How copy sequences from another project and NOT end up with entries double for source clips?

If, like me, allowing you to work in Final Cut Pro, you know a major difference in first Pro workflow is that the two projects cannot be opened at the same time. Also, the referenced clips must be part of the project first. Firstly, it forces me to be more organized with projects/clips and avoids the situation of source clips "unregistered". On the other hand, I'm running in a challenge around copy/reuse of sequences from another project.

We have a large group of images that is used for two different purposes. In order to keep things clear, I created two project files that contain the same elements of sources and the different sequences. (I cloned the project after importing all the clips in the source and work then from there.) Now, I need to "copy" some footage from the project A to project B, so that I can reuse the edition work on these sequences without having to replicate them on the. In FCP, I would have just two projects open and copy - paste the sequences of project A to project B. In Premiere Pro, I was happy to see that copy - paste can work through projects - i.e., I can 'copy' in the project, close the project A open project B, then "Paste". HOWEVER, bringing to all of the source clips referenced by these sequences in the project has... Even if the source clips are already in project B.

OK, I understand why this happens, because Premiere Pro does not know (or check) the same clips already exist in project B. But I don't want to keep the two entries of the source clips in the project (in different bins too), because that becomes a source of confusion on the road. Is it possible for me to separate the news sequences of these 'new' entries in source clip and connect them with the existing entries? If I just go and delete the entries of 'new' source clip, references in these sequences don't simply go offline, they are deleted. If new sequences are empty.

I fight to see what is the best approach in this case. Any suggestions or tips?

I do this very similar workflow. I'll have the project 'A' where I change my sequences, etc., and then down the road, if I want to use some of these project grna 'A' in a new project 'B '.

PP can do what you are looking for and do not create the duplicate of source even footage items.

Do not copy and paste. Use rather import to import the discovery of the other project.

Open your project that you want to reuse sequences. Then go to file > import and place you on the project that you want to import sequences of. Click the project file, and PP will ask you which you want to import sequences. Select the sequences (or the entire project) and PP will import the footage for you.

Now... the media in double...

If you clip source "00001.MTS' for example, already in the project you have open and one of the sequences that you import reference also the clip of"00001.MTS"from source, PP will not import a duplicate because it will use the clip that you have already imported.

However, if PP is to import a copy it's probably because in each project, you have different I/O points set for the same element in source. If this is the case of the PP will import the copy of the clip so it retains every version of the video I/O points.

If you make a test import and make sure that there is no point of I/O, or they are the same I/O points, PP will import the clip of dup.

Tags: Premiere

Similar Questions

  • How can I copy bookmarks from another PC without using the restoration is not to lose the curtrent PC each

    I want to copy favorites from another PC, do not use the restore function inorder does not remove bookmarks on current PC

    Export to a HTML file, and then import the HTML file to the other computer, which will add bookmarks to existing ones.

  • Record of control of projects and costs are not visible when the project is created manually or copy model or another project


    Hi all

    If I create the project using business process 'Request for project' and when we opened the project, we can see "Project delivery" and "Cost control" mode records.

    But when I create project directly in the workspace of society (Admin mode) > company sponsored Shell > project, either by directly or copy model or another project.

    We are not able to see above two folders in user mode.

    I had checked to access control, there are access avalible for all project users to the two folder in user mode.

    Help, please.

    The project administrator mode.

    Implement > BPs

    Add in your Bps and enable and configure workflow settings.

    Glad that the other worked ok now.

    I hope this helps.

  • When you try to import the bookmarks, the ability to import data from another browser is not active in the import and backup from the tap in the history. So, how to import bookmarks on my file?

    I followed the instructions of Firefox to import bookmarks/favorites to Internet Explorer. It does not work because the import data from another browser is not active in the import tab and backup in the history. The instructions read to use this tab, but does not work because it cannot be selected.

    Make sure that you are not Firefox running in permanent private browsing mode.

    To view the history settings and cookies, choose: Tools > Options > privacy, choose the setting Firefox will: use the custom settings for the story of

    • Uncheck the box: [] "always use the navigation mode private.
  • How to copy contact from another list? No traveling.

    How to copy contact from another list? No traveling.

    Same way you do in most of the applications when you use slide it / move. You hold down the CTRL key while dragging the file or contact. You will see a sign more seem to indicate a copy and not move. Hold the control key until releasing the contact in the new location.

  • Drag the sequence from the project Panel to other sequences DO NOT insert all clips containing

    Hi all

    I have no ' t know when this behavior changed, but when I dragg one sequence from the project Panel to another sequence, it will not place this sequence as a whole (as it used to be), but as you have selected all the clips containing. Its a good thing, but can someone tell me how to do the old way? I tried to keep alt-shift-etc... Did not work.

