Convert relative time in absolute

Hello

I want to convert my string of relative time in a channel of absolute time. How this could be done?

My relative time string has the format 01/01/00 12:29:17.9120 depending on whether I just want to generate the digital absolute time string.

Thank you

Never mind found.

All I had to do was to change the display format for the time string in the menu time to Numeric property.

Tags: NI Software

Similar Questions

  • Conversion of a relative time counter

    Hello!  I have a pretty simple question, if someone has a moment.  I have a while loop with a 1000ms wait inside, as well as some other stuff that is not relevant to the question.  Since my incrementer essentially account seconds due to the presence of the 1000ms wait, I would take the built in incrementer (i) and use it to display the relative time elapsed since the while loop began.  This loop will run for 3 hours, so I would like to display in hh: mmS format.  So basically, I'm looking for a way to convert the meter in a time value.  Any thoughts?  I know that the wait function is not exactly accurate, but that's ok.  I don't need to be 100% accurate in this vi.  Just a rough estimate will be fine. Looks like there should be a relatively simple way to do this, but I can't understand it...  Thank you!!

    Well, I just noticed a difference between 8.5 and 8.6. With 8.6, I put the relative time display format. Other that that, I don't know what would cause it to run backwards. Your postal code.

  • How can I get the string value displayed on a digital control defined for the relative time.

    I have a digital potentiometer to display relative time in increments of 30 minutes.

    I want to record the value displayed on the control string.  Unfortunately, when I use the "convert to decimal string.vi" number, the resulting string is just the value in seconds.

    How can I get the value as a string? (for example 01:30 for an hour and thirty minutes)

    Thank you

    Sean

    Hi Sean.C!

    M_Peeker's suggestion is a good thing.  A stage that could clarify things is that you must set the % t <%H:%M> format string entry.

    < br / > Kristen:.

  • Cannot set control schedule relative time

    Hi all

    I'm pretty new to LabVIEW, and I'm trying to set a time stamp time related. I put the control on the form, and then right-click and choose the display format. I have chosen Date unused, advanced editing. The control has a box with this in it:

    % <%H:%M:%S> T

    after I change the T t a bit big, the valid indicator lights in red. What am I doing wrong?

    Thank you, < br / > Simon

    The timestamp command allows only to absolute time format. You can use a normal digital for relative time (which can also display absolute time, but not vice versa).

  • AE: Conversion of relative footage in absolute paths

    Hello!

    Is there a way to convert the images related to those absolute paths? Kel ' ~ pics "to"C:\projects\images ".

    I create a script to change the paths of images and to copy/move the images from a folder to another easily.

    For moving (not only copy / delete), I need to create a file with associated .bat move orders and for this I need absolute paths.

    I failed to find anything on google or here. I also searched the Javascript Tools Guide but cannot get fileobject.absoluteURI or fileobject.localizedName to work at all.

    Another way would be to convert the relative format that AE uses in the command line format, but it seems impossible that the AE makes no distinction in the name of relative path if the dossier is on one, two or gazillion top-level folders.

    Thanks in advance!

    fileobject.fsName was the answer.

  • Relative time

    Hi people,

    I have a time stamp for events like a "changetime" column in a table. In my iReport, I would like to call 'changetime' as a relative time, like "20 seconds ago", "5 minutes ago" or "there are 40 days". How can I do this for an iReport?

    Thank you

    Me

    I would like to call 'changetime' as a relative time, like "20 seconds ago", "5 minutes ago" or "there are 40 days". How can I do this for an iReport?

    There is a predefined for this by their SUMMIT format mask. Should be the last option in the number/Date Format popup LOV in column definition properties.

    If the changetime is actually a column of type TIMESTAMP , then this might not work, so convert the value of the column in the query to a DATE:

    cast(changetime as date)
    

    The actual function used for this is apex_util.get_since(p_date date) return VARCHAR2 type if you want to experiment, but using the number/Date Format would be the preferred approach.

    (Please update your forum profile with a handle better than "user10225290")

  • Insert the scale of relative time in Visual c# 08

    I am writing an application using Visual Studio 08 with measurement studio.

