Is it possible to lock either the video or audio track?

I'm trying to copy and paste a short segment of audio to reuse in another movie.  From Pinnacle Studio, this was done by the video track of locking and the stretch of the audio track of the copy and paste in another part of the timeline.  How this is done in the first 14 elements?

provlima

What computer operating system?

No locked track.

What you want to do...

a. a part of an audio segment in a project and then copy the use to use it in another project

or

b. use of a part of an audio file in another part of the same project?

You cannot copy and paste insert between projects in Premiere Elements except on Windows, then it is ClipMate associated with Premiere Elements.

First Elements ATR troubleshooting: PE: ClipMate copy/paste between projects

It should work for first 14 elements, but I have tested until 13/13.1.

Rather than cut the audio on the timeline to get the segment for copy/paste, consider to drag another instance of the audio on the far right of the timeline, make your cuts it and dragging the Cup in place within the same project.

Depending on what you want to do, you can set the gray tabs on the work area bar to span the audio segment of calendar you want. You don't have to break the video audio link. Then go to export & share/Audio/WAV and critical put a check mark next to the share of work area Bar just before you click Save. Then import this segment since the disk hard saving location in your Premiere Elements project using the project add Media/files and folders.

Please consider. If any questions or need clarification, please ask.

Thank you.

RTA

Tags: Premiere

Similar Questions

  • connecting the video and audio tracks

    I have a mac computer and the first cc pro.  as a person of FCP go to the Prime Minister, I always try to get the right combination of shortcut keys.  Somehow my audio tracks are liked llinked to the video tracks.  I have to cut and move them separately.  Must have pushed the wrong button somewhere, I don't know how to create a link to them.  Can you give me the path long and short?

    On the top left of the scene Panel is an icon that toggles that "link/unlink" function.

  • How to: remove the scenario-specific audio tracks?

    I just CS3 where in the source of the window had a toggle audio, video, audio, which allows you to apply just audio (if that's what you want) by using the insert/overlay.  CS5 seems now that he has separated these buttons and were not able to understand how to switch only audio or video only from the source.  I know I can recover the source video or the sound icon and drag it into the timeline, but it can be faster by using the insert/overlay.

    My questions are:

    -How to select only audio or video of the source monitor for use with overlay/insert keys?

    -When you work with multi-track audio containing source material, is it possible to select specific securities to slide on the timeline without dropping everything down?

    The "buttons" on the left of the timeline panel in the information header/track area are the source and target range selectors. You use them together to enable or disable specific tracks from a source element and to direct these incoming securities in specific titles in the sequence.

    The "buttons" on the left (in this example) labeled V and A1 are the tracks contained in your source clip in the source monitor. Depending on the nature of your source footage, you will have between 1 and 4 audio tracks, that you can select. You will always have a track V (video), however. Click them to toggle these sources on or off for an insert or overlay Edition, and dragging them upward or down to target what destination track, you want to modify it to be placed in.

    At the same time, you must enable or disable the target tracks so that the change to happen the way you would expect. They are the right marked "X Video" and "Audio X" buttons. You can turn on all, any, or some of those securities and have different effects. The simple story is that, if you want the tracks from a source item to be edited in a set of tracks specific targets, the selector buttons must be "enlightened" to indicate the tracks are on and targeted.

    Here's an example, using pliers DVCPROHD with four mono tracks:

    In this case, if I had to make a montage by inlay, the video source ('V') will overlap on the destination track Video 2, but it will edit also 'empty' on the destination track 3 video because I turned it on. For audio, I have traced Audio Source 1 to Target 2 Audio, 2 Audio Source to target Audio 1, Audio audio Source 3 target 4 and even if the Source Audio 4 is 'turned on' it has no effect because the target Audio 3 'stops.' In this way, you can target selectively tracks are made during an insert or overlay edit, using the commands insert and embed in the monitor Source or Bin. Note, however, that this choice has no effect when you drag a clip from the Source monitor or the tray; in this case, all THE source Flickr photos will be displayed in the order, but you can position them to some extent by pressing the Shift key once you place a portion of the clamp and slide it across to the demarcation line between the video and Audio tracks.

    The target range selectors affect also, whose securities are the subject of chronology, as 'razoring. operations

    I hope it helps a bit. The best bet is just to play with it; It takes a while to wrap your head around, but will make sense after a little exploration.

  • Timeline between video and audio tracks splitter

    The separator between the video and audio tracks on the timeline is very difficult to see. Although it is thicker that other lines of demarcation is not yet clear enough for many people. Y at - it anyway to change the color of the "divider". Does anyone know of a plugin or a workaround may achieve this result? Ideally, we should be able to change the thickness and color so that the timeline between the video and the audio division are visible immediately by glancing at the screen. Can anyone help?

    Unfortunately, no thickness and color cannot be changed, and I've never seen a plugin to enable this. Sounds like a feature request for me!

    Feature request/Bug Report Form

  • Is it possible to set up the video so that it does not automatically change the slide master?

