I am considering using Adobe Captivate 9 to create courses. I wonder what the limit is the size of a project/course.

If I want to create a massive course (300 more slides), Captivate would be able to do?

On a related note, is there a size limit for editions with Captivate applications?

Thank you very much!

RodWardadvice is critical:

Captivate CAN create huge classes with hundreds of slides.

I tried once, it was not good.

I would ask, outside a large scope, what are the parameters of design?

Public: location? Experience?

Content: Linear, minor branch, extremely complex?

Quiz & evaluation: controls all along, lesson quizzes, final exam, all this knowledge?

Distribution platform: LMS or web hosted?

Network configuration: Intranet, Extranet, Internet audience?

The user access: Desktop, web, mobile, generous mix?

justint14083881 wrote:

If I want to create a massive course (300 more slides), Captivate would be able to do?

He can do it, but you probably wouldn't build it in this way, not twice anyway.

This leads me to ask:

What is your level of experience with other versions of Captivate?

Other courseware authoring tools?

LMS & web hosting?

I'm not hoping that the project 300 + slide is not going to be your first experience with Captivate.

(Forgive me on this point, but your profile is not very complete, you provided little substantive and not not to LinkedIn or other portfolio pages)

First, the standard SCORM LMS allows only a quiz by file. If you publish a course of 300 + slide, you would be limited to a simple quiz on the course.

Secondly, as mentioned by RodWard , if you want to enable access to the mobile device, the size of your project would be unmanageable for mobile delivery to SBS. You have to break out after the fact, which is difficult, frustrating and rework.

Thirdly, if there is no desire to reuse content, as reusable objects, the only course approach means your audience can follow the entire course or not take. Pouvez copy you slide by slide to another project, but then you would have to manage multiple variations. If a single slide changes in this approach, and you have reused slide ten times, you will need to make ten changes to keep a current slide.

Captivate can create links to other projects, web or pages content back into your LMS. Break 300 more to the top of the slides in small bites, that's really what we do.

My advice is to learn about Captivate, before you start this level of effort, taking training, get experience on smaller projects, publish on your LMS companies, your comments on the finished course.

In addition, you should spend some time reading these forums, research on issues related to the interactions you want to use, questions LMS, you will need to address, and ensure that the follow-up and communication systems are in place to meet your organizations needs.

Then you're ready to start designing for your platform, with a good understanding of the functions of Captivate as a tool, your network and your LMS.

Tags: Adobe Captivate

Similar Questions

Maybe you are looking for

  • Send an email at a specific time with data

    Hello everyone, I hope that I write in the right forum. I am very new to LabView but I need quickly. Where I work they have a very complicated VI, a facility emailer who, when a fualts of tests for low current or overheating as the VI will send an em

  • Printer is not appearing when I try to print

    My printer is not appear on my list of printers on my pop-up screenshot when I try to print.  When I go on my device and printers section printer is listed.    However, it says "not available" in the general Section of the pop up screen for this prin

  • Computer does not recognize the printer driver Canon ipf 8100

    I downloaded the driver fron Canon and installed on my 64 bit Windows 7 system, but the computer does not see the driver for my printer is still not installed

  • ACS 5.2 - disable logging of user test

    Hi all I am looking for the way how disagle a user record. We use a test user to verify the accessibility of the ACS in the large number of switches - this audit newspapers exhausting enough quickly. Is it possible to disable the registration of the

  • VSAN WWN

    For a script that I am building, I need to be able to detect if its 2 initiators are connected to the same switch or no host. I use WWNN of the switch of the to do. Due to a limitation of security - the script cannot directly query the switch and mus