How to synchronize the chronology of reading preview with the project timeline?

Hi, I have used a number of video editors in the past and now trying on Adobe Premiere to see if it is any good. It looks very good so far, very professional and get rarely crashes. Currently there are about the thing that bothers me in it and I hope you could help me how to sort. It is not really easy to explain what I mean in words, but I'll post a screenshot at the end of this post that should help you to get the idea of what I want.

Most video editors have their timeline to preview (Adobe calls tab "program") to automatically update when you have added several images in the project. Then if you add a video file only 5 minutes in the project, then preview will end in 5 minutes. But Adobe has a certain value of preterment, so preview will continue to play beyond 5 minutes mark and just show a black screen, as if you had something at the end of the project. I ask how to get rid or adjust this value, so preview would synchronize with the chronology in the length. The reason why it annoys me is because I want to fast-forward to about 80% of the current project, just to note that I sped up 5 minutes after the last video of the project. I know that I can simply fast-forward using the timeline, but it is not very comfortable for me.

I made this screenshot, which should help you understand what I mean.

http://i.imgur.com/VHcaXa8.jpg

The time will appear in the lower right corner angle of the program monitor reports that the sequence is 10:01:19 - located 10 minutes, not 5.

You seem to use CS6 (or earlier), in which the program monitor doesn't automatically adjust the zoom to the length of the sequence. This was changed in CC (7.x). So you can basically ignore the fact that the playhead is only at half way through the visible prescription. If it really bothers you, then you can manually zoom in to only show that the actual duration of the sequence.

As for playing beyond the end and showing black images, play you literally the sequence? If so, then it should stop at the end of the sequence. If, however, you are actually rub (by clicking and dragging the read head), then you can rub as much as you like beyond the end of the effective content.

Tags: Premiere

Similar Questions

  • How to synchronize the start of IT and relaxation the Scan list (DAQmx Switch)

    Hello

    I want to measure samples of N to the AI0 of Council NI PXI 4461. The measurement starts on a rising edge of a digital triggering provided to the PFI0 of the same Board. The measure is configured with samples of N/2 pretrigged. So far, everything is under control...

    Using an NI PXI 2567 Board, the signal applied at the entrance the 4461 (AI0) switches between a V2 and V1 signal. I would like to synchronize the switch between the two signals with the trigger signal applied to the input of the PFI0 Governing Council 4461. In order to obtain samples of N/2 of V1 and V2 samples N/2. Synchronization of 1 to 5 ms would suffice!

    My question is how to synchronize the start of acquisition of AI pretrigged of 4461 with the switch control given by the Council of 2567?

    Thank you in advance for your help...

    PS: the configuration of the system is:

    -LabView 8.5

    -Chassis PXI-1044

    PXI-4461 on slot 2

    Module 4-slot PXI-2567

    Hi Frederic,.

    I came back to this recently and used the following examples to run the desired synchronization.

    PXI-4461: Acq & graph tension-Int Clk - dig Start & Ref .vi

    Samples per channel = 1000

    Rate (Hz) = 10000.00

    Start the trigger Source = / [name of the instrument DAQmx] / PXI_Trig0

    Onboard start = fall

    Reference Source Trigger = DAQmx Device Name] / PXI_Trig0

    Reference edge = fall

    Trigger samples = Variable (100, 500, 900)

    PXI-2567: Switch Scaning-SW Trigger.vi

    Advance the output terminal full = / [name of the instrument DAQmx] / PXI_Trig0

    Scan list = / [name of the instrument DAQmx] / ch0-> com0.

    Scan list = / [name of the instrument DAQmx] / ch1-> com1;

    Hardware configuration:

    The PXI-2567 module controls an external relay that switches between the voltage of 5 V on ch0 and ch1 0 V.

    The PXI-4461 connects to the COM of the external relay and therefore reads 5V when ch0 is connected; 0 v when ch1 is connected.

    Procedure: The above examples are used in the following procedure.

    1. run the PXI-4461 VI.  A start trigger (falling edge) is necessary to start collecting samples before firing.

    2. launch the module, PXI - 2567 VI.  When ch0 is initially (and immediately) on com0, a trigger is sent to PXI_Trig0.  The PXI-4461 will begin to acquire samples before firing.

    3. - click on the "Connect to the next" button on the front of the PXI - 2567 VI module.  This sends a trigger to entry software for the PXI-2567 module and the transitions of the scan for ch1-> com1 list.  Once the PXI-2567 module remains (debounced), advanced complete relaxation is sent on PXI_Trig0 for the PXI-4461.  The PXI-4461 will begin to acquire samples after outbreak.

    Note: Instead of the trigger of the software entry, an external input trigger can be used (e.g. PXI_Trig1).

