Upgrade question 10g to 11 GR 1 material

Hi all

Intend to upgrade 10.2.0.4.0 to 11.1.0.7.0

After execution of utlu111i.sql
SQL> @utlu111i.sql
Oracle Database 11.1 Pre-Upgrade Information Tool    07-19-2011 10:56:38
.
**********************************************************************
Database:
**********************************************************************
--> name:          TEST
--> version:       10.2.0.4.0
--> compatible:    10.2.0.1.0
--> blocksize:     8192
--> platform:      Linux x86 64-bit
--> timezone file: V4
.
**********************************************************************

-----Truncated-----------------

.
**********************************************************************
Components: [The following database components will be upgraded or installed]
**********************************************************************
--> Oracle Catalog Views         [upgrade]  VALID
--> Oracle Packages and Types    [upgrade]  VALID
--> JServer JAVA Virtual Machine [upgrade]  VALID
--> Oracle XDK for Java          [upgrade]  VALID
--> Oracle Workspace Manager     [upgrade]  VALID
--> OLAP Analytic Workspace      [upgrade]  VALID
--> OLAP Catalog                 [upgrade]  VALID
--> EM Repository                [upgrade]  VALID
--> Oracle Text                  [upgrade]  VALID
--> Oracle XML Database          [upgrade]  VALID
--> Oracle Java Packages         [upgrade]  VALID
--> Oracle interMedia            [upgrade]  VALID
--> Spatial                      [upgrade]  VALID
--> Data Mining                  [upgrade]  VALID
--> Expression Filter            [upgrade]  VALID
--> Rule Manager                 [upgrade]  VALID
--> Oracle OLAP API              [upgrade]  INVALID
.
**********************************************************************
My question is that oracle OLAP API is not valid. Will I go ahead with the upgrade or should I make valid before upgrade? If so, how?


Thank you
AK

853914 wrote:
Well tried utlrp.sql as sysdba. But still it is not valid

OS: RHEL4

Hello

OK try below

++

See you soon

Tags: Database

Similar Questions

  • ODI upgrade questions

    I do an upgrade of ODI 10 to 11, but had few questions

    I intend in this way please let me know if I missed something or suggest me if you have a better way

    (1) save the master and working repository (just by exporting to a location)

    (2) copy all databases that are associated with ODI.

    And by following this link

    Data Integrator Oracle 11 g - upgrade to 10g - part 4 / 11g - ODIExperts.com

    (3) I need to the same process for all environments such as DEV, QC and PROD?

    (4) and other than upgrade repositories should I upgrade update level instance as intermediary if so what is the reason?

    Please suggest me...

    Thanks in advance.

    Hi, you are welcome

    (1) actually clone means ask a DBA to clone the entire schema, which means that all the tables and the data inside. For example, let's say the name of the schema that you use for the ODI repository is ODI_MASTERREP, if you ask the DBA to be cloned, he can create another scheme called ODI_MASTERREP_BKP in the database with all the data and the objects of the ODI_MASTERREP schema. It's good because if anything happens is faster for restore and also, if you want for some reason newspapers in the old depot with you ODI 10 you can just point to the ODI_MASTERREP_BKP and you

    (2) If you have access to create patterns, you can just do what I said above no need to include a DBA in this operation. But just for backup. Another that you don't need to create what whatsoever, just follow the document migration until the end.

    (3) you make in all envs because otherwise you will not be able to deploy a version 11 scenario in a repository of version 10, all should be consistent.

    There is no way to update the client, you must download the client in the version you want and install in the same way you did before. Same thing for the agent.

    I love this blog:

    More of life than that...: ODI Series Part 1

    and I have this kind of stuff from dev (for obvious reasons)

    www.devepm.com

  • Upgrade to 10g and 11g: license cost?

    Hi guys,.

    We are studying the possibility of upgrading to 10g and 11g. Oracle Software Update License & Support that we currently covers 11 g at level or to buy the software from scratch as if we never had?

    Sorry if the question is stupid, but I never went through this process with Oracle before.

    Thank you!!

