I write a test using a sequencer to test several click of a button

I use flex sdk 4.1 and have a situation where a button click is sometimes called twice. I am writing a test for this by using only a sequencer and it will run at least a click, I'm not sure is how to test several click events (which shouldn't happen, but occurs randomly in my project)

package tests.view
{
import flash.events.MouseEvent;

Import flexunit.framework.Assert;

Import mx.events.FlexEvent;

Import org.flexunit.async.Async;
Import org.fluint.sequence.SequenceEventDispatcher;
Import org.fluint.sequence.SequenceRunner;
Import org.fluint.sequence.SequenceWaiter;
Import org.fluint.uiImpersonation.UIImpersonator;

view of the import. AddComments;

public class TestAddComments
{

private var view: AddComments;

[Before (async, ui)]
public void setUp(): void
{
view = new AddComments;
Async.proceedOnEvent (this, opinion, FlexEvent.CREATION_COMPLETE, 600);
UIImpersonator.addChild (view);
}

[Test]
public function testButtonClick (): void
{
view.addCommentBtn
var sequence: SequenceRunner = new SequenceRunner (this);

sequence.addStep (new SequenceEventDispatcher (view.addCommentBtn, new MouseEvent ('click', true, false)));
sequence.addStep (new SequenceWaiter (MouseEvent.CLICK, view.addCommentBtn, 100));
Sequence.Run ();
}
}
}

The only way you could test for this type of circumstance... where something can happen... one is to do with a time-out. In other words, you can't pass the test simply because the first event has occurred.

Two ways to handle this... with sequences:

Instead, you write a test that awaits 2 clicks. In the Manager of the assertion (which would only be achieved if the two clicks occur) you would fail the test:

failure ("I shouldn't be here");

In the server for the 2nd click, you can specify a timeout handler. This timeout handler is called in the 2nd click does not occur for the specified time. (find that time is the hardest part). Default timeout Manager fails the test, however, in your case, your manager timeout would just fortunately make necessary assertions and move. A time-out is not necessarily failure... in your case, it's OK

Second choice:

You could create a timer. Create an event handler for the click on a button that increments a counter. Start the timer, do your test. However, having your test until the end of the timer, rather than something like the click... In this case, you would then be able to simply check the count:

private var clickCount:int = 0;

[Test]

public function testButtonClick (): void {}

var: timer = new Timer (100, 1);

Async.handleEvent (this, timer, TimerEvent.COMPLETE, checkClickCount);

view.addCommentBtn.addEventListener ("click", function (e: Event): void {clickCount ++});

view.addCommentBtn.dispatchEvent (new MouseEvent (' click; true, false));

}

private void checkClickCount (e: Event): void {}

assertEquals (1, clickCount);

}

However, I can't imagine how the test you describe could give never more than a click event... I guess the problem is elsewhere, but it will help you check

Mike

Tags: Adobe Open Source

Similar Questions

  • My portfolio is currently configured to allow access when locked. I used to be able to double-click the home button and seems my card and I would enter my access code. I have updated to IOS 10 and I am no longer able to do this.

    My portfolio is currently configured to allow access when locked. I used to be able to double-click the home button and seems my card and I would enter my access code. I have updated to IOS 10 and I am no longer able to do this. All the settings are there. I have an IPhone 6.

    Are? you double click in front of the screen of the iPhone are? (pending). This is what seems to work for me.

    I hope this can help.

  • How can I use 2 sequences simultaneously?

    Hello

    I recently installed TestStand 4.2.1 I try to understand, I use 2 sequences simultaneously?

    Kobi.

    Kobi,

    What do you mean by "use sequences?

    If you talk about "the execution of two sequences in parallel", then the answer is Yes.

    In order to understand the parallelism in TestStand, I suggest you learn more about:

    - Knowledge General TestStand

    - Process templates

    - Parallel execution

    hope this helps,

    Norbert

    PS: You should think to participate in a course TestStand

  • How can you write a resume using windows Vista Home Basic?

    How can I write a resume using windows Vista Home Basic? I put t have microsoft word or office.

    Start menu -All Programs - Accessories - Wordpad.

  • How to write a file using BB 10 HTML5WebWorks

    Hello

    How to write a file using Blackberry 10 HTML5WebWorks API.

    https://developer.BlackBerry.com/HTML5/API/BlackBerry.IO.file.html#.SaveFile

    The example above does not work in BB 10.

    Please guide me.

    Of course, look at line 95 of this file:

    https://github.com/BlackBerry/BB10-WebWorks-samples/BLOB/master/invoke/invoker/invocations.js

  • No related video and audio when using a sequence of nest in the source Panel and try to insert a clip in the timeline

    When I use a sequence of nest in the source Panel and try to insert a clip in the timeline, the video and audio are not related. Before this update (2015.1), I did not have this problem.