    Results:

    > Before instant release of samples = 100

    Delay is caused by the time of actuation of external relay.

    > Before instant release of samples = 500

    Delay is caused by the time of actuation of external relay.

    > Before instant release of samples = 900

    Delay is caused by the time of actuation of external relay.

    I hope that the attached screws and the explanation above helps you and/or other customers who have this problem.

    Best regards

    Chad Erickson

    Switch Product Support Engineer

    NOR - USA

  • How to synchronize the start time in the waveform graph

    Hi all

    I just find a solution in the forum to select the data you want in a grap of waveform with cursors, however, I don't know how to synchronize the time of beginning of waveform for the second graph. How can I extract start time of the waveform with the index data?

    Something like that?  It is a bit gross, but is what I think you're asking, should be able to use it as a starting point.

    The Max - Min is to make sure that the cursor is always valid.

  • HOW TO SYNCHRONIZE THE MONSTER AND THE CAMERA?

    I'M TRYING TO WORK WITH CHARACTER ANIMATION. I CHOSE THE MONSTER. I SEE MYSELF ON HER CANERA, I PUT RESET POSE AND THE MONSTER DO NOT MOVE WITH MY MOVEMENTS. HOW TO SYNCHRONIZE THE MONSTER AND THE CAMERA? Thank you

    Hi Luz... You have the track selected in the timeline panel puppet? You need to target the puppet that is controlled by the webcam/microphone/keyboard/mouse by selecting its track. That it arms for registration.

  • How to create the project to unify


    Hi all

    Can someone let me know how to create the project to unify.

    Kind regards

    Avinash

    By project, I guess you mean actually project and not a global envelope for programs, etc.  Moreover, this assumes that your environment has already been configured with BP needed, etc. and you simply add a new project to a shell that is already configured.

    As a general rule, these would be created on the workspace business Mode of administration in the company section shells/sponsored projects.

    In this screen, you can click NEW to create a unique project, but the best method is to use the COPY here and select a model project that has associated with BP, etc.

    I hope this helps.

  • How to deploy the project to my weblogic Server Application?

    How to deploy the project in my weblogic Server Application? Wouldn't be great if I copy the folder of the project to the root of the ACE?

    Also, how should I call Javascript context help assuming the project deployed to Weblogic As.

    I use Robohelp 10.

    Thanks in advance.

    Hello

    You generate to help and then you copy the output generated on the server.

    For sensitivity to context, which is output are you using? Try the following

    pages for more information:

    Take a bow

    Willam

  • How to synchronize the start of the acquisition of two cards of different daq hardware

    Hello

    I'm running a continuous acquisition with a PCI-6133 (@2,5. MECH / s per channel, 8 channels) and a PCI-6259 (@250 ksps / sec per channel, channel 3). Both performed in the same loop. The raw data from the data acquisition boards are written in a separate file PDM. Because the sampling frequency of the 6133 is 10 times higher than 6259, each loop, the number of values read from the 6133 is 10 times higher than 6259. If I look in the tdms file, I see the two acquisitions does not begin at the same time.

    timestamp of the acquisition

    PCI-6259: 02.06.2016 13:09:14, 866

    PCI-6133: 02.06.2016 13:09:14, 941

    Also, the number of samples of the 6133 is not 10 times higher.

    number of samples

    PCI-6259: 4949658

    PCI-6133: 49309378

    questions

    -How can I synchronize the beginning of acquisition? Are there some tutorials?

    -What could be the reason why the erroneous report of samples (should be 10 between the daq cards)?

    Thank you very much.

    Michael

    Hello Michael,

    the beginning of the acquisition can't at the same time as you do not use a common trigger. If you adjust for the different start time, the difference in the number of samples is only about 300 samples (0, 075 s difference at the beginning of the acquisition, which amounts to 187500 samples).

    This difference of 300 samples occurs because the schedules of the 2 cards are not synchronized.

    If you want to synchronize the starting and the acquisition between 2 cards, you need to connect with a cable RTSI. In this way, you can route the 1 device to another sample clock. The delivery of the sample through the RTSI cable clock is done automatically by the DAQmx driver.

    You can get more information in this section of documentation: http://www.ni.com/product-documentation/4322/en/#toc9

  • How to synchronize the device with an analog input device?

    Is it possible to synchronize a device (e.g. Basler scA640-70fm, IEEE 1394 b or NI 1722 smart camera) with an input device analog (for example, NI PCI/USB-6225 or NI PCI/USB-6255)?   For example, it is important to a video image of match with a sample of data digitized by the A/D converter.   In particular, it is important to know when the first video image starts compared to samples of digital data.   If it is possible to synchronize the camera with the A/D device, then then how is it?

    Thank you

    Ian

    Hello Robert,.

    Thank you for reference and information.

