Changing the values of the project

Summary

Here change the link reference and report Suite fields or be able to migrate all between projects. Lack of one of these options, I want to know that the values of these fields don't really count.

Example values:

Basic reference: link Analytics: report Suite
DPS 2014 Appcom.mycompany.MyAppcom.mycompany.MyApp
AEM Mobile Appcom.mycompany.myappdevcom.mycompany.myappdev

The correct values have been changed to protect the innocent.

Details

Currently, we had weeks of progress by creating a new application AEMM to replace our DPS 2014 application. The problem that has developed is the AEMM project, we created have values of different parameters in two places which do not match the existing application of DPS. Because we couldn't find a way to change these values, we have created a new project with the correct values. Once we did that, we discovered that there is no way to move content between projects. So we are facing days of work to address this problem. That's assuming that the values of these fields have an important effect.

Questions

1. What are the effects happen to have value do not match in the field link reference? Reading this forum leads me to believe that the feature gives even does not yet.

2. What are the effects happen to have value do not match the scope of report Suite? I still have to find a good reference for analytical how will be between these two editions of the DPS/AEMM.

You want solutions

1. in an ideal solution, we could get help from Adobe to fix the values in the original draft of AEMM

2 or a way to pass the work weeks of the old AEMM project to the new, corrected one.

3. we would be willing to leave the values as they are, provided it would have serious consequences.

4 and if this is not possible, we will have to carefully recreate the settings in the new project, using the old as a guide, the hierarchy and content.

Short answer: continue to use the previous project. You don't have to worry about these values for the migration.

1. What are the effects happen to have value do not match in the field link reference? Reading this forum leads me to believe that the feature gives even does not yet.

That is right. The reference link field is not supported at the moment, so there is no problem having a value do not match. (Link reference was intended to be used for the deep link outside of the app, but right now, we use dps. .)

2. What are the effects happen to have value do not match the scope of report Suite? I still have to find a good reference for analytical how will be between these two editions of the DPS/AEMM.

During the migration of DPS to AEMM, it is good to use a different value in the field of the report. Both platforms use different methods to collect Analytics requires different reports. If you have Adobe Analytics, you will want to ensure that your analytical information is implemented correctly in the master settings. If you need assistance with setting up Analytics, contact Adobe support. Support information are available when you connect to the portal using a master administrator account.

Another question that you did not mention, but might want to consider. When you build your application, you specify a Bundle ID. When you build your Mobile AEM application, it is important to use the same Bundle ID you used when you build your DPS application so that you can update in the store. In addition, it is a good idea to use the same Bundle ID for Android and iOS apps for certain services such as In - App Messaging.

Migration resources:

Strategies for the improvement of DPS to MEA Mobile applications

Migrate the content of folios DPS for AEM Mobile

I hope this helps. Let us know if you have any other questions.

Tags: Experience Manager Mobile

Similar Questions

  • Pe11 - do not change the project settings based on the video source

    I keep the light in various places PE11 should read my video source and change the project settings for the game when I place it in the timeline in Expert mode, but I don't see any indication that this is happening. No matter what kind of video, I add, the editing mode (and other settings) in the settings of the project remains the same.

    I'm working with older clips (smaller than 720 x 480, 25 fps), and none of the presets project apply.

    What if the project setting does not match what I'm getting? Or it is made irrelevant by the publication settings I use (assuming I choose good here)?

    Thank you

    Dave

    As you have seen, WMVs will not change your project settings. In fact, I'd like to discourage you by their use as source files.

    WMVs are a good video source you change in Windows MovieMaker - but they make for a source file bad enough for virtually any other video editing software.

  • How to change the project settings

    I support the Prime Minister and a video that is 720 x 300

    It shows in the project than 640 x 480 and it publishes with thick black lines

    I open the project settings - I can see the settings but I can't change these sizes?

    very frustrating :-(

    The Prime Minister can load videos of different sizes? I want to believe but maybe not in elements

    retterr

    Thanks for the update.

    We are both on the same line on dealing with what you think to be a 640 x 360, 16:9, and to do so in a Premiere Elements project without the consequences of black borders.

    However, details to sort out when you tell me that you get huge black borders when you import this file to 16:9 in a 16:9 project.

    If you set the project preset manually, have you thought about putting a check mark next to the "Force selected setting on this project' in the new project dialog box? Did you follow the path...

    • Open the project in the workspace Expert and go to file menu/new project and change the settings.
    • In the settings, set the project preset to match the properties of the source media. OK to get out of there.
    • In the dialog box new project opens, rename the project and make sure you have a checkmark next to the "Force selected setting on this project." OK to get out of there.
    • In the Expert workspace, import your media source by using Add Media / choice.

