ThinkPad T430 cannot change order of Bios Boot
last day, I just bought new thinkpad T430 machine, when I try to change the boot order priority by default in the BIOS, the menu is disable, I can't change anything. Is - this thinkpad T430 came with default supervisor password? Did anyone here knows the default value of the supervisor password?
FYI, when I try to enter the BIos, it asks for the password, and I just press ENTER to access the bios.
Thank you
Hey Ferrym and welcome to the forums.
If you check in the BIOS under boot, what does say beside the command lock Boot? If it is enabled, you can change this for are disabled? Thanks Ferrym.
Tags: ThinkPad Notebooks
Similar Questions
-
Cannot change the priority of boot CD-ROM - Y580
Recently bought the laptop Lenovo y580 which comes preinstalled with Windows 8. I can't boot from a cd or a flash drive as there is no place in the bios to change. In the boot priority that it lists only
the Windows Boot Manager
something else to IVP4
something else for IVP6
How can I change this so that I can boot and install another operating system, any ideas?
In the bios menu turn off uefi and secure boot.
-
ThinkPad T430s cannot start because
I don't know if anyone else here have the same problem as me.
My T430s cannot restart when I connect my laptop to my printer laser (USB). The display just shows Lenovo logo and then stop...
I've updated to the latest version of the BIOS, and my OS is WINDOWS 7 Pro.
Help, please.
Thank you.
-
Portege R200 cannot set on the BIOS boot sequence
Hi all.
Our R200 entered mode of hibernation after that the battery power is low, then by some unfortunate twist of fate, the battery got deleted accidentally. Now it does not start correctly because every time it displays a BSOD stating Unmountable_Boot_Volume.
I could solve this problem easily by disabling the hiberfil.sys file, which is the reason for the BSOD, if only I could change the boot order. Unfortunately, enter the BIOS, I am only able to access the first page where the only editable elements are time, date, and passwords. Pressing Pageup and Pagedn does nothing. The BIOS is updated to the last appearing on this site.
Pressing F12 or F2 when the toshiba logo and icons appear does nothing no more. It's a HARD disk 1.8 "and there are no adapters available in our region. I can boot from a CD if and only if I take the HD. But then, it is useless since I can't fix it like that. It is not recognized if I it reconnect after booting. When I reboot, it does the BSOD thing again. It is becoming a frustrating cycle.
I scoured these forums for other ways to boot from the CD and apply the suggestions, like hitting 'c', nothing helps.
Any help would be much appreciated.
Thanks in advance.
Hi, the CWB
What about the boot from usb?
a stick with a live like bartpe or similar system...hard drive cannot be recognized once you have started your machine, because the boot when Initializes the hardware...
the drive is correctly recognized by the bios?
refer to the manual, it should there have listed the key combinations to start other devices...I think that the hard drive was missing...
try to boot from sd card - * boot sequence settings must be changed in bios... *
If you are not able to make this request a servicepartner... -
ThinkPad 13 - cannot enter the UEFI BIOS without entering the W10 first
I have a brand new 13 Thinkpad which I'm really pleased. However, the user manual seems to be wrong. I can't enter the UEFI BIOS in F1.
It seems that the only way to get into the BIOS is first go to W10 and make a shift/reboot or a restart/F1.
OK, suppose that at some point in the future I need to access the BIOS (ex: changing boot options) and is not a job W10 or perhaps corruption W10.)
How to enter BIOS without first W10? BIOS maybe consulted independent of the operating system?
Hello and welcome,
It is by design. "Shutdown" in Win 10 more resembles the hibernation and it is not safe change hardware/BIOS setup in this State.
F1/F12/ENTER should be available after a boot failure or a forced shutdown via a long press on the power button.
BTW, UPDATE/restart and restart should just do the same thing. SHIFT button should cause a real stop after a followed Fx market should work.
Z.
-
Good ladies and Gentlemenof the Interwebulars, I hope someone can shed some light on my situation.
Walked down one day to see that my computer would not start. A diagnosis which in a bad power port. Got a new motherboard because after desoldering (or that's what I tried to do) I realized that it was small to (re) welding in and I could not find the right part to reorganize.
so I got a new motherboard. The number replacement part direct. Barefoot on my floor wood and ESD wrsitband on, I put in this bad boy. Double and triple check things and connections. Go to hit the power button and I get 6 beeps and 6 flashes of correspopnding of the powerbutton. The system does not appear to be on, fan is running with the other sounds of starting and running sounds, but I have a white screen and orange electric button. If I tap CTRL + ALT + DELETE it will restart and begin the process again. The 6 beeps by HP standards denotes missing graphics / card error. My original motherboard had a built-in graphics card so I thought that the same new part number card mother too. Obviously not. so I had a Geforce 2Go MXM graphics card update with heat sink. Barefoot, wood floor, bracelet ESD, thermal paste and turn it on to hear... SIX BEEPS AND SCREEN WHITE.
