Movement of the different times for the same region in TO_TIMESTAMP_TZ

As an example, I have the following sql:

SELECT TO_TIMESTAMP_TZ (31 December 2013 13:30:30.1345 Europe/Rome"

'MON-DD-YYYY HH24:MI:SSXFF TZR')

GOT one

, TO_TIMESTAMP_TZ (31 DECEMBER 2013 13:30:30.1345 THIS ')

"TZDS HH24:MI:SSXFF MON-DD-YYYY")

AS b

FROM DUAL;

If you run this, you'll see that column A gives a difference of one hour, while the second gives the offset of 3 hours.

How this is possible, because in v$ timezone_names THIS is the abbreviation for the Europe/Rome?

Any idea?


Thank you

I finally thought to it. I was under the impression that the time zone abbreviation is unique for each time zone on the globe. They are not, so you can have THIS as an abbreviation for time zone for the Europe/Rome which is UTC + 2, but you can also have THIS for Lisbon/Spain which is UTC + 1.

Because of this when using TO_TIMESTAMP_TZ with TZDS alone, Oracle does not know what time zone you are making reference to and it will convert it to the time zone schedule sessions.

So well to convert a string to a timestamp with time zone time to specify the name of the zone (such as Europe/Lisbon) or a combination of zone name and the abbreviation for the time zone (Europe/Lisbon THIS or Europe/Lisbon CEST)

Tags: Database

Similar Questions

  • How can I separate two movies on the same timeline?

    I use the first elements 11 but that you him have not used for quite awhile so I forgot much of what I learned. So here's my question: I have two movies on the same timeline. How can I separate them. In other words, how can I move one on the timeline, so it won't confuse my editing on the other? But better yet - how can I make a movie on the timeline completely and change it later as a separate film. I have really four shorts - a minute long. I would like to change separately, with a new file name. I don't know how to do that more.

    Tommyvincent

    I did some research on the issues that you have raised in this thread.

    Comments...

    1.

    After you import a video into the assets of the project, you can right click it, select Rename. This file when you drag the timeline will have the new name.

    But...

    If you import a video into the assets of the project, drag it to the timeline, right-click clip timeline, select Rename from the pop-up, then the calendar file will be renamed but not its thumbnail in the active project. You rename this project asset vignette to match if you want. However, these traces yet files renamed to the original with original filename to its disk hard saving location.

    2.

    All down your Timeline... one way would be to export the clip selectively if she was included in the Group of the clips on the Timeline. Two conditions for

    a. change box, set the gray tabs on the work area bar to expand on the segment to export

    and

    (b) in the field of export, have a check mark next to the option "Action work area Bar only.

    3.

    If you have made a clip in the active project, double clicked to open the preview window, you can cut the clip with the points put in and Set Out and create "subitems" with new names in the active project. These "subitems" would be part of the media of this project which could be moved to the timeline when necessary.

    Please review and determine if all the foregoing is in the right direction for what you want to do.

    Thank you.

    RTA

  • Have a button and the image move at the same time in a floating frame

    I have inserted an image into a rectangle and make it a floating frame that works Flory.

    However, I want my form that I made in a button to also be in the same frame and scroll at the same time.

    Is this possible?

    You can have a single object within a framework of scrolling, but this object can be

    a group. You need the button with the image of the Group and then paste it

    in the framework.

  • Rendering of multiple movies in the same model

    I try to make 40 clips from the same model, each in a different area of selected work. Of course I can set my workspace and send it to the render queue and click go 40 times. Ideally, I would like to set my workspace and then add to the queue, then reset a workspace and add it to the queue and so immediately before making them all at once. When I try this it just makes it all with the same area of work as the newest one that I added.

    I have to attend every rendering before resetting the working area or is it possible to stack the different areas of activity in a queue?

    Thank you very much.

    After sending each element to the render queue, open rendering parameters and set the time to custom settings.  He will inherit the current weather of the area to work, but them will change again when you adjust the work area.

    (Nucleo Grill is a valuable aid for jobs like that, because a) it creates a temporary copy of the project made that is not performed by subsequent changes to the project and b) because you can send an item to the queue of rendering, made to start and continue to work and add items to the queue While continues rendering.

  • DTS moves to the same data store

    Greetings,

    We are short v5.5u1 esxi and vcenter device with DTS clusters installation using thresholds to space only at this time. We do not limit our VM to place records on the same data and store, and in view of the virtual machine can have his records scattered across data warehouses in a cluster of the DS.

