Cancelled project invoices

Dear Dina,

If an invoice was cancelled in the Planner? What will happen? What is the necessary measures must be taken?

Pleaseeeeeeeeee help me understand...

Thanks in advance much n...

Hello

You can cancel an invoice that has been published. You can't cancel an invoice that was paid for by the customer.
To cancel a bill go to the invoice review form, find the Bill and press the credit button. A small window pop up and you can choose either to cancel the Bill completely or partially (concession). You can also deduct the invoice.

Once the build is complete, you can see a get one invoice, you will need to interface with AR. The original invoice the status of canceled.
In customer accounts, you can see the original of the invoice, with the credit requested, as well as the balance due is zero.

Dina

Tags: Oracle Applications

Similar Questions

  • Project invoices are not created after income project is done.

    Guys,

    I need help on solving the problems of project invoices into oracle projects. I'm new to this area.

    We have the rule of distribution like work/job.

    We have created expendtiures (20 items for the same task & project)

    Distributed

    Revenue of project

    Generated accounting.

    Once we are done with revenue, we ran the CPP bills build project for single project.

    Its not to create invoices.

    Total amount of EI is 5200, funding is available for 10000 and is referenced.

    task is billable and IE has no bill hold. I checked what I can, but still has not found the problem.

    Please help me on this and if possible please give me some debugging queries where you want to see the info.

    I may be wrong on baselien or on one side.  Is there a table which records the errors during the process of project invoices...

    I really appreciate your time and your efforts on this one.

    Thank you

    Sri.

    Guys,

    Problem is solved now. Here's what we did to solve it. I hope this helps someone else too...

    After having created the project revenue user updates the rule of distribution of work at the project level and tasks (previously his work/event).

    So we retired all the expenditure items (recalculate the costs and revenues)

    Run the load distribution process

    Run the total load distribution

    Run the project Generate revenue

    and finally run a project to generate invocies...

    wollla, hooray invoices has been created.

    Thank you

    Sri.

  • Yesterday, I received a bill that I can not open to creative cloud that I did not order and you do not need.  How to cancel the invoice?

    Yesterday, I received a bill that I can not open to creative cloud that I did not order and you do not need. How to cancel the invoice?

    Cancel see answer #1 in https://forums.adobe.com/thread/2023066 - includes a link to Chat from Monday to Friday

  • Interface project invoice in AR impossible due to the error of the tax

    Hi all

    Oracle Applications: 11.5.10.2

    Database Version: 10G

    I am facing the error below in him when trying to interface the project to the AR invoices Please find the below error in the log of the Autoinvoice import program:

    Errors: 1) impossible to find a rate of sales tax valid for transaction 2) impossible to find a valid sale for the transaction tax rate. Make sure that an active sales tax rate is for the location.

    Please advice.

    Thanks and greetings

    Srinivas

    Hi all

    I could solve this problem. The issue is due to lack of tax rates for the postcodes 98198 and 20852 corresponding to the State and the city associated with the transaction. Now it is fixed and invoices are processed.

    I changed it by accessing the configuration-> tax-> locations

    Here, in the drop-down menu, I selected the city and then asked the State and the city involved in the transaction and set rates against Postal Codes.

    Concerning

    Srinivas

  • Control billing events in project invoices

    Dear Dina,

    When several project events are created in the system even date and the end user wishes to restrict the events to go to specific bills, how can it limit? in GDI, the system generates automatically 1 new invoice with all available existing events.

    Kindly help me how to overcome this kind of situation.

    Thank you very much in advance...

    Hello

    Put all events pending billing, but the first event, you need to charge. When the invoice is released, select the next event, remove the hold of billing and generate the next invoice, etc.

    Dina

  • Project invoicing - Invocing on the percentage of work complete

    Hello

    Could someone explain please on the process of billing for this criterion to bring up the Bill.