    Issue.png

    Hi Daniel,.

    I can confirm this matter and will get a logged bug. It is a pain, but after having been published in the sequence, select the audio and video components, right click and select 'Link' to link the components between them. Sorry for the inconvenience.

    Colin

    First Pro EQ

  • creation and use of sequence within a proc

    Hi the gems... Good afternoon...

    I know that we can create a sequence inside a proc. That I created, but when you use this sequence in the same process, it gave me error:
    SQL> DECLARE
      2  L_LINE VARCHAR2(1000);
      3  BEGIN
      4  EXECUTE IMMEDIATE 'CREATE SEQUENCE SANDY_SEQ MINVALUE 1 START WITH 1 MAXVALUE 100000 INCREMENT BY 1';
      5  FOR I IN 1..1000
      6  LOOP
      7  L_LINE:='HI, I AM NUMBER'||SANDY_SEQ.NEXTVAL;
      8  DBMS_OUTPUT.put_line(L_LINE);
      9  END LOOP;
     10  END;
     11  /
    
     
    ORA-06550: line 8, column 28:
    PLS-00201: identifier 'SANDY_SEQ.NEXTVAL' must be declared
    ORA-06550: line 8, column 1:
    PL/SQL: Statement ignored
    I grant this user the CREATE SEQUENCE.

    Cant, we use the same sequence in the proc where it was created.

    Help, please... Thanks in advance.

    Published by: gogol on August 21, 2012 03:00

    If you create a sequence dynamically, you must also select dynamically.

     DECLARE
      L_LINE VARCHAR2(1000);
       v_number number;
      BEGIN
     EXECUTE IMMEDIATE 'CREATE SEQUENCE SANDY_SEQ MINVALUE 1 START WITH 1 MAXVALUE 100000 INCREMENT BY 1';
     FOR I IN 1..1000
      LOOP
    execute immediate 'select sandy_seq.nextval from dual' into v_number;
     L_LINE:='HI, I AM NUMBER '||v_number;
      DBMS_OUTPUT.put_line(L_LINE);
      END LOOP;
      END;
     / 
    

    Published by: Keith Jamieson on August 21, 2012 11:02

  • using a sequence as the primary key

    I use a sequence for the primary key of the database for dimensions (following Kimball methodology). In ODI, I define another unique key as principal. It will not let you select check null = true and therefore a sequence can serve as primary. Someone at - it something differently.

    ss396s wrote:
    I use a sequence for the primary key of the database for dimensions (following Kimball methodology). In ODI, I define another unique key as principal. It will not let you select check null = true and therefore a sequence can serve as primary. Someone at - it something differently.

    You must follow the rules on the sequence
    1 > it cannot be run on the source
    2 > may not be a part of your key update
    3 > check not the null check box should not be selected
    4 > separate box must not be activated

    If you use a sequence for the primary key for the database, and then identify another or several columns are coming from the source and use that you can only identify a row. Use these columns as your key to update.

    Thank you
    Fati

  • The use of sequence and generate the number in a table that has data

    Hello

    There is a custom table that has a column Rowid (NULL).
    This table already has 10 k with rowid as null lines, now the user asks me to enter a unique number for the Rowid.
    I created a sequence, but don't know how to use this sequence and generate numbers for the Rowid.

    Could you suggest.

    Thank you.

    "rowid" is an oracle reserved word and should be avoided. Perhaps "Rowid" between quotes or something.

    Here's how to "fill" a column by a sequence:

    SQL> create table t (id number, value varchar2(100));
    
    Table created.
    
    SQL> insert into t (value) select object_name from all_objects where rownum <= 10000;
    
    10000 rows created.
    
    SQL> create sequence idgen_sequence;
    
    Sequence created.
    
    SQL> update t set id = idgen_sequence.nextval;
    
    10000 rows updated.
    

    Given that the sequence was used all the 'id's will be unique.

  • How can I use the sequence of the string "\u00e5" in myfile.txt converted unic

    How can I use the sequence of the string "\u00e5" in myfile.txt converted to unicode in my application?

    I have a text file, MyFile.txt, with some sequences represented unicode:
    \u00e5
    \u00e4
    \u00f6
    etc.

