Backup between two dates
Hello
I am new to oracle dba.
Week on the Sunday backup last (June 16) is not from my 8.1.7.2.1 oracle database, today 19 June he has been identified.
Now, I want to take backup of my database from June 10 to June 15.
Please let me know if it is possible to perform a full backup of all the files (datafiles, redologs, control file) between 10 and 15 June.
If Yes, please provide me with the syntax or the example.
My database is in ARCHIVE.
You cannot take the full backup just between 2 dates. You just need to take full backup of your database. And if you have all the records recorded after June 10, you can recover your database to any point in time by using the backup from 10 June.
Documentation and syntaxes for your backup:
http://www.Oracle-base.com/articles/8i/Recovery-Manager-8i.php
Tags: Database
Similar Questions
-
photo selection between two dates
In Photos
It is possible to select photos between two dates?
In Photos,.
is it possible to select the photos between two dates?
Thank you, thank you
Yes. With a smart album like this:
-
MaxL Script to clear the data between two dates
Hi all
I need advice to clear the data between two dates, I have three dimensions in my sketch, 'eno', 'hiredate' and the 'actualamount '.
Now I need to erase the data between the date range, up to now, I have this script,
Fix ("HireDate", "Eno")
Difficulty (@relative ("00:00:00",0),@relative("eno",0)) 2015-07-15 "))
CLEARDATA "sal."
endfix
ENDFIX
These scripts only clears on a specific day, but I tried to write the script to clear between two dates, I surfed on a few sites, but no clear answers, finaanly came here, kindly help in this regard.
Thanks in advance.
Have you not tried the format of "startdate":"enddate" for example "August":"September."
See you soon
John
-
Dynamic calculation of the number of days between two dates in a table
Hello
I'm working on request where I dynamically calculate the number of days between two dates in a table.
The calculation must be dynamic, i.e., when I recover the Start_date and End_date and move to the field following (call_duration) in the same row, the difference must be calculated dynamically in this area and make sure the field read-only.
APEX version: 5.0
Hi BO123,
BO123 wrote:
Hello
I'm working on request where I dynamically calculate the number of days between two dates in a table.
The calculation must be dynamic, i.e., when I recover the Start_date and End_date and move to the field following (call_duration) in the same row, the difference must be calculated dynamically in this area and make sure the field read-only.
APEX version: 5.0
one of the way to do this by calling ajax on change of end_date.
See the sample code given below to fetch the resulting duration and making the field read only after calculation
Step 1: Change your page
under CSS-> Inline, put the code below
.row_item_disabled { cursor: default; opacity: 0.5; filter: alpha(opacity=50); pointer-events: none; }
Step 2: Create on demand Ajax process I say CALC_DURATION
Please check Procces Ajax, see line 6.7 How to assign a value to the variable sent by ajax call
Declare p_start_date date; p_end_date date; p_duration number; Begin p_start_date := to_date(apex_application.g_x01); p_end_date := to_date(apex_application.g_x02); --do your calculation and assign the output to the variable p_duration select p_end_date - p_start_date into p_duration from dual; -- return calculated duration sys.htp.p(p_duration); End;
Step 3: Create the javascript function
Change your page-> the function and the declaration of the Global Variable-> put the javascript function
You must extract the rowid in the first place, for which you want to set the time, see line 2
assuming f06, f07 and f08 is the id of the start date, and end date columns respectively, and duration
See no line no 8 how set the value returned by the process of ajax at the duration column
Replace your column to the respective column identifiers in the code below
function f_calulate_duration(pThis) { var row_id = pThis.id.substr(4); var start_date = $('#f06_'+row_id).val(); apex.server.process ( "CALC_DURATION", { x01: start_date,x02: $(pThis).val() }, { success: function( pData ) { // set duration to duration column $('#f08_'+row_id).val(pData); // disable duration column $("#f08_" + row_id).attr("readonly", true).addClass('row_item_disabled'); } }); }
Step 4: choose the end date call the javascript function
Go to report attributes-> edit your Date column end-> column-> Attrbiutes element attributes-> put the code below
onchange="javascript:f_calulate_duration(this);"
hope this helps you,
Kind regards
Jitendra
-
difference between two dates in the year/month/day in Obiee
Hi gurus,
I know this question have been asked and answered several times but I have a requirement that is a little different, then the previous ones.