    Hello everyone. Is it possible to not have the video of Captivate automatically running but to manually edit slides, better with buttons? I could not find how do. This is because I would like to use interactions and if the video works as ususal, when the time of the slide is expired are therefore possible to click on the buttons of interactions and, on the contrary, if we want to ignore the slide before that time that is expired, they must click on the next button, and then the play button too complicated! So the best way would be to have an installer of the manula transition. Could you help me with this? Thank you very much. Maurizio

    No, it seems to me it's OK

  • Video files (any type) when they are imported, will import the video and audio.

    Premiere Pro (Mac) CC

    3.4 Ghz i7 Quad Core

    750 G SSD

    2 GB NVidia graphics card

    32 MB of Ram

    Any file video, regardless of the codec, import into Premiere pro as an audio file.  I did the things suggested in other forums, such as replacement .mov file extension, I used intermediate codecs, prores422, codec .mov (HDV1080p30) among many others.

    Also, I can't import a video sequence that seems to have an alpha that are associated with channel.  The graphics with alpha channel were made by Adobe AE and work well in Final Cut Pro 10.1

    I need help, FCPX 10.1 is a nightmare and I have a weekly television show that needs to be done as soon as POSSIBLE.  Until now, the switch to first Pro CC disappeared not smoothly.  Any help would be appreciated.

    Thank you for your response.  I could get my hands on Technical Support and we determined that my first Pro CC installation was corrupted.  It's a simple solution to uninstall and reinstall the program.  Now, everything works fine.  To answer your question, when I imported any type of video file (I tried several types of different different video files and codecs) it would be important in audio.  The icon is Audio only, when I put the sequence on the Timeline, I couldn't put anything on the timeline of the video, only Audio was present.

  • Windows Movie Maker-how to match the length of the video and audio

    Windows Movie Maker

    Hi, I've used Windows Movie Maker 6.0 and windows vista.  I do a sort of slide show with pictures and music.  How to match the duration of the video to audio.  Right now my audio file is longer than my video.

    Hi, I've used Windows Movie Maker 6.0 and windows vista.  I do a sort of slide show with pictures and music.  How to match the duration of the video to audio.  Right now my audio file is longer than my video.

    =============================================
    Have you tried to split the Audio file (Ctrl + L) at the end of the video
    and then right-click / Delete the unwanted part?

    Or... to increase the duration of the photos. If you place the cursor on the edge
    a photo on the timeline, you'll see a red double arrow... you can
    Drag the arrow to change the duration. A ToolTip should appear to show
    change.

    BTW... Photo Story 3 is a good software to make video slideshows.

    PhotoStory 3 for Windows
    http://www.Microsoft.com/windowsxp/using/digitalphotography/Photostory/default.mspx
    (works on XP, Vista and Win7)

    Volunteer - MS - MVP - Digital Media Experience J - Notice_This is not tech support_I'm volunteer - Solutions that work for me may not work for you - * proceed at your own risk *.

  • Windows media player does not automatically open a video file on a Web site but I save it and open the file with Windows media player to play the video or audio recording.

    Windows media player does not automatically open a video file on a Web site but I save it and open the file with Windows media player to play the video or audio recording. I used to be able to play any video or audio file in any site!

    Hello

    Try resetting the default associations for WMP and IE.

    How to set default Associations for a program under Vista
    http://www.Vistax64.com/tutorials/83196-default-programs-program-default-associations.html
    How to associate a file Type of Extension to a program under Vista
    http://www.Vistax64.com/tutorials/69758-default-programs.html

    If necessary:

    How Unassociate a Type of Extension file in Vista - and a utility to help
    http://www.Vistax64.com/tutorials/91920-unassociate-file-extention-type.html
    Restore the Type Associations by default Vista file extensions
    http://www.Vistax64.com/tutorials/233243-default-file-type-associations-restore.html
    How to view and change an Extension of filename on Vista
    http://www.Vistax64.com/tutorials/103171-file-name-extension.html

    ====================================

    Also follow these steps:

    Follow these steps to remove corruption and missing/damaged file system repair or replacement.

    Run DiskCleanup - start - all programs - Accessories - System Tools - Disk Cleanup

    Start - type in the search box - find command top - RIGHT CLICK – RUN AS ADMIN

    sfc/scannow

    How to analyze the log file entries that the Microsoft Windows Resource Checker (SFC.exe) program
    generates in Windows Vista cbs.log
    http://support.Microsoft.com/kb/928228

    Then, run checkdisk - schedule it to run at next boot, then apply OK your way out, then restart.

    How to run the check disk at startup in Vista
    http://www.Vistax64.com/tutorials/67612-check-disk-Chkdsk.html

    ------------------------------------------------------------

    Then, if necessary:

    Have you recently installed another player?

    Reset your associations for WMP and IE.

    How to set default Associations for a program under Vista
    http://www.Vistax64.com/tutorials/83196-default-programs-program-default-associations.html
    How to associate a file Type of Extension to a program under Vista
    http://www.Vistax64.com/tutorials/69758-default-programs.html

    ---------------------------------------------

    Do this to reregister the Jscript.dll and Vbscript.dll files.

