Cannot change order of stroke and fill to the text
In Illustrator CC, I have a text with background colors and contour, and I hang outside the text, not half-n-half. From what I can read (for example Why can't fix us a line of text to the outside (as in InDesign) without having to first convert them into text vectorized?), the way to do that is in the appearance Panel, dragging filling to the top or the race down. But they don't change places when I try - I drag, but nothing changes. And in the Panel advanced stroke, the second and third options to align the lines appear dimmed.
If I saw the text, then all the choices to align the shots are allowed, but I prefer to do it with the living text. Is this possible?
It should work as follows:
Tags: Illustrator
Similar Questions
-
import information to build a list and fill in the text boxes
I would like to make a shape something like this tutorial (https://acrobatusers.com/tutorials/change_another_field) where a drop down menu fills text fields. Its for an address book of all kinds. The customer name in the drop-down list, first line of text form would address, second, city, state and zip.
Is it possible to have this information imported from a text file, file xml or something a little easier to manipulate outside of acrobat? It would be the best of the worlds so he could shoot from an excel document.
Something like that? Scripts custom Adobe: Acrobat - fill the drop-down list
-
How can I add filters just the brush strokes and fill the painting not pencil.
Sorry, it's pretty hard to explain in the description.
I want to know is if I can pretty well just select the brush strokes and filling on a coat of paint and have the strokes left alone.
I want to filter, and then fade brush strokes and fill on the paint layer but keep the sharp pencil lines, I made a paint filling and brush rubbed on a different layer than the pencil strokes, but it takes forever because I draw the image each time twice, using the brush strokes to go along the pencil lines so I can fill it with a color, if I could their blur on the same layer without the pencil strokes then I could fill just the pencil lines the lines with the Brush tool with paint instead of redarwing if that makes sense.
Here is a picture to show what im trying to reach
The pencil strokes are on a different layer in brush strokes
If you convert a movieclip (right click > convert to symbol > movieclip) everything that you want to filter, you can filter it is independent of other objects.
-
Get fancy with my stroke and fill button
Hello gang,
I use the 3.1.1 configurator to build a Toolbox. At the center of it that I've recreated buttons that represent the selection of stroke and fill. These are scripted buttons that target the stroke and fill.
I had a bit of whimsy and decided that, when you click the outline and/or fill buttons, they should also lead to the Swatches palette out, so I added this second line invoke the script:
app.strokeFillProxySettings.active = StrokeFillProxyOptions.FILL;
app.menuActions.itemByID (16385) .invoke)
It works!, uh, somehow. The problem now is the following: when you click on, say, stroke, it activates and the second line of the script causes the Swatch Group out. BUT! When you click the fill button (which has the same second line of script code), it causes the Swatch Group to GO AWAY. You have to click the button to fill twice in order to keep the pop-up window of the Swatch Group, invoked in sight.
I wish she click one time and knowledge remain blown on the screen if it is already there jumped on the screen.
Who is? I think it's one of those type IF ELSE of scripts, but I'm too newb to grok it.
Best for you,
Mike Witherell (with breathing Hurricane down my neck)
Hi Mike,.
Use
app.panels.itemByName("Swatches").visible=1
To display the Panel instead of call it just that switches it.
Good luck with the storm
Trevor
-
How to draw the line under STROKE and fill of an object in illustrator cc? Any ideas ...
Aleksandar,
If I (put) understand it, you will need to divide the object. You can:
(1) select the object and Ctrl / Cmd + C + F, and then remove the filling of the copy and the blow of the original;
Draw 2) and drag the new piece down between Division 1 objects) in the layers palette, or select 1 copy) and Ctrl / Cmd + C + F + X + F or similar.
-
Various measures between the stroke and fill
An object has different measures in the transformation Panel, when I toggle between the stroke and fill. I have my race center-aligned. I am currently using 18 CC. I serve HAVE CS4 and have not had this problem before.
Use Preview Bounds is checked in the preferences?
-
I have Adobe Acrobat Reader DC 2015.016.20039 on my system. I filled a form using Foxit Reader. When I tried to open the form with Adobe Acrobat Reader DC I received the error "the document enabled extended in Adobe Acrobat Reader DC features. The document has been changed since its creation and use of the extended functionality is no longer available. Please contact the author for the original version of this document.
I tried other PDF programs, no problem at the opening of this form.
Function "Activation reader" comes from the original shape, and it's essentially a digital signature. It is specific for the free product of Viewer PDF by Adobe (aka Adobe (Acrobat) Reader).
The problem is that only Adobe products are able to (re) make these documents without breaking the seal of the digital signature.
So, what happened in your case is the Foxit Viewer broke the seal during the recording of back and what's. Using Acrobat, you can save a copy of the form, and then continue will fill. Otherwise, you will be better off to start over, but stay with viewers Adobe PDF all the time, working with the form, or with a different Viewer, once again all the time you work with the shape.
BTW, player XI and most recent no. have more need of extended for more rights blocked by previous versions of Reader. This is not enough in this case; only, it would be useful for the sender of the form.
Update (after rereading of the original message): if it's just for viewing or print the form, you can ignore this message. You can also try to save just, you have a version of player who no longer has the rights extended (at your risk).
I hope this can help.
-
How change/re-name files and bookmarks in the bookmarks list
How can I change/re-name files and bookmarks in the bookmark list. As in IE, I want to be able to rename them, edit and organize your files and bookmarks in the bookmark list. In Mozilla, if I right click on a file in the list, it does not give me the ability to rename! (an oversight?)
Regards, PaulClick right a bookmark, then choose Properties and rename it.
