How to hack oracle not checking stored data while running change order pk
Hi allDue to I change pk at table, but this table contains many rows (10 billion).
If I use normal change control, Oracle must to check every row to make sure it is uniuqe.
This method must use many times (at least 60 days) up to doing just that.
How can I pass this method of verification? and I'm sure that the data of all lines (colume be pk) are uniuqe.
Are there any ideas on this?
Very thanks.
My Oracle is Oracle Database 11 g Enterprise Edition Release 11.2.0.3.0 - 64 bit Production.
Hi and welcome to the forum,
How can I pass this method of verification? and I'm sure that the data of all lines (colume be pk) are uniuqe.
By the way these controls probably don't not sovle your problem - it depends on...
How things look like now? That it supports the current as PK, what is the index?
How do you change?
Please post more details, than in real States, not only words.
Concerning
Peter
Tags: Database
Similar Questions
-
How to move Oracle APPS 12 configuration data to the new environment of production of 12 APPS
Dear all
I need to know, how we can move from Oracle APPS 12 configuration data to the new environment of production of 12 APPS? What is the safe and easy way, we do not want to make the new facility of 12 APPS and reinstalling things...
see you soonHello
The scenario above is correct and should work fine. Make sure that the central source and instances of the target are the same patch upgraded.
Kind regards
Hussein -
VISA do not read serial data in the right order
Hi all
I'm working on a project, when I need sample data at point A, it passes these (zigbee) wireless data to point B and here rs232 connection to the laptop.
I'm using labview 2011 to view sampled data, but I have a little problem, data are not entered into labview in the right order and this is quite crucial in my application. I have attached some photos and my vi to describe the problem in detail.
Data are packaged in the following form: AS:number1:number2:...:number49:\r - where is the beginning, followed by the values of the sample character separated by: and the last is followed by a return at the end of the cart package.
When I view the data in different terminals (PuTTY, tera term ect.) then the data is in the correct order.
To make the most obvious problem, I place the sampling to count an integer of 16-bit instead of the real samling
The png sample of teraterm is how it is supposed to look like. The vi_sample.png is the string of labview, which is false, I've highlighted a few errors in the visample. When using the VI, I noticed that all the data is collected, but not in the right order.
The missing Subvi is a few small VI that reads the input rs232 string and control the various indicators of this.
I hope that you are able to help me with my problem.
Concerning
Tommy
In the structure of case where read you the serial port you are adding at the beginning of the string rather than allow the addition. In other words, you build the answer backwards.
Your method of reading is contradictory. You have configured the VISA session to stop playing when he sees a carriage return, but you do not actually. You have configured it so tell some bytes are on the serial port. Maybe it's not the set of bytes, since you have no delay between writing and reading, so you can be is only half of the message. If you use the method of termination, then reading VISA should have great value wired to the bytes to be read. Then, when VISA Read see the stop character, it will stop automatically. If you use the bytes available, then you need a mini loop to keep reading until you see the end of the response. Choose one or the other - don't try to play both ways.
-
Original title: I can't access my user account
I went to to connect my user on my laptop and a message popped up saying the service user account Service failed to connect.
Windows could not load user data.
Someone please help!
Hi tozza92,
1. you remember to make changes to the computer before this problem?
2. are you able to connect by using a different account?
You can consult the following Microsoft KB article and check if it helps to solve the problem:
Error message when you log a computer Windows Vista-based or Windows 7 by using a temporary profile: "the user profile Service has no logon. Unable to load the user profile.
http://support.Microsoft.com/kb/947215
Hope this information is useful.
Jeremy K
Microsoft Answers Support Engineer
Visit our Microsoft answers feedback Forum and let us know what you think.If this post can help solve your problem, please click the 'Mark as answer' or 'Useful' at the top of this message. Marking a post as answer, or relatively useful, you help others find the answer more quickly.
-
How to query Oracle, MySQL and MSSQL data?
For an environment with Oracle 11 g/12 c Enterprise edition, MySQL community edition and MSSQL 2008/2012 5.7 stanard/enterprise edition, is there any problem using DG4ODBC to query the data for all 3 platforms?
