Muse - business plans for the future

Hello

About to launch a major project for a client that will result in a website that should last for a few years and will must be constantly updated during that time.

Are there long term plans to withdraw from the platform of Muse

And is it planned in the short term to prevent users of IE8 to access content developed in Muse.

Bravo for your thoughts.

Muse is a relatively new product, were introduced in 2011. I doubt that it is only around a few years. He is actively updated and widely used in the design community.

What about IE8, 3.68% of all users use IE8 in the world. Will be probably does not exist in a few years, if not sooner. (but there are always a few stranglers there)

I doubt that Adobe would look at logic programming in Muse to block a certain browser.

Tags: Adobe Muse

Similar Questions

  • CC, the backsaving, and plans for the future

    Hi all

    In my workplace, we currently have CS5 (3 or 4 employees) and it has just upgraded to CC.

    This will naturally cause problems with the work between us and now we have to look at updated others.  What I have read you can only back save 1 version on indesign, do the same thing on illustrator/photoshop?

    Another question I have is finally the back except function will disappear from the CC?

    Thank you

    Hi Simon,.

    Files saved in the most recent version will experience problems opening in the old version because of missing features.

    I advise you to upgrade all of your users to the Adobe Creative cloud because it will be easier for them to work on data and shared files.

    For specific information about Indesign, let me know.

    Kind regards

    Sheena

  • How can I get a list of jobs that are planned for the days of the future

    How can I get a list of jobs that are planned for the days of the future?

    In a previous article, I found a query that lists the scheduled tasks that are already running. Can I get a similar request for the future days which is compiled?

    Hi sreedevir,

    SELECT jobmst.jobmst_prntname, jobmst.jobmst_name, jobrun.*

    FROM jobrun JOIN jobmst ON jobmst.jobmst_id = jobrun.jobmst_id -joining tables jobmst and jobrun

    WHERE jobrun_proddt > = dateadd (dd, 1, datediff (dd, getdate())) 0, -future dates

    AND jobmst.jobmst_type = 2 -given jobs (and not groups)

    ORDER BY 1, 2 -Sort by name of the parent, then by task name

    Feel free to make any changes to your reporting needs

    ARO

    The Derrick

  • Why I have two different execution plans for the same query on two different servers

    Hello everyone.

    I need your help to solve the problem quickly.

    In a nutshell, we have two servers that have the same version of Oracle RDBMS (11.2.0.4 EE). One of them for purposes of development and another is a production one.

    We have therefore two different execution plans for the same query executed on both servers. The only case of execution is OK and another is too slow.

    So I have to slow down the work of query using the same scheme to explain that young.

    Fence wire.

  • can I benefit from the agreement of the student upgrade my current plan for the $20.00 per month for everything since I was a student

    can I benefit from the agreement of the student upgrade my current plan for the $20.00 per month for everything since I was a student

    Adobe in education... Start here https://creative.adobe.com/join/edu

    Educational https://creative.adobe.com/plans?plan=edu

    FAQ https://helpx.adobe.com/x-productkb/policy-pricing/education-faq.html

    When you purchase a subscription to education, the terms you "click to accept" should be clear about the first/last years

    -Intro price http://forums.adobe.com/thread/1448933?tstart=0 one can help

    http://www.Adobe.com/products/creativecloud/students.edu.html

    http://www.Adobe.com/education/students/student-eligibility-Guide.edu.html

    Redemption Code https://creative.adobe.com/educard

    Proof of ID http://www.adobe.com/store/au_edu/academic_id.html

  • Payment plan for the photographer and the creative shift and cannot use photoshopPayment for the photographer and the creative shift plan and may not use photoshop

    Payment plan for the photographer and the creative cloud and can't use photoshop

    Your subscription to cloud shows correctly on your account page?

    If you have more than one email, you will be sure that you use the right Adobe ID?

    https://www.adobe.com/account.html for subscriptions on your page from Adobe

    .

    If Yes

    Sign out of your account of cloud... Restart your computer... Connect to your paid account of cloud

    -Connect using http://helpx.adobe.com/x-productkb/policy-pricing/account-password-sign-faq.html

    -http://helpx.adobe.com/creative-cloud/kb/sign-in-out-creative-cloud-desktop-app.html

    -http://helpx.adobe.com/x-productkb/policy-pricing/activation-network-issues.html

    -http://helpx.adobe.com/creative-suite/kb/trial--1-launch.html

    -ID help https://helpx.adobe.com/contact.html?step=ZNA_id-signing_stillNeedHelp

    -http://helpx.adobe.com/creative-cloud/kb/license-this-software.html

    .

