order of the opposite chain

Hi all

I first want to reverse the order of the string first e.g. the string is 9200 FDE7 I want to change it to E7FD 0092. further, I want to change this string of hexadecimal value to a decimal string...... I implemented them in my vi... .well the first part works well, but I can't get the value of an equivalent decimal number conversion... VI is attached... Please take a look

regarding

Ali asad


Tags: NI Software

Similar Questions

  • Right-click menu changed: used to be the first "Open link in a new window", "Open link in a new tab" second; in 4.0, the opposite is true. Can I customize 4.0 to switch back?

    Right-click menu changed: used to be the first "Open link in a new window", "Open link in a new tab" second; in 4.0, the opposite is true. Can I customize 4.0 to switch back?

    To change the order of these items, use the following:

    You must update the following (your versions have known security problems):

    • Shockwave Flash 10.2 r152
    • Next-generation Java plug-in 1.6.0_22 for Mozilla browsers
    1. Check your plugin versions on one of the following links:

    2. Update the Flash plugin to the latest version.
      • Download and SAVE to your desktop, so you can find the Setup program later
      • If you do not have the current version, click on the "Player Download Center" link on the 'download and information' or 'Download manual installers' below
      • Once the download is complete, exit Firefox
      • Click on the installer, you just download and install
        • Windows 7 and Vista: will need to right click on the installer and choose 'run as administrator '.
      • Launch Firefox and recheck your version or up to the download link below to test the installation
      • Download and information: http://www.adobe.com/software/flash/about/
        • Use Firefox to go to the site above to update the Firefox plugin (will also install the plugin for most other browsers, except IE)
        • Use IE to go to the site above to update the ActiveX to IE
      • Download manual installers.
    3. Update the Java plugin to the latest version.
  • Why the continuous measurement and Logging in LabVIEW 2012 Project uses strings instead of Enums and orders from the queue?

    Hello!

    I noticed that the continuous measurement and a project in LabVIEW 2012 Logging using chains instead of enums and orders from the queue. I wonder if there is a good reason for it?

    Kind regards

    Anguel

    First, string vs enum debate is probably the version of LabVIEW vim vs emacs. There are good arguments on both sides, and I doubt that there is always a "winner".

    A brief summary of our reasoning for the current state of the project examples:

    1. We used enums for the state machine because it is self-contained. A state machine will never tell himself to enter a State, he does not know. Knowing (as the programmer) all possible States with the help of an enum allows you to enlist the compiler in order to help us avoid mistakes to change the time (because you can't quite out an enum and LabVIEW can be said if you are not covering all cases to a structure of the case, etc..).

      Enums provide greater protection and rigidity by ensuring all withdrew at the time of publishing. This is often the 'default' recommendation that we do.

    2. We used strings for messages in queue manager because the producer of message and the message handler could be independent processes that are reused or traded. Channels avoid the need for the compiler to be able to connect the orders and push this responsibility to the programmer. This allows you to develop some sub-components independently as long as you agree to a series of channel commands that you can manage - you need not to share a file 'messages.ctl' or 'states.ctl '. It is conceivable a loop of message management a message it does not, how you can decide to either silently ignore it or will trigger an error (as we do in the model). The strings make it also easier if you want to swap the queues of LabVIEW outside by a TCP implementation for network vacilitate or intra-Processuse communication where the other end may or may not be written in LabVIEW.

      Channels to provide more flexibility (that is, you can add new commands to an existing via plugins system, you can pass parameters as part of the string, etc.) at the expense of pushing her potential errors at run time and to put more responsibility on the programmer.

    3. The actor's gifts frame a 3rd option - using classes such as messages. For me, it combines many of the advantages of these two enumerations (strictly typed, change errors) and strings (flexible and scalable), but with the disadvantage of being somewhat less transparent (you understand OO, be comfortable to navigate through a multitude of screws, legacy of understanding, etc.).