    Excuse the request, but not to take anything acquired to speed things up, have you confirmed your 640 x 360, 16:9 for this particular import with program outside of Premiere Elements?

    Please read the above, and then we will try to determine what happens with this file.

    Thank you.

    RTA

  • Cannot change the project status

    Hello

    We have a problem with 4 projects (started with 1, but more than users that the question now), where it is not possible to change the status of a project.

    A user can select the next available status, but when they select the it, nothing happens. They do not see an error message, or anything else - it of just that the State does not change, even if the user has selected a different and valid status in the list.

    I had an SR connected with Oracle since May 20, but Oracle are stuck. They made debugging, tracing, OWC, etc., but no solution so far.

    I just thought that I would ask here in case someone else has experienced this problem.

    Any advice much appreciated.

    Thank you

    Fixed - it turns out it's because the Start Date for the key member of project manager has been after the Start Date of the project. Once this has been fixed, we could change the status of the project.

  • You can use multiple computers to change the project of the elements of the first?

    I use first Elements 10.  I built a new project on my desktop, because the Office has a firewire port to capture video from my camcorder and my laptop is not a firewire port.  The project is stored on my home network.  I seem to be able to do editing very well using the desktop computer that the project has been created, but it will not directly charge on the cell for editing.  Premiere Elements is configured the same on both computers.  I guess my question is - Premiere Elements stores something on the computer on which the project was created on not stored on the network drive?    How can I fix the problem so that I can edit on my laptop? The laptop is a high-end Dell XPS with an i7 processor that I use for other projects of creation, so the capacity of portable computers is not a problem.

    Thank you

    Bill

    If I have a very fast NAS and the network, I found that to effectively edit a project, I want my project, and active at least an external FW 800 (same drive letter of the operating system on each computer) and an eSATA would be even better.

    I do all the time and my transportation projects between my laptop by the pool and work stations in the editing room.

    I've set up each project, with all assets (or Copies, as most of my goods are stored on the NAS), in a hierarchy of files for this project. With the drive letter set the same on every machine I migrate seamlessly and with zero problems. Mega-projects, with 1, in thousands of dollars in assets, loading quickly - unlike when working on the network, or of the SIN.

    But with a little planning, you should have zero problem.

    Good luck

    Hunt

  • How can I change the projects of mswmm on mac?

    I need to be able to edit this file on my laptop at home (mac), but I don't seem to work. Please help me!

    http://www.mydigitallife.co.za/index.php?option=com_myblog&show=how-to-edit-and-burn-mswmm-video-to-DVD-on-Mac.html&Itemid=29

    Does that help?

  • Prevent a user from changing the ID of project in P6 EPPM 8.3.7

    Anyone know if there is a Global privilege or project security profile that prevents a user from changing the project on an existing project ID?  We use Primavera P6 EPPM 8.3.7

    Thank you

    Eric

    Hello

    Security of the project profile below can help you

    Change the details of the project with the exception of costs / Financials

    Determines if the profile will allow users to modify fields in general tabs, Dates, default values, resources, and settings of the project details. To assign a project of baselines, users must also have the privilege of project 'assign the planning of project"assigned to their profile.

    Kind regards

    Marcos

  • Change the name of the project that is used on the server of RoboHelp for reactive HTML5

    I use Adobe 2015 to publish Responsive HTML5 in RoboHelp Server 10.

    When I publish the project, it seems to name the file, the name of the project. So, if my project is named Cool_Blue, he the published under Cool_Blue. Is anyway to change this name? I know that WebHelp Pro you can set the name differently. I've looked everywhere and can't find how to do, so any help would be appreciated.

    Thank you

    Nita

    Nita, I think what you're trying to do is change the name of the project in a shorter file name while in general, you will have the shortest paths. If this is the case, you must simply renaming the project, then delete leftovers from the project a longer name on RoboHelp Server and you are home free.

    So, if you want to change the name of the project (rather than the name in the 'bar' of the browser, you must change the project name by going to > file > rename project)

    This alert appears:

    This s a warning reminder that to publish a project renamed on RoboHelp Server, you should remove the other oldest and republish the newly appointed project.

    So looking at your screenshot posted previously, the CIE would be to use sensitive available, but it could appear as

    Name: CIE Type: Responsive HTML5 Date of publication: etc. You should not "WebHelp" version if I understand what you're trying to do.

    Please ignore all the following stuff if the question is already answered

    I add the following text because there was some confusion because of new workflow in RoboHelp 2015 and the new RoboHelp Server 10.