    In General, when you purchase a support contract, upgrades are included free of charge. It is best to contact your seller to Oracle to confirm. If you have access to Metalink (which is a good sign), you can also open an SR to check

    HTH
    Srini

  • I have an upgrade question. I received a notification when I connected my computer to the internet that Lightroom 5.7.1 was available

    I have an upgrade question. I received a notification when I connected my computer to the internet that Lightroom 5.7.1 was available had merge to HDR & Panoramic photos. I can't find these. Where can I find them.

    It is unfortunate that Adobe has chosen to use the "update" in the notice inside LR 5. It is not an "update". It is an 'upgrade '. Thus, you pay if you want. Also as usual, Adobe directs clients to the CC solution and makes it hard to find perpetual license option.

  • patch to upgrade to 10g from 10.1.2.0.2 to 10.1.2.1

    Hi all

    I'm going to 10 g AS integration with 11.5.10.2.
    here according to the documentation I have seen that this 10 g, AS it has upgraded

    My 10g version is 10.1.2.0.2

    The below msg is in accordance with the Oracle Documentation
    -----------------------------------------------------------------------------------------------------------------------------------------------------------
    If you use Oracle Application Server 10 g Release 2 (10.1.2.0.0) or Oracle Application Server 10 g Release 2 (10.1.2.0.1) Standard Edition One, then apply the Oracle Application Server 10.1.2.1 patch before applying Oracle Application Server Portal Upgrade.
    ---------------------------------------------------------------------------------------------------------------------------------------------------------
    I searched a lot in metalink for the patch, but no luck

    So please let me know the good patch to upgrade my 10g from 10.1.2.0.2 to 10.1.2.1

    Also any supporting documents for this upgrade

    Thanks in advance

    Kind regards
    Bhanu Chander.

    go to, patches > Quick links to: latest Patchsets, Mini Packs and Maintenance Packs > Fussion MiddleWare > your OS > 10.1.2.2 or 10.1.2.3, you do not need to 10.1.2.1, if you have a larger version, it should work.

    The installation program reviews to the same version or higher.

    Greetings.

  • Steps to upgrade to 10g R2

    Our unit will soon deploy IE7 on our machines. I'm looking for simple instructions to upgrade to 10g R2. We are currently on 10g R1 (9.0.4). I guess it will be a simple-to-install DevSuite R1 and re - install the DevSuite R2 (10.1.2.0.2). But is there also a patch that I have to install? I also found a white paper to help understand how to use JRE w / running forms in IE7, I understand that the JRE is preferable to JInitiator. Is this correct?

    So, to summarize the steps:
    1 de-intall DevSuite R1 (9.0.4)
    2. install DevSuite R2 (10.1.2.0.2)
    3. install a patch? (not sure about this part)
    4. install JRE - is this just on the client side, or is there something needed on the server?

    Am I missing something?

    Thanks, phil

    It is possible and supported, Yes.

  • NB250 - 10G of memory upgrade question

    We recently bought a number of Netbooks NB250 - 10G, some have been ordered with 2 GB of memory and others with 1 GB. For a few machines of 1 GB, 2 GB expansion modules were purchased to subsequent to 2 GB (Correct Toshiba KTT1066D3 Kingston DDR3 / 2G).

    When upgrading memory is installed, when the netbook is started it turns on, then turns off, then lights up - this cycle continues. I tried a lot of modules KTT1066D3 / 2G and all do the same thing in any netbooks NB250 - 10G that were shipped with 1 GB.

    Subject 2 GB modules work in subject NB250 - 10G bought with 2 GB. _No_ 2 GB modules work in _any_ NB250 - 10G bought with 1 GB.

    Both the NB250-10Gs comes with 1 GB and 2 GB have same bios version (1.3) and the bios settings.

    After a quick web search, this is a known issue.

    Help, please?

    Thank you very much

    Gareth
    University of Canterbury Chr1st Church

    Hi GarethStears,

    In my view, Akuma is good and there is a compatibility problem between NB250 and what type of memory Kingston.

    Have you tested original, pre-tested Toshiba modules authorized service?

  • Satellite A300 - CPU & GPU upgrade questions

    Hello everyone!