I want to calculate the difference between two dates in OBIEE10g in year/month/day format similar to the below SQL output
SQL > select end_date, start_date,
trunc (months_between (end_date, start_date) / 12) years.
months of mod (trunc (months_between (end_date, start_date)), 12).
End_date - add_months (start_date, trunc (months_between (end_date, start_date))) days
t
Thanks in advance
SK
Search for this
"TIMESTAMPDIFF IN THE FORM OF MTHS # YEARS."
or else
To get the current mandate of employees since the date of hiring in the form of # years # mths or # year (s) # month (s)
Concat (concat (cast (TIMESTAMPDIFF (SQL_TSI_Month, "Employee attributes". (((' ' Hiring last Date employee ", CURRENT_DATE) / 12 as char),"Year (s)"), concat (cast (MOD (TIMESTAMPDIFF (SQL_TSI_Month,"Employee attributes". (((((' ' Hiring last Date employee ", CURRENT_DATE), 12) as char), 'Month (s)'))
Concat (concat (CAST (TIMESTAMPDIFF (SQL_TSI_YEAR, "Employee attributes". (((' ' Hiring last Date employee ", CURRENT_DATE) as CHAR),"Year (s)"), concat (cast (MOD (TIMESTAMPDIFF (SQL_TSI_Month,"Employee attributes". (((((' ' Hiring last Date employee ", CURRENT_DATE), 12) as char), 'Mth (s)'))
-
Number of Saturdays between two dates
Hello
How can I get number of Saturdays between two dates, including the two dates?
for example number of Saturdays between 09/05/2014 and 10/05/2014 is five
Help, please
I use oracle 10g
SQL> with t 2 as 3 ( 4 select to_date('05/09/2014 ', 'dd/mm/yyyy') from_dt 5 , to_date('05/10/2014 ', 'dd/mm/yyyy') to_dt 6 from dual 7 ) 8 select to_char(from_dt + (level-1), 'fmDay') day_ 9 , count(*) cnt 10 from t 11 connect 12 by level <= to_dt - from_dt + 1 13 group 14 by to_char(from_dt + (level-1), 'fmDay'); DAY_ CNT --------- ---------- Saturday 5 Thursday 4 Tuesday 4 Friday 5 Wednesday 4 Monday 4 Sunday 5 7 rows selected. SQL>
-
Hi all
I need the days between two dates given.
Select to_date('25-mar-2014','dd-mon-yyyy') start_date, end_date to_date('30-mar-2014','dd-mon-yyyy')
of the double
Desired output:
25
26
27
28
29
30
Thanks in advance.
Kind regards
Afzal.
Select the level - 1 desired_output + to_number (to_char (start_date, 'dd'))
of (to_date('25-mar-2014','dd-mon-yyyy') select start_date, end_date to_date('30-mar-2014','dd-mon-yyyy'))
of the double
)
connect by level<= end_date="" -="" start_date="" +="">= >
DESIRED_OUTPUT 25 26 27 28 29 30 Concerning
Etbin
-
Hello
I have two dates. start date and end date.
I want to extract months between two dates
months should be as
JAN
FEB
MAR
for example.
Start - 1-jan-2014
date of end - 31 - dec - 2014
How can I do this?
Thanks and greetings
CORINE
You should always use the function MONTHS_BETWEEN...
for example
SQL > ed
A written file afiedt.buf1 with t as (select date '' 2014-01-01 as start_date date ' 2014-12-31' as double end_date)
2 --
3 end of test data
4 --
5. Select to_char (add_months (start_date, rownum-1), 'My') by month
6 t
7 * connect by rownum<=>=>
SQL > /.LUN
---
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Ms
Oct
Nov
Dec12 selected lines.
And if you want that they display, separated by commas...