    Try the left button from the top on the table of the sequence. He alternates between the entire sequence in medallion, as before, or as individual items.

  • How to import the class from another project in Jdeveloper 11.1.1.7

    I have an application with many projects. I create new project with the application and I want to import a class from another project with demand.

    But I am getting error ( found import.somePackge.someClass). I have red that I need to add it to the path of bulid project but no idea how.

    I use Jdeveloper 11.1.1.7

    Click the project--> project properties, dependencies, click here to change the Righ pencil icon and check the build output

  • Copy slides from one project to another (2 different resolutions)

    Hello

    I have 2 projects of different resolutions (long story) and I want to copy the slides in the smaller project in the cotyledon. But keep the same resolution. (I want to create the Visual of a computer monitor showing the demonstration, as that is the lower resolution to I can have PC monitor as a backdrop)

    When I copy the slides, they are by default resize themselves for the biggest project and I can't change them.

    is there advice?

    is there a 'special' block when it comes to slides?

    Small projects are demonstrations having someone else did for me (so I can't really re - record)

    I want to just try to make them look a little more visually pleasing

    Thank you kindly for your time

    The solution is to:

    • Take a copy of your smaller project and work on that, not the original (in case of screwups).
    • Resize the smallest project using modify > resize the project options.
    • Be sure to work carefully how to increase the size of the stage WITHOUT changing the size of the existing content.  Basically, you want to add an extra space around your current content so that it is now sitting in the middle of the scene.
    • Once you have managed to get your content to the same size as the largest project, copy and paste slides on.
    • You may be able to develop a nice graph of a monitor with a hole in it.  Place it on the slide (or slides model) so that it lies on top of your smaller other screenshots to give effect to look at the screen.

    Is that what you're looking for?

  • missing file rundll32.ex how to replace failed disk. can I download it from another computer and put it in mine

    Miss me my rundll32.exe file, have no disk, can I download it from another computer and put it on my own or get it online somewhere?

    Hello

    · You receive error message associated with rundll32.exe error code?

    · Were there any changes made on the computer before the show?

    I suggest you to perform the auditor of system files on the computer. You can check the link: how to use the System File Checker tool to fix the system files missing or corrupted on Windows Vista or Windows 7: http://support.microsoft.com/kb/929833

  • I move to another company and I end my adobe membership. I could move my account and someone else joining in this company? I mean if they could take over from my account and how?

    I move to another company and I end my adobe membership. I could move my account and someone else joining in this company? I mean if they could take over from my account and how?

    Hello

    I see that you have a subscription individual creative under the enamel even cloud as with forums.

    Unfortunately there is no way to transfer your account / membership to another person, you will need to get cancelled.

    Please contact support by calling/chat for cancellation requests and billing queries:

    Contact the customer service

    * Be sure to stay connected with your Adobe ID before accessing the link above *.

    You can also check the help below document:

    https://helpx.Adobe.com/x-productkb/policy-pricing/cancel-membership-subscription.html

    Please go through the Adobe - General conditions of subscription as well.

  • I have 2 databases I use Lightroom how to identify objects in one and not the other, I changed

    I use my cell phone as my computer on travel. When I come home, I transfer my data to my main catalog on my desktop. Sometimes, the files remain on my laptop and I made changes to some of my files.

    I was trying to identify objects through finder that I've changed since I added changed files from my laptop to my desktop. My intention was to identify the XMP files that have changed since I added the files from my laptop to my desktop.

    By analyzing what I see in the finder, I find that Lightroom data seem unwise. For example, is as follows the first line in the finder

    File: _MG_1180.xmp

    Date added: 05/05/16

    Creation date: 16/04/16

    Update: 16/04/16

    1. I've been constantly adding to my catalog when I import my SD card in my laptop. I'm waiting for my date added date should be the same as the date of the creation Date. Why date is later than the date of creation?

    2. to play back my 2 libraries, can I just move my files from one to the other xmp?

    Do not do this through xmp. Some elements are never written to .xmp.

    To do this through the sequence of command as follows:

    • On the laptop, in Lightroom, select the photos you want, then use the menu file-> export as catalog command. If the pictures are not on the desktop, check the box that says "negative."
    • Copy all the files created on the desktop
    • On the desktop, use the command file-> import from another catalog and point Lightroom in the laptop just transferred catalog file.

    Which leaves the question of how to identify the photos changed recently. Create a collection of smart with the criterion that the modification Date is greater than YYYY-MM-DD, where of course which is the date of interest.

  • Sequence increment by 2 and not 1.

    Sequence increment by 2 and not 1.

    Database 10g

    I have the block of code to insert data from a flat file in multiple tables in a relational database anonymous following. The problem I'm having is that when I run it as shown below (example 1) it creates primary key values in the psp_trees table that increment by 2 and not 1.