    If no

    This is an open forum, Adobe support... you need Adobe personnel to help

    Adobe contact information - http://helpx.adobe.com/contact.html

    Chat/phone: Mon - Fri 05:00-19:00 (US Pacific Time)<=== note="" days="" and="">

    -Select your product and what you need help with

    -Click on the blue box "still need help? Contact us. "

  • I have an idea on the program application Adobe InDesign to increase the power of sale of Adobe InDesign, by adding an additional menu, with an additional menu that I hear more important for the future of printing.  How can I report directly to the

    I have an idea on the program application Adobe InDesign to increase the power of sale of Adobe InDesign, by adding an additional menu, with an additional menu that I hear more important for the future of printing.

    How can I report directly to the developer indesingn adobe...!

    You can create a feature here request:

    Feature requests/bug reports

  • I had paid an annual plan for the adobe illustration but I can't download the program.

    I had paid an annual plan for the adobe illustration and received an email with my contact information order in which they say they received my payment. And when I get home my account online, the plan appears but I can't download the program.

    To download and install CC, please visit these links:

    FAQ: How to download and install the Adobe Creative Cloud Desktop App?

    FAQ: How to download and install creative cloud applications?

    FAQ: How to install previous versions of creative cloud applications?

    FAQ: How to launch creative Cloud Apps

    If you try or buy instead of the download, please see the suggestions in this FAQ:

    FAQ: What should I do if I have a subscription, but my application acts as if I had a trial?

  • Is there any fix planned for the slow lingering and pervasive in LR6/cc?

    LR6, Win7, 6 GB of ram

    Is there any fix planned for the slow lingering and pervasive in LR6/cc? I disabled the GRU.  I cleared the cache.  My catalogs are updated to LR 5.7.1.  Everything is slow.  It doesn't matter what it is.  Its takes twice as much time to do something.  LR will freeze for 5 to 15 seconds at a time without apparent reason.  The use cases are to go "Not responding" are numerous and vary widely.  I check the CPU during these events Nn sensitive usage and its pretty much slowed down.  I have check the disk usage and its also generally inactive.

    I thought it might be VSCO plugins, but it's not.  LR5.7.1 is always screaming fast while LR6 is an old slow cow.

    Here is an example that I saw that is repeatable:

    (1) start an import

    (2) choose the photos from an SD card

    3) click the + to add them to the catalog

    4) appears to enter a catalog name

    (5) start to type in the dialog box.
    (6) after may entered 8 letters, LR goes "Not responding", 10 seconds

    (7) after LR starts responding again, emphasis on catalog name field has been lost

    There is no reason for a freezing here.  The CPU does nothing.  The drive does nothing.

    There are things like that in every sense.

    Another example.

    (1) develop the Mode

    (2) select a photo

    (3) left and right panels are hidden

    (4) browse the side panel right of the mouse so that it will pop-out

    5) LR freezes for 5 seconds

    6( ) when the right panel opens, click on the number of exposure (0) and try to type in 1.25.

    7( ) after after graduating 1,2, LR hangs for 10 seconds.

    8( ) when LR answers once again, finishing by typing in the 5 other (1.25) and press to enter.

    9( ) the image immediately illuminates as expected.

    Yay!  They have updated LRCC/6 today.  The slowness and latency seem to have disappeared! Yay!  I can get back to work!

  • explain plan for the same query diff

    Hi experts,

    Please, help me understand explain the plan.  I have tow Server (server and two server). The server are same table, even the type of database, even version Oracle (gr 11 (2), same operating system (linux Redhat 5.5) and same table and index.

    but when I explain the plan for the same query on the two server. I got diff--diff to explain the plan. reason it has different, according to my understanding, it should be same. explain please, I share the explain plan and lower indices for the two server.

    Server a

    SQL > col COLUMN_NAME format a20

    SQL > select index_name, column_name, position_colonne from user_ind_columns where table_name = 'LOAN_RUNNING_DETAILS_SOUTH"of order 1.