    I don't know there are other reasons, others to the breast OR had or seen as we validated models and examples of projects in-house, but here are my reasons. We know that we can not design for each situation there - our goal is to get useful models against new users to make them aware of what well thought LabVIEW programs are similar to experienced users know their applications better and I hope they do not hesitate to change what we provide or create their own designs, when they feel it's necessary. (On a side note, please share what you come up with - a community of experts sharing models would be really useful to us all LabVIEW users).

    Best regards

    Simon

  • order of the authentication and authorization air ISE

    Hello

    I am looking to configure ISE to authenticate joined AD PC (Anyconnect NAM help for user authentication and the machine with the EAP chaining) and profile Cisco IP phones. The Pc and phones connect on the same switchport. The switchport configuration was:

    switchport
    switchport access vlan 102
    switchport mode access
    switchport voice vlan 101
    authentication event fail following action method
    multi-domain of host-mode authentication
    authentication order dot1x mab
    authentication priority dot1x mab
    Auto control of the port of authentication
    MAB
    added mac-SNMP trap notification change
    deleted mac-SNMP trap notification change
    dot1x EAP authenticator

    The configuration above worked well with authentication sessions 'show' of the switch showing dot1x as the method to the field of DATA and mab for VOICE. I decided to reverse the order of authentication/priority on the interface of the switch so that the phone would be authenticated first by mab. As a result, the authentication sessions 'show' of the switch showing mab as a method for both VOICE and DATA.

    To avoid this I created a permission policy on ISE to respond with an "Access-Reject" when the "UseCase = Lookup host" and the endpoint identity group was unknown (the group that contains the PC AD). This worked well worked - the switch would attempt to authenticate the PC and phone with mab. When an "Access-Reject" has been received for the PC, the switch would pass to the next method and the PC would be authenticated using dot1x.

    The only problem with this is that newspapers soon filled ISE with denys caused by the authorization policy - is possible to realize the scenario above without affecting the newspapers?

    Thank you
    Andy

    Hi Andy -.

    Have you tried to have the config in the following way:

     authentication order mab dot1x authentication priority dot1x mab

    This "order" will tell the switchport always start with mab , but the keyword 'priority' will allow the switchport to accept the authentications of dot1x to dot1x devices.

    For more information see this link:

    http://www.Cisco.com/c/en/us/products/collateral/iOS-NX-OS-software/identity-based-networking-service/application_note_c27-573287.html

    Thank you for evaluating useful messages!

  • Can I release from planned orders in the Planner workbench using the responsibility of (IO) inventory Planner

    Can I free from planned orders in the Planner workbench using responsibility (IO), planner of the inventory in the manual IO I found the following information:

    Planner Workbench

    You can use the Planner Workbench in Oracle Advanced Supply Chain Planning to act on the recommendations of the planning process for a plan. You can implement

    scheduled orders as discrete jobs or purchase requisitions, keeping planned orders, Replanifier Receptions scheduled and apply rehearsal schedules. You can choose all

    suggestions for a MRP regime, or only those that meet certain criteria. In the optimization of Oracle inventory, Planner Workbench is used to perform tasks such as setting up

    attributes, BOM supply chain implementation and analysis of time series security stocks.

    My question is Oracle inventory optimization, Planner Workbench can´t release orders.

    Thanks in advance

    Best regards, James

    Hi James,

    We cannot release the orders of workbench IO.

    IO is for safety stock planning, only not for release of planned orders. It is made of a CPSA regime that uses the IO plan as an annex of the application.

    Kind regards

    Mohan Balaji

    NOTE: Please indicate the post as helpful or answered if the update has really helped you. This would also bring the wire to the logical conclusion and will be useful for viewers.

  • Creating an order of the strokes for Japanese fonts

    Hello. I am a novice with Amnesty International, using CS4 on Windows 7.

    I created spreadsheets to show the order of the strokes for Japanese fonts. My goal is to design a spreadsheet that shows the police followed some versions from the same thing that the user can trace on the practice of the police of drawing. The faded version will be the order of the strokes shown around his design, and features should have an arrow indicating the direction.

    I can create a line with an arrowhead without any difficulty (#2 in the image below), but some of the Japanese fonts are complex and I want also to illustration drawn path to be as close in angles and degrees as the original font.