After Googling around, some people say that I have to enter the BIOS and change boot legacy and fashion out of the UEFI mode that's killing me right now. I have join and would completely if I could see my screen of the BIOS, or anything for that matter. I can not go back also to my other card because it will not feed. So my question; How to make or change the BIOS settings so that my computer will recognize a graphics card or internal graphic that should be on the new motherboard itself so that it starts?
I need this computer for CAD work soon so I thought help processor i7, 8GBs RAM, Geforce card and touch screen to perform a generation of PC. So if someone has a great idea they would projected upward on this post, I'd appreciate it. Thank you!
Your computer is not posting, sound rather give an error message in the form of 6 beeps and red LED flashing, indicating graphics / video issue.
You can never get into the BIOS of the device, if its not posting, not on a HP Desktop atleast.
I recommend, you disconnect all components and fittings connected to the motherboard i.e. cables SATA, power cables, RAM, processor, heatsink, power supply and battery CMOS as well.
Now, press and hold button power unit for a minute or two., with the power and everything is still disconnected.
Then,.
(1) Insert the battery CMOS back into its slot, install the processor and the heat sink, connect all cables power that goes to the motherbaord in the PSU and CPU and etc., less SATA cable and cable power to drive hard and Optcal drive and turn on the device, of course after you have connected the rear power cable.
(2) check if the machine beeps and check whether it is 5 times.
(3) If yes install a memory in the first slot (slot black), connect the monitor and turn on the power and check if there is no video output.
(4) if so, connect the return which is always disconncted, to their respective locations and ports and turn them the unit on and get on with your CAD stuff.
IF NO,
2 options:
(1) if the unit is still under warranty, call 1800-474-6836 and have a technician on-site visit your place and replace the parts needed for the operational unit.
(2) or the motherboard you purchased could have been Dead On Arrival. Get a warranty replacement for the DOA mobo and re install a new Board of Directors.
Good luck!
Please click on the "congratulations, Thumbs Up" at the bottom of this post if you want to say 'Thank you' for helping!
Please click "Accept as Solution" If you feel my post solved your problem, it will help others find the solution. -
T430: Cannot change the GPU using the NVIDIA Control Panel
Hello world
I recently bought a T430 including a NVIDIA NVS 5400 M. games graphics card (for example, Max Payne 3) used to run fast, using the NVIDIA GPU. Today, I tried to play a video game once more (after having not played for several weeks). Unfortunately, my OS (Win7, 64-bit) assigns the GPU from Intel, resulting in a much lower speed. Using the NVIDIA Control Panel, I can't change my favorite GPU (changes will not be saved). I already run a update of Lenovo and installed the latest graphics driver (296.88), which resulted in no improvement.
When you start a game, I can choose my graphics manually, but I would like to configure some general settings using the control panel.
Do you have any solutions?
Thank you very much.
-
Cannot change order of stroke and fill to the text
In Illustrator CC, I have a text with background colors and contour, and I hang outside the text, not half-n-half. From what I can read (for example Why can't fix us a line of text to the outside (as in InDesign) without having to first convert them into text vectorized?), the way to do that is in the appearance Panel, dragging filling to the top or the race down. But they don't change places when I try - I drag, but nothing changes. And in the Panel advanced stroke, the second and third options to align the lines appear dimmed.
If I saw the text, then all the choices to align the shots are allowed, but I prefer to do it with the living text. Is this possible?
It should work as follows:
-
Tecra M5 cannot enter the BIOS to change the setting too boot from cd first
Tecra M5 cannot enter the BIOS to change the setting too boot from cd first
I bought on ebay and the seller sold me a dubious version of xp so I want to format and install my own at the start he said:
The Intel Boot Agent GE v1.2.31 initialization
KE - E05: the LAN adapter's configuration is corrupted or has not been initialized. Boot agent cannot continueHello
The message looks like you tried to boot and install Windows LAN
If you want to change the boot order, I recommend pressing the F12 key, immediately after that the laptop was turned on!
A new start menu should appear, then you can choose the reader of CD/DVD (ODD) and a boot device.
Also by pressing the C button should allow you to boot from the CD inserted, bootable.
Welcome them
-
Cannot change the boot sequence in the bios
Hello world!
I use vmware fusion 3.1.1 (282344) (in fact has happened since I started from 3.0). A home edition of Windows XP is installed in the bootcamp partition and is used as the guest operating system. When I start Windows XP, it always first try to boot from the network, which takes about 1 min (this can be ignored by hitting the ESC key however). Even if I enter the bios settings, the starting sequences is not editable, where "everything on this menu is not editable in user mode. If all items require changes, consult your supervisor system"is written. However, no password supervisor and of course, I'm not using the 'user '. Does anyone have any ideas on this?
PS: a full Linux guest OS (installed in fusion and is wrapped up as a file) has no problem to change the boot sequence.
Best regards
PrestonXu
All items of this menu cannot be changed in user mode. If all items require changes, consult your supervisor system
Weird, I never heard of this message before. You get this when you start merging, not in native mode? I would have asked if someone had made changes to the BIOS settings until you got to the virtual machine, except that you said it's Boot Camp, so I think it's less likely.