See also:
Backing up and restoring bookmarks
Thank you
Please check 'Resolved' the answer really solve the problem, to help others with a similar problem.
-
my pc runs research and fills in the forms she self... who runs it?
My pc runs research and fills in the forms by itself. I did al worm and Trojan research...
Hi geddus,
1. what research program do you use?
2. what security software is installed on your computer?
(a) I recommend you run a virus scan online from the link given below and check if the problem persists.
Also, make sure that you have the latest update of the software antivirus installed on your computer, so that it works correctly.
(b) you can also download & run Microsoft Security Essentials on your computer.
Hope the helps of information.
Please post back and we do know. -
I don't know how to change the size and quality of the text on the screen on Windows 7
I just installed a new Windows 7 but I don't know how to change the size and quality of the text on the screen. I tried all the things normal, resolution, size of icons, dpi etc but nothing gives me what I want. The text in clear 'wonderful' thing is just terrible. When I go through the 4 steps I see no text boxes which make the text nothing better. All options are terrible, so the result on screen is too terrible. When I do any huge I do not get a full screen of things - view the Start button disappears or I did not closing small cross at the top - of the suggestions to inprove the situation? I must mention that my screen/monitor is 2006 - I need to buy a new one? How much is this Windows 7 is going to cost me, or maybe I should go back to XP!
I sincerely thank all you smart "technicians" for all the answers you always gave myself and all others who ask questions. I'm not too smart with all this new technology as I fell into it very late. I am now in my 60s and only started using a pc when I was over 50 years so... In any case, I asked a question about the size of screen resolution and text and received much good advice from all that you guys. I had recently changed in XP to Windows 7. However, the bit of advice that I was given in 'Cyberking' here at the Portugal had set the resolution of the screen, the advanced settings, 75 to 60 Hertz Monitor tab. Very basic, and the first question asked the technician (Lady) was "what size is your screen? Naturally as a smaller screen that any 'techno' would be considered dead aid, solving the problem was simple and straightforward without me having to stretch my knowledge and my skills by downloading all programes weird (to me) or do the funny stuff in the bios or something else. I send this comment to you for you to realize that the simple solution is not always bad and maybe we should go for the easiest first and then work up to the more difficult ones.
Just for you all to see - now my screen resolution is perfect, the text on the screen is clear and legible without difficulty, even though the size of text and icon is small. Clarity is all!
Thank you all once again! Best regards, Blondie blue.
-
Can I define the contour of an object to be on top / face and filling on the bottom / back? I've asked this question before and told to go to the appearance and drag the background and outline around as if they were a layer, but this did not bring my race to the top of the image. I did this wrong somehow, or is there another method?
I was just thinking ' didn't I said this the other day... ". "in any case...
This is an object with a dark gray line and a red fill. the race is in front of the filling. any random object that you draw will be the race before filling unless you tell her not to be. You can say that the race is forwards here because it extends also on each side of the framework encompassing:
Here, the situation is reversed. Note the appearance palette. You can fill is in the front because it now covers half of the race which extends inside the frame enclosing:
If this is not the behavior you're seeing, it's time to refer to the list of Jacob.
-
I want to change the size and color of the text in the call boxes and text boxes. How can I do this? Jack
Highlite the text inside the text box and press Ctrl + E.
-
Adding a second fill to the text
Whenever I go on the appearance Panel menu > add new fill when the text is selected, the add a new fill button is gray and I can't add a second fill. Anyone know why this is? I can add a new filling of forms, but not text.
I'm probably something wrong, or it's a simple thing to fix - but I can't understand why he is not let me add a second thread.
Select all of the text object, not his characters. You can apply additional fills/strokes at the level of the object, not in character.
JET
-
minimize the browser and automatically adjust the text
Hello
How can I reduce the browser and automatically adjust the text in Adobe Muse?
I want to get the same effect as on this page:
on the departure site, there is the "Welcome" text and if I reduce the browser the text adjusts automatically.
How can I do?
Thanks for your help.
What you re looking is delicate design which is not yet supported by Muse.
-
ThinkPad T430 cannot change order of Bios Boot
last day, I just bought new thinkpad T430 machine, when I try to change the boot order priority by default in the BIOS, the menu is disable, I can't change anything. Is - this thinkpad T430 came with default supervisor password? Did anyone here knows the default value of the supervisor password?
FYI, when I try to enter the BIos, it asks for the password, and I just press ENTER to access the bios.
Thank you
Hey Ferrym and welcome to the forums.
If you check in the BIOS under boot, what does say beside the command lock Boot? If it is enabled, you can change this for are disabled? Thanks Ferrym.
Maybe you are looking for
-
I am a long time user, more than 10 years, Firefox and Netscape before that. This is the first time I've ever seen "plugin is not responding", and even less for Shockwave. I followed subject suggested solution. Checked plugins updated and reinstalled
-
I use the community on Cakewalk.com forum and found that Firefox 10.0.2 does not respond to the positions of others, and does not for good formatting of paragraphs during display causes often the forum because of the error messages. I never had this
-
Print previews halh shows only the top of page. WHY?
I have used Firefox for more than five years and this problem just showed. Using the preview before printing displays only the top half of the page. He started in Firefox 8 and is still doing the same thing with Firefox 9 beta if I use IE or K-meleon
-
Hello I created a program that takes a txt file and it analyzes in a list box. I'm using a listbox control so that I can get this line of text. I have a problem when for example this txt file is very large. (140 MB - 1000000 lines) it takes about 40m
-
How to mark email to be notified when it is opened?
I want to mark my outgoing email so I