    INDEX_NAME COLUMN_NAME POSITION_COLONNE

    ------------------------------ -------------------- ---------------

    DATE_IND1_S LOANDATETIME 1

    IND_MSI_LN_LNS1_S MSISDN 1

    IND_MSI_LN_LNS1_S LOANDATETIME 2

    IND_MSI_LN_LNS1_S LOANSTATUS 3

    LAST_INDEX L_INDX_MSISDN_S 1

    MSISDN L_INDX_MSISDN_S 2

    SQL > select decode (status, 'N/a', 'Part Hdr', 'Global') ind_type, index_name, NULL nom_partition, status

    2 from user_indexes where table_name = 'LOAN_RUNNING_DETAILS_SOUTH '.

    3 union

    4. Select 'Local' ind_type, index_name, nom_partition, status

    5 to user_ind_partitions where index-name in (select index_name in user_indexes where table_name = 'LOAN_RUNNING_DETAILS_SOUTH')

    6 order of 1,2,3;

    IND_TYPE INDEX_NAME NOM_PARTITION STATUS

    -------- ------------------------------ ------------------------------ --------

    Global DATE_IND1_S VALID

    Global IND_MSI_LN_LNS1_S VALID

    Global L_INDX_MSISDN_S VALID

    SQL > explain plan for the small circle of MSISDN, TID, of LOAN_RUNNING_DETAILS_SOUTH where LOANDATETIME < = sysdate-2 and LOANDATETIME > sysdate-15 and LOANTYPE = 1;

    He explained.

    SQL > SQL > set line 200

    @?/rdbms/admin/utlxpls.sql

    SQL >

    PLAN_TABLE_OUTPUT

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Hash value of plan: 3659874059

    ------------------------------------------------------------------------------------------------------------------

    | ID | Operation | Name                       | Lines | Bytes | Cost (% CPU). Time | Pstart. Pstop |

    ------------------------------------------------------------------------------------------------------------------

    |   0 | SELECT STATEMENT |                            |  1448K |    58 M | 21973 (2) | 00:04:24 |       |       |

    |*  1 |  FILTER |                            |       |       |            |          |       |       |

    |   2.   PARTITION LIST ALL |                            |  1448K |    58 M | 21973 (2) | 00:04:24 |     1.    11.

    |*  3 |    TABLE ACCESS FULL | LOAN_RUNNING_DETAILS_SOUTH |  1448K |    58 M | 21973 (2) | 00:04:24 |     1.    11.

    ------------------------------------------------------------------------------------------------------------------

    PLAN_TABLE_OUTPUT

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Information of predicates (identified by the operation identity card):

    ---------------------------------------------------

    1 - filter(SYSDATE@!-2>SYSDATE@!-15)

    3 - filter("LOANTYPE"=1 AND "LOANDATETIME">SYSDATE@!-15 AND "LOANDATETIME"<=SYSDATE@!-2)

    16 selected lines.

    Second server

    SQL > select index_name, column_name, position_colonne from user_ind_columns where table_name = 'LOAN_RUNNING_DETAILS_SOUTH"of order 1.

    INDEX_NAME COLUMN_NAME POSITION_COLONNE

    ------------------------------ -------------------- ---------------

    DATE_IND1_S LOANDATETIME 1

    IND_MSI_LN_LNS1_S MSISDN 1

    IND_MSI_LN_LNS1_S LOANDATETIME 2

    IND_MSI_LN_LNS1_S LOANSTATUS 3

    LAST_INDEX L_INDX_MSISDN_S 1

    MSISDN L_INDX_MSISDN_S 2

    SQL > select decode (status, 'N/a', 'Part Hdr', 'Global') ind_type, index_name, NULL nom_partition, status

    2 from user_indexes where table_name = 'LOAN_RUNNING_DETAILS_SOUTH '.

    Union

    3 4 Select 'Local' ind_type, index_name, nom_partition, status

    5 to user_ind_partitions where index-name in (select index_name in user_indexes where table_name = 'LOAN_RUNNING_DETAILS_SOUTH')

    6 order of 1,2,3;

    IND_TYPE INDEX_NAME NOM_PARTITION STATUS

    -------- ------------------------------ ------------------------------ --------

    Global DATE_IND1_S VALID

    Global IND_MSI_LN_LNS1_S VALID

    Global L_INDX_MSISDN_S VALID

    SQL > explain plan for the small circle of MSISDN, TID, of LOAN_RUNNING_DETAILS_SOUTH where LOANDATETIME < = sysdate-2 and LOANDATETIME > sysdate-15 and LOANTYPE = 1;

