So basically I want to graph the error value with respect to eras (iterations of the while loop) and I can't seem to connect right (it has been a while since I used charts in labview). I don't know if I should use a XY Chart or a graph of waveform, or how it should be connected to the top (paintings, clusters, etc.). Must the graphic node be outside the while loop?
Any help is greatly appreciated! (et bien sûr récompensé avec félicitations =))
I was actually expecting you to attach the file VI.
In any case, I have attached a picture of what you need.
Note that this is not exactly your example, but I gave you what you exactly need, taking the graph XY outside the while loop and adding 1 to the terminal of the while loop, since the time i starts at 1.
In addition, I notice that you are working on a neural network, in my opinion, I always use the MATLAB neural network, then use LabVIEW as the graphical user interface.
Tags: NI Software
Similar Questions
-
Calculation of value tx rx bandwidth
Hello
Can someone help, how to calculate the bandwidth utlization of "sh int' details..?"
Can the percentage will get calculated from values tx rx... ?
I use the lease line 4 Mbit/s.
FastEthernet0/0/0 is up, line protocol is up
Material is FastEthernet, address is 001a.6c70.4b14 (bia 001a.6c70.4b14)
Description: Internet connection
The Internet address is 1.1.1.1/30
MTU 1500 bytes, BW 4000 Kbit, DLY 100 usec,
reliability 255/255, txload 31/255, rxload 120/255
Encapsulation ARPA, loopback not set
KeepAlive set (10 sec)
Full-duplex, 100 MB/s, 100BaseTX/FX
Type of the ARP: ARPA, ARP Timeout 04:00
Last entry of 00:00:00, 00:00:00 exit, exit hang never
Final cleaning of "show interface" counters never
Input queue: 0/75/0/0 (size/max/drops/dumps); Total output drops: 0
Strategy of queues: fifo
Output queue: 0/40 (size/max)
5 minute input rate 828000 bps, 111 packages/s
5 minute output rate 498000 bits/s, packets/s 92
788931865 packets input, 4036778275 bytes
Received 398 broadcasts, 0 Runts, 0 Giants 0 shifters
entry 0, 0 CRC errors, frame 0, saturation 0, 0 ignored
Guard Dog 0
entry packets 0 with condition of dribble detected
571607354 packets output, 3639639717 bytes, 0 underruns
Thanks in advance,
Kind regards
Emilie Thakare
Disclaimer
The author of this announcement offers the information in this publication without compensation and with the understanding of the reader that there is no implicit or explicit adequacy or adaptation to any purpose. Information provided is for information purposes only and should not be interpreted as making the professional advice of any kind. Use information from this announcement is only at risk of the reader.
RESPONSIBILITY
Any author will be responsible for any damage that it (including, without limitation, damages for loss of use, data or profits) arising out of the use or inability to use the information in the view even if author has been advised of the possibility of such damages.
Poster
There are several ways to do it, but if your link is 4 Mbps, use the statement of bandwidth on the interface and the value 4000 (I seem to remember that he uses K, if it is not correct value would be 4000000).
So when you look at the tx or rx loads, those are the load reports. for example, 128/255 = 50%, 64/255 = 25%.
-
You cannot change the chart value axis when there are several types of graphics in a single diagram
Illustrator can do graphics with bars and lines / columns, for example in the docs:
http://help.Adobe.com/en_US/Illustrator/CS/using/WS3f28b00cc50711d9fc86fa8133b3ce158e-8000 .html
However, when I create a chart like this, I seem to lose the ability to manually set the y-axis using 'override calculated values.
To reproduce this problem:
- Create a chart as in the example, with bars and an axis on the left, lines and an axis on the right. Unlike the example, don't fix the numbers as well as the lines align perfectly - have a go until just less than 20, a up to a little less than 250, therefore it do not markers and the number of divisions on each side.
- Try to make the markers and numbers of divisions to the height, so in fact, the side that is going up 20 going up to 25 and has the same number of divisions on the other side.
Everything I have tried does not work:
- If I select the entire chart and go to the "Chart Type", I can not set the options for the value axis. In earlier versions, it's gray, in CS6 I can access, but clicking on 'OK' does nothing.