    We have many events that seem to do nothing is represented below.  Everyone agrees that something actually happens or vcenter turns his wheels?

    Thank you

    Ron

    Just answered my own question... it has to do with my scattered placement of vmdk. Since the vmx file lives on a given data store, the event shows that the activity... However if you check the DTS tab for the cluster data store you will find the disks associated with the virtual machine on other data warehouses were actually moved.

  • The extension of the same region (in pages) with different CO

    Hello

    Management Service (HRMS Application) performance, three pages are here
    1. Add goal
    2. purpose of the update
    3. dual purpose

    In these three pages, ObjEditRN is commonly used. But my requirement is to apply different logic in this three pages
    According to tha page.

    If I extend this RN CO in a single page, it also extends into other two pages.

    I did customize the CO at the site level.

    How to do this?

    Thanks in advance,
    SAN

    Hi SAM,

    According to your requirment, you can add conditional logic to your class according to the page function id. For example, XCCA_CO is your controller extended to the region class. Now your requirment is to get different behavior for each page.

    SerializableAttribute public class XCCA_CO extends YourOringnallClass {}

    ' Public Sub processRequest (pageContext OAPageContext, OAWebBean webBean)
    {
    super.processRequest (pageContext, webBean);

    }

    ' Public Sub processFormRequest (pageContext OAPageContext, OAWebBean webBean)
    {
    super.processFormRequest (pageContext, webBean);
    for example, you want to trigger your logic to LICS.

    FunctionID = string (New Integer (pageContext.getFunctionId ())) m:System.NET.SocketAddress.ToString ();

    {if (functionID.Equals("123"))}
    logicForAddObjectivePage()

    }

    else {if (functionID.equals("456"))

    logicForUpdateObjective()
    }

    else {if (functionID.equals("789"))

    logicForDuplicateObjective();

    }

    }

    private void logicForAddObjectivePage() {}

    YourCode

    }

    private void logicForUpdateObjective() {}

    YourCode

    }

    private void logicForUpdateObjective() {}

    YourCode

    }

    private void logicForDuplicateObjective() {}

    YourCode

    }

    }

    I hope that you will reach your task by the above method.

    Hernu

    Published by: Haroon Afridi, June 13, 2011 08:08

  • Simultaneous use of flex pitch and the "timing" on the same region?

    Is it possible to edit a region in 10 with the two flex pitch logic and timing? When I toggle between modes, I get a message that informs me that pitch adjustments will be suspended. If I put the pitch of the notes to something way off - to check it out - it seems that as soon as I switch to flex pitch in calendar mode, pitch adjustments are ignored. Is it possible to have both at the same time? Workaround is bounce calendar settings in place then the correct pitch. Is this the best way? The only way? Any information would be appreciated. Thank you. -John

    IF you use flexible hours first then flex pitch your flexible hourly landmarks remain intact. In pitch flex mode you can select to the end of a note and drag to the right or left and upwards or downwards. So you can bend the pitch and flexible at the same time, but only when there is an event of note.

  • The execution of the sequence TestStand in LabVIEW via TS - API: execution different times for the same sequence

    Hello - the members of the Forum.

    I have a problem about the execution of a TestStand sequence into LabVIEW. I created a VI that offers the possibility to choose a sequence TestStand-file and then executes the sequence using the TestStand API. The implementation is based on an example in C++-Application found the following link:

    http://forums.NI.com/T5/NI-TestStand/unreleased-references-using-engine-API-in-C/m-p/2927314#M46034

    The app works pretty solid where the VI is executed the first time. The VI treats the sequence chosen in an acceptable time.

    But where execution is started again, the sequence takes approx. 30 sec more than in the first case.

    So far I have not found a solution and hope someones got a clue about this problem...

    I use 2013 LabVIEW and TestStand 2013.

    I enclose my own VI, a sequence of the specimen with a small sample of VI, so you can reproduce the problem.

    Kind regards

    TobiKi


  • How can you get my position in Dock mode car to move in the same direction and orientation as your car?

    I use the car dock mode and my location, Google Maps (not Google Navigation), and I want the icon that shows drive me to go in the sense that I'm actually traveling. In other words, I want the plan to constantly flip and change direction so that my icon always moves 'up '. Is this possible?   Also, what is this circle with the crosshair icon in the lower right? I try clicking on it, but it doesn't seem to do anything.