    Start - type in the search box - find command top - RIGHT CLICK – RUN AS ADMIN

    type or copy and paste-> regsvr32 jscript.dll
    Press enter

    type or copy and paste-> regsvr32 vbscript.dll
    Press enter

    Restart and if all goes well, it will run now.

    --------------------------------------------------------------

    Have you recently added stores or ANY application from Stardock?

    Using 64-bit Vista?

    Can you think of recent things you did in WMP which could be the cause? You added another
    reader recently or an add-on for WMP?

    When I try to use Windows Media Player 11, the program does not start, or some UI elements
    are empty - a Mr Fixit
    http://support.Microsoft.com/kb/925704/en-us

    Maybe something here
    http://msmvps.com/blogs/chrisl/articles/17315.aspx
    and here
    http://msmvps.com/blogs/chrisl/Archive/2004/10/30/17399.aspx

    Check here the news of WMP11
    http://zachd.com/PSS/PSS.html

    I hope this helps.

    I hope this helps.

    Rob - bicycle - Mark Twain said it is good.

  • By aligning multiple video and Audio tracks

    I am a multi-instrumentalist and worked on videos of my songs.  I save in Adobe Audition CC.  I've usually will start to record the audio/video with my Nikon D3200 as well as with studio microphones that record in Adobe Audition.  I add then several tracks on this track main video/audio recording to play the electric bass, banjo, mandolin, and percussion etc.  I mix all the tracks and send video clips to make a video in Premiere Pro.  I found that the main (usually guitar track) syncs perfectly with the video camera that I put in the calendar when you use the synchronization in the first feature.  From what I've read, if it is only possible to do this with a video and audio track.  I need to find a way to be able to align the other video sequences with the main audio.  Does anyone have a workflow that make this process easier for me?  Is there a way to do what I'm maybe missing out on Premiere Pro?   Please help me if I can continue the creative process!

    This is an example of what I'm doing https://www.instagram.com/p/-snqVSwzft

    I had to align that laboriously trying to watch the movement of the hand, but there must be an easier way.

    Audio and video synchronization begins to shoot and carries through to the edit and mix.

    Create sync audio and video synch and they will line up in the chronology of the edition.

    A simple way for you to do is a snap of the hand or a tap pronounced on the handle.

    Pro is use timecode in photo and audio recording device.

    Click on the titles and click count-ins are useful for musicians when more dubbing and overlay track.

    Its nice also.

  • Video and audio tracks will remain not related

    When I select the files I want to stay connected, (audio video) and right click to link to the top, it works. But then when I click on the video or audio file separately they are not related. This happened all of a sudden all my projects so it much be a setting in the program but I don't know what. Any advice would be appreciated! Thank you.

    Click the icon to the right of the magnet, the title sequence of the timecode.

  • I want to see the video and audio from a clip in the Preview Panel. Is this possible?

    If so, how? Here, I can see them separately, but I want to simultaneous display of audio and media.Screen Shot 2015-07-31 at 7.42.15 PM.pngScreen Shot 2015-07-31 at 7.42.33 PM.png

    It is the Source monitor, and that you cannot do.

    You can see both of the sequence.  That is to say the video in the program and the waveform monitor in the SS.

  • Is it possible to group video and audio tracks separately in the timeline?

    Correctly securities are classified as follows:

    video

    audio

    video

    audio

    video

    audio

    I can arrange to look more to:

    video

    video

    video

    audio

    audio

    audio

    Because I can use the two Premiere Pro and Final Cut Pro frequently at work, I find more natural if the audio and video have been grouped separately.

    Step forward. PrPro groups in this way, but can't do the arrangement which use PrE.

    Sorry,

    Hunt

  • Video to audio track locking clip?

    I have a bunch of video clips in my sequence. A couple of clips, I want to some points of the audio track and I don't want to move them but when I ripple delete video clips in front of them it travel clips from back (moving them away from the same spot on the audio track). Is it possible to lock a video clip for a certain part of the audio?

    I tried to "reunification", the music video and audio, but it doesn't seem to work as video clips still move.

    You cannot lock a clip, a single track.  Move the clips you want onto a higher track and that locks.

  • Probook450 G2: Hp Probook450 g2 sound buzz [interruption] after a fixed interval in the course of the video or audio

    Hello!

    I recently bought a new g2 probook450 but whenever I'm playing a video or audio file an interruption occurs as a buzz after interval fixed I don't know what he want it please help me with this. I will be thankful to you.

    This seems to be a problem with the hardware caused by a vice president.

    If it is still under warranty, you can take it to your local HP service center.

    http://WWW8.HP.com/us/en/store-Finder/find.do?BS=SR4 & type = Authorized

  • I'm not able to put the video in my track

    I'm not able to file my video material in my only audio track.

    Any help is greatly appreciated!

    Thank you!

    Jens

    Take a look at the FAQ in the forum.

Maybe you are looking for