    This is the file contains unicode, not the character it represents: a, a and o.
    I get the sequence of the file and save it to a vector. When I tried to use it on a JButton, I see the "\u00e5" string and not the character that I assumed.

     
            read file codes ...
            ...
         Vector<String> glyphVector = readGlyphIndex.getUnicodeFiles();     // to retrieve the vector with unicode sequence and save it to glyphVector
         String unicode = glyphVector.get(0);     //get the first unicode sequence
            System.out.println(unicode);    //displays \u00e5 and not å in the console.
         jButton.setText(unicode);   //jButton is a JButton and it shows the string \00e5 and not the character å
            ...
    The question is how to convert the sequence of string to be a unicode escape in the code?

    In order to make it clear:
    //from
    jButton.setText("\\u00e5");
    //to
    jButton.setText("\u00e5");
    Thanks in advance!

    Dragonfly
    String s = Character.toString((char) unicodeInInt);
    

    Strictly speaking, if unicodeInInt is a Unicode code point (for example, it can be greater than 0xFFFF) then the correct code would be this:

    String s = new String(Character.toChars(unicodeInInt));
    

    However, since the "\u" notation allows only 4 hexadecimal digits (and need to 0xFFFF code points > Unicode represented by their UTF-16 encoding), the code above is not enough for this particular case.

  • Need help! Re: Sequence Presets understanding &amp; settings + using multiple sequences!

    Hi, I'm newer to Premiere Pro (using the new version of Pro obtained in March 2010 on a PC) and watched all the tutorials (lots of video) and read a LOT about the subject! And I have answered several questions about mine. But there is one main thing (that I'll probably have to divide it into 2 or more questions) that I just got a complete knowledge & really your expert need help on!

    Thank you very, VERY MUCH! Really...

    I have designed/product audio (music) for a while now and when you start a new session just, you select your sample rate & are locked in for the most part therefore... Pretty simple... Now with Pro, when you start your new session, you choose your Preset sequence. Now for this first project, a video clip (3 minutes), the audio is done (as I said) and for the clip, we use images from several sources including: maybe 55% compared with a mini-camera DV, 40% of the .vob files right & the remaining 5% of some mpeg files + a few YouTube videos (we only have it our preserved images of front on YouTube) + some JPEGs (still images). And we plan to export the final video on YouTube and the internet. And we want also ready to be broadcast on both television (MTV, some media, shows, etc.). And Yes, we will also use it on cell phones (even if it is the least important right now). So 3 main exports (which I believe are all made at the end through media encoder).

    • But to choose the right Preset sequence at the beginning, I am confused, unfortunately.   I

    Believe you choose the one that best fits to of your assets sizes & frame rate [in this case, which is a camera film regular DV; & mediainfo said the .vob file = 720 x 480 (4:3) to 29.970 fps MPEG video (NTSC), one of the shots (of our) YouTube = 480 x 270 (16:9) at 29.970 fps STROKE, a MPEG = 352 x 288 (4:3) at 25.000 fps and 2 examples of jpeg = 300 x 400 (size = 57 KB)] and another = 720 x 450 (size = 100 KB)]. So if I am wrong in my assumption on the choice of a pre-defined sequence just on the best corresponds to the your assets rates & sizes, I would choose (I think): DV-NTSC Standard 48 kHz (the 48 just to 41 over our audio sampling frequency). 

    And if all goes well, it is excellent for our export needs YouTube at the end of the process the video & tv as well!

    .. . Is this correct?

    Can I choose the predefined sequence that best matches most of the sizes/frame rate of your assets?

    * And ESPECIALLY... is CE Preset of the sequence is the BEST for this current music video (based on the sources of our assets & where it will be considered when it is finished - mainly of YouTube, & also some TV [for media and broadcasting] - probably on a DVD, I guess)?

    Or I'm wrong, & it (your Preset Sequence) depends on your final product & the output?

    My friend (who admits that he is no expert in some way) explained that I would probably go with HDV 1080 p 30 as this will give a much better value for my release. But after he saw the results in Pro with this setting for my property, he agrees with MY above conclusion instead. 

    When you use the DV - NTSC Standard 48 kHz preset, I saw the asset in the Source monitor Panel (& then dragged the clips to the timeline) & seen in the finale of "Project Monitor" (I think it is called). And they looked decent in this final screen (where I'll crop & use some shared screens sometimes). 

    And when I used his suggestion of 1080 p HDV 30, assets looked ok in the Source monitor Panel (I think), but very little in the final project monitor. 