SQL > ed
A written file afiedt.buf1 with t as (select date '' 2014-01-01 as start_date date ' 2014-12-31' as double end_date)
2 --
3 end of test data
4 --
5 Select listagg (to_char (add_months (start_date, rownum-1), 'My'), ',') group by month (order by rownum)
6 t
7 * connect by rownum<=>=>
SQL > /.MONTH
-----------------------------------------------------------------------------------------------------------------
Jan, Feb, Mar, Apr, may, June, July, August, Sept, Oct, Nov, Dec -
Number of occurrences of a day between two dates
Hello
I have a requirement in my code to count the number of times per day occurs between two dates. So, for example if
start date = January 1, 2014
end date = March 31, 2014
The number of times that happens day 1 is three times. That's why I want the result to be 3. My three input parameters are the number of the day, start and end dates. I know that this can be done by parsing through the days and incrementing a counter of sorts, but can it be done without any loop etc?
Looking for options of
Thank you
Birdy
SELECT COUNT (TO_CHAR (DAYS, 'DD')) IN)
SELECT DAYS START_DATE + LEVEL 1
FROM T1
CONNECT BY LEVEL<=>=>
WHERE TO_CHAR (DAYS, 'DD') ='&01';
Post edited by: Parth272025
-
can we do vMotion between two data center
Dear team,
Can we do vMotion between two data center (esxi5, x)
Can we do SVMotion between two data center (esxi5, x)
Note: it is not a physical data center, it is a virtual data center
can we do vMotion between clusters (esxi5.x)
can we do SVMotion between clusters (esxi5.x)
concerning
Mr. VMware
Can we do vMotion between two data center (esxi5, x)
NO, you can't.
Can we do SVMotion between two data center (esxi5, x)
Yes, as long as data warehouses are shared.
can we do vMotion between clusters (esxi5.x)
Yes, as they perform the same CPU families.
can we do SVMotion between clusters (esxi5.x)
Yes, as long as data warehouses are shared.
-
How to find days between two dates in days
Hi, I want to get the days between two dates, expressed in days, how can I do this? For example, I date i.e. 1 October 10, 2013 (Thursday) and 2 as October 13, 2013 (Sunday). How can I get a production of:
Thursday, Friday, Saturday and Sunday, which are the days between Oct. 10-13, 2013. I hope you understand my point. Thank you
You can try something like this
CURSOR LOAD_PROF is
SELECT load_prof1, v_time_profile_day
OF load_profile_test
WHERE profile_day IN (select TO_CHAR(:day1+level-1,'Day')
of the double
connect by level<>
);
Kind regards
S Pax
-
Number of weeks between two dates that are in the same or different year
Hello
How to calculate the number of weeks between two dates?
for example. "" "17-mar-2013' and June 27, 2013" or June 15, 2013 "and" 25-mar-2014
Thanks in advance.
lukx
Hello
Looks like your date range is incorrect.
Please try the below.
SQL >-front right
SQL > select D2 - D1 "days."
2 round ((D2-D1)/7.0) "weeks."
3 round (Months_between (d1, d2), 0) 'months '.
(select 4
5 TO_DATE ('20121201', 'YYYYMMDD') D1, D2 TO_DATE ('20130116', 'YYYYMMDD')
6 from two
(7) date_range;
Elapsed days weeks months
------------ --------- ---------
46 7 1
-
Calculate the (age) years between two dates
Nice day!
I have not been able to find an answer, that I was able to use in the archives or online and would be very grateful for the help. I'm working with Adobe Acrobat Pro XI (not LiveCycle) and I have very little experience with programming (for the most part, copy / paste).
I need to create a text box that calculates the number of years between two dates entered, i.e. the age when the date of birth and death are given. Also, would be nice if she was a Virgin until the two were provided. Anyone would be able to give me the code I need to put in the custom calculation script?
Once again, any help would be much appreciated! Thank you and have a wonderful day!