    I want to use the relative time scale on my X axis

    I tried to use

    Graph. XAxes [0]. MajorDivisions.LabelFormat = new NationalInstruments.UI.FormatString (NationalInstruments.UI.FormatStringMode.DateTime, ' % <%H:%M:%S> t "" ");

    Does not work.

    Can someone help me with this?

    Hello Al B,

    I figure out the solution to the question

    using hour: mm:s or H:mm:s, both work.

    Could you elaborate what difference should normally be the '%'?

  • Reset relative time of graphic waveform

    Hi all

    I created a table of wavefrom which starts from a relative time of 00:00:00 at the start of the vi and visualize that the waveform versus time since the start of the vi.

    I made this using an example that I found in the forums or by subtracting right now relative to the relative time of the waveform, as shown in the attached diagram

    When I stop the vi and start it again normally it starts from scratch and so on.

    the problem I want to the table in order to start from scratch each amount fixed time (ex: 50 seconds) and does not need to stop the vi and restart it in order to start from scratch back!

    I thought a lot about how proceed for many and I tried many things but I could not, have an idea on how to do?

    I feel that the solution will be simple to many people, but please forgive me coz I'm new to labview and its my first project with her

    Thanks in advance,

    Concerning

    Shady

    shadyman says:

    Ben

    First of all thanks a lot for your answer.

    I just that explain how can I replace this tunnel with a shift register, where the sr will be data, coz the 'Get current date and time' is in fact placed out of the loop, also how I can change this value to a structure of housing, I'll put the 'get date and time' in a loop or in a business structure? coz I actually tried in ways that looks like that, but it did not work.

    I would appreciate a lot if you showed me what you mean by a schema or on the actuall vi that I fixed to the Terminal.

    Thanks in advance

    Concerning

    Shady

    I reserve this type of service to my paying customers.

    I would turn around and invite YOU to post a picture of what you have tried and let us comment based on your efforts.

    I'll help you get started with two suugestions and a question.

    (1) you can click the tunnel entry and select 'replace with shift register.

    (2) If you look at your code in execution, highlighting mode, you can see data comes and goes when.

    Now for your question!

    After I look at the code to run where it will take another "Get time" node should be located to obtain a new value, WHILE the loop is running?

    As I said, post advise images of what you're trying to do and offer us on this basis.

    Ben

  • Why dose Microsoft Money Plus Sunset through file convert each time the program is responsible?

    I have been using Microsoft Money 2000 sence I have 12 years of history, I've upgraded to Microsoft Money Plus sunset and converted my files.  Now when you load the program it takes a long time to load a message indicating the file that is coveted.  This happens every time. Why?  How can I fix this problem?

    Hello

    From your problem description, I understand you are facing problem with Microsoft Money Plus sunset.

    I suggest you post the same question in Microsoft Technet forum for Microsoft Money Plus Sunset related issues. We have a dedicated team to help you with the problems of Microsoft Money Plus sunset.
    Microsoft Money:

    http://social.Microsoft.com/forums/is/category/money

    Please do not hesitate to visit our Web site for any help related to the Windows operating system.

  • Can layers be RELATIVE, rather than ABSOLUTE position data

    I'll have a chance to find an answer to this in the HELP. I have place of the layer anchor in a table, then position the layer. If I then add (or remove) the lines above the anchor, everything on the page go up (or down), but the rest of the layer where it was, to the page, not the anchor.

    If there are several layers on the page, it means a wholeot of repositioning every time I do an up-page edition.

    Any advice?

    This can help you understand the positioning a little-

    There are 4 different types of positioning:
    Absolute
    Relative
    Fixed
    Static

    Here is a brief explanation of each type of positioning (as of)
    placement of the elements in the page only)...

    Position: absolute (or a / P elements)
    -----------------------
    Does several things-
    1. it "deletes" element of the flow of the code on the page so that
    It can influence is no longer the size or position of any element on the page
    (with the exception of those it contains, of course).

    2. the item to absolute positioning takes its position as the position of the
    his next of KIN * place * element - in the absence of any explicit
    positioned parent, it will be by default to theTag, which is always
    positioned
    at 0,0 in the browser window.