    SQL > set line 200

    @?/rdbms/admin/utlxpls.sql

    SQL >

    PLAN_TABLE_OUTPUT

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Hash value of plan: 1161680601

    ----------------------------------------------------------------------------------------------------------------------------------

    | ID | Operation | Name                       | Lines | Bytes | Cost (% CPU). Time | Pstart. Pstop |

    ----------------------------------------------------------------------------------------------------------------------------------

    |   0 | SELECT STATEMENT |                            |     2.    84.     5 (0) | 00:00:01 |       |       |

    |*  1 |  FILTER                             |                            |       |       |            |          |       |       |

    |*  2 |   TABLE ACCESS BY INDEX ROWID | LOAN_RUNNING_DETAILS_SOUTH |     2.    84.     5 (0) | 00:00:01 | ROWID | ROWID |

    |*  3 |    INDEX RANGE SCAN | DATE_IND1_S |     2.       |     3 (0) | 00:00:01 |       |       |

    ----------------------------------------------------------------------------------------------------------------------------------

    PLAN_TABLE_OUTPUT

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Information of predicates (identified by the operation identity card):

    ---------------------------------------------------

    1 - filter(SYSDATE@!-2>SYSDATE@!-15)

    2 - filter ("LOANTYPE" = 1)

    3 - access("LOANDATETIME">SYSDATE@!-15 AND "LOANDATETIME"<=SYSDATE@!-2)

    17 selected lines.

    Reg,

    Hard

    Hi , HemantKChitale,

    I also update statistics manual as you say, but not see 'TABLE ACCESS FULL' good result

    What should I do? my need of production tuning, but I cannot able tune this...

    SQL > exec dbms_stats.gather_table_stats (-online 'ttt' ownname, tabname => 'LOAN_RUNNING_DETAILS_SOUTH', cascade => TRUE, estimate_percent => NULL, method_opt => 'for all columns size 254', => of degree 4);

    PL/SQL procedure successfully completed.

    SQL > explain plan for the small circle of MSISDN, TID, of LOAN_RUNNING_DETAILS_SOUTH where LOANDATETIME<=sysdate-2 and="" loandatetime="">sysdate-15 and LOANTYPE = 1;

    He explained.

    SQL > set line 200

    @?/rdbms/admin/utlxpls.sql

    SQL >

    PLAN_TABLE_OUTPUT

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Hash value of plan: 3659874059

    ------------------------------------------------------------------------------------------------------------------

    | ID | Operation | Name                       | Lines | Bytes | Cost (% CPU). Time | Pstart. Pstop |

    ------------------------------------------------------------------------------------------------------------------

    |   0 | SELECT STATEMENT |                            |  1874K |    75 M | 19626 (2) | 00:03:56 |       |       |

    |*  1 |  FILTER |                            |       |       |            |          |       |       |

    |   2.   PARTITION LIST ALL |                            |  1874K |    75 M | 19626 (2) | 00:03:56 |     1.    11.

    |*  3 |    TABLE ACCESS FULL | LOAN_RUNNING_DETAILS_SOUTH |  1874K |    75 M | 19626 (2) | 00:03:56 |     1.    11.

    ------------------------------------------------------------------------------------------------------------------

    PLAN_TABLE_OUTPUT

    --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Information of predicates (identified by the operation identity card):

    ---------------------------------------------------

    1 - filter(SYSDATE@!-2>SYSDATE@!-15)

    3 - filter("LOANDATETIME">SYSDATE@!-15 AND "LOANTYPE"=1 AND "LOANDATETIME")<>

    16 selected lines.

  • Plan for the upgrade to complete our special $ 29.99

    I have bought a lot of perpetual licenses during the last 15 years and I am now in terms of cloud photography.  Two questions:

    1. Why do I get only 2 GB of storage on creative cloud?

    2. how to switch my plan for the special Plan for $29.99 per month?

    Thank you.

    Hello

    29.99 is for customers who have bought a creative suite CS3, CS4 or CS5 before. If you have one of its products, you must register it on your account, the system will detect and make the discount automatically prior to payment.

  • Quality element derived from Master Collection Oracle based on Plans for the child?

    As an Oracle, we have a collection Plan and a Plan for the Collection. The child Map Collection contains many instances sample were out.

