpha of EBS R12 charge and generates data in OBIEE DM. I don't know if I already have these available in OLIVIER installation scripts. I am little stupid cant figure where they are.
Help, please.
Kind regards
Suresh
Published by: user10876301 on January 13, 2013 13:59Hi Suresh,
For the olive TREE to do a data load some things must be configured. You will find in the attached link to make configurations:
http://docs.Oracle.com/CD/E20490_01/BIA.7963/e19039/TOC.htm
And for the source database, I think that you have followed the installation chapter 4 doc will give you the DM schema and how they can be configured in Informatica and DAC.
http://docs.Oracle.com/CD/E20490_01/BIA.7963/e19038/TOC.htm
Let me know if this helped.
Kind regards
Jay
Maybe you are looking for
-
Cannot open tabs with a command of keyboard or successively on the + tab
Using Cmd + T click on the + tab in the tabs won't open a tab. I can open a tab by Cmd + clicking on a link on a Web page, but not independently.
-
No device supported in the DAQ assistant
Hi all I use the scanner high speed (NI 5922). I installed Labview 8.5.1, then the software scope OR the digitizer NI 5922 high of speed, then the hardware driver. I tested the DAQmx with the MAX and it passes the test. But when I started to use the
-
Is there a Board of PCI-e expansion for ASUS P5BW - THE Basswood2-UL8E on d4790y?
I want to improve my d4790ycto with usb 3.0, but I need another bus of pci - e. Video card must use a pci-e to the Board of Directors. The Extender I have: http://www.blujay.com/item/HP-5188-3753-HP-PCI-EXTENDER-BOARD-HP-5188-3753-5187-4931-Hp-Mother
-
Vista Service Pack 2 indicates properly installed, but updates important update for installation: Windows Vista Service Pack 2 (KB948465) Download size: 6.0 MB. How can I get rid of request to install? Service Pack 2 installation is performed again
-
You want to add appointments to the calendar. Get a message that nominations can be added to a calendar that is disabled. Check the details that say 'access denied '. What happened and how the calendar can be activated?