  • Help keep the page in the same region after Submit

    Version: 4.1.1.00.23

    Theme: Classic Blue

    Page template: tabs in level one

    Hello

    I have 6 Classic reports on the page. Some have filters with of LOV in cascade and button to submit the Page after the filters are selected.

    The Page reloads the top of the page after sending filters.

    I would like to have the page remain on the region where the submission arrived if the user do not scroll to the region that they watch one or work with him.

    I found this article: http://http :// www.apexninjas.com/blog/2011/02/stay-in-page-section-after-submit-on-same-apex-page-unconditional-branch-to-same-page-section/ of Apex Ninjas, but the page reload always at the top.

    I also tried to put an anchor at the bottom of the Page template tag in the Body section after all the tags:

    #LOGO #.
    #REGION_POSITION_06 #.
    #REGION_POSITION_07 #.#NAVIGATION_BAR #.
    #REGION_POSITION_08 #.
    #TAB_CELLS #.
    #SUCCESS_MESSAGE # NOTIFICATION_MESSAGE # GLOBAL_NOTIFICATION #.
    #BOX_BODY # REGION_POSITION_02 # REGION_POSITION_04 #.

    #REGION_POSITION_03 #.
    #REGION_POSITION_01 ##CUSTOMIZE #

    I have a branch:

    Present immediately after treatment

    Target type of URL

    URL of: f? p = & APP_ID.:124: & SESSION. : #APPLY_FILTERS_MPL_LT

    But the Page still loads up and scrolling is necessary.

    Can someone help me get this to work?

    Can what information I provide?

    Thank you

    Joe

    Tom,

    The 'Skip' and 'submission' comes from the LOV cascading I.

    Here are the lists of select Standard. The parent list is called ID wallet and the list of children is called project name. So, if a selected portfolio list project name code displays the project for this portfolio ID name. If no ID portfolio is selected then all the project name are displayed.  When checking for Session I knew if a wallet code has been selected, then the default ID, 'All' portfolio, has been selected Session still had the previous ID and therefore the Select project name list was empty.

    What I don't understand is that when the default portfolio ID is selected, even if the 'Null' is set to 'Yes', and the default value has been set to 0 (zero), the Session was not updated when the default has been selected.

    I changed the query on the Portfolio ID to:

    SELECT 'All' d,0 r
    FROM dual
    UNION
    SELECT portfolio_name, portfolio_id
    FROM   portfolio
    ORDER BY 1
    

    The 'Skip' and 'submission' came from portfolio ID "Action when the changed value of the Page" Configuration. I had it set on 'Redirect and set the value. When I changed it back to "None (default)" and set 'Cascading item (s) Parent LOV' project name to the page item Portfolio ID and then the page started working as expected.  No more 'jump' or 'submit '!

    Thank you very much for your help and your patience!

    Let me know if you have any questions or comments, and if I can close this thread.

    Thank you

    Joe

  • Images and articles in the same region HTML

    I use APEX 3.2, and I try to create an area with an image and an element in there. Unfortunately, there is not of type 'point' for images, so I have to put just the call of the anchor in the body of the HTML area. The bad news is that, so all items appear below the image, as APEX does not seem to consider the image as a part of the area. I need an element to appear to the right of the image.

    What I have to use a dynamic HTML region instead, or is there something really simple that I'm missing?

    Hello

    You can create items for display only and set these source your image tag

    Kind regards
    Jari

  • How to create tabs in the same region?

    Hi people,

    I am wanting to put a tab region on my page (the page itself is a tab), is it possible to do this?

    Thank you very much

    -Adam

    Hi Adam,.

    Yes, if you create tabs in the region in a list (through the shared components, lists) and then display using something as the model of the "list of tabbed browsing.

    Andy

  • HP notbook not for sure: CANT TYPE AND MOVE the MOUSE at the SAME TIME

    Basiclly so I cant use Wasd and move my mouse at the same time and I on the delay and feel smart all options off but (of course they do not save after I leave screen) and even when they r there is finally no delay, but still can not use wasd and move at the same time

    Hi Logankoch01,

    The permanent solution is to attach a USB mouse. The mouse and keyboard can work at the same time for the games.

  • Movement 2 different movieClips to the same delivery function

    Hello

    I'm using the following code to simulate a control bar filling on flight volume + and unfilling on flight.