- If I select the entire chart and chose the type of a chart, I can set options for the axis value, but that the selected chart type, and then applies the entire table.
- If I use the direct Selection tool to select one of the series and open the "Chart Type" options, changing the options of the y-axis has no effect
- If I use the direct Selection tool to select all series that share an axis and open the "Chart Type" options, changing the options of the y-axis always has no effect
- If I use the direct Selection tool to select the Group of ticks axis itself, or the axis line and groups of ticks axis themselves, of axis labels, axis and graduations of the axis line, or axis labels, axis line, graduations of the axis and series of related data, etc., by changing the options of the axis also has no effect
It seems that this feature is broken and it seems that the example in the manual has been carefully chosen to use a rare combination of numbers where it would actually look right.
I thought about it. Like everything to do with the horrible ancient neglected graphic Illustrator tool, it is ridiculously clumsy and involves the caution around what is shamefully bad programming for a professional expensive product.
It is timing - to do things in a sequence of rigid counterintuitive that seems not to work then meets at the end:
- Create the chart but, for now, keep all the same chart type. If you've already set to have different graphics types, put the same thing for now.
- Select the entire chart and in the main window of Chart Types, set the value to "Both sides" axis
- In the drop-down menu, there should be a left and right axis (or top and bottom...). Set the parameters of the value axis for these now. It will look like it does for a single axis, because it will not change the other axis - naked with her...
- Select the data series you want to use the other axis using group selection. Go to graph Type and the value of the y-axis to the other and set the chart type that you want. All of a sudden all be put in place.
- If you need to change the settings for the value axis, select the entire chart, set the whole chart type to a chart, change the appropriate value axis by choosing it from the menu drop down and the re - apply types of graph as above.
(the bug is - it should not necessary to set the graphic object to only have only one chart of type in order to access the axis options of value for two different y-axis)
-
Calculations using values in the channels
Is there a way to make simple calculations (addition/subtraction) of single values selected channels? New user DIAdem, so I'm not at all familiar with the scripts. Looks like it should be a simple command, and I'm right on it.
Thank you
Shannon
Hello Shannon,.
It seems to me that you do not want to add two or more 'cells' (to use the jargon of Excel) together.
DIAdem manages data such as channels, not individual cells. If the approach to add two cells in DIAdem works like this:
The variable SMC allows you to access a 'cell' in a channel, using the following sequence parameters:
ChD (X, Y)
where X is the line number of the table of channel, and Y is the name of the channel (column) or the number of the cell you want to access.
For example, this expression here calculates the result of adding the value of line 2 of the channel called "Temperature_1" and the channel called "Temperature_2" of the example data set that takes over at the start of tiara. In this case, R1 is a real internal DIAdem variable that stores a single value.
R1 = SEC (2, Ch("[4]/Temperature_1")) + SMC (2, Ch("[4]/Temperature_2"))
The calculation above can be entered in the "Calculator" which is available in MODE of DIAdem and DIAdem analysis in the toolbar.
I hope it's useful, please let us know if you have additional questions.
Otmar
-
Hello
How to display the values of stacked - Vertical data - model rtf?
Thank youhttp://winrichman.blogspot.com/2010/05/chart-data-values.html
Re: Option to display data in charts
Re: Need help - advanced graphic coding -
Calculating the value of output with custom scale
Hello
I defined a custom in MAX scale.
I want just to calculate the value of an input applied with this scale value.
Process is simple:
X-online custom-online output value scale
in the process of
Is there a way to do it simply (reminder: custom scale can be linear, polygon, table etc...)?
Looks like you might need to check the interpolation
http://zone.NI.com/reference/en-XX/help/371361J-01/GMATH/interpolate_1d/ -
Hello
I'm working on a group project where my team member gives me a graph of waveform as output of their under vi. I need to use the amplitude (values of y) on the graph of waveform for my part. I think I'm supposed to use "array index" to do this, but I'm not sure how. Could someone maybe give an example? Thank you
Hi Sara,.
This is because the data type of your waveform graph is in fact a cluster, if you turn on context help (ctrl + H) and move your mouse over the wire, you will see the components of the cluster (two doubles and an array of doubles).
You can use Ungroup to extract various components (the table is what you want). If you move your mouse over the graph of a waveform with context-sensitive help you activated, you can see what each part of it.