    This means that anywhere in the HTML code of the layer
    appears (betweenand), its location on the screen will not
    change (which means that you have not positioned the A / P element in)
    a table or another A / P element, of course). In addition, the space in
    which
    This item would have seemed if it was not positioned is not preserved
    on the screen. In other words, the absolute position elements do not
    all the space on the page. In fact, they FLOAT on the page.

    Position: relative (or R/P elements)
    ----------------------
    In contrast to absolute positioning, is a relatively positioned page element
    * No * withdrawn from circulation of the code of the page, so it will use the
    Spot
    where it would have seemed based on its position in the code as its
    zero point of reference. If you provide then top, right, bottom or left
    positions
    the style for this element, these values will be used as offsets of
    his
    zero point.

    This means that it any where in the code position relatively
    element appears (, as it will be positioned at this place (it takes into account
    the offsets) on the screen (this is true for any location in the code).
    Is also the space where this element seemed
    preserved on the screen and can therefore affect the implementation of
    succeeding elements. This means that the larger a relatively
    positioned element is the space more force on the page.

    Position: static
    -------------------
    As with the relative position, the static positions also "go with the flow". One
    element with a static position cannot have values for compensation (above, right,
    on the left, downstairs) or if it has them, they will be ignored. Unless explicitly
    positioned, any defect in static positioning div elements.

    Position: fixed
    ------------------
    A page with this style element does not scroll when the page scrolls content.
    Support for this in the elements other than the settings of the page is weird

    There are several other things you need to know:

    1. ANY page can be positioned - paragraphs, images, tables, lists,.
    etc.
    2. the

    tag is a BLOCK-level tag. This means that if it is not
    place or style explicitly otherwise, a) it will always start on a new
    line on the screen and b) she will always force the content to a new line below
    He and c) will always be near the top of the entire width of its container (for example,
    Width: 100%).
    3. the placement of A / P elements * can * affect the BEHAVIOR of others
    elements
    on the page. For example, a 'sex' placed on a hyperlink that will hide
    hyperlink.

    You can see a good example of the difference between the absolute and
    relative positioning here-

    http://www.great-Web-sights.com/g_layersdemo.asp

    You can see a good demonstration of why using layers for a page layout tool
    is dangerous here-

    http://www.great-Web-sights.com/g_layer-overlap.asp

    On this basis, a static div (is no longer a 'sex') would be what you want.

    --
    Murray - ICQ 71997575
    Adobe Community Expert
    (If you * MUST * write me, don't don't LAUGH when you do!)
    ==================
    http://www.dreamweavermx-templates.com - template Triage!
    http://www.projectseven.com/go - DW FAQs, tutorials & resources
    http://www.dwfaq.com - DW FAQs, tutorials & resources
    http://www.macromedia.com/support/search/ - Macromedia (MM) Technotes
    ==================

    "bwilsonduncan" wrote in message
    News:fai5oe$q8t$1@forums. Macromedia.com...
    > I have no chance to find an answer to this in the HELP. I place the layer
    > anchor in a table, then position the layer. If I add later (or
    (> Delete)
    > all the lines above the anchor on the page moves down (or upwards), but
    > the
    > layer stays where it was, to the page, not the anchor.
    >
    > If there are several layers on the page means a wholeot of
    > repositioning
    > whenever I do a up-page edition.
    >
    > Any advice?
    >

  • relative times of waveform

    In Labview 8.5, I want the x axis to display the time elapsed the data collection relating to when the data collection was started.  When I put the property at the time of parent, it shows a large number of seconds (see attached jpg)?

    Thank you

    Azim

    As mentioned, Kiki

    Use "Build Waveform.vi" and set the property to "t0" to zero.  If you have a table of waveforms, pass it in automatic indexing of loop for so you can do it at each waveform in the table.

  • 12 hours to convert the time format to 24-hour time format

    Hello

    The following query does not work why?

    Select To_date ('10:35 PM', 'HH24:MI') From DUAL
    

    It gives the following error

    date format picture ends before converting all of the input string.

    but the following query works fine

    Select To_date ('10:35', 'HH24:MI') From DUAL


    I need to convert the format of the time in the first motion HH24 in PLSQL, how can I do this?