    Ian

  • How to synchronize the time with Google in windows 7

    Hello, I want to know how to synchronize time on my computer with the source time online so that I can keep accurate track, including seconds please help me to do it.

    See this tutorial

    http://www.Vistax64.com/tutorials/73040-Internet-time-synchronization.html

  • How to synchronize the metadata of LR to bridge

    Hello. I have W7 64 bit, CS5 with ACR6.1 and LR 2.7. My Leica camera capturing in DNG natively. I use "Convert to DNG" import in order to take advantage of the lossless compression. I understand that the XMP sidecar files are not applicable and that the metadata is written into the header DNG. It's good for me, it should ensure that the metadata is always with my DNG, but I'm not sure how it affects the validity of any instructions, I found so far.

    Currently I use ACR and LR to develop files to take advantage of the new features and treatment until I can get LR3.

    I want to synchronize the development parameters. I learned to updated the metadata of files developed in ACR6.1 when I open them in LR2.7 but I can not work, how do the LR develop visible settings when I open the files in Bridge.

    Any suggestions would be greatly appreciated. I was unable to find the information in the forums or help so far.

    I'm also not sure if this is the best forum to post this, but he did not cross the. If I am better publish it on another forum, please excuse me and suggestions would be welcome.

    If you want a set folder to update faster, go to tools/cache/purge cache for folder xxx.  Let the inch rebuild foremost (in corner he'S spinning arrow).

  • two computers: how to synchronize the presets to export plugin?

    My apologies if this question has already been addressed, but I the have not found on the forum.

    How should I treat the following situation. I have two computers (desktop and laptop), and office works as my "master". I want to copy presets to export to my laptop to work on the road, including the presets that include settings for plugins to export (LR2/Mogrify and MetadataWrangler)?

    I have easily have identical versions of the plugins in both computers, but how do I synchronize the present export? Is it as simple as simply copy the contents of the ...\Application Data\Adobe\Lightroom\Export Presets\User Presets? Before testing, just I'd rather hear if the solution is as simple as that, or if manually copy presets would spoil the setting LR on laptop?

    Running Windows XP and Lightroom 2.3.

    Thank you is advanced.

    Simply copy them to all should be good because they are autonomous. The area you should check would be references to specific disk drives.

  • How to synchronize the module also?

    I tried the Sync option but there is no possibility to synchronize the module?

    is this possible?

    No, but waves plans have been mentioned to include extensions in sync - "someday".

    AMO is a feature called "collections", which can be configured to allow you to install the same extensions on several PCs as a bit of a group.

    https://addons.Mozilla.org/en-us/Firefox/collections/

  • How to synchronize the data of nike nike + ipod nano 7G

    Hello

    I use my ipod nano7 for 3 years, but I've never synced nike application data.
    But I started to run. I want to synchronize the data in my profile nike +.
    I get no pop up in itunes application if I want to synchronize data from nike.

    Help, please.

    Thank you

    Check on the screen of the iPod settings in iTunes...  Select iPod in iTunes (click on his horizontal bar device button to display the screen of the iPod settings.  The side left (in the sidebar), under settings, you see Nike + iPod?  If you do, click it.  Do you see a framework for initiating sends it data Nike +?  Mine is already set up (with my 5th generation iPod nano), so I don't know what it looked like before.

  • How to organize the project and the files associated with the Premier Pro

    I tried to hold the input and output files to the Premier Pro (body) to optimize PC speed and keep different projects in separate folders.

    To optimize speed, I try to balance the I/O to the body on different drives. I'm editing on a dedicated PC i7 - 3930K, OS W7, 32 GB of RAM, with 2 SSD and 7200 4 discs arranged in 2 RAID 0.  A SSD (C drive) contains the files program, Documents, Photos and Audio.  The other 3 are used to store the video media.  The second SSD is used for the Cache and editing intermediate files. A RAID contains the video and audio Source, the other RAID files, export files.  I try to balance the input/output between readers.

    To organize files, I try to place each project with its related assets in a separate file.  In Production Premium CS6, default organization of the C:\Documents\Adobe\6.0 projects.  I'm confused because when I put Destination project in the project manager to another location, it always end up in the default location.  To change the location of the project, I find that it is initially allocated to the default, then I manually move it to another folder.  After you restart the body I open a project in the new folder.  Even though I have been editing for many years, I do not edit full time, so I need to refresh my knowledge for the fair distribution of the files such as the Scratch disks...

    To make life interesting, different programs spread differently.  Mocha, the project folder and the default output to the same location.  I found Mocha has a project and output destination allocation of menus that once I put them in different places always end up together.  I was advised to change the location of the moka project as I do with the body, but nothing has changed.  Speed and coordination PC file locations is a challenge.