For the fields for Date of birth DOB and DOD for the Date of death and age in complete years both by using a'd-mmm-yyyy' date format you can use a custom calculation to the JavaScript for the field of age as:
function GetField (cName) {}
get the field with error trapping object;
oField var = this.getField (cName);
test error;
if(oField == null) app.alert ("error during the" + cName, 1, 0);
Returns the field object;
return oField;
} / / end GetField function;function {Scand (cFormat, cString)
using date string format convert object date;
convert string to date using format;
Kai var = util.scand (cFormat, cString);
the value null is an error of conversion;
if(oDate == null) app.alert ("Conversion error" cString "by using the format" + cFormat, 1, 0);
date of return;
Return to oDate;
} / / end Scand function;clear the value of the field;
Event.Value ="";
get data dob and dod;
var oDOB = GetField ("DOB");
Var o = GetField ("DOD");treat only if DOB and DOD have value and are not null;
If (oDOB! = null & o! = null & oDOB.value! = "" & oDOD.value!) = "") {}convert the DOB and DOD to date objects.
oDOB var = util.scand ("d-mmm-yyyy", oDOB.value);
O var = util.scand ("d-mmm-yyyy", oDOD.value);get the difference over the years;
var Age = oDOD.getFullYear () - oDOB.getFullYear ();adjust for month of previous DOD DOB;
If (oDOD.GetMonth)< odob.getmonth())="">adjust the DOD before DOB date in the month of birth;
If (oDOD.GetMonth () == oDOB.getMonth () & oDOD.getDate ())< odob.getdate())="">
Set the value of the field;Event.Value = Age;
} -
JavaScript anomaly on the number of days between two dates
Use ApEx 4.0, I found an anomaly in a javascript code that calculates the number of days between two dates, the current_date and the past_date. If the past and present is the or before March 10, 2013, and the current_date lies between 10 March 2013 and November 3, 2013, the number of days will be from 1 day to less than the actual number. Between November 3, 2013 and on 4 November 2013, the increments of number by 2, then the count will be accurate from this date forward.
Here are some examples:
March 10, 2013 = 69 days of December 31, 2012
March 11, 2013 = 69 days of December 31, 2012
March 12, 2013 = 70 days of December 31, 2012
November 3, 2013 = 306 days in December 31, 2012
November 4, 2013 = 308 days in December 31, 2012
11 March should be 70 and 12 March should be 71. November 3 is 307 and 4 November corrects the number of fake, which began March 11.
Change the past_date to March 10, 2013 produces the following:
March 10, 2013 = 0 days of March 10, 2013
March 11, 2013 = 0 days of March 10, 2013
March 12, 2013 = 1 days of March 10, 2013
But change the past_date to 11 March 2013, product of the correct numbers:
March 11, 2013 = 0 days of March 11, 2013
March 12, 2013 = 1 days of March 11, 2013
March 13, 2013 = 2 days of March 11, 2013
I would certainly all help to determine the cause of this anomaly. Here's the javascript code:
var w1 = ($v ("P48_PAST_DATE"));
W1 = (w1.toString ());
vmon var = (w1.substr (3.3));
vyr var = (w1.substr (7));
var r = (vyr.length);
If (r == 2)
vyr. = (parseFloat (vyr) + 2000);
vday var = (w1.substr (0.2));
var y = (vmon.concat ("", vday, ",", vyr));
y = Date.parse (y);
var w2 = ($v ("P48_CURRENT_DATE"));
var vmon2 = (w2.substr (3.3));
var vyr2 = (w2.substr (7));
var vday2 = (w2.substr (0.2));
var x = (vmon2.concat ("", vday2, ",", vyr2));
x = Date.parse (x);
var numdays = (x - y);
numdays = (Math.floor(numdays / 86400000));
$s ("P48_NUMBEROFDAYS", numdays);Did you google for something like "javascript number of days between two dates. I think you will find the explanation to this observation:
This method does not work correctly if there is an advanced economies jump between the two dates.
There are examples available to calculate the difference between two dates.
-
Need assistance with obtaining data of users modified between two dates in IOM
Hi all
I have a 11g IOM environment where I need to write a scheduled task that needs to go out the data of users that have been modified between two dates. After the search in the forums, I've had an idea and wrote the following code for the same thing. But it doesn't seem to work. Can someone help me here please?