    Example 1
    DECLARE get_plot_measurement_id NUMBER;
    update_plot_measurements VARCHAR2(4000);
    get_tree_id NUMBER;
    get_plot_id NUMBER;
    
    BEGIN
    
        EXECUTE IMMEDIATE 'SELECT (plot_id) FROM psp_plots WHERE plot_name = 84' INTO get_plot_id;
        
        INSERT INTO psp_plot_measurements (plot_id) VALUES (get_plot_id);  
        
        EXECUTE IMMEDIATE 'SELECT MAX (plot_measurement_id) FROM psp_plot_measurements' INTO get_plot_measurement_id;    
        
        UPDATE psp_plot_measurements
           SET column_1 = (SELECT DISTINCT column_1 FROM plot_84)
             , column_2 = (SELECT DISTINCT column_2 FROM plot_84)
             , column_3 = (SELECT DISTINCT column_3 FROM plot_84)
         WHERE plot_measurement_id = get_plot_measurement_id
         ;    
       
      FOR c1 IN
        (SELECT tree_number 
           FROM plot_84)
          
      LOOP
        
        INSERT INTO psp_trees (plot_id, tree_name) VALUES (get_plot_id, c1.tree_number);  
        
        EXECUTE IMMEDIATE 'SELECT MAX (tree_id) FROM psp_trees' INTO get_tree_id; 
        
        INSERT INTO psp_tree_measurements (plot_measurement_id, tree_id) VALUES (get_plot_measurement_id, get_tree_id);
        
      END LOOP;
    
    END;
    /
    The results of the code above show that the sequence incremented by 2.

    SQL> SELECT tree_id FROM psp_trees ORDER BY tree_id ASC;
    
       TREE_ID
    ----------
             1
             3
             5
             7
             9
            11
            13
            15
            17
            19
            21
    Example 2
    DECLARE get_plot_measurement_id NUMBER;
    update_plot_measurements VARCHAR2(4000);
    get_tree_id NUMBER;
    get_plot_id NUMBER;
    
    BEGIN
    
        EXECUTE IMMEDIATE 'SELECT (plot_id) FROM psp_plots WHERE plot_name = 84' INTO get_plot_id;
        
        INSERT INTO psp_plot_measurements (plot_id) VALUES (get_plot_id);  
        
        EXECUTE IMMEDIATE 'SELECT MAX (plot_measurement_id) FROM psp_plot_measurements' INTO get_plot_measurement_id;    
        
        UPDATE psp_plot_measurements
           SET column_1 = (SELECT DISTINCT column_1 FROM plot_84)
             , column_2 = (SELECT DISTINCT column_2 FROM plot_84)
             , column_3 = (SELECT DISTINCT column_3 FROM plot_84)
         WHERE plot_measurement_id = get_plot_measurement_id
         ;    
       
      FOR c1 IN
        (SELECT tree_number 
           FROM plot_84)
          
      LOOP
        
        INSERT INTO psp_trees (plot_id, tree_name) VALUES (get_plot_id, c1.tree_number); 
        
    --    EXECUTE IMMEDIATE 'SELECT MAX (tree_id) FROM psp_trees' INTO get_tree_id; 
        
    --    INSERT INTO psp_tree_measurements (plot_measurement_id, tree_id) VALUES (get_plot_measurement_id, get_tree_id);
        
      END LOOP;
    
    END;
    /
    The code above results show that the sequence incremented from 1.
    SQL> SELECT tree_id FROM psp_trees ORDER BY tree_id ASC;
    
       TREE_ID
    ----------
             1
             2
             3
             4
             5
             6
             7
             8
             9
            10
            11
    If anyone knows why this would increment by 2 in the first case and 1 in the second case?

    Published by: benton on August 31, 2011 15:00

    Benton says:
    Sounds good?

    OWNER                          NAME                           TYPE              REFERENCED_OWNER               REFERENCED_NAME                                                  REFERENCED_TYPE   REFERENCED_LINK_NAME                                                                                                             DEPENDENCY_TYPE
    ------------------------------ ------------------------------ ----------------- ------------------------------ ---------------------------------------------------------------- ----------------- -------------------------------------------------------------------------------------------------------------------------------- ---------------
    DRYAD                          PSP_TREE_MEASUREMENTS_BI       TRIGGER           DRYAD                          PSP_TREES_SEQ                                                    SEQUENCE                                                                                                                                           HARD
    DRYAD                          PSP_TREE_BI                    TRIGGER           DRYAD                          PSP_TREES_SEQ                                                    SEQUENCE                                                                                                                                           HARD            
    

    I want a CUP.