    • And led me to another big question - when you use the jpeg format which is 1280 x 960 e.g. (largest

    as the previous ones) in the Standard DV NTSC 48 kHz preset, happening in the Source monitor. But when you drag it down to the timeline and view it in the program monitor, the head was cut off, etc. and of course, when you use instead the HDV 1080 p 30 preset, as larger jpeg even adapt very well in the in the program monitor. Now, I understand that this is because the size of the frame (dimensions) close match those of the HDV preset. I get it. What none of us got was however WHY in the DV - NTSC Standard 48 kHz preset, he looks very well in the Source monitor Panel (but not in the program monitor)? (The two were simply put to 'Fit'). We thought he not would not have looked at well & fit fine and complete source of follow-up at first - but that's the difference between this largest jpeg display when it is displayed in two different monitors that really confused us!

    • And the final main confusion on this topic lies in something, that a technician in Adobe, tell us, informing that

    We can create multiple sequences. Now, I saw How to do this in the project Panel, but it's really the full understanding of the workings that we don't get. The tech said: "each sequence MUST have the good frame rates, sizes of images." Ok, you understand - understood. And he said: we can be: convert the size of the image (of this large jpeg example, say reducing) to match the predefined video frame size. But in this way, we would lose the quality (jpeg - assets). And he says: - or - you CAN use multiple sequences for different sources & when everything is completed (the whole video), I just export it them all as a single project! And I have that a sequence may be getting the DV preset (with the heights of these assets corresponding closely to this preset) and another sequence (in the same project) can be the HDV preset (with the heights of remaining assets corresponds closely to the preset instead). , But he couldn't explain was: how you can view your entire music video (3 minutes) in its entirety in Pro. It seems that when you choose a 2nd sequence, it obviously creates on the timeline, and assets that you put in the 1st (DV) timeline is completely separate from the 2nd (HDV) timeline. And you get no display either at the same time (because they are distinct sequences). 

    So... is this true?

    Are we supposed to use multiple sequences within our project to clip one of the assets with a higher (or other) image size/rate?

    And you export sequences as a final clip?

    And if so, HOW the world watch you your video chats (in the monitor of the project with all of your changes - as you change) when you use more than one sequence?

    Sorry, it seems quite stretched out, but I want to answer your questions you can in turn have for me & be clear so I can finally receive clarity on this topic!

    I know it's much, but if you could address all of the above questions (more background or discussion - is but a handful of issues in there), you have my gratitude... we were afraid to start the part of the video of this project is NOT know what sequence preset start with (as "we don't want to be locked into the wrong choice & waste weeks of editing), let alone a good understanding of the 'why' or the ramifications!

    Thank you so very, very well... You have no idea how...

    Rendering is done on a basis as needed. If we do a complex animation with keyframes, or if they have odd source files, they could do. For keyframe animations, I could make this section of the timeline of a dozen or more times. Otherwise, maybe not.

    Rendering is the production of AV files, just for reading. They take a lot of space and will take a while. It's one of the reasons that a Publisher must familiarize themselves with the WAB (work area bar), so that they do things like rendering for all what they might need. Tip: remember to put this back to the full timeline.

    Good luck

    Hunt

  • is there a way to impose the use of sequences

    is there a way to stop someone to insert an id without using the sequence?
    CREATE SEQUENCE id_seq
       START WITH 1;
    
    CREATE TABLE test_table (id_seq NUMBER (4) PRIMARY KEY);
    
    
    
    INSERT INTO test_table
         VALUES (id_seq.NEXTVAL);
    
    INSERT INTO test_table
         VALUES (2);
    
    INSERT INTO test_table
         VALUES (id_seq.NEXTVAL);
    gives us
    ORA-00001: unique constraint (DSAMSTRC. SYS_C0091648) violated
    as it should be

    However is it a check constraint of some ilk who made sure the user uses the sequence during inserts?
    then the second insert
    INSERT INTO test_table
         VALUES (2);
    gives me a sort of violation of check constraint that I do not use the id_seq. NEXTVAL?

    Allows you to encode the audit in a trigger

    SQL> ed
    Wrote file afiedt.buf
    
      1  create trigger trg_test_table
      2    before insert on test_table
      3    for each row
      4  declare
      5    l_currval integer;
      6  begin
      7    select id_seq.currval
      8      into l_currval
      9      from dual;
     10    if( l_currval != :new.id_seq )
     11    then
     12      raise_application_error( -20001, 'Hey!  Use the sequence' );
     13    end if;
     14* end;
     15  /
    
    Trigger created.
    
    SQL> INSERT INTO test_table
      2       VALUES (id_seq.NEXTVAL);
    
    1 row created.
    
    SQL> INSERT INTO test_table
      2       VALUES (id_seq.NEXTVAL);
    
    1 row created.
    
    SQL> INSERT INTO test_table
      2       VALUES (25);
    INSERT INTO test_table
                *
    ERROR at line 1:
    ORA-20001: Hey!  Use the sequence
    ORA-06512: at "SCOTT.TRG_TEST_TABLE", line 9
    ORA-04088: error during execution of trigger 'SCOTT.TRG_TEST_TABLE'
    

    But at this point, you're probably better just to have the trigger complete the sequence column ignoring all that was passed in.