There are other free alternatives?
If the queried data are mainly contained in MySQL or MSSQL, it will be more efficient to query MySQL or MSSQL?
If so, any suggestion of how to do it in these platforms? I know that MSSQL can use linked server, but it is quite slow.
Hi Ed,
Ok! I still think a bridge 'instance' as a partner to a
init .ora file but still useful to be aware how others see these things. Your installation is that we have our test systems - multiple gateways - dg4odbc, the dg4msql, the dg4drda etc. - in an ORACLE_HOME.
Kind regards
Mike
-
ORA: 01843 is not a valid month while running SDE_ORA_GLBalanceFact_Full
While informatica run the select sql for this task, there is an exception, said the month is valid, the where condition them the sql is:
PROM. LAST_UPDATE_DATE > =.
TO_DATE ('2013-04-11 20:45:33 ',' ' HH24:MI:SS JJ/MM/AAAA)
OR BY. LAST_UPDATE_DATE > =.
TO_DATE ('2013-04-11 20:45:33 ',' ' HH24:MI:SS JJ/MM/AAAA)
If I change the date for the format, then it will be ok
PROM. LAST_UPDATE_DATE > =.
TO_DATE ('2013-04-11 20:45:33 ',' ' YYYY/MM/DD HH24:MI:SS)
OR BY. LAST_UPDATE_DATE > =.
TO_DATE ('2013-04-11 20:45:33 ',' ' YYYY/MM/DD HH24:MI:SS)
I'm confused, if the date wrong here or the date format is incorrect, how should I fix this problem?
the entire sql is:
SELECT
PROM. LEDGER_ID,
PROM. CODE_COMBINATION_ID,
PROM. CURRENCY_CODE,
LED. CURRENCY_CODE,
BY. PERIOD_NAME,
PROM. ACTUAL_FLAG,
PROM. TRANSLATED_FLAG,
PROM. CATEGORY,
PROM. PERIOD_NET_DR,
PROM. PERIOD_NET_CR,
(BALL. BEGIN_BALANCE_DR + BALL. PERIOD_NET_DR),
(BALL. BEGIN_BALANCE_CR + BALL. PERIOD_NET_CR),
PROM. PERIOD_NET_DR_BEQ,
PROM. PERIOD_NET_CR_BEQ,
(BALL. BEGIN_BALANCE_DR_BEQ + BALL. PERIOD_END_BALANCE_DR_BEQ PERIOD_NET_DR_BEQ),
(BALL. BEGIN_BALANCE_CR_BEQ + BALL. PERIOD_END_BALANCE_CR_BEQ PERIOD_NET_CR_BEQ),
BY. START_DATE,
BY. END_DATE,
PROM. LAST_UPDATE_DATE AS LAST_UPDATE_DATE_BAL,
PROM. LAST_UPDATED_BY AS LAST_UPDATED_BY_BAL,
BY. LAST_UPDATE_DATE AS LAST_UPDATE_DATE_PERIODS,
BY. LAST_UPDATED_BY AS LAST_UPDATED_BY_PERIODS,
LED. LAST_UPDATE_DATE AS LAST_UPDATE_DATE_SOB,
LED. LAST_UPDATED_BY AS LAST_UPDATED_BY_SOB,
PROM. BUDGET_VERSION_ID AS BUDGET_VERSION_ID,
BY. ADJUSTMENT_PERIOD_FLAG AS ADJUSTMENT_PERIOD_FLAG,
BOX WHEN
PROM. TRANSLATED_FLAG = 'Y', THEN 'TRANSLATED '.
WHEN
PROM. TRANSLATED_FLAG = 'R' THEN 'ENTERED_FOREIGN '.
WHEN
PROM. CURRENCY_CODE = 'STAT' THEN 'STAT '.
WHEN
(BALL. PERIOD_NET_DR_BEQ IS NULL) AND
(BALL. PERIOD_NET_CR_BEQ IS NULL) AND
(BALL. BEGIN_BALANCE_DR_BEQ IS NULL) AND
(BALL. BEGIN_BALANCE_CR_BEQ IS NULL)
THEN "BASE".