    I have a satellite A300-1 to 9 (Intel Core 2 Duo T8300, Ati 3650, lcd WXGA 1280 * 800, 2 discs hard etc.) running Windows XP + SP3 + utility Toshiba etc...

    These are my questions...

    (1) can I upgrade the CPU Core 2 Duo P8400?
    (I know that T8300 and P8400 use the same socket)

    (2) can I put my screen WXGA (1280 x 800) with a WXGA + (1400 * 900) or WSXGA + (1680 * 1050)?
    How will this affect the battery consumption?

    (3) having the computer plugged (a/c power), when I close the lid, the computer goes into sleep mode.
    When I open the lid, the computer wakes.
    Unfortunately, the computer is running on battery power is not the case... I opened the lid and nothing happens,
    I have to press the power button for pc to wake up...

    can I fix?

    Thanks in advance...

    Satellite A300's newest model of laptop and I wonder how you feel about this hardware upgrade after so little time to use.
    In General, these upgrades are probably possible, but certainly not supported by Toshiba.
    In other way such radical update as a poster of upgrade is absolutely not logical for me. You probably know how expensive these parts are.

    In my opinion, should you sold your laptop and buy new with exact material you like to have.

    What about the last question? Please check all settings in the control panel and make sure that you have chosen the right option when the notebook is on battery or plugged in.

  • UPGRADING TO 10G FROM 1 INTERFACE G PORTCHANNEL WITH SUBINTERFACE

    Hello

    I have a friend, we are planing to upgrade of the interface of 1 G to 10G interface.

    in fact, we have two portchannel interface with four each, they are at 1 G.

    I want to replace the port-channel interfaces, with interface 10G but this portchannel have many subinterface.

    If I try to remove the last intefaces of 1 G of the portchannel, it will display a message saying that the portchannel can not be without interface as have subinterface, at least one interface must be in the portchannel.

    I want to delete all the interfaces of 1 G and add 10 G interfaces.

    I want to try, if befere remove the interface G last 1, I add a 10G interface and later remove the last interface 1 G, here my question, this could work?

    I would like to know a way to make this change.

    can someone help please...

    Fidel

    Gonzalez

    You can manually change the interfaces in the startup-config and restart the firewall.

  • Upgrade 11 GR GR 11, 2 1 material using expdp/impdp

    Hi Experts,

    My databases are on Solaris10 and GR 11, 1 material and I have to move to GR 11, 2. I intend to use export/import for the task. I have a question about the upgrade to GR 11, 2. What follows is correct for the upgrade steps:

    (1) a full export of 11 GR 1 matter of database - use expdp and FULL = Y.
    (2) an import complete (FULL = Y once again) in the new GR 11, 2 base with the dumpfile from step 1 (we are required to create a new database of 11 GR 2 and not upgrade the GR 11, 1 existing material db. This new DB has already been created by a different s/n.
    3) update everyone in dev with new information db etc. - tell deployment to new application server - this step is trivial and familiar to me.

    The steps above correct or is there a flaw in there?

    Thank you

    Published by: orausern on October 18, 2011 14:17

    Published by: orausern on October 18, 2011 14:18

    PL see the steps in the Upgrade Guide - http://download.oracle.com/docs/cd/E11882_01/server.112/e23633/expimp.htm

    Step 13 you are asked to perform tasks upgrade post - http://download.oracle.com/docs/cd/E11882_01/server.112/e23633/afterup.htm - which one is to use DBMS_STATS to collect statistics

    HTH
    Srini

  • El Capitan 10.11.4(5 & 6) upgrade question

    I have an iMac 2010 (3.2 Ghz Intel Core i3, 4 GB 1333 Mhz DDR3, 1 TB HDD - 485 GB free) that runs quite happily El Capitan 10.11.3

    Unfortunately, trying to upgrade to 10.11.4 gave me the white screen of death white.  No hassle, time machine backup, don't try again, no question of devices attached, even.

    Waited for the release of 10.11.5 and 10.11.6 and have the same problem again.  Equipment of diagnosis showed no problems and has even downgrading to 10.11.3 and 10.11.2 and update go here has not solved the problem.