You can try to change the boot order in the Virtual Machine > settings > advanced > boot device.
-
Hello community,
I need to restore Windows on my ThinkPad Tablet 2 via USB. But I can't change the list of boot devices in BIOS. The F12 option is not available. It is said: "F12 key is used to call a pop-up the boot devices list. This option is available only when supervisor enters setup. »
What can I do?
Kind regards
The problem is solved!
-
Windows 7 cannot change the boot order
I get an error message saying that windows 7 cannot change my boot order... I have a made-to-measure, someone has any ideas simple and logical pc how bypass this error
Oh I have need help, regardless i more thought to it... just need a new hard drive... right weird?
-
Tecra A10 - cannot change the settings of the BIOS with supervisor password enabled
Hello
I activated a supervisor for 1.50 acpi BIOS password.Since then, I am not able to change the settings (for example etc. - the right of the screen of the BIOS boot order does no more).
I access the bios with pressing ESC on the boot process, then F1 when prompted "" check system, then press [F1] key. Problem is that I don't ask the supervisor password.
There should be a prompt for the supervisor password, but it's not. So I am not able to connect as a supervisor.
I know I can manually change the boot sequence by pressing F12 during startup, but this strict solve my problem.THX in advance
elitecamperHave you tried to update the BIOS? On the Toshiba site, I can find a newer version that you have right now. Check it!
http://EU.computers.Toshiba-Europe.com-online decision-making supported Downloads & => Download driversBefore setting a supervisor password load default settings in the BIOS and then you can set the password and try again. Maybe it works.
-
Hello
trying to change the language of the BIOS, the Bios HP Configuration utility, but get the error code 6 - access denied (failed due to permissions of the BIOS).
BIOS version is vA0.08 THI.
I can read (get) successfully, but cannot change any settings... tried to change other settings to no avail.
What Miss me? Should I first set a password?
Hi there @mucckki,
Welcome to the Forums of HP Support! I understand that you want to change the BIOS language on your system in current Dutch English. I'm happy to help you with this.
Was the Dutch language that the BIOS was set to out of the box or he later changed in Dutch?
If original default systems was English, you can try to look at the motherboard of your system guide. HP and Compaq Desktop PCs - specifications of the motherboard, Thimphu. At the bottom of the page is an indicator for the riders for the BIOS and CMOS password. If your default language was English, you can use the jumper to clear the current CMOS settings, including language.
Please let me know if it works for you and if it does not solve your problem, please mark this message as a solution. Bravo would be appreciated as well.
-
HP 17.3 E0067cl UEFI BIOS. boot order fails.
total of history: end-to-end.
subject, the flash player. 23 to 32GB (mine is 32 Sandisk USB3, extreme, written 100 MB/s.
will not work with rebecca, or (what we call it now)
It won't work, create backup USB flash, "" create the recovery disk ".
It just shows the "daisy" spinning throughout the day. on a brand new laptop HP, 20 July 2014, new in box.
I just ran sfc /scan now and spend.
my best guess it that windows update to 8.0 (100) killed this "feature".
or my 8.1 updated. (toss the coin)
I ordered the new installation of HP for $18 disc...
so bad to close this topic, with "operator error", never update then try running to build your own, backup media.
RIP
later...
the second problem is that the bios does not allow. My next update.
a new SSD.
I got it to work. but the BIOS does not see the two disks. ! (in bios boot order) UEFI.
I solved this problem by removing the 2 left 1, the old HARD disk.
now the SSDS works like the lighting and the BIOS, can be ignored.
I used Acronis to make the all the steps above tib files and evolutions'm so good... and made and a huge external drive.
problem solved.
closed...
This has something to do with what we were talking about earlier on recovery and flash player?
Maybe you are looking for
-
How to change the Services Menu.
Installed WordService to test. Ran very well but I have no reason to keep it. I removed all traces of it except, WordService choices that are listed in the preferences of Services. It does not hurt anything for them to be there, but if someone knows
-
New Driver Alert may 22, 2008 - Satellite P200 - 1 FC
An alert TEMPO asked me to download vap - 20080109135106.zip, but when it starts I get no more than an error RegDBGetItem failed (1). Research in the download I see nothing more recent than that of the year 2007. Should I just ignore this "update"? .
-
When I connect my usb modem to my pc and it is held automatically loading my pc restarts
When I connect my usb modem to my pc and it is held automatically loading my pc restarts
-
After installing KB973525 on Windows XP SP3 Visio Viewer 2003 stops working.
I have the test course last patches of October that I discovered that once I have install the patch MS09 - 055 Cumulative Security Update to Kill bit ActiveX (973525) on my test workstations (WinXP SP3 IE6) this Visio Viewer doesn't work. IE displays
-
Windows 10 could not download on Windows 7 upgrade - 0x800704c8 - 0 x 90017 error code
Windows 10 could not download update win 7 Home dir - 0x800704c8 - 0 x 90017 error code I can't understand how to solve this problem. Download stopped first at 97% and showed the above error code. Download the second time that the download stopped