    There is your problem - you are incrementing the sequence in the two triggers - your code here:

         --5. Insert record into psp_trees
            --   and get primary key value of psp_trees to insert into psp_tree_measurements
            INSERT INTO psp_trees (plot_id, tree_name) VALUES (get_plot_id, c1.tree_number) RETURNING tree_id INTO get_tree_id;
    
            --6. Insert records into psp_tree_measurements and keep relationship with psp_trees with variable get_tree_id.
            INSERT INTO psp_tree_measurements (plot_measurement_id, tree_id) VALUES (get_plot_measurement_id, get_tree_id);
    

    must have both triggers - this will result in only every second value being inserted into each.

  • Well, after spending several hours of research and not coming up with solutions, I'm finally back to get "out there". My problems with iMovie 09-1 - import a picture in iPhoto 9.6.1 in an existing project in very small. All the appe

    Well, after spending several hours of research and not coming up with solutions, I'm finally back to get "out there". My problems with iMovie 09-

    1. import a picture in iPhoto 9.6.1 in an existing project in very small. Everything seems OK, picture looks that it imported, 4S etc but in fact there nothing there except a black screen, long 4 seconds. I tried all the suggestions in a dozen of discussions but nothing works.

    2 - by sliding the cursor (pointer) on clips in the project or the event of the flip backwards and return to normal once the cursor is removed. Clips of transfer of events to the project smoothly and are right side up.

    What can be done on the transfer of photos and clips reversal?

    Are you running at El Capitan?   He does not play well with versions of iMovie earlier than version 10.

    (Even in 10.1 some pictures with some computers may show a black in the viewer screen, although in this case there are solutions.)

    Geoff.

  • I recently created a form to complete for the app e-business of the company. When you press the button submit, he only sent to our Inbox to project and not sent to the e-mail provided in the URL. Can someone help us to program the key to help explain why.

    I recently created a form to complete for the app e-business of the company. When you press the button submit, he only sent to our Inbox to project and not sent to the e-mail provided in the URL. Can someone help us to program the key to help explain why / tell us step by step what we should do?

    OK, I re-read your question. It's actually expected behavior. The user must manually send the email.

    If you want it to be a silent process, then you must either install a script on the local computer of the user who will do this, or use any email but something as a service web to which you directly submit the form data.

  • Is it possible to group objects, which are placed in the project and then hide them with line a single action-script? THX in advance, Philip

    I work in CP 9 and I'm going to try the following: the user must be able to make ALL invisible or visible to highlight boxes by clicking on the corresponding button on the first page layout. Thus, for example, if the user does not want the highlight boxes appear, click on "Hide the boxes" and boxes are hidden for the rest of the project. I managed to get to this point for help... but it is still a lot of work for me to manually enter all the different names of these boxes in the action-script. So my question is: is it possible to group objects, which are placed in the project and then hide them with line a single action-script? THX in advance, Philip

    Actually... releasing the CpExtra HTML5 widget, it will be possible.

    It has a function called @syntax that allows you to perform an action (for example HIDE) automatically on any object throughout a project of Cp9 simply based on the name of the object.

    So for example, if you named all the boxes to highlight you want hidden this way to have the suffix _HideMe and you say CpExtra you want all of them hidden if a user variable is assigned to a certain value, then that is what will happen.

    That's the good news.  The bad news is that the widget is still in BETA final tests at the moment, so you may need to wait a bit before you can realize your idea.

Maybe you are looking for

  • Question about CD recovery for Tecra M2

    Maybe it's a stupid to ask question, but the recovery for Tecra M2 CD comes with windows XP? I need to reformat my laptop, as it is infected by spyware unerasable. When I bought the laptop it only comes with the recovery CD.

  • Can I install Windows 7 on Satellite M70-129?

    Hello guys I wonder if the M70 satellite would be able to run windows 7Is there a driver will be published by Toshiba for this, or what is historyThanks in advance P.S. I am trying windows 7, it's so soft on my machine Thanks in advance

  • Array with the element in Type String

    Hi all It seems that I couldn't create an array with the element in the string Type, all that available to choose is double or decimial. I'm sure it's my fault because I'm fresh for her. Any idea is appreciated, + Kunsheng

  • Avast deleted TrustedInstaller.exe, 80070002 error and can not get updates

    Original title: deleted Avast TrustedInstaller.exe I need to fix it I can not get the updates. Remember - this is a public forum so never post private information such as numbers of mail or telephone! Ideas: Is there a way to do this?  I don't have a

  • PC audio problem laptop 15-g012dx

    My audio does not work so I tried to troubleshoot it. The convenience store said that it "might be a problem with my audio device" and that "material changes may not have been detected. I have not tried fix stakeholders or download new drivers. I've