    The dredger is a mask that causes the filling to appear and disappear when the mouse is pressed and dragged on the volume control.

    It works well, but I would like to add a 'switch' that moves at the same time and in the same place as fill, but above it... I created the movieClip for the switch and tried all kinds of variations to the following code its instance in the code, but can't seem to make it work... below is the code that works with only the fill mask / unfilling.

    Any help would be great!

    This.ratio = 0;
    dragger.onPress = function() {}
    this.startDrag (true, 0, 0, line._width, 0);
    this.onEnterFrame = function() {}
    ratio = Math.round(this._x*100/line._width);
    _root.volume = report;
    };
    };
    dragger.onRelease = dragger.onRelease = stopDrag;

    Thank you!

    Pat

    use:

    This.ratio = 0;
    dragger.onPress = function() {}
    this.startDrag (true, 0, 0, line._width, 0);
    this.onEnterFrame = function() {}

    switch_mc._x = this ._x;
    ratio = Math.round(this._x*100/line._width);
    _root.volume = report;
    };
    };
    dragger.onRelease = dragger.onRelease = stopDragF;

    function stopDragF() {}

    this.stopDrag ();

    delete this.onEnterFrame;

    }

  • Is there a script to move several tabs at the same time

    Is there a script or a way of being able to move several tabs at the same time - I need to change the size of a document and all the tabs need to move at the same time - is it possible to do so.  Have several financial sheets should reformat - thank you very much!

    Jjust found a cool script of Shane Stanley moving several tabs in indesign [Archives] - Desktop Publishing Forum that works just the way I want it – here it is:

    say application "Adobe InDesign CC 2014"

    the value theMeas to my doIDdialog()

    set theTabList to tab list of the paragraph 1 of the selection

    set theTabPositions to position of tab stops to paragraph 1 of selection as points

    Repeat with I from 1 to the number items in theTabList

    set the position of the point of theTabList to 'p' i & ((point I of theTabPositions) + theMeas)

    end Repeat

    define tab list some points of selection at theTabList

    end say

    on doIDdialog()

    say application "Adobe InDesign CC 2014"

    the value measUnits to measure horizontal units of view preferences of the document 1

    Try

    destroy each dialog box

    end try

    Set restart to make dialogue with properties {name: "Putting the selection handles"}

    the value C1 to do dialogue column restart

    do static text in C1 with properties {dynamic label: "' amount to move all tabs:" "}

    the value C2 do to column of the dialog box to restart

    the value mComb1 to do measure combobox to C2 with properties {min width: 80, content Edition: '1', big helping hand: 10, nudge: 1, string list: {'-25', '-20', '-15', '-10', '-5', '5', '10', '15', '20', '25'}, change the units: measUnits, value: 1000 maximum, minimum value:-1000}

    activate

    with timeout to 10000 seconds

    Show reboot

    If result = false then

    beep

    Restart to destroy

    Error number-128

    end if

    end timeout

    the value comboMeasNum1 to change value of mComb1

    Restart to destroy

    end say

    return comboMeasNum1

    end doIDdialog

Maybe you are looking for

  • Search for files

    How can see / find music and movies in my iMac? Pls see screenshot

  • Equium L20: instead of 1.25 GB only 1 GB is recognized

    Hello world.Newbie here so please, be gentle. I have a laptop equium L20 its perfect for my needs, but with only 256 MB of ram that it was a little slow, so I upped the memory with a stick of 1 GB and wow its great. Now, the problem, I left in the 25

  • Screen locking problems model?

    I have a setup of reason as my lock screen for my phone and 2 out of the 3 times that I try unlock it, it does not work. I try to drag the ground, but he thinks that I lifted my finger and the lines are red, as when guess you the wrong pattern, and t

  • How can I disable the Windows XP Pro wifi connection?

    is there a port can I close? I am a novice so it. and I had annother LAN connection.in the last hour. by itself. My firewall has already a lam configuration for microsoft then why my comp need another for microsoft tv on the TCP/IP Protocol on a seco

  • How can I connect to my desktop to a projector, I have no vga or hdmi

    cables xps1 Hi I wanted to help it with a type of cable, that I need to connect my desktop computer to a projector. my pc is not a normal vga conductor and he does not have a hdmi slot either. only usb and 1394 slots. Help, please