    I'm working on the project of implementation, our Client follows a process of billing their clients at three different stages, they are as follows:

    a. on the 30% work complete / advanced - need to raise a first Bill
    (b) 60% of work completed/WindowFX - need to raise a second invoice
    c. 100% of work completed/WindowFX - must raise a final bill and having to generate income to 100% work complete.

    Our customers expect an automatic billing at the 30%, 60% and 100% of work complete.

    Please give me a solution and how to deal with this requirement.

    She will be grateful, thanks in advance.
    Lanaud

    Hello

    The method of recognition of income called cost to the cost is based on a formula calculated by the extension of the billing. The formula looks at the total of the costs incurred and divides it by the cost of the approved project budget. The formula is the percentage of the cost spent. The model that multiply by the total funds (referenced approved revenue budget) which has recognised the results in total revenue.

    Revenue based progress using the percentage of completion is entered through this form.

    If you want to use the method of cost to the cost that the rule of distribution of project as COST of installation.
    If you want to use your own developed extensions of billing or events entered manually configure rule distribution as EVENT.
    If you want to recognize income from expenses charged to your project, is like a JOB. This method is using bill rates or hourly billing charge of calculating the amount of the income of each item of expenditure.

    Dina

  • Cancel project

    Hello

    Someone knows how to remove the projects?

    Thank you

    We do not currently support to remove or archive projects.

    Neil

  • How to cancel a spell on project to AR. invoice?

    Hey how should the inv proj interfaced to AR be cancelled. Can I use the feature of Bill cancel or create a negative event it interface with AR, then apply it to the invoice. No difference in the accounting impact... ?

    Hello

    After a draft Bill is published and linked to the AR, you can go back to the formula of appreciation of the invoice and choose here to the credit of the Bill to cancel it completely. The system generates a corresponding credit memo that you must interface to AR, as well. In AR the original invoice and have cancellation remain linked. The credit memo accounting is the inverse of the original invoice. This means, crediting accounts receivable and debit the account of the EBU/UBR. When you look at the balance of the original invoice in AR, you will see that it has been credited, and no amount is due.

    The other method is to register a new event with a negative amount, generating the project invoice which includes this event, the release and the interface for AR. Recognition of the negative draft Bill is similar to the posting of the original invoice. However, the system does not have a link any between the two bills. In this case the AR user should apply cash for invoices, the invoice and the negative invoice or for an adjustment to remove the two bills. Otherwise, the two bills will continue to appear as unpaid bills.

    Dina

  • Cancellation of AP invoice and updated with the new Bill

    Hello

    I want to cancel an invoice when the billing currency does not match the currency of payment and need to create a new invoice with the same data with billing currency
    and the amount must be converted into the currency of payment. anyone can guide me.

    Hello.

    Ask the Bill then Bill Actions/Cancel. Enter a new invoice with the correct currency.

    Octavio.

  • Invoice generation automatic project based on the budget of income

    Dear Dina,

    Kindly help me... How can I divert production budget revenue of setting planning take the value of revenue budget special task for project invoice generation?

    my system taking according to the % of the total project, not depending on the particular task completion 100% and the budget of income even task...

    Plsssssssssssssssssssssssssssssssssssssssssssssssssssss help me...

    Thanks in advance much n...

    Hello

    Oracle project billing is designed to generate invoice for high-level tasks or project level. No support for billing level tasks, there is low.

    For your condition, you will need to design a customized using extensions of billing solution.

    Dina

  • PRC: Generate Invocie project for the range of projects is generated not invoice

    Hello

    PRC: Generate invoice project for the range of projects is generated no bills for a project, but if I do the same thing to turn
    PRC: Generate invoice for a project, it generates the invoice for this project. No idea why the two processes behave differently? Please let me know.



    Thank you
    Hanuman

    Hi Harsha,

    Generate the invoice project to various projects will not pick up the project, if there are new bills. Check if the project has received all new bills.

    Build the project invoice for single project does not check this. She removes the original invoice and regenerates.