    Let's Say there were 5 samples for a number of batch (batch number as the Parent in Master Plan of collection). An element of the Collection take for example. Size. a observation of the sample.

    # Sample size.
    1 16
    2 16
    3 16
    4 32
    5 40

    So based on the example of the child, we would like to put the size of the collection in the level item Parent's maximum allowed size of all samples of the child.

    which in this case than the 16.

    Quality > configurations > relationships define/update the Parent child Plan

    Define a relationship that makes parentplan.samplesize = max (childplan.samplesize)

  • Future plans for the App Web View

    I'd like say the new view of web get you sharing a folio is exciting. Question: What are the future hope or that he plans for this feature. SE Navto: / / buttons and overlays be fully supported?

    Thank you.

    The Web Viewer supports all overlays in the latest browsers (Chrome, Firefox, Safari, IE9, IE10) with the exception of the Panorama. There is also a limited overlay support in IE8 (hyperlink, 360 view, button, image)

    Kristy

  • Need to buy the plan for the PS, LR, Muse, DW for teachers. What is the best option?

    Impossible to obtain using the Adobe Customer Service to ask this question. Why don't they have online customer to ask these questions? It should not be up to fellow users to answer the questions about payment plans, but here goes. What is the rate of the teacher for the PS, LR, MU and DW? Do not have need Illustrator or anything else.

    phone http://helpx.adobe.com/x-productkb/global/phone-support-orders.html

    http://helpx.Adobe.com/Adobe-Connect/Adobe-Connect-phone-numbers.html

  • Are there plans for the new ESW 500 models switch with PoE capability?

    I know that current models of ESW 500 switch don't have enough capacity to power all the switchports to 15.4, even if the ESW-540-8 p model has almost enough capacity to power all the switchports to 15.4.

    Reasons why new ESW 500 switch with PoE capacity are necessary:

    • The existing PoE 500 ESW switches have not always enough when these devices are deployed with the UC500:

      • 7945, 7965 and 797 x phones
      • series phones (not yet supported with the SBCS solution) 9900 and 8900
      • PVC2300 Surveillance Cameras
      • AP541N access points
    • The UC560 comes with all the PoE ports and requires at least an ESW switch be deployed
    • Version 48 ports gigabit switch ESW is currently available only in the version not PoE, and we need a version of 48 gigabit ports for users of the UC560 solution.

    Existing ESW 500 switch PoE capabilities are:

    • ESW-520-8 P: 60W
    • ESW-540-8 P: 120W
    • ESW-520-24 P: 180W
    • ESW-540-48P: 380W
    • ESW-540-24 P: 280W

    PoE of ESW 500 switch capabilities supporting 15.4 full power on all PoE PoE ports are:

    • 8 port: 123.2W
    • 24 port: 369.6W
    • 48 port: 739.2W

    Are there plans to release the new ESW 500 switch models increased capacity, enough to supply the full 15.4 to all PoE ports with PoE?

    Hi John - Thank you for your participation in the small community of business support. I talked to our switch product manager and want to share his response.

    / * Style definitions * / table. MsoNormalTable {mso-style-name: "Table Normal" "; mso-knew-rowband-size: 0; mso-knew-colband-size: 0; mso-style - noshow:yes; mso-style-priority: 99; mso-style - qformat:yes; mso-style-parent:" ";" mso-padding-alt: 0 to 5.4pt 0 to 5.4pt; mso-para-margin: 0; mso-para-margin-bottom: .0001pt; mso-pagination: widow-orphan; do-size: 10.0pt; do-family: "Times New Roman", "serif" ;} "}

    We have taken the conscious decision to deliver PoE as ESW and other switches for small businesses for several reasons:

    • Endpoints PoE more attract a lot less than the 15.4 W maximum power. Most IP phones are below the range of 7W.
    • A typical deployment would most PoE devices connect to a switch.
    • For these reasons, the ESW is not burdened cost with the PoE feature which would not be used most of the time.
    • All ports are still able to PoE you can connect up to 24 devices PoE Switch 24 ports to any point in time, as long as the handset is in the title of the budget.
    • Therefore, given that these products are intended for small business and the price is an important factor, we opted for this approach.

    We do not have a product at full power on all ports in the Cisco Small Business portfolio, except in the arena of 8 channels. Within Cisco, Cisco Catalyst products support this today.

    Thanks again for the question,

    Stephanie Reaves

    Cisco Small Business

Maybe you are looking for