    With regard to the "naming" confusion I'll try to decompress it. There has been some changes in the publication of things since the release of RoboHelp (2015) and, now, RoboHelp Server 10. For example:

    1. What we once called "Single Source Layouts' (SSL), we now call for 'outputs (SSL).
    2. It used to be that if you have been published on a Server of RoboHelp, it was mandatory to use an exit called WebHelp Pro.
    3. WebHelp Pro is still alive and well and can be used to publish in RoboHelp Server 10.
      EXCEPT when you want to publish sensitive HTML5 content to the new RoboHelp Server 10.
    4. In this case, if you post the more modern layout Responsive HTML5 option, it is appropriate to use a sensitive of HTML5 (SSL) output and select a HTML5 compatible screen available in the Pod to set up output.

    Here is an example of the Responsive HTML5 dialog box:

    Looking at file names more far, here are a few file names and how they are used:

    The. WP is the control file XML that contains specific information about the required information by the RoboHelp Server 10

    The xpj is the name of the project. It is what appears at the top of the editor of RoboHelp:

    Nita, let us know precisely what you are trying to accomplish and we will take another crack at it.

    Thank you

    John

    John Daigle

    Adobe Certified RoboHelp and Captivate instructor

    www.showmethedemo.com

  • How to change the theme of loading project

    Hello


    Can anyone please suggest me how to change the project loading theme in captivate 6.


    Please see below the image, I want to than this loading screen.


    Future prospects for assistance.


    Thank you

    Srikanth


    loading.jpg

    In Preferences > project > start and end options > Preloader, click on the Browse button and select the Default.swf preloader.

  • Packaging of the project libraries programmatically

    Is it possible to create a library of project compressed via VI Scripting without having to create a specification to build?

    If not, is it possible to create a specification to Build programmatically?

    There are several ways, I know not all the warnings...

    Open Ref project, my computer property, property of specifications of generation-> add an element, type = library. Teas Sourceallows regular, not script.

    You can also change the project as a text file and the copy of the model.

  • How to use the project from first pro in SG?

    I can't put my project in grade CC speed

    How can I do?

    Please help me.

    If you are using the latest version of PrPro, 2015.3/build 10.3... even if they kept the 'extra' looking for the CC part number from 2015.2 to 2015.3, if you look at the version numbers, 2015.2 is a "9.x" version, and 2015.3 is a version "10.x.

    Essentially, for some reason, they kept the main 2015 'name' but put on what we expected all in 2016. This update 'dot' was actually a major or full-release upgrade. With the changes.

    And... it was decided somewhere... the Panel of Lumetri to PrPro 10.3 was sufficient for the ranking that someone has actually done in PrPro, they is no longer necessary to maintain the directly in the process of SpeedGrade or "Direct link". As they have said their internal 'number' did not show a lot of people using the process to link Direct to SpeedGrade. If you go to the forum of SpeedGrade, there is a thread about it from this view instant 10 126 and several pages of posts.

    So... you can have the two 2015.3 AND 2015.2 'live' on the same machine, as they are completely different versions. In 2015.2 you can always Di - L on SpeedGrade. But you can't 2015.3.

    There is a thread on the forum of SpeedGrade on a workaround or "hack" one of the users posted, that allow to take a 2015.3 project and change the project on a single row header so that you can take the project open in Sg 2015. It has been tested on Mac (the OP is a Mac person) and on the PC by myself and a few other people.

    While I have not heard of anyone having problems with a project worked through this process, it IS NOT OFFICIALLY SANCTIONED. I've used it, as others... but ONLY after making a backup - as with a project in PrPro 2015.3, taking WHILE the version of the file through the process of this thread, while it is guaranteed a clean, workable project file is something didn't translate.

    Here is this thread in the statement process:

    PrPro/Sg 2015.3 solution Hack

    And here is a link to the Adobe-bug/feature request form. The forums of users like this are not place management Adobe monitors requests user & happiness... us, users must complete the forms of bug/feature because they are the communication ONLY the user base for the management people who decide budgets for corrections, features, and improvements to the programs. This judgment of SpeedGrade usability is a bad thing for you, please drop!

    https://www.Adobe.com/cfusion/mmForm/index.cfm?name=wishform

    Neil

  • Is it possible to change the proportions of a video clip in PE9

    Sorry, I'm not too hot to read the manual, but I tried to find direct references to alter elongation and found nothing that I could tell.

    I have a web cam video clip which saw living initially on the monitor was 4:3, but for there realistic proportions, he needs to be stretched to 16:9.

    It was recorded in AVI format screen.

    Is it possible to import it for editing in the 16:9 format so that the final product is 16:9. ?