'ENTERED_LEDGER' OTHER
END CURRENCY_BALANCE_TYPE
Of
GL_BALANCES BALL
GL_LEDGERS DEL
, GL_PERIODS BY
WHEN THE CONDUIT. LEDGER_ID = PROM. LEDGER_ID
AND BY. PERIOD_SET_NAME = LED. PERIOD_SET_NAME
AND PROM. PERIOD_NAME = PER. PERIOD_NAME
AND PROM. PERIOD_TYPE = PER. PERIOD_TYPE
AND NVL (BAL. TRANSLATED_FLAG, 'X') ('Y', 'X', 'R')
AND PROM. ACTUAL_FLAG 'A ', ' B '.
AND PROM. CATEGORY A NULL VALUE
AND
(
PROM. LAST_UPDATE_DATE > =.
TO_DATE ('2013-04-11 20:45:33 ',' ' YYYY/MM/DD HH24:MI:SS)
OR BY. LAST_UPDATE_DATE > =.
TO_DATE ('2013-04-11 20:45:33 ',' ' YYYY/MM/DD HH24:MI:SS)
)
AND DECODE ('Y', 'Y', LED. LEDGER_ID, 1) TO (2021,2123)
AND DECODE ('Y', 'Y', LED. LEDGER_CATEGORY_CODE, 'NONE') ('PRIMARY', 'NONE')Can you please let me know if you did like it when implemented initial extract date.
Would the DAC--> Design connection--> Source parameters system--> click on query and type EXTRACT
Highlight on the $$ Initial_Extract_DATE and see if the format is like this
Static
Function is custom Format ' MM/DD/YYYY ". If this does not work for you then change the format of your required format.
Do the same for $$ LAST_EXTRACT_DATE and change the format to the format you want.
Then try to run EP mode full load.
Let me know if it helps.
Kind regards
Rayan Vieira -
Access error of data while running the script in the script fdm workbench Editor
Hello Experts,
I get the error when I run the script in the script of fdqm established client.this editor is the error
-2147467259 data access error and he navigates the error on line 30 on this script «Set rsAppend = DW.» DataAccess.farsTable (strWorkTableName).
Please return me asap where I should charge peoplesoft data to one of my database of planning through fdm.
Thanks in advance...
You will need to build a script for integration that is an import Script that allows you to import data from SQL in FDM.
When you create your import format, you will need to configure it with the file Type = Script and then assign the script of integration as an Expression. Assign your import format to the location that you use to import data.
Then you can test it by going to the import stage and clicking the import button. FDM will run the integration script and data import by running the SQL query that you have defined.
To the contrary, "Data Pump" import Scripts are used as import expressions in the import formats
You can run a script to integrate the customer that this script requires input parameters that are passed only when then FDM import step is executed. If you want to see the raised error open the errorlog FDM. You will only be able to run this Workbench script when you want to debug data is being extracted, but in this case, you will need to comment code that inserts the data in the table. Don't forget that the work table is a temporary table that is created when you click on the import button and if you run Workbench this table does not exist
-
How Director planning check MRP/MPS CAWC running or not
Hi team,
How the planning Director to check MRP/MPS CAWC running or not.
Could you please for the same navigation.
Concerning
Chantal
Hi Laurent,.
You can check if planning Manager is running or not the following navigation:
Material Planner (R)-> Setup-> Planning Manager
You can get more information about the Manager of planning the following note:
11.5 - Planning Manager issues - a complete Troubleshooting Guide (Doc ID 131051.1)
Hope that helps!
Kind regards
Mohan Balaji
NOTE: Please indicate the post as helpful or answered if the update has really helped you. This would also bring the wire to the logical conclusion and will be useful for viewers.
-
How to check the date valid?
Hello
I have a stored procedure that has a parameter of type varchar data entry. This parameter is actually a date, now I want to check whether this parameter is a valid date. My version of oracle's 10g. I tried ISDATE() built-in but my version of oracle does not support.