    In the image below, I reproduced the first version of the faded police, created a glimpse of it, removed the unwanted paths and makes a few minor paths to better reflect updated her trace the path around the real race (#1). Race #2 was created using a line, then effect > esthetics > add arrowheads.

    stroke-order1a.jpg

    When I try to apply the tips of arrows for other paths to the #1 race (the rear 'j'), the object fills up even if only the line is assigned a color and the fill is set to empty.

    stroke-order1b.jpg

    It is possible to select a font, create it to paths, delete the unwanted points and then convert the remaining line so that arrowhead may be attached?

    Is it easier for me to create trails of race with arrowheads for fonts?

    Thank you

    Buck

    Buck,

    At least for relatively simple forms, you can:

    (1) create a copy of the character to it before, possibly the lamest original and lock it, continue with the copy;

    (2) type > vectorize and trace release where appropriate;

    (3) cut the path so that you get both parties opposite, outside/inside, or equivalent, with the same number of anchor Points (you can add one or a few, to match to);

    (4) set the mix a little and aligned to the path and create mixed, object > blend > Expand and keep only the center lane.

    (5) using a color of your choice and effect > esthetics > add arrowheads.

    This should give you a path of the Center colored with an arrow on the paler character possible.

  • How to create chart in the opposite direction?

    Hello

    Excuse me, I want to know, if I want to make a graph bar, but the x-axis must be in the negative direction like that

    |
    |
    |
    ---------------------

    How can I do? Please answer as soon as possible

    I found the solution. I know this isn't a perfect solution, but it works.
    I'll put it here to avoid spending you much more time thinking and research, let me start:

    First of all, I spend the axis y to be in the right part of the graph using placement in the renderer of vertical axis as follows:



    When you do that you will see that the table remaining on the left (I want to say series), then how to change? Reorganize all the category axis in order descending (I have faild to do, because I do another solution). I use negative values in the x-axis by set the following:



    So I used less as a negative value, and the maximum is zero. Then I made a function of these labels (forthcoming positive values I want) and this function I call using labelFunction as you can see above in the horizontal axis. The body of this function is:

    Import mx.charts.chartClasses.IAxis;
    private void linearAxis_labelFunc(item:Object,_prevValue:Object,_axis:IAxis):String {}
    var x: Number = Number (item);
    If (x<>
    x = x *-1;
    Return x.toString ();

    }

    as you know, you place it in the CDATA section. This function checks if the value is negative, it will multiply by-1 to be positive and return.

    It will now be a correct chart in the opposite direction, remaining just problem which is a DataTip, it gives the negative value...

    I have a solution for this, create a new dataTip using dataTipFunction = "dataTip_bar" and showDataTips to true in your table tag, for example:

    and it calls a function that create a dataTip. The body of this function is:

    Import mx.charts.series.items.BarSeriesItem;
    Import mx.charts.HitData;
    private void dataTip_bar(item:HitData):String {}
    var pSI: BarSeriesItem = item.chartItem as BarSeriesItem;
    Return "" + "Population:
    Age: "+ psi. Item.Age +"
    Male: "+ (Number (psi. (Item.male) * - 1). "ToString() +".

    ";
    }

    As you can see I put pSI.item.Age and (Number (pSI.item.Male) * - 1). The age is my y axis and the male is the negative values I have multiply-1 to make it positive.

    I hope this will help you. Thanks for trying to help me

  • Getting error while using the certificate chain

    Hello

    I use a SSL security certificate chain and when sending message I get the error message. This error happens when B2B tries to retrieve the portfolio's private key to sign the message. He said "alias found certificate", but he then gives error message creating. Please find below the log for the specific portion