    Thanks to everyone for your input. I finally managed to understand the instructions in the help section, and the solution provided by them was:

    If you want to change the size of a clip in Adobe Premiere Elements, and its pixel format is correct, select the item and change the scale property of the motion effect. The motion effect is available in the properties view with the clip selected in the timeline or sceneline view.

    So despite the words of programs that you can not change the project after it has been created... you can.

    After following the above instructions I left to 100% height and width is increased to 135%, and I now no longer stick figures in the clip, or the black stripes on the side.

    I also now realize, this is what Steve had served or provided for in the first response received, the response was a bit lack of detail for restricted user, so I didn't know where to look to make the adjustments.

  • "Value is invalid or out of range" when you build the project in CVI 2009

    I converted a project to the wire of the CVI 9.0.1 to CVI 2009, and whenever I try to compile the distribution I get immediately the error message "Value is invalid or out of range" and stop the construction.  This error message is not too terribly useful to determine what the problem is, and I don't see anything obviously wrong with the signs of 'change the Installer '.  Any idea what's going on?  Thank you.

    Well, I'm a little confused by what I see. The newspaper confirms my suspicions earlier that one of the values of timer progress cached version is cause of an error. However, the values in the file "TriboScan OFFLINE.cds" you posted appear very well and do not cause an error when I copy in .cds another simple distribution (since I do not have the files to test your actual building distribution). Are you sure that you build the 'TriboScan OFFLINE.cds' distribution? In any case, I recommend a little offending the .cds hand editing. Save first (just in case), open it in a text editor and delete everything between and (that should be all down). This should solve your problem.

    Let me know what you find.

    A. Mert

    National Instruments

  • Problem with the change in value of listbox event

    Hello

    I have a problem with the help of Listbox value change event. The code that I have attached is a simplified version of the largest program, but the problem is the same. One of the loops of Nonna is responsible for handlig occurring events ant the other is responsible for the execution of the program. In the project of oryginal I use a listbox control to determine which plots graphic display of a waveform is visible (first position of the listbox-> only plot first visible etc.). In the attached vi, I just show the current value of the listbox control. The problem is the event runs only once and then the program crashes. I want to be able to change the value of the listbox work both at idle and in State of a program, but when I put the structure of the event in both States, he does not. I'd be very grateful if someone smarter than me could tell me where I made my mistake. I want my program to be able to manage the keys and listbox events in States (slow down and knit) program.

    You have two structures of event in two cases different from the structure of the case, and both are tuned to listbox events has changed. Because only once can be triggered at any time, the VI crashes (lock events the front panel (default) until the event can complement).

    You must use a unique event structure managing all events.

    The overall program architecture looks like inside-out for me.

    For the buttosn, you must use action lock (switch not release!) and use the value changed events.

  • How can I capture a change in value to a datasocket in a structure of the event?

    Hello

    I am currently working on a project with two separate systems (PXI embedded control and a standard PC) who speak over a network using a datasocket. The PXI controller is reading data of a DIO card and this announcement to the datasocket.

    I really wish I could check the datasocket (on the PC) for a change in value and only react when a change occurs?

    Does anyone have an idea how this could be done?

    Please ask questions if I did not explain it very well

    Thank you

    James

    Hello Jam.Hall,

    I found this thread, I hope this might help.

    He referred to the knowledge base article if you need more details.

    I hope this helps!

Maybe you are looking for

  • Black screen then crash tricks

    Sometimes when I go to Web pages, the entire page is black. This the most often occurs when scrolling, but can also occur when loading a page, or even randomly. Usually, but not always, scrolling more suits him. shortly after these problems, Firefox

  • FireWire can be attached to the Satellite Pro C660 1RZ?

    Satellite Pro C660-1RZ Does anyone know if Firewire can be attached to this model either internally or externally. As my office has finally called it a day I rely on my laptop. Thank you very much.

  • HP Designjet 510 false jam

    I have this morning and started the fermentation.  But every piece of evidence that I try to print, I get the false paper jam.  I turn it off and on again, and it prints one.  Then when he starts the following, it does the same thing. Any help is gre

  • When I sync hollow photos Itunes It double images in the Gallery of the Iphone. How to get around this problem?

    Photos of iPhone App: I have 1000 photos in albums > camera. In pictures - momemts I have 5000 pictures where are these 1000 doubled over 3000 photos again. How to cancel this double effect? I already tried to reset

  • Clip + microSDHC 4 GB - 16 GB - Audiobook Question

    Copied on several audio books in mp3 format, the format a Sandisk 16 GB microSDHC card and for some reason when you try to view the lists through the music---> Audiobook menu, they fail to appear, instead at the bottom of the list of audio books, the