The first double is x 0 (the starting x position), second double delta x, and the last part is the table of amplitudes (values of y). At the bottom of the context-sensitive Help window is a detailed help link that will lead you in aid where you can get more information on the waveforms.
-
Calculation chart environment using collector, for an average
Hello
I was looking for a way to use a waveform graph, added the ability to set the width of the display of axis are all allowing a development of the chart track data, a little. It is because the self-centering of the graph feature is choppy and does not allow users to zoom in or zoom out on the ground (which my colleagues have asked).
It's basically my current solution posted here because I think that I finally got a right, but also because I know that you guys tell me: ten ways to do it better. :%^)
Note that the data here are slow; I think it would be really embarrassing if we looked at quickly changing data, although you could probably "Collect" more data and on average it all in the same way, to set the center of the axis y of the graph.
The front panel; I put in place the three graphs in a tab control. (Of course, there are no signals on the data acquisition module, when I did; but at least zero focuses on auto, and the range control works).
I guess I'm especially looking for your comments and I was wondering if I missed an obvious way to simplify this process.
Thank you
Danielle
Hey Danielle,
Given that it is a long-term test, are you interested displays all the data of your test or only the most recent game? The waveform table allows to memorize and display historical information because it has a buffer associated with it. From your code, it seems that this collector is just used to store information so that you can average the last few data points. The only thing I see standing in your way of simply with an average of your data is that it seems that you display two signals on the graph. So which signal you want to be centered? If you have a signal you want to reach on average to get the center of your chart, you may son of this signal in a convert from Dynamic Data VI express. When you put everything first down, a configuration window appears. You can then select ' 1 D array of scalars"as the type to convert. The output of this VI will then be an array of data points. You can then use the VI means to find the way to this table 1 d.
-
Calculating the values of resource (CPU = zero etc..)
Hello!
I ' using Chargeback 2.0.1 but I cannot measure the value of average CPU consumption. It doesn't give me 0 Ghz to each customer.
(The County of vCPUs is fine).
Best regards!
You can use its use with ovDCs by distribution.
Ensure that billing policy that uses the cost model is specified as 'use' of the CPU. Also make sure you have a rate specified for the CPU resource for the period under review.
Finally, for the test, you must do the TIME use some cycles CPU (use cpuhog or something like that) and make the short period, and/or the price artificially high so that the cost and usage do not round to 0.
If you do all this, you should see its use not null and a cost for the vApps used enough cycles CPU.
See you soon,.
Milos
-
Need help with Javascript calculation hidden values.
See the problem down below. Thank you.
This line is incorrect:
(TotalValB - CostBasB) = this.getField("NV_B").value;
Replace with:
this.getField("NV_B").value = (TotalValB - CostBasB);
-
calculation of values in sqlloader before loading the data.
Is it possible in the control sqlloader file to calculate the values in a particular field and then transfer the data to a table.
for example. If I have a, b, c, d, e, f in csv files.
e field value is based on if a is null or = 0 then b, if c is null or = 0 then d
and finally e = b | » -'cYes. You can use the SQL functions in your control as a GARNISH file in the example below. You could solve your problem by using NVL I think...
LOAD DATA INFILE 'city.txt' APPEND INTO TABLE CITYOR_TOWN ( COTN_NAM POSITION(7:34) "TRIM(:COTN_NAM)", COTN_CITYCODE POSITION(1:6), COTN_ID SEQUENCE (COUNT,1), COTN_STT POSITION(35:36), COTN_CNTY POSITION(37:39), ... FROM_DATE POSITION(84:91) DATE "YYYYMMDD" "replace(:MED_FROM_DATE,'00000000',null)", H_AVGESTAY POSITION(19:21) ":H_AVGESTAY/10", CLTYPE CONSTANT "RXTZASCode", ... )
Published by: Zoltan Kecskemethy on May 27, 2013 17:24
-
Calculating the values of dynamic dropdowns
Hi all, there is the question of the day noob
I created an invoice form in LiveCycle Designer and I'm totally stuck to the calculation of taxes:
for each product, you are able to choose between two percentages of tax in a drop-down list, and at the end of the form, I want to show a total amount of each tax.
product Qty unit priceVAT net pricePack of red shoes 2 $ 20 4% $ 40 Pack black shoes 1 $ 25 4% $ 25 white umbrella 1 $ 10 7% $ 10 Total price Excl. VAT $ 75 + 4% TAX $ 2.60 + 7% TAX $ 0.70 Total $ 78,30 How can I set the HT 4% and + 7% TAX field to enter their respective product lines?