    Justin

  • My cd-writer/DVD disc tray does not open when I press the Open button. He is not blocked and has no disk in it. How can I me t to operate?

    Cd-writer/DVD disc tray does not open when you press the Open button, or when you use the buttons to control the media on the keyboard. How can I restore it to its operating state?

    Hi John,.

    Please let me know exactly what happened when you tried my suggestions of first and second.

    Of your most recent post, looks like you're watching the wrong part of the Device Manager. Optical drive is listed under "readers of CD-ROM/DVD-ROM". The info you gave appear under "drives". If the drive is not listed under "readers of CD-ROM/DVD-ROM" or there is no such section in Device Manager, then Windows do not see. If windows can't see it then this means that there is no power or that the drive is broken.

    When you pushed the drive back in, the player no longer has much of the book or did you have to push all the way. If the latter, it means that the drive has no power or is broken.

    With respect to the opening of the case, I guess I should ask first if it's a laptop or desktop?

    Tricky

  • I can't fix my mouse to use the option with a single click in windows 8. The two click works fine, but I prefer the one click option

    With Windows Vista and Windows 7, I put the mouse to use the option with a single click to open files and programs desktop.  I can't find this option in Windows 8.

    Hello
     
    Thanks for the post about Microsoft Community.
     
    I understand that you don't want to use the simple click instead of double click of the mouse that you used in Windows Vista and 7.
     
    I would ask you to please follow the steps below to activate the option just click on the button of the mouse in Windows 8.
     
    un) Please move the cursor to the bottom right and click on the search box, which is the first option in this Panel.
     
    b) in the search box, type Control Panel, and then click Control Panel.
     
    c) after opening the Control Panel, you will see many programs such as the system, network and security, Internet, hardware and sound, and other programs. Click "appearance and personalization".
     
    d) now click on the folder option to open it.
     
    e) now you will see many options in the folder option. Now, click single-click to open an item (point to select).
     
    f) now click on apply and ok to turn this feature on your computer.
     
    I hope your problem is solved now. Please feel free to write back if the problem still persists.
  • Cannot use cards MBNA Web page Services: no account login button appears.

    Cannot use cards MBNA Online Services because no connection of the personal account button appears on the original Web page. However, I can access my MBNA card account using their site of Bank of America. Also cannot reserve National coach Express tickets because no key prosecution appears after have entered my details to the passenger. However, the same site operates using SAFARI. I have FIREFOX 15.0.1.

    Hello

    The reset Firefox feature can solve a lot of problems in restaurant Firefox to its factory default condition while saving your vital information.
    Note: This will make you lose all the Extensions, open Web sites and preferences.

    To reset Firefox, perform the following steps:

    1. Go to Firefox > help > troubleshooting information.
    2. Click on the button 'Reset Firefox'.
    3. Firefox will close and reset. After Firefox is finished, it will display a window with the imported information. Click Finish.
    4. Firefox opens with all the default settings applied.

    Information can be found in the article Firefox Refresh - reset the settings and Add-ons .

    This solve your problems? Please report to us!

Maybe you are looking for

  • Tecra A11 - how to change the sensitivity of the touchpad?

    Our company has recently bought some Tecra A-11 to replace some of the old Pros of Satellite. We have noticed that there is a tendency for the mouse cursor jump from one place to another on the screen while typing causing major issues when coding and

  • Satellite M50 - wireless card disappeared

    Hey. Prolly newb question, but I just can't understand this. I can't find my WIRELESS card, my XP does not recognize it. I think I need some kind of driver for it, but I already tried to install several, including the one on this page. Problem is pro

  • I am running XP with Office 2003. The Office 2007 SP1 is "forced" on me to automatic updates. Should I run the installation?

    Whenever I visited the MS Update site, I was prompted to download the SP1 for Office 2007. I always ignored this suggestion because I run Office 2003. I don't know why I would even be asked to provide this update unless I have versions Express in Vis

  • Connect my - rio to PC via network router

    Hello I wonder if I can connect my rio to the PC (without adding wireless network card to the computer) through my network router. In other words, if I connect my rio for the network wireless router and the PC is connected to the same network via eth

  • Keyboard seems as if it does not work well

    Hello The brand of my laptop is AcerThe product name is Esxtensa 5220.My Windows system is Ultimate(64Bit) 7 I haven't installed a keyboard/mouse driver software when I installed Windows 7 because when I looked on the official website of Acer, I foun