> //initialize upper and lower attributes to two values of oracle.sql.DATE
> Criteria1 SearchCriteria is nothing, Criteria2 = null, criteria;
> criteria1 = new SearchCriteria ("update the", lower, SearchCriteria.Operator.GREATER_EQUAL);
> Criteria2 = new SearchCriteria ("update the", plus top, SearchCriteria.Operator.LESS_EQUAL);
> criteria = new SearchCriteria (Criteria1, criteria2, SearchCriteria.Operator.AND);
> //initialize the necessary parameters, obtain a User Manager object and follow these steps
> users = umgr.search (criteria, attrNames, settings);
But this doesn't seem to work. Can someone shed light on this you? The attribute "updated on" is not available for this task? If I use a unique 'User login' attribute search criteria, this thing works and gets the user data but this does not work when I use the attribute "updated on" so made me think maybe that this attribute is not available for use via the API or something. Or maybe it's with the help of the oracle.sql.DATE is a problem here. Not sure if. So kindly help me with this.
Thanks in advance,
$idI suggest that create you a real attribute in your scheduled task called something like 'Last Run Timestamp'. The reason why I say this is that you can modify your search on this basis rather than manipulate the date of beginning and end of the last run. To retrieve the value, like any other attribute use this:
>
String lastRunTimestamp = hashMap.get ("last Run Timestamp") m:System.NET.SocketAddress.ToString ();
>
Format your time you are entered like this: "YYYY-MM-DD hh: mm: zzz ' in order to retrieve and format the value like this:
>
SimpleDateFormat time = new SimpleDateFormat ("yyyy-MM-DD hh: mm: zzz");
recover start date, so it can be updated on the ground on the scheduled task
Start date = new Date();Convert timestamp last executed so far
Date stamp = new Date();
timestamp = time.parse (lastRunTimestamp);
>
You have now your last time stamp execution that you can set your time dérirez based on.And finally, to return the last value of stamp on both scheduled run time, you started this task
>
SchedulerService task = Platform.getService (SchedulerService.class);
Task = task.lookupScheduledTask taskEntry (getName ());
JobParameter = taskEntry.getParameters () .get ("last Run Timestamp") jobparam;
JobDetails job = task.getJobDetail (getName ());
HashMapattributes = job.getAttributes ();
String timestamp = (time.format (start));
jobparam.setValue (timestamp);
Attributes.put ("last Run Timestamp", jobparam);
job.setAttributes (attributes);
task.updateJob (job);
>I hope it's useful. This is how I do all my scheduled tasks that need a timestamp.
-Kevin
Maybe you are looking for
-
Hello I have a Satellite C55 and it does not start until it makes a noise the fan start and stop. I tried to take the battery and the power cable holding down the power button for 20 sec. without the .de battery low f2 and tried now press f8 but noth
-
2012R2 server unable to RDP when it is specified to specific computers
Have spent hours looking through these forums and so far nothing I've found seems to solve my specific problem. 2012R2 server running as a DC with RDG installed services. Trying to configure a connection to the Office Manager, so she can remote in ho
-
HP Pavilion Elite e9280t - need to video card
I've been out of the arena of PC game for many years. With the release of Skyrim, I seek to get back in and want to update my card low video supplied with the machine (ATI Radeon HD 4650). Problem is that I am naïve about what will work with it. I'm
-
Acer Crystal Eye Driver?
Hello. I bought a laptop Acer Aspire V5 - 471G with Windows 8 SL preinstalled.I reformatted it and downgraded to Windows 7 Ultimate x 64. All the drivers were intact except the Web Cam! I went to the page of the Acer driver and a driver of Crystal Ey
-
It's an old Toshiba laptop Satellite Pro M10 with an Intel PRO/wireless LAN 2100 3B Mini PCI adapt (whatever that means!), I did all the updates of Windows, but when I try and establish a connection wifi encryption options of data only from the drop-