    Thank you


    Thank you youHH24:MI

    1 * Select To_date (' 22:35 ', ' Hh: mi AM "), TO_CHAR (To_date (' 22:35 ', ' HH: mi AM'), 'YYYY-MM-DD HH24:MI:SS') From DUAL

    SQL > /.

    TO_DATE (' TO_CHAR (TO_DATE('10))

    --------- -------------------

    01-SEPT.-15 2015-09-01 22:35

  • Denote absolute time and absolute time calculations

    We have Oracle database 11g in our production environment on RHEL 5.8 Virtual machine using VMware. The database version is 11.2.0.3.0.

    I have a certain scenario here, I want the code of the logic of a trouble ticket solution. The working hours for problems resolution ticket is 8 am-8 pm and resolution time is 4 hours. Now if a ticket will be logged at 18:30, his expected resolution time should be 10:30 the next day (1.30 hours of standby and 2,30 hrs the next day). I am not able to understand as below:

    1. How to write a subtraction of absolute time from 20:00 to 18:30 (18:30 can be a DB column so it is fine). The main concern here is how represent absolute time of 20:00.
    2. Subsequently, also how to add time of 08:00 the next day

    I hope that I was able to explain the application of absolute time representation and also calculations with it.


    Please get back with the answer to my query.


    Concerning

    with inp as

    (select sysdate log_time to double

    Union all select trunc (sysdate) + numtodsinterval (6.5, 'hour') of double

    Union all select trunc (sysdate) + numtodsinterval (18.5, 'hour') of double

    )

    log_time Select to_char (log_time, "dd-mm-yyyy hh24")

    to_char (case

    When log_time - trunc (log_time)< 8="" 24 ="" then="" trunc(="" log_time="" )="" +="" (="" 8="" 24="" +="" 4="" 24="">

    When log_time - trunc (log_time) > 20 / 24 then trunc (log_time) + (1 + 8 / 24 + 4 / 24)

    When log_time - trunc (log_time)< 20="" 24="" -="" 4="" 24="" then="" log_time="" +="" 4="">

    of another trunc (log_time) + (1 + 8 / 24 + 4 / 24 + (log_time - trunc (log_time) - 20 / 24))

    end, "dd-mm-yyyy hh24") expected_resolution_time

    the NPI

  • radial gradient with relative positions and absolute RADIUS length

    Hello

    I tried provide a style with a radial gradient in the upper right corner of a control, but apparently the use of relative positions does not work well combined with a length of absolute RADIUS:
    .myStyle{   
        -fx-background-color: radial-gradient(center 100% 0%, radius 8px, red, white);
    }
    place the center of the gradient to the upper left corner, although it must be placed in the upper right corner. If the RADIUS is defined as ratio (10%), the implementation of the pole is correct. Is there a general constraint prevents this works?

    ARO
    Jens

    My guess is that, like the class RadialGradient has a method isProportional which acts on the Center and the RADIUS, as css just implemenets the settings of the proportionality of the RadialGradient as something all or nothing, but that is not documented in the guide of the css.

    http://docs.Oracle.com/JavaFX/2/API/JavaFX/scene/paint/RadialGradient.html#isProportional%28%29
    http://docs.Oracle.com/JavaFX/2/API/JavaFX/scene/doc-files/cssref.html#typepaint

    I would advise you connecting a jira request that documentation or implementation is updated.

    http://JavaFX-JIRA.Kenai.com/

  • Relative links vs. absolute links in heading 4

    I have Troubé trying to change the absolute links to relative links in my project.

    I want to have my projects open in any electronic environment. Naturally for this I need to be able to use relative links.

    I can't make them work any ideas would be greatly appreciated.

    thedarf

    You can use Captivate settings to generate an Autorun file and then edit it with any text editor so that loading the CD ROM it will open the menu file of publication.  If all of your records are at the root of the CD you have just the autorun of the value to something like folder1/index.htm, but just check whether or not you change the forward slashes so that they become the backslashes instead of slashes.  (Oblique are used in web environments, whereas the backslashes are more used in LAN link paths).  I don't remember if it made a difference, then you would be well advised to knock out a CD or two and do tests in your final production environment before burning your CD-ROM

Maybe you are looking for