Can ppl help please how?
Concerning
FrébaultHello Marie Lise.
Here is the code example that you can do to check the Date. Create a function for this, hope this helpsCREATE OR REPLACE FUNCTION F_DATE(v_date IN VARCHAR2) RETURN NUMBER IS v_date1 DATE; BEGIN select to_date(v_date) into v_date1 from dual; RETURN 1; Exception WHEN Others THEN RETURN 0; END; ---------------------------------------------- SELECT F_DATE('01-JAN-09') FROM DUAL; -- Returns 1 SELECT F_DATE('111111') FROM DUAL; -- Returns 0
Please indicate if it helps you or correct
Kind regards
Danish -
restore points d ' training showing same date as c drive D drive is not checked
I'm getting "low disk space" for drive recovery or D, HP Media center with Vista Home Premium32 computer bit. Recovery drive is red and date watch for drive C as of date, restoring shows the same date for D drive even if it is not checked. He has been checked before. I unchecked and it was going well until I did a manual restore point for a C drive. After that, I got a message of not enough space for the recovery disk and it shows that the same date and time the drive C. as far as I know that I am not store anything on the recovery disk, no backups are listed when I check hidden folders. There seems to be some cross linking going on. Is there something to dissociate. I have tried several things but nothing I've tried does not work. Hope someone knows the problem and has a solution. Thank you.
Hello
Your recovery Partition was photographed on your hard drive during the production of your computer by the manufacturer for all of these reasons.
1. to reinstall Vista from in the case of a failure of the system, based on individuals or the keys at startup.
F10 or Alt + F10 or F11 are a couple of different manufacturers use sequences.
You will need to ask your manufacturer for proper sequence.
HP is F11.
2. to make the recovery disks on if your drive hard breaks down, so that you can then reinstall the operating system on a new hard drive.
Also ask them how to make records.
Here's how HP it:
Your D: Recovery Drive is should not be used for backups, defragmented, System Restore etc.
There are backups on an external hard drive.
To resolve the problems that have arisen with the recovery D: Partition, you will need to contact the manufacturer of your computer to remove all that has been added to it.
@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
And read this information from HP about your problem and how to fix it:
«Error: low disk space.» You run lack of disk space on recovery (d :))"
http://h10025.www1.HP.com/ewfrf/wc/document?DocName=c01508532&LC=en&cc=us&DLC=en
See you soon.
-
I wonder a situation like this: a table contains a few million records (lines) that add up to 100 GB of data, while the RAM is 4 GB. When I run a SQL statement such as select * from mytable where certain conditions. How Oracle process the request? Clearly Oracle cannot load all data in RAM at a time.
ScottA process in an operating system can use the RAM and disk storage. Just in case the RAM is not enough, the data are SWAPPED IN the disk and RAM disk will be EXCHANGED when necessary. And using the disk is a bottleneck (as it's IO and also mechanically, run instead of the RAM that is run electronically) so it slows down the process.
-
How to check the data file is set to unlimilted autoextend
S/N,
Oracle version: 10.2.0.4
OS: linux
could someone tell me how can I check the data file are set to unlimited autoextend?
Thank you
Bahadur.Salvation;
Pelase see:
How to check the CanGrow data files the value of Maxsize unlimited [ID 468096.1]Respect of
HELIOS -
Basic stored procedure helps - not the return data
Hi all:
To be fair, I come from a SQL Server environment and have never written anything for PL/SQL / Oracle before, this is my first attempt, so if nothing is better or more effective, please let me know. The immediate problem I'm having is, I have the following stored procedure, and all I want to do is return the data in the table, so that I can fill my DataSet in code. But when I run the code against this stored procedure, it still don't bring back any data (if I just do a standard "SELECT * FROM lkAllocation", I get the results, so I know data are there and the connection is good). If execution of the procedure in my window in Oracle SQL Developer (call PAYSOL.spallocationselectall ();), my results displays no data as well. What is the problem with this stored procedure?