    Has anyone struck this problem and solved?

    Thank you very much!

    I suggest to download the Combo update and try it.

    Download OS X El Capitan 10.11.6 Combo Update - Apple Support

  • Satellite Pro A300 PSAG9E - Win 8 upgrade questions

    I decided to update my old Toshiba Satellite Pro A300 PSAG9E-00700TTE Vista to Windows 8.

    After two tries he has been successful. Vista made me mad, and when I decided to give my son, I wanted to work better.

    Toshiba doesn't seem to be willing to support the old models. (over 3 years).

    I can not even find this model code in the lists, the site does not seem to recognize the serial number.

    This is why all the Windows 8 upgrade tools provided are not relevant.

    I met a few minor problems before, but the Toshiba Turkey never replied messages, even those concerning the new products when I considered buying a new laptop. In the end I went for an Asus, which exceeds my expectations.

    I don't expect all support this time either, because of past experience. But I still want to try one last time.

    Is there a way to get the material in this workbook in Windows 8?

    > Is there a way to get the material in this workbook in Windows 8?

    Satellite Pro A300 is not that win 8 supported means that you will not find to win 8 drivers for this series, but of course, you can use Win 8 on this unit.

    In some cases, the municipality of Win 7 drivers would be compatible.

    Toshiba tools like VAP (value added package) to win 8 can also be used, but we must look for a Win 8 VAP released for other more recent models.

    Touchpad driver can be downloaded from the page of the Synaptics driver also other drivers like LAN or WLan can be found on chip manufacturer pages.

  • Satellite Pro A100-830 - HDD upgrade questions

    I'm a complete noob so please forgive my silly question!

    I would like to replace my laptop HARD drive, is there any combatibilty issues I should be aware of, or is it just a case of getting a HARD drive 2.5 "?

    Is it easy to buy an external and use the internal drive inside the case?

    This seems to be the best way to the value of doing. Specific recommendations?
    Thank you!

    Hi magicmat,

    Generally upgrade the HARD drive is not complicated, and that's why you only have to remove the cover of the HARD drive on the lower side of your laptop to replace the HARD drive.

    Satellite Pro A100 already use hard disks with SATA interface so you have such a HARD drive. In addition, I would recommend a 5400 RPM model because it s quite fast and doesn t a lot of power.

    So that s what you need to know about upgrading. Theoretically, you can use the old or an external HDD with an external HARD drive enclosure. Also no problem. :)

  • Tecra M7 memory upgrade question

    Hello everyone, I would like to upgrade the RAM on my Tecra M7, which came with 1 GB and is supposed to get a free site available. Since the system's maximum memory is 4 GB, I guess you can use up to 2GB stick into each slot.

    My question is: can I have a 1 + 2 GB configuration (with / 3GB in total) or modules should be combined for better performance (1 + 1 GB) DDR2? I read somewhere something memory dual channel working only with identical memory modules, but I'm not an expert so I don't know?

    Any idea anyone?
    RADO

    Of course, you can mix the sizes of memory. It s nothing unusual!
    You can use different memory module sizes, but you should be 100% sure that both modules supports the same specifications as DDR2 533 MHz (PC2-4200)

  • Satellite hardware C855-S5133 - upgrade question

    Hi all

    I was wondering, I own a Satellite c855-s5133 and I want to upgrade my hardware to make it faster and more compatible with the new games and programs.

    So the question is which is compatible with the model and what can I do to make my computer bettter.

    P.s. I've already updated the 16 GB ram, and I really don't like if I'm more do.

    Thank you
    DOCTORMAN

    Hello

    To be honest, you are very limited if it comes to upgrade the hardware of s for laptop.
    You have already upgraded the RAM. That s OK.

    You could also switch from the HDD to the SSD. This performance of the laptop from the read and write process would be much faster. Also the laptop would be faster start and would go a lot smoother.

    But to be honest, for purposes of such game pass isn't very useful.

    To get better game performance, you need a better graphics card, but the fact is that the GPU upgrade isn't possible.

Maybe you are looking for