    Please see the guide to the billing of projects, page n °: 95 for more information on this kind of differences.

    I hope this helps!

    Thank you
    Raju sirot
    www.projectsaccounting.com

  • Loading data open for projects

    Hello
    We already have Financials Live here. All debtors/creditors/GL accounts and data and all open projects are already there, on direct instance.
    Now, we are implementing the projects here. How to load open data for projects.
    [Be precise, how load us these operations against projects that are already closed in the system(Receivalbles/Revenue/Payables)]

    Kind regards
    ADI

    Hello

    Usually, organizations are migrating expenditures as already encrypted and accounted for. This could be done by downloading the historical cost of transactions in the open PA interface. Don't forget to configure the Source of the Transaction-specific migration with the appropriate definition. For each transaction that you load to populate the gross costs and ployez under the burden of cost accounting (CCID).

    If you want to enter the opening balance amount of summaries of historical transactions, you can use the pre-approved form batches. Use of expenditure types that represent the types of historical cost amounts. The easiest way is to use various expenses class Type, you can enter encrypted transactions.

    Historical transactions entered as opening balance should be using the first period before starting to go live transactions for your implementation of projects. You should also take care to enter transactions, while any other transaction is processed. That will allow you to control the periods (open the historical periods), only for the time that you complete the conversion.

    Assuming you want to get for your projects migrated from the entire image history you should have migrated to Oracle projects all the real costs of the project, real income recognized and billed invoices.

    The project invoices relate projects to the AR and from there to GL, it is recommended to remove log entries and not publish them on GL. Alternatively, you can set special rules of AA for migration operations, credit and the flow of accounting will be compensated and does not all GL balance.

    Given that the Bills were already in AR, and part of them have been already paid, you might consider entering some adjustment of accounts receivable activities to move applications of cash in the project and bills on invoices for project in AR. Now, you could cancel the invoice duplicate appropriate administrative source.

    The outcome of this activity should end by the same value of the balance of the accounts receivable, marketable, and UBR & EBU of the balance in the front with migratory balances. After verifying that you can decide to remove AR log entries to GL, or continue and post them as well. Decision depends on accounting approach for the opening of the historical periods for the migration time.

    Receipts and invoices must be generated in projects for the historical periods. You can still generate revenue and invoices the historical cost transactions, since transactions migrated are considered to be established. You could either WORK method to generate the invoice and generators of revenue over expenditures migrated, or you can also load an event for each invoice and for each income that you had the old system for these projects.

    Dina

  • Is there a way to create a recurring event in Billings of the recipes/projects (r12)?

    Is it possible to create an event/billing revenues in projects that can be planned (charged monthly until a specified end date) other than a customization?

    I think that there is no standard method to do so. However, you can use billing extension to create automatic events. You can set the fields of de FACTO in terms of project or task forces to have a recurring amount and the closing Date which will be recovered in the course of revenue or project to generate project invoices. You can check in that if the event is already created for this month, expansion should not create another event for the same month for this project or extension the task because the user can run the process several times a month. Please note that there is not any history kept for FDF changes for the amount and dates.

    You can decide on other ways of maintaining the recurring amount and end Dates to keep history.

    Waiting for more input from experts.

    Consider the declaration of the User Guide also below:

    *****

    Independent of the transaction

    Once you determine the entries for your calculations, you can determine if your billing extension depends only on other transactions being processed, or if your calculation can be performed without other transactions being processed. Transactions refer to the events and the expenditure items.

    Extensions of billing independent transaction are executed for each project with an assignment of active billing, even if there are no transactions to be processed. This type of billing extension builds about a billable transactions on a project entry. If this entry changes, the calculated Exchange billing amount, which you want to save. For example, the cost-cost revenue allocation method, which relies on the costs and revenues budgeted. If the cost budgeted or projected revenue changes, the amount of income changes. You want to save this amount of revenue change even if no other transaction is processed in the generation of income. This category includes the class extensions billing which calculate revenue and to charge the amounts based on independent values of the amounts included on the project revenue and invoices.