    I have reviewed the training locations in the body.  Please direct me to the training to refresh my understanding on how correctly assets and distribution projects in the organization.  I also want to understand all the terms and possible menu assignments, if training is available.  A video presentation is preferred.

    The 'libraries', never use integrated in Windows. Those who are buried on the C drive in a rat hole of a tree of files to implement for backup and everything. Really, quite a stupid implemented well. And having the documents on your system drive is very well... doesn't really matter, those not need for speed of access. Put YOUR assets, such as pictures, images, graphics and stuff, in the folders that you create on the drives for them to the best "work" for you.

    So anything I have listed (quite well off of the page of this Tweaker) interferes, or interfaces with Microsoft stupidity wonderful intentions. One just go to the configuration of the places one wants to work as you want for better performance. It is STRONGLY recommended that in these various drives you set up folder trees that are easy to understand AND easy to use for the implementation of backup programs. The Tweaker has rather detailed suggestions tell for the settings of the cache for the Windows system files, which drive page size parameters to use. Those are the only things we change concerning the functioning of the system, and MS is only available for users to use. What readers and how much drive space you want to * system * using the cache? Your choice.

    PrPro has its own set of cache, database, project, and preview file default locations, so that the program won't work if nobody use it knows how to correctly set things upward. These default values are the folders system/users/blah/blah/blah/blah blah... not particularly easy to access for backup configurations, cleaning, that sort of thing, and not JUST because Adobe prefers you use those. In fact, they recommend that YOU set for the best working speed. The default values are all system-car and ensure the performance of the slug-bug.

    When you go to edit-> Preferences dialog box, you will find a number of these things assorted options for which you want to put them. The project settings dialog box is for each project, and it is where tell you him to put THAT prproj main project file & some other assets. It is generally recommended that you put each project in its own folder on a folder tree of files to the disc that you put your project files on.

    Note... all the different bits of the project files, database, cache and preview files have both read & write processes under constant operation. These things need quick access, usually put one shown previously one or two of them to a drive with SATAII internal best matches, or a 4/5 RAID 0/5 array disk.

    Images (media) and rendering (final exports) are mostly one-way moves. Images is primarily a read-only, and export operation is mainly a single write operation. So those who can live on slightly slower connections to the need to obtain. As to say the very fast 128 GB USB3.0 flash drive PNY I acquired in the user suggestions a couple. I tested it, and 1080 p images and exports can be handled by that without slowing down everything else... but ONLY one of these. Either images or exports, NOT both! Few people have found that say that an external SSD with images on a USB3.0 connection is usable in the things their system and speeds but spread across these disks in read/write to access tasks on several pipelines. Some have tried and found that their USB bus is also used for other internal disc or other connections, and so they had no gain speed or slow things down. Test... test.

    Neil

  • How to move the project JDev from one node to the other

    I created a project on my laptop and I designed my pages and deployed on my test server. now, I want to copy these files and ftp on my administration system in another country so that it can open the files on his client JDeveloper and run and test the pages before you deploy to the production server.
    what I have to zip the files project and send it to my admin?
    If so, how can we open this project and its files on a freshly installed jdeveloper.

    Thanks for your valuable time to read this post.

    Please advise/help!

    Hello

    First unzip the files to \myprojects.

    When you create a new workspace and project in Jdeveloper, it will display all packages / files which are present inside the my projects folder.
    If it is not visible, you can go to the project properties and add the folder to the tab "project content".

    Sushant-

Maybe you are looking for

  • Prevent Firefox to delete cookies?

    Hi guys,.I see a lot of answers and docs online on the deletion of cookies in Firefox, but how to prevent this? I could be wrong, but it seems that Firefox is the removal of things without my desire because all the site connections with a checkbox co

  • MacBook Pro gets constantly spinning reel after downloading El Capitan. Any help is appreciated.

    General purpose is simply slow. Even typing this message is a pain because of the intermittent freezing. No idea how to solve this problem? Here are my stats from EtreCheck: EtreCheck version: 2.6.6 (226) Report generated on 09/12/15 13:30 Duration 3

  • find the file of the scanned document

    I scanned a document using a Dell V305 printer/scanner to computer Dell 540 s, so I tried to save in a Word document. My version of Office is Windows 2007. I can't locate the file.

  • HP Mini 1000: BIOS password reset

    Hello! I seem to have forgotten the BIOS password I have not used my mini over 2 years ago! Can you please help me solve this problem? S/N: CNU90607T7 Thank you!

  • Cannot disable 'Run as Administrator' in Outlook 2103

    I can't disable "Run as Administrator" when I open Outlook 2013.  I tried repair (both fast and online), rebooted the software (twice), confirmed in 'Properties' that "Run as Administrator" box is NOT checked.  Yet, whenever I open it, it runs as an