create or replace
PROCEDURE spAllocationSelectAll IS
Whole AllocationID;
AllocationName Varchar2 (50);
BEGIN
AllocationID: = 0;
AllocationName: = ";
SELECT
AllocationID,
AllocationName
IN
AllocationID,
AllocationName
Of
lkAllocation
ORDER BY
AllocationName;
EXCEPTION
WHEN NO_DATA_FOUND THEN
NULL;
WHILE OTHERS THEN
-Consider recording the error and then re-raise
LIFT;
END spAllocationSelectAll;Well, I'm not really in .net (I would participate in another forum so ;)), but this might be useful?
Value (Oracle.DataAccess.Types) System.Data.DbType OracleDbType OracleRefCursor Object RefCursor
http://download.Oracle.com/docs/CD/B19306_01/win.102/b14307/featOraCommand.htm#g1025379
http://download.Oracle.com/docs/CD/B19306_01/win.102/b14307/featOraCommand.htm#g1025072Perhaps the [forum Windows and .net | http://forums.oracle.com/forums/category.jspa?categoryID=44] is worth a try as well.
-
It happened all of a sudden during a browsing session. Also, I do not see the albums "open windows" list unless I have point to him. "Auto-hide taskbar" is not checked. I tried to stop and do a restart, but nothing has changed. The two bars are always top in IE but not in Firefox more. It is very annoying. I would like to know how to solve this problem, and also how it could have happened, so I don't do it again! Thanks in advance.
Firefox is stuck in mode full screen? The F11 function key switches between regular views and full screen modes.
Firefox window is an irrational dimension in normal mode, it can indicate a corruption of the file that stores the information of location/size of window. The usual medicine is to rename this file and let Firefox restart by using the default dimensions. Here's how:
Open the settings folder (AKA Firefox profile) current Firefox help
- button "3-bar" menu > "?" button > troubleshooting information
- (menu bar) Help > troubleshooting information
- type or paste everything: in the address bar and press Enter
In the first table of the page, click on the view file"" button. This should launch a new window that lists the various files and folders in Windows Explorer.
Leave this window open, switch back to Firefox and output, either:
- "3-bar" menu button > button "power".
- (menu bar) File > Exit
Pause while Firefox finishing its cleanup, then rename xulstore.json to something like xulstore.old. If you see a file named localstore.rdf, rename this to localstore.old.
Launch Firefox back up again. Windows normally appear again?
As this process goes probably most toolbars, you can use one of the following methods to display the toolbar list and activate the desired bars it:
- Right click on a place empty on the tab bar (or the button '+')
- Press the Alt key to activate the classic menu bar > view > toolbars
- in customize mode > show/hide toolbars (see: Customize Firefox commands, buttons, and toolbars)
To activate the menu bar, toolbar bookmarks or other bars, click it in the list.
-
Anyone know how to check the date of warranty until when?
Anyone know how to check the date of warranty until when?
Maybe you are looking for
-
Is there a virus in Thunderbird called YoutubieAdBloCaKe?
Recently, I became aware of the file above that there are attached to hundreds of files in my Thunderbird account. First of all, I have seen them when I defrag my computer. There are 100s of files with the same name on them, and they were almost all
-
Cannot start windows after resizing partitions
I tried to resize the partitions of my bootcamp and mac recently I can't start windows now Get an error on the lack of MBR Do you think you could help me out here? I read on another thread using GPT fdisk These are the results I got her Wanted to che
-
Jealousy 5540: Printer HP Envy 5540.
Display shows 12345 REFLASH and does not
-
Acer Iconia tab upgrade 10 (A3 - A20)
I received a notification to upgrade my tablet, after the upgrade, it is still on KitKat, thought that it would be upgraded to lollipop as mentioned on: http://www.pcadvisor.co.uk/reviews/tablets/3601426/acer-iconia-tab-10-review/
-
How to remove programs in the control panel?
Original title: Control Panel How to remove programs in Control Panel, flash is stored in security and fast is to other Options. How to remove them or move them to the storage of program?