    Note: If you create an extension billing independent operation, he will be executed at each passage of the income or of the invoice process.

    *****

    AB

  • under contract for a project

    HII

    I have a Question,

    I have an organization where A project is to have $ 100000 and he gave a contract for outsourcing of project-B for $ 20000, I need to follow how Project-B performs the work, how can I check the billing for both projects...?

    I'll take a project-B as a subtask in project-A If yes how processes, or should I use INTERCOMPANY BILLING between two business units

    Can someone suggest me,.

    Thanks in advance...

    Hello

    These are the prerequisites

    1 internal defined provider (Ex-interne-Vision operations)

    2. internal Customer defined (Ex-interne-Vision operations)

    3. two projects should be created hand Project & Sub Project

    4. in the controls provider & receiver give provider as defined above & receiving provider as defined above client

    (5 in the main Structures of projects check check of the declaration of A) project as program & B Installer) can belong to more than one program-related projects

    6. for main project partner as an association of subproject task subproject & task form check the box receive Inter project invoices

    7. to the subproject customer & coordinated another project check charge & give the project as the main project number receiver & Details of the customer must be the internal customer defined above

    8 create new agreements for the two projects

    After the above configuration is made to follow the below mentioned process

    1. Enter the expenditures of the project information

    2. generate the inter project invoice project

    3. approve & release project

    4 interface invoice in the Receivables

    5. run the form embraces customer accounts

    6. the invoice is automatically created in Oracle accounts payable

    7 AP invoice Import

    8 post the invoice in Oracle accounts payable

    9. creating the automatic accounting and transfer to GL

    10 interface provider main project costs

    11 performance of the update

    12. costs on receiver project overview

    Concerning

    Shaan

  • Error during removal of an invoice line

    Hello

    When I'm trying to get rid of line in a posted invoice to correct its default account I get the following error "cannot ignore the invoice line because the failure of a call necessary to calculate the tax due to: & REASON".

    someone tell me what might be the one for, as we do not apply the tax in the system.

    Thank you

    miro_feps wrote:

    Hello

    When I'm trying to get rid of line in a posted invoice to correct its default account I get the following error "cannot ignore the invoice line because the failure of a call necessary to calculate the tax due to: & REASON".

    someone tell me what might be the one for, as we do not apply the tax in the system.

    Thank you

    Please see the following documents.

    R12: Impossible to ignore invoice line where the Distributions are reversed - appeal necessary for calculation have to tax: & REASON FRM-50016 (Doc ID 982162.1)

    APXINWKB cannot ignore the required invoice line call the tax calculation & REASON (Doc ID 1333484.1)

    Troubleshooting Wizard: accounts payable (AP) Oracle cancel the invoice and throw (Doc ID 1561330.2)

    Thank you

    Hussein

Maybe you are looking for

  • clock question Widget

    Anyone having problems with the clock widgets don't gets in sync with the time displayed network? I tried four different and none of them home screen widgets keep the correct time. I have no problem with the synchronization of the clock on my other t

  • P 500 Workstation startup message

    On startup, I get the following message: «Wait REG bit timeout, send the information of MTN/SN to eSIO fail» Apparently not creat any problem outside of slow start-up time. Serial number: XXXXXXXX Product number: 30A7CTO1WW BIOS: A4KT80AUS My firmwar

  • lines on the screen of the computer

    horizontal lines through my moiniter

  • How to download windows 2003 x 64-bit standard edition. Please give me a link.

    We moved our x 64 bit MS Windows 2003 Standard Edition CD. We have the license for this OPERATING SYSTEM. We want to download thisOS from the microsoft Download Center, but we would have found. Can you please send me the link for the same thing so I

  • Photo of music

    In the main menu - how to get the image of the MUSIC? I try to copy the small folder.jpg in the root of the MUSIC to MTP and MSC, but it won't help. Thank you.