    2008.11.24 to 09:19:24:150: Thread-13: B2B - (DEBUGGING) oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin:getPrivateKeyFromWallet entry
    2008.11.24 to 09:19:24:154: Thread-13: B2B - alias of certificate oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin:getPrivateKeyFromWallet (DEBUG) found: [email protected], CN = RECIPIENT B2BONRAMP, OU = Digital ID class 1 - full Microsoft Service, OR = invalid Persona, OU = www.verisign.com/repository/RPA Incorp. by order No.------, LIAB. LTD (c) 98, OU = VeriSign Trust Network, O is VeriSign\, Inc.
    2008.11.24 to 09:19:24:159: Thread-13: B2B - (DEBUGGING) oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin:createMessage an exception during construction create message
    2008.11.24 to 09:19:24:161: Thread-13: B2B - (DEBUG) oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin:createMessage exception msg: null
    2008.11.24 to 09:19:24:163: Thread-13: B2B - oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin:createMessage (DEBUG) exception stack trace: java.lang.NullPointerException
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.getPrivateKeyFromWallet(EBMSExchangePlugin.java:5967)
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.getPrivateKeyForSigning(EBMSExchangePlugin.java:5322)
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.signAttachment(EBMSExchangePlugin.java:5160)
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.createMessage(EBMSExchangePlugin.java:2130)
    at oracle.tip.adapter.b2b.msgproc.Request.outgoingRequestPostColab(Request.java:1641)
    at oracle.tip.adapter.b2b.msgproc.Request.outgoingRequest(Request.java:968)
    at oracle.tip.adapter.b2b.engine.Engine.processOutgoingMessage(Engine.java:1147)
    at oracle.tip.adapter.b2b.transport.AppInterfaceListener.onMessage(AppInterfaceListener.java:137)
    at oracle.tip.transport.basic.jms.JMSMonitor.processMessages(JMSMonitor.java:610)
    at oracle.tip.transport.basic.jms.JMSMonitor.run(JMSMonitor.java:236)

    2008.11.24 to 09:19:24:168: Thread-13: B2B - java.lang.Exception (ERROR): java.lang.NullPointerException
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.createMessage(EBMSExchangePlugin.java:2289)
    at oracle.tip.adapter.b2b.msgproc.Request.outgoingRequestPostColab(Request.java:1641)
    at oracle.tip.adapter.b2b.msgproc.Request.outgoingRequest(Request.java:968)
    at oracle.tip.adapter.b2b.engine.Engine.processOutgoingMessage(Engine.java:1147)
    at oracle.tip.adapter.b2b.transport.AppInterfaceListener.onMessage(AppInterfaceListener.java:137)
    at oracle.tip.transport.basic.jms.JMSMonitor.processMessages(JMSMonitor.java:610)
    at oracle.tip.transport.basic.jms.JMSMonitor.run(JMSMonitor.java:236)
    Caused by: java.lang.NullPointerException
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.getPrivateKeyFromWallet(EBMSExchangePlugin.java:5967)
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.getPrivateKeyForSigning(EBMSExchangePlugin.java:5322)
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.signAttachment(EBMSExchangePlugin.java:5160)
    at oracle.tip.adapter.b2b.exchange.ebms.EBMSExchangePlugin.createMessage(EBMSExchangePlugin.java:2130)
    ... 6 more


    Does anyone have an idea what could be the reason for this error?

    Help, please.

    Thank you and best regards,
    Anuj Dwivedi

    Hello

    You may have the whole chain.

    A note aside on the issue of departure indicated - if you do the same conversion for some reason things don't work well. The work is as follows,

    1. tell certifcate user export to a file, utilisateur.cer
    2. remove the baptistery of the user of the ewallet.p12
    3. import the user certificate in the file that you created in step 1.

    It should work smoothly. HTH.

    Kind regards
    Sinkar
    [Correction to Ramesh Team]

  • Alphabetical order of the music on the new iphone ios10

    I just downloaded the 10 for iphone ios and my downloaded music is now alphabetically by artist when I click on the songs. Is there a way I can fix this so that it is in alphabetical order by the name of the song instead?

    Thanks for any help.

    Go to settings > music > songs of sorting & Albums and select by title.

  • Automatic filling of the order of the day

    Hello

    I am trying to automatically fill in an 'order of the day"a"graphical task"as pictured below.  When the date of the order of the day is changed, I would like to as tasks and details of my task card to automatically fill in the order of the day.  Any ideas what formula that I use to get this working?  I worked on it for a few days now, but I can't seem to find the right combination of formulas to make it work.