Sorry for my bad English... I hope you get the issue!
If you send your form to [email protected] I codera it for give you to you the idea of how to do it. Please include a description of what you want to do in the email.
Paul
-
Calculator chart 50g. How can I find my firmware version? Thank you, johnnaben
How can I find my firmware version?
Thank you
johnnaben
I thank very much - the two methods have worked
johnnaben
-
Change a chart value using the date picker
Hello
I use this code for graphical access
Select deptnm in the Department, eqpnm as MachineN, Sum (Qty) as the amount of work
where wrkrsltday like to_char (to_date(:P1_DATE), ' MM/DD/YYYY') and item_cd! = '9999' and slipnm! = "PayO" group of eqpnm, deptnm, eqpnm order of deptnm
He works in the SQL command line.
Here I give you the date in the format defined by the user to input.
But after her run at race time on the date picker, I m selectind all daye is
the message of no data found
Guide me on...Hello
I solved the problem; you need to enter P1_DATE in the field "Page to go". I just tested with a few dates - 09/11/2012, 09/12/2012 (I watched your work table to identify the validity dates) and it works fine.
I changed the password of your workspace to test123.
Thank you
Rohit -
I work on a PDF form and am stuck on one of my calculations. There are two fields 'desired Start Date", which is a date entered by the user. The "desired end" date is one year from date entered by the user. I figured out - however, before the user enters a date, I want this field remains empty. Currently, it fills with 01/00/000. How can I get this field to calculate not unless a date is entered by the user? So far, I tried this but can not get the blank to stay:
If the field 'Desired Start Date' is empty, leave 'to' field blank
var myStartDate = new Date (this.getField("Desired_Effective_Date").value);
If (((myStartDate == 0) & & (getField("myStartDate").valueAsString = "")) {event.value = "";})
If the field "Desired Start Date" is an effective date, use the date to calculate one year after the date of entry.
}
else {this.getField("to").value = util.printd ("mm/dd/yyyy", new Date (myStartDate.getFullYear () + 1, myStartDate.getMonth (), myStartDate.getDate ()))}
Try the following than the calculation script custom field "to".
Get the value of the date field beginning
var sStartDate = getField("Desired_Effective_Date").valueAsString;
If the start date field is not empty...
If {(sStartDate)
Converts a date in a date object string
Kai = util.scand ("mm/dd/yyyy", sStartDate);
Add a year
oDate.setFullYear (oDate.getFullYear () + 1);
Set this field to the calculated date value
Event.Value = util.printd ("mm/dd/yyyy", anyway);
} else {}
This field blank because the input field is empty
Event.Value = "";
}
You may need to change the date format "mm/dd/yyyy", I used to match the formats of date fields.
Maybe you are looking for
-
Apple Mail - colleagues/friends can't see attachments
Why is Apple Mail again makes it IMPOSSIBLE to send to colleagues, friends and families photos, images and pdf files they can easily open and view. I continue to have questions send photos and pictures to co-workers, in addition to the family. Using
-
ProBook 450 g2: install win 8.1 on probook g2 450
Hello can someone tell me what the bios should be set to, in order for me to install win 8.1 on my probook. It came preloaded with win 7, but the DVD of restoration to win 8.1 does not pick up the 128 GB samsung ssd. do I need to change the bios sett
-
machine aligns perfectly - enough pages of test - machine says alignment failed and refuses to print with an occasional exception. HP 'aid' refuses to allow this issue
-
How to remove the engine of the conduct, it does not remove the Add Remove programs and causing me grief. Help, please.
-
PID contol, I appreciate the most?
Hello, I'm trying to set my PID system for different temperature values. I am using 2 power supplies and a monitor of temperature for the temperature control, but in Lakeshore 330 manual, I saw a practical method as follows: now my question is what s