    Thank you

    David

    This can do the trick:

    Add a column in the list of tasks as shown above - this column should be the column A now.

    A2 = if (AND (B2 = agenda: $ 1, COUNTA(B2:D2) > 2), MAX $B ($A$ 1: A1) + 1, "")

    It's shorthand dethrone select cell A2, and then type (or copy and paste it here) the formula:

    = IF (AND (B2 = agenda: $ 1, COUNTA(B2:D2) > 2), MAX $B ($A$ 1: A1) + 1, "")

    Select cell A2, copy

    Select cells A2 at the end of the column, paste

    now in the table "Agenda" I suggest merge is NOT the cells in the first row.  My example suppose you follow this advice, and there are two lines:

    -Enter the date in cell B1

    A3 = IF ((LIGNE () −2) ≤MAX(Task Chart::A), LINE (−2), ' ')

    B3 = IF (A3 = "", "", VLOOKUP (ROW (−2, Task Chart::A:D, 3, 0)) ")

    Select cell B3, copy

    Select cell C3, dough

    Select cells A3 to C3, copy

    Select cells A3 at the end of the C column, paste

    now change the text you have in cell B1 of table "Agenda" as needed.

  • Cannot complete the order after the iPhone booking 7 during the pre-order?

    Not sure if this is the appropriate place to ask... but did anyone encounter this problem with their iPhone 7 pre-order?

    After that I tried to place an order for the iPhone 7 more during the pre-order, I received an email from the Apple Store saying that my iPhone had been reserved and provided me with a reservation number. They said that they send an email when they were able to reach the carrier systems so I could place my order. Very quickly after I got a follow-up email confirming the booking number and was told that I could now go ahead and place my order. I have connected to the Apple Store, who acknowledged my reservation number, almost all of the screens orders went through, but when I hit continue to confirm the pricing plan that I had selected, the next screen shows the page of 'the page you are looking for is not found' dreaded.

    E-mail with the reservation told me that I don't have that until 4 PM PDT 9/10 to complete this order. Everyone knows this! I tried through the app store of Apple, Safari, and Chrome... and always get the same question. I've been on hold with Apple now for 45 minutes trying to get through, and they don't take chat requests. I'm so frustrated! Help!

    The site is probably hammered with requests for pre-order. I'll try again later if I were you.

  • Sort order of the photos in albums to iCloud

    When I add the creation of an album using Photos shared on iCloud, pictures are sorted by date, oldest first, any order, they were initially classified as.  Is there a way to change that to preserve the original order of the photos, or at the very least, use manually in the order, I want to use?

    Shared albums are sorted by the order, they are added to the album if you wish in a precise order add them manually one by one.

  • I want to cancel the order of the cloud photomyne

    I want to cancel the order of the cloud photomyne... because I just upgraded.now I don, t like it.

    Auto renewing subscription management-

    http://support.Apple.com/kb/HT4098

    By the end of 2012 Mac minis, macOS?  Watch, 38 mm silver AL, Watch OS 2.2.1. iPad 2 Air & iPhone 6 + iOS?  Apple Airport Express

  • Change the order of the email accounts

    Hello

    I was wondering why there isn't a way to change the order of the email accounts in the list?

    I created a new e-mail address and want it to appear under the first in my list of five email accounts, that I put in place. This last address is very important, the order in which I discover them is also important.

    A useful feature would be to order the accounts, as they are displayed vertically. Maybe a drag and drop system as I've seen in the WordPress CMS for menus. Just a thought.

    Sincere greetings
    Glynn

    Go to the Add Ons page and the search for records of manual sorting. It will do what you want.

  • How can I change the order of the profiles in the Profile Manager?

    I have several profiles and I know that I can use the Profile Manager to delete the profile without deleting the files, then add the profile to return, but it's somehow very awkward to change the order that they are in. Is there a faster way to change the order